Design Areas
Design Area Calc. Mode Occupancy Area of Total Water Pressure @ Min. Min. Min. Calculated Hose Margin To
Name (Model) Application Source Density Pressure Flow Heads Streams Source
1 Demand (HW) Commercial_Ordinary2 1401.46 601.9 212.7 0.241 18.6 24.1 14 249.9 82.8
Contractor Information
Name of Contractor: Engineering Services SAC
Design
Remote Area Name 1
Special Heads
Location
Source W1
Notes
Hoses
Inside Hose Flow / Standpipe Demand (gpm) 249.9
Sprinklers
Ovehead Sprinkler Flow (gpm) 351.9
Other
Required Margin of Safety (psi) 0
System Demand
300
280
260 S1
240
220
S2
200
180
Pressure, psi
160
S3
140 D2
123.681
120
100
80
60
40 D1
20
0
0 400 500 600 700 800 900 1000 1100 1200
Flow, gpm
Graph Labels
Values
Label Description
Flow (gpm) Pressure (psi)
S1 Supply point #1 - Static 0 248
S2 Supply point #2 750 195
S3 Supply point #3 1125 137.5
D1 Elevation Pressure 0 26.2
D2 System Demand 601.9 129.9
Open Heads
Required Calculated
Head Ref. Head Type Coverage K-Factor
Density Flow Pressure Density Flow Pressure
Overhead
P01 100.1 5.6 0.241 24.1 18.6 0.27 27 23.3
Sprinkler
Overhead
P02 100.1 5.6 0.241 24.1 18.6 0.252 25.2 20.3
Sprinkler
Overhead
P03 100.1 5.6 0.241 24.1 18.6 0.254 25.4 20.6
Sprinkler
Overhead
P04 100.1 5.6 0.241 24.1 18.6 0.264 26.4 22.3
Sprinkler
Overhead
P05 100.1 5.6 0.241 24.1 18.6 0.243 24.3 18.9
Sprinkler
Overhead
P06 100.1 5.6 0.241 24.1 18.6 0.245 24.6 19.2
Sprinkler
Overhead
P07 100.1 5.6 0.241 24.1 18.6 0.263 26.4 22.2
Sprinkler
Overhead
P08 100.1 5.6 0.241 24.1 18.6 0.241 24.1 18.6
Sprinkler
Overhead
P09 100.1 5.6 0.241 24.1 18.6 0.243 24.3 18.9
Sprinkler
Overhead
P10 100.1 5.6 0.241 24.1 18.6 0.241 24.1 18.6
Sprinkler
Overhead
P11 100.1 5.6 0.241 24.1 18.6 0.243 24.4 18.9
Sprinkler
Overhead
P12 100.1 5.6 0.241 24.1 18.6 0.264 26.5 22.3
Sprinkler
Overhead
P13 100.1 5.6 0.241 24.1 18.6 0.244 24.5 19.1
Sprinkler
Overhead
P14 100.1 5.6 0.241 24.1 18.6 0.247 24.7 19.5
Sprinkler
PIPE INFORMATION
Node 1 Elev 1 K-Factor 1 Flow added(q)* Nominal ID Fittings L C Factor total (Pt)
Node 2 Elev 2 K-Factor 2 Total flow (Q) Actual ID quantity x (name) = length F Pf per ft elev (Pe) NOTES
T frict (Pf)
PIPE INFORMATION
Node 1 Elev 1 K-Factor 1 Flow added(q)* Nominal ID Fittings L C Factor total (Pt)
Node 2 Elev 2 K-Factor 2 Total flow (Q) Actual ID quantity x (name) = length F Pf per ft elev (Pe) NOTES
T frict (Pf)
PIPE INFORMATION
Node 1 Elev 1 K-Factor 1 Flow added(q)* Nominal ID Fittings L C Factor total (Pt)
Node 2 Elev 2 K-Factor 2 Total flow (Q) Actual ID quantity x (name) = length F Pf per ft elev (Pe) NOTES
T frict (Pf)
PIPE INFORMATION
Node 1 Elev 1 K-Factor 1 Flow added(q)* Nominal ID Fittings L C Factor total (Pt)
Node 2 Elev 2 K-Factor 2 Total flow (Q) Actual ID quantity x (name) = length F Pf per ft elev (Pe) NOTES
T frict (Pf)
PIPE INFORMATION
Node 1 Elev 1 K-Factor 1 Flow added(q)* Nominal ID Fittings L C Factor total (Pt)
Node 2 Elev 2 K-Factor 2 Total flow (Q) Actual ID quantity x (name) = length F Pf per ft elev (Pe) NOTES
T frict (Pf)