Вы находитесь на странице: 1из 24

M.F. AL - HAJRI CONT. EST.

P.O. Box 4626


31952 Al- khobar
Kingdom of Saudi Arabia
Tel No. 837-377
Fax No. 837-3888

GRAVITY TEST (GT NO. O10)

8" dia.RTR pipe


Water C.B.No.
Filling Point 18

VALVE
BOX Legend:
NO. 01
C.B.-Catch Basin

V.B.-Valve Box

Gravity Test NO.010

From MH-08- 18 RTR to Existing Holding Tank

NOTE: The Gravity Test for 1 Catch Basin-Valve Box and the 8" RTR Pipe will perform at
the same time after finished concrete of Manhole.
edc '08
M.F. AL - HAJRI CONT. EST.
P.O. Box 4626
31952 Al- khobar
Kingdom of Saudi Arabia
Tel No. 837-377
Fax No. 837-3888

GRAVITY TEST (GT NO. O9)


Water Filling MH-8
Point

Legend: 18"RTR Pipe


M.H.-Manhole

H.T.-Holding Tank

Gravity Test NO.009

From MH-08- 18 RTR to Existing Holding Tank Existing Holding tank


NOTE:
The Gravity Test for 1-Manhole Holding Tank and the 10" RTR Pipe will perform
at the same time after finished concrete of Manhole.
HOLDING
TANK
HOLDING
TANK

edc '08
M.F. AL - HAJRI CONT. EST.
P.O. Box 4626
31952 Al- khobar
Kingdom of Saudi Arabia
Tel No. 837-377
Fax No. 837-3888

GRAVITY TEST (GT NO. O8)


Water Filling MH-5
Point

Legend:

M.H.-Manhole New 10" RTR pipe

Gravity Test NO.008


MH-06

From MH-05-10 dia.RTR to MH-06-10 dia. RTR

NOTE: The Gravity Test for 2-Manhole and the 10" RTR Pipe will perform at the same time after finished concrete of Manhole.
edc '08
M.F. AL - HAJRI CONT. EST.
P.O. Box 4626
31952 Al- khobar
Kingdom of Saudi Arabia
Tel No. 837-377
Fax No. 837-3888

GRAVITY TEST (GT NO. O7)


Water Filling MH-7
Point

Legend:

M.H.-Manhole

Existing 10" RTR pipe

16"RTR Pipe
Existing Manhole

Gravity Test NO.007

From MH-07- 16 RTR to MH-08-16 RTR MH-08

NOTE:
The Gravity Test for 2-Manhole and the 16" RTR Pipe will perform at the same time after finished concrete of Manhole.
edc '08
M.F. AL - HAJRI CONT. EST.
P.O. Box 4626
31952 Al- khobar
Kingdom of Saudi Arabia
Tel No. 837-377
Fax No. 837-3888

GRAVITY TEST (GT NO. O6)

MH

4" RTR-4"pipes (VENT-03)

Water Filling MH-03


Point

Legend:

M.H.-Manhole

16"RTR Pipe Gravity Test NO.006

From MH-#3 RTR-16 dia. To MH-#7 RTR-16 dia.

From MH-# 3 to 4 dia. Vent Pipe.

MH-07

NOTE:
The Gravity Test for 2-Manhole and the 12" RTR Pipe will perform at the same time after finished concrete of Manhole.
Vent 4" dia RTR , gravity test will follow after finished the construction of Manhole
edc '08
M.F. AL - HAJRI CONT. EST.
P.O. Box 4626
31952 Al- khobar
Kingdom of Saudi Arabia
Tel No. 837-377
Fax No. 837-3888

GRAVITY TEST (GT NO. O5)

MH MH-04

4" RTR-4"pipes (VENT-01)

12"RTR Pipe

Gravity Test NO.005 LEGEND:

M.H.-Manhole

From MH-# 4 RTR-12 dia. To MH-# 3-RTR-12 dia.


From MH-# 4 to 4 dia. Vent Pipe.
Water MH-03
Filling Point

NOTE: The Gravity Test for 2-Manhole and the 12" RTR Pipe will perform at the same time after finished concrete of Manhole.
Vent 4" dia RTR , gravity test will follow after finished the construction of Manhole
edc '08
M.F. AL - HAJRI CONT. EST.
P.O. Box 4626
31952 Al- khobar
Kingdom of Saudi Arabia
Tel No. 837-377
Fax No. 837-3888

GRAVITY TEST (GT NO. O4)

VALVE Test Plug


BOX
C.B. NO. 01 C.B.
NO.20 NO.16
Air vent C.B. C.B.
NO.14
C.B.
NO.15 NO.13

8" dia.RTR 8" dia.RTR 8" dia.RTR 8" dia.RTR 8" dia.RTR
12"X 8" Reducer
8" dia.RTR RISER NO.04

M.H.-01
Water
C.O.No filling
point 12"
.19 dia.& filler
riser 3.0
mtr. ht.
12"RTR PIPE
LEGEND:

B.V.-Valve Box 8" dia.RTR 8" dia.RTR


C.B.-Catch Basin Test Plug Gravity Test NO.004
C.O.-Clean-out From MH-#01 RTR-12 dia. ., C.B.-13 RTR 06dia. C.B.-14 RTR 06dia.,
C.B.-15 RTR 06dia., C.B.-16 RTR 06dia., V.B. -01- RTR-
C.B. C.B. 06dia.,C.B.No.20-6dia.RTR, C.O.-19 RTR- 08dia.,
NO.19 NO.17

NOTE: All end pipe of 8"dia. RTR reduced to 6" dia


Riser must be 3.0 meter high
All (F) Funnel 4" RTR ,Clean-out (C.O.)RTR 4" and Vent 4" dia RTR , gravity test will follow after finished the Mainline of RTR Pipe
12"& 8" dia.
edc '08
M.F. AL - HAJRI CONT. EST.
P.O. Box 4626
31952 Al- khobar
Kingdom of Saudi Arabia
Tel No. 837-377
Fax No. 837-3888
Test Plug

GRAVITY TEST (GT NO. OO2)


C.B. C.O.
NO.8 NO.6

C.0. No.05
12 "dia. RTR Pipes
Water Filling
Point M.H.No.02
entrance 8"
dia. pipe &
filler riser 3.0
mtr. ht.

12"X 8" Reducer Air vent


RISER NO.02
8"Dia.RTR 8"Dia.RTR Test Plug 8" dia.RTR

C.B.
NO.5

C.B.
NO.6
LEGEND:

C.B.-Catch Basin
C.B.
NO.7 C.O.-Clean-out

M.H.-Manhole

Gravity Test NO.002


From C.O.No.05- 8" dia. to,C.B.-08 RTR 6 dia., C.O.-06,C.B.-08 RTR 6 dia.,C.B.-07 RTR 6 dia. ,C.B.-06 RTR
6 dia., C.B.-05 RTR -6dia., and MH-#2 RTR-12 dia.

NOTE: All end pipe of 8"dia. RTR reduced to 6" dia


Riser must 3.0 meter high
All (F) Funnel 4" RTR ,Clean-out (C.O.)RTR 4" and Vent 4" dia RTR , gravity test will follow after finished the

Mainline of RTR Pipe 12"& 8" dia.


All (F) Funnel 4" RTR ,Clean-out (C.O.)RTR 4" and Vent 4" dia RTR , gravity test will follow after finished the

Mainline of RTR Pipe 12"& 8" dia. edc '08


M.F. AL - HAJRI CONT. EST.
P.O. Box 4626
31952 Al- khobar
Kingdom of Saudi Arabia
Tel No. 837-377
Fax No. 837-3888

GRAVITY TEST (GT NO. O1)

12 "dia. RTR Pipes


M.H.No.02

8"Dia.RTR
8"Dia.RTR 8"Dia.RTR 8"Dia.RTR
Test Plug
RISER NO.01 Test Plug Air vent
M.H.No.04
C.B.
C.B. C.B. NO.1
NO.4 NO.2

LEGEND:
C.B.No.03
Water filling M.H.-Manhole
Point 6"
dia.pipe C.B.-Catch Basin
entrance,filler
riser 3.0 mtr. ht

Gravity Test NO.001


From C.B.-03 RTR 6 dia.,C.B.-02 RTR 6dia. ,C.B.-01 RTR 6 dia. MH-# 4 RTR-12 dia ,C.B.-04 RTR 6dia.,and MH-
# 2 RTR-12 dia.

NOTE: All end pipe of 8"dia. RTR reduced to 6" dia

Riser must be 3.0 meter high


All (F) Funnel 4" RTR ,Clean-out (C.O.)RTR 4" and Vent 4" dia RTR , gravity test will follow after finished the
Mainline of RTR Pipe 12"& 8" dia. edc '08
M.F. AL - HAJRI CONT. EST.
P.O. Box 4626
31952 Al- khobar
Kingdom of Saudi Arabia
Tel No. 837-377
Fax No. 837-3888

NEW PIPELINE NOT INCLUDED IN HYDROTEST DIAGRAM


S/N DRAWING NUMBER LINE NO. QUANTITY UNIT REMARKS
0834, 0836, 0848, 0849, 0852,
1.0 BA-142776 0856,0857,0858,0868,1075,1099,1126,1125,1128, 20 EA
1129,1130,1131,1132,1144,1145
0829, 0835,0837,
2.0 BA-142777 11 EA
0838,0859,0859,0872,0873,0874,1133,1135
0878,0880,0936,0936,0963,1094,1147,0829,0840,
N
O
3.0 BA-142778 0842,0865,0877,(0878/2), 17 EA T
(0878/3),0879,1138,1146
0885,0886,0929,0956,0977,0862, I
(0881/3),0883,0884,0885,0887,0889,0895,0896,08
N
4.0 BA-142779 97,0898, 32 EA
(0907/2),0950,0954,0955,0973,0974,0975,0976,09
C
77,0978,0993,0999,1107, L
0903,0904,1139,(088/2),0891,0903,0904,(0921/1), U
(0921/2),0922,0923,0924,0925,0930,0931,0932,09
D
5.0 BA-142780 25 EA E
33,0934,0936,0938,0969,(1021/1),(1021/2),1043,
D
(1140/2)
0911,0938,0938,0960,1109,0899,0909,0910,0911, I
6.0 BA-142781 16 EA
(0912/2),0913,0951,(0956/2),0957,1108,1137, N
0914,
7.0 BA-142782 (0912/2),0914,0915,0916,0917,0918,0920,0958,09 11 EA H
59,0984 Y
0926,0937,0937,(0902/2),(0909/3),0905,
8.0 BA-142783 11 EA D
(0907/2),0926,0927,0928,0937,
0941,0943,0941,0943,1017,1018,1019,1024,1026, R
9.0 BA-142845 17 EA O
0935,0953,0965,0967,0985,0988,0992,0998 T
10.0 BA-142784 0946,0947,0944,0946,0947,0989,0996,0997 8 EA E
S
T

D
I
A
D
R
O
T
E
0894,0982,0983,0994,0995,1014,1016,1022,1030, S
1032,1033,1034,1036,1037,1038,1039,1040,1041, T
11.0 BA-143534 1042,1055,1091,1092,1101,1102,1103,1104,1110, 38 EA
1111,1112,1114,1120,1121,1122,1123,1124,1125, D
1114,1120, I
12.0 BA-135728 1081,1082 2 EA A
1083
G
13.0 BA-139784 1 EA R
14.0 BA-142834 1078,1079,1080, 3 EA A
15.0 BA-646707 1087,1088 2 EA M
16.0 BA-646708 1098 1 EA
0940,0949,1051,1052,1053,1054,1056,1058,1
BA-142785 10
17.0 070,1071, EA
18.0 BA-142782 1140,0882,(0891/2),(0891/2) 4 EA
TOTAL 229 EA

PREPARED BY:
EDC/QCM
M.F. AL - HAJRI CONT. EST.
P.O. Box 4626
31952 Al- khobar
Kingdom of Saudi Arabia
Tel No. 837-377
Fax No. 837-3888

CB-12
GRAVITY TEST (GT NO. O3)
Water filling
point 6"
dia.pipe
&filler riser
3.0 mtr. ht.
Test Plug Test Plug

C.B.
LEGEND:
C.B.
NO.11 NO.10
RISER NO.03 C.B.
M.H.-Manhole
NO.9
C.B.-Catch Basin

Air vent
Test Plug
8" dia.RTR 8" dia.RTR 8" dia.RTR 8" dia.RTR

MH-01 MH-03

12"RTR PIPE

Gravity Test NO.003


From MH-#1 RTR-12 dia., to C.B.-12- RTR 6dia.,C.B.-11-RTR-6dia.,C.B.-10-RTR-6dia., C.B.-09-
RTR-6 dia.,C.B.-09 RTR 06dia., and MH-03-RTR-12 dia.

NOTE: All end pipe of 8"dia. RTR reduced to 6" dia

Riser must be 3.0 meter high


All (F) Funnel 4" RTR ,Clean-out (C.O.)RTR 4" and Vent 4" dia RTR , gravity test will follow after finished the
Mainline of RTR Pipe 12"& 8" dia.
edc '08
M.F. AL - HAJRI CONT. EST.
P.O. Box 4626
31952 Al- khobar
Kingdom of Saudi Arabia
Tel No. 837-377
Fax No. 837-3888

INSTALL GAS DEHYDRATION


SYSTEM
AT
ABQAIQ PLANTS

GRAVITY TEST LIMIT


AND
RISER
LOCATION MARK
CONTRACT NO.6600019182

B.I.-10-00332

Вам также может понравиться