Академический Документы
Профессиональный Документы
Культура Документы
VALVE
BOX Legend:
NO. 01
C.B.-Catch Basin
V.B.-Valve Box
NOTE: The Gravity Test for 1 Catch Basin-Valve Box and the 8" RTR Pipe will perform at
the same time after finished concrete of Manhole.
edc '08
M.F. AL - HAJRI CONT. EST.
P.O. Box 4626
31952 Al- khobar
Kingdom of Saudi Arabia
Tel No. 837-377
Fax No. 837-3888
H.T.-Holding Tank
edc '08
M.F. AL - HAJRI CONT. EST.
P.O. Box 4626
31952 Al- khobar
Kingdom of Saudi Arabia
Tel No. 837-377
Fax No. 837-3888
Legend:
NOTE: The Gravity Test for 2-Manhole and the 10" RTR Pipe will perform at the same time after finished concrete of Manhole.
edc '08
M.F. AL - HAJRI CONT. EST.
P.O. Box 4626
31952 Al- khobar
Kingdom of Saudi Arabia
Tel No. 837-377
Fax No. 837-3888
Legend:
M.H.-Manhole
16"RTR Pipe
Existing Manhole
NOTE:
The Gravity Test for 2-Manhole and the 16" RTR Pipe will perform at the same time after finished concrete of Manhole.
edc '08
M.F. AL - HAJRI CONT. EST.
P.O. Box 4626
31952 Al- khobar
Kingdom of Saudi Arabia
Tel No. 837-377
Fax No. 837-3888
MH
Legend:
M.H.-Manhole
MH-07
NOTE:
The Gravity Test for 2-Manhole and the 12" RTR Pipe will perform at the same time after finished concrete of Manhole.
Vent 4" dia RTR , gravity test will follow after finished the construction of Manhole
edc '08
M.F. AL - HAJRI CONT. EST.
P.O. Box 4626
31952 Al- khobar
Kingdom of Saudi Arabia
Tel No. 837-377
Fax No. 837-3888
MH MH-04
12"RTR Pipe
M.H.-Manhole
NOTE: The Gravity Test for 2-Manhole and the 12" RTR Pipe will perform at the same time after finished concrete of Manhole.
Vent 4" dia RTR , gravity test will follow after finished the construction of Manhole
edc '08
M.F. AL - HAJRI CONT. EST.
P.O. Box 4626
31952 Al- khobar
Kingdom of Saudi Arabia
Tel No. 837-377
Fax No. 837-3888
8" dia.RTR 8" dia.RTR 8" dia.RTR 8" dia.RTR 8" dia.RTR
12"X 8" Reducer
8" dia.RTR RISER NO.04
M.H.-01
Water
C.O.No filling
point 12"
.19 dia.& filler
riser 3.0
mtr. ht.
12"RTR PIPE
LEGEND:
C.0. No.05
12 "dia. RTR Pipes
Water Filling
Point M.H.No.02
entrance 8"
dia. pipe &
filler riser 3.0
mtr. ht.
C.B.
NO.5
C.B.
NO.6
LEGEND:
C.B.-Catch Basin
C.B.
NO.7 C.O.-Clean-out
M.H.-Manhole
8"Dia.RTR
8"Dia.RTR 8"Dia.RTR 8"Dia.RTR
Test Plug
RISER NO.01 Test Plug Air vent
M.H.No.04
C.B.
C.B. C.B. NO.1
NO.4 NO.2
LEGEND:
C.B.No.03
Water filling M.H.-Manhole
Point 6"
dia.pipe C.B.-Catch Basin
entrance,filler
riser 3.0 mtr. ht
D
I
A
D
R
O
T
E
0894,0982,0983,0994,0995,1014,1016,1022,1030, S
1032,1033,1034,1036,1037,1038,1039,1040,1041, T
11.0 BA-143534 1042,1055,1091,1092,1101,1102,1103,1104,1110, 38 EA
1111,1112,1114,1120,1121,1122,1123,1124,1125, D
1114,1120, I
12.0 BA-135728 1081,1082 2 EA A
1083
G
13.0 BA-139784 1 EA R
14.0 BA-142834 1078,1079,1080, 3 EA A
15.0 BA-646707 1087,1088 2 EA M
16.0 BA-646708 1098 1 EA
0940,0949,1051,1052,1053,1054,1056,1058,1
BA-142785 10
17.0 070,1071, EA
18.0 BA-142782 1140,0882,(0891/2),(0891/2) 4 EA
TOTAL 229 EA
PREPARED BY:
EDC/QCM
M.F. AL - HAJRI CONT. EST.
P.O. Box 4626
31952 Al- khobar
Kingdom of Saudi Arabia
Tel No. 837-377
Fax No. 837-3888
CB-12
GRAVITY TEST (GT NO. O3)
Water filling
point 6"
dia.pipe
&filler riser
3.0 mtr. ht.
Test Plug Test Plug
C.B.
LEGEND:
C.B.
NO.11 NO.10
RISER NO.03 C.B.
M.H.-Manhole
NO.9
C.B.-Catch Basin
Air vent
Test Plug
8" dia.RTR 8" dia.RTR 8" dia.RTR 8" dia.RTR
MH-01 MH-03
12"RTR PIPE
B.I.-10-00332