CALCULATION SUMMARY

Project Name : Stano 1 Project Location: Edificio Begonias

Drawing No. : N2 City: Lima, Peru

Design Areas
Design Area Calc. Mode Occupancy Area of Total Water Pressure @ Min. Min. Min. Calculated Hose Margin To
Name (Model) Application Source Density Pressure Flow Heads Streams Source

(ft) (gpm) (psi) (gpm/ft) (psi) (gpm) # (gpm) (psi)

1 Demand (HW) Commercial_Ordinary2 1401.46 601.9 212.7 0.241 18.6 24.1 14 249.9 82.8

File: D:\lchavez\Data\LCHAVEZ 2010\Lchavez\Actual 2013\Edificio Torre begonia\calculo hidraulico\calculo.tyc3


Date 06/11/2014 Copyright 2002-2012 Tyco Fire Protection Products Page 1
HYDRAULIC CALCULATIONS
for
Job Information
Project Name : Stano 1

Contract No. : N2 City: Lima, Peru

Project Location: Edificio Begonias Date: 03/10/2012

Contractor Information
Name of Contractor: Engineering Services SAC

Address: Av. Juan de la Fuente 960-Miraflores City: Lima, Per

Phone Number: 445-8215 E-mail: www.essacweb.com

Name of Designer: M. Caldas

Authority Having Jurisdiction: CGBVP

Design
Remote Area Name 1

Remote Area Location

Occupancy Classification Commercial_Ordinary2

Density (gpm/ft) 0.241

Area of Application (ft) 1401.46

Coverage per Sprinkler (ft) 100.1

Number of Calculated Sprinklers 14

In-Rack Demand (gpm) 0

Special Heads

Hose Streams (gpm) 249.9

Total Water Required (incl. Hose Streams) (gpm) 601.9

Required Pressure at Source (psi) 129.9

Type of System Wet

Volume - Entire System (gal) 392.9 gal

Water Supply Information


Date DD/MM/YYYY

Location

Source W1

Notes

File: D:\lchavez\Data\LCHAVEZ 2010\Lchavez\Actual 2013\Edificio Torre begonia\calculo hidraulico\calculo.tyc3


Date 06/11/2014 Copyright 2002-2012 Tyco Fire Protection Products Page 2
Job : Stano 1 Node Labels: Node Reference
Pipe Labels: Off

Diagram for Design Area : 1

File: D:\lchavez\Data\LCHAVEZ 2010\Lchavez\Actual 2013\Edificio Torre begonia\calculo hidraulico\calculo.tyc3


Date 06/11/2014 Copyright 2002-2012 Tyco Fire Protection Products Page 3
Job : Stano 1

Hydraulic Analysis for : 1


Calculation Info
Calculation Mode Demand
Hydraulic Model Hazen-Williams
Fluid Name Water @ 60F (15.6C)
Fluid Weight, (lb/ft) N/A for Hazen-Williams calculation.
Fluid Dynamic Viscosity, (lbs/ft) N/A for Hazen-Williams calculation.

Water Supply Parameters

Supply 1 : W1 Flow (gpm) Pressure (psi)


0 248
750 195
1125 137.5

Hoses
Inside Hose Flow / Standpipe Demand (gpm) 249.9

Outside Hose Flow (gpm) 0

Additional Outside Hose Flow (gpm)

Other (custom defined) Hose Flow (gpm) 0

Total Hose Flow (gpm) 249.9

Sprinklers
Ovehead Sprinkler Flow (gpm) 351.9

InRack Sprinkler Flow (gpm) 0

Other (custom defined) Sprinkler Flow (gpm) 0

Total Sprinkler Flow (gpm) 351.9

Other
Required Margin of Safety (psi) 0

W1 - Pressure (psi) 129.9

W1 - Flow (gpm) 601.9

Demand w/o System Pump(s) N/A

File: D:\lchavez\Data\LCHAVEZ 2010\Lchavez\Actual 2013\Edificio Torre begonia\calculo hidraulico\calculo.tyc3


Date 06/11/2014 Copyright 2002-2012 Tyco Fire Protection Products Page 4
Job : Stano 1

Hydraulic Analysis for : 1

System Demand

300

280

260 S1

240

220

S2
200

180
Pressure, psi

160
S3
140 D2
123.681

120

100

80

60

40 D1

20

0
0 400 500 600 700 800 900 1000 1100 1200
Flow, gpm

File: D:\lchavez\Data\LCHAVEZ 2010\Lchavez\Actual 2013\Edificio Torre begonia\calculo hidraulico\calculo.tyc3


Date 06/11/2014 Copyright 2002-2012 Tyco Fire Protection Products Page 5
Job : Stano 1

Hydraulic Analysis for : 1

Graph Labels
Values
Label Description
Flow (gpm) Pressure (psi)
S1 Supply point #1 - Static 0 248
S2 Supply point #2 750 195
S3 Supply point #3 1125 137.5
D1 Elevation Pressure 0 26.2
D2 System Demand 601.9 129.9

Curve Intersections & Safety Margins


Intersection Safety Margin
Curve Name
Pressure (psi) Flow (gpm) Pressure (psi) @ Flow (gpm)
Supply 191.8 774.9 82.8 601.9

Open Heads
Required Calculated
Head Ref. Head Type Coverage K-Factor
Density Flow Pressure Density Flow Pressure

(ft) (gpm/psi) (gpm/ft) (gpm) (psi) (gpm/ft) (gpm) (psi)

Overhead
P01 100.1 5.6 0.241 24.1 18.6 0.27 27 23.3
Sprinkler

Overhead
P02 100.1 5.6 0.241 24.1 18.6 0.252 25.2 20.3
Sprinkler

Overhead
P03 100.1 5.6 0.241 24.1 18.6 0.254 25.4 20.6
Sprinkler

Overhead
P04 100.1 5.6 0.241 24.1 18.6 0.264 26.4 22.3
Sprinkler

Overhead
P05 100.1 5.6 0.241 24.1 18.6 0.243 24.3 18.9
Sprinkler

Overhead
P06 100.1 5.6 0.241 24.1 18.6 0.245 24.6 19.2
Sprinkler

Overhead
P07 100.1 5.6 0.241 24.1 18.6 0.263 26.4 22.2
Sprinkler

Overhead
P08 100.1 5.6 0.241 24.1 18.6 0.241 24.1 18.6
Sprinkler

Overhead
P09 100.1 5.6 0.241 24.1 18.6 0.243 24.3 18.9
Sprinkler

Overhead
P10 100.1 5.6 0.241 24.1 18.6 0.241 24.1 18.6
Sprinkler

Overhead
P11 100.1 5.6 0.241 24.1 18.6 0.243 24.4 18.9
Sprinkler

Overhead
P12 100.1 5.6 0.241 24.1 18.6 0.264 26.5 22.3
Sprinkler

Overhead
P13 100.1 5.6 0.241 24.1 18.6 0.244 24.5 19.1
Sprinkler

Overhead
P14 100.1 5.6 0.241 24.1 18.6 0.247 24.7 19.5
Sprinkler

File: D:\lchavez\Data\LCHAVEZ 2010\Lchavez\Actual 2013\Edificio Torre begonia\calculo hidraulico\calculo.tyc3


Date 06/11/2014 Copyright 2002-2012 Tyco Fire Protection Products Page 6
Job name: Stano 1 Sheet number:___________________

PIPE INFORMATION
Node 1 Elev 1 K-Factor 1 Flow added(q)* Nominal ID Fittings L C Factor total (Pt)
Node 2 Elev 2 K-Factor 2 Total flow (Q) Actual ID quantity x (name) = length F Pf per ft elev (Pe) NOTES
T frict (Pf)

(ft) (gpm/psi) (gpm) (ft) (ft) (psi) (psi)


(in)
P08 -5.25 5.6 24.1 25 1x(us.Tee)=5 0.66 120 18.6
164 -5.91 24.1 1.049 5 0.1835 0.3
5.66 1
164 -5.91 -2.9 32 9.24 120 19.9
163 -5.91 21.2 1.38 0 0.0381 0
9.24 0.4
163 -5.91 24.3 32 9.35 120 20.2
162 -5.91 45.6 1.38 0 0.1568 0
9.35 1.5
162 -5.91 25.2 32 1x(us.Tee)=6 6.48 120 21.7
008 -5.91 70.8 1.38 6 0.3545 0
12.48 4.4
008 -5.91 -21.4 50 12.92 120 26.1
009 -5.91 49.4 2.067 0 0.0255 0
12.92 0.3
009 -5.91 70.7 50 13.02 120 26.5
010 -5.91 120.1 2.067 0 0.1319 0
13.02 1.7
010 -5.91 65.1 50 12.96 120 28.2
011 -5.91 185.2 2.067 0 0.294 0
12.96 3.8
011 -5.91 -6 50 12.96 120 32
012 -5.91 179.2 2.067 0 0.2767 0
12.96 3.6
012 -5.91 -2.5 50 12.96 120 35.6
013 -5.91 176.7 2.067 0 0.2696 0
12.96 3.5
013 -5.91 -0.7 50 12.96 120 39.1
014 -5.91 176 2.067 0 0.2677 0
12.96 3.5
014 -5.91 -0.1 50 12.96 120 42.5
015 -5.91 176 2.067 0 0.2675 0
12.96 3.5
015 -5.91 0.1 50 1x(us.90)=5 3.92 120 46
016 -5.91 176.1 2.067 5 0.2678 0
8.92 2.4
016 -5.91 0 50 1x(us.90)=5 1.96 120 48.4
017 -5.91 176.1 2.067 5 0.2678 0
6.96 1.9
017 -5.91 0 50 1x(us.90)=5 92.95 120 50.3
022 -5.91 176.1 2.067 5 0.2678 0
97.95 26.2
022 -5.91 0 50 1x(us.Tee)=10 29.18 120 76.5
025 -5.91 176.1 2.067 10 0.2678 0
39.18 10.5
025 -5.91 175.9 80 2.17 120 87
n100 -5.91 351.9 3.068 0 0.1411 0
2.17 0.3
n100 -5.91 0 80 1.08 0 87.3 Butterfly 8000
n101 -5.91 351.9 0 0 0.9089 0
1.08 1
n101 -5.91 0 80 1x(us.90)=7 1.08 120 88.3
144 -5.91 351.9 3.068 7 0.1411 0
8.08 1.1
144 -5.91 0 80 1x(us.90)=7 5.33 120 89.4
145 -5.91 351.9 3.068 7 0.1411 0
12.33 1.7

2006 National Fire Protection Association Page 7


Job name: Stano 1 Sheet number:___________________

PIPE INFORMATION
Node 1 Elev 1 K-Factor 1 Flow added(q)* Nominal ID Fittings L C Factor total (Pt)
Node 2 Elev 2 K-Factor 2 Total flow (Q) Actual ID quantity x (name) = length F Pf per ft elev (Pe) NOTES
T frict (Pf)

(ft) (gpm/psi) (gpm) (ft) (ft) (psi) (psi)


(in)
145 -5.91 0 100 1x(us.90)=10 43.31 120 91.2
146 -49.21 351.9 4.026 10 0.0376 18.8
53.31 2
146 -49.21 0 100 1x(us.90)=10 142.47 120 111.9
147 -49.21 351.9 4.026 10 0.0376 0
152.47 5.7
147 -49.21 0 100 1x(us.90)=10 27.76 120 117.7
148 -49.21 351.9 4.026 10 0.0376 0
37.76 1.4
148 -49.21 0 100 1x(us.90)=10 2.96 120 119.1
149 -49.21 351.9 4.026 10 0.0376 0
12.96 0.5
149 -49.21 0 100 1x(us.Tee)=20 4.9 120 119.6
150 -49.21 351.9 4.026 20 0.0376 0
24.9 0.9
150 -49.21 249.9 150 1x(us.90)=14 6.56 120 120.5
151 -55.77 601.9 6.065 14 0.0138 2.8
20.56 0.3
151 -55.77 0 150 1x(us.45)=7 10.8 120 123.6
152 -55.77 601.9 6.065 7 0.0138 0
17.8 0.2
152 -55.77 0 150 1x(us.45)=7 4.76 120 123.9
153 -55.77 601.9 6.065 7 0.0138 0
11.76 0.2
153 -55.77 0 150 1x(us.90)=14 32.87 120 124
154 -55.77 601.9 6.065 14 0.0138 0
46.87 0.6
154 -55.77 0 150 1x(us.90)=14 9.84 120 124.7
155 -65.62 601.9 6.065 14 0.0138 4.3
23.84 0.3
155 -65.62 0 150 2.24 120 129.3
n103 -65.62 601.9 6.065 0 0.0138 0
2.24 0.0
n103 -65.62 0 150 2.24 0 129.3 Gate A2360
n102 -65.62 601.9 0 0 0.0054 0
2.24 0.0
n102 -65.62 0 150 2.24 0 129.3 Check 590
n104 -65.62 601.9 0 0 0.2691 0
2.24 0.6
n104 -65.62 0 150 2.24 120 129.9
W1 -65.62 601.9 6.065 0 0.0138 0
2.24 0.0
P10 -5.25 5.6 24.1 25 1x(us.Tee)=5 0.66 120 18.6
165 -5.91 24.1 1.049 5 0.1835 0.3
5.66 1
165 -5.91 2.9 32 9.13 120 19.9
001 -5.91 27 1.38 0 0.0595 0
9.13 0.5
001 -5.91 24.5 32 1x(us.Tee)=6 25.4 120 20.4
005 -5.91 51.5 1.38 6 0.1964 0
31.4 6.2
005 -5.91 21.4 50 12.92 120 26.6
040 -5.91 72.9 2.067 0 0.0523 0
12.92 0.7
040 -5.91 52.7 50 13.02 120 27.3
039 -5.91 125.5 2.067 0 0.1431 0
13.02 1.9

2006 National Fire Protection Association Page 8


Job name: Stano 1 Sheet number:___________________

PIPE INFORMATION
Node 1 Elev 1 K-Factor 1 Flow added(q)* Nominal ID Fittings L C Factor total (Pt)
Node 2 Elev 2 K-Factor 2 Total flow (Q) Actual ID quantity x (name) = length F Pf per ft elev (Pe) NOTES
T frict (Pf)

(ft) (gpm/psi) (gpm) (ft) (ft) (psi) (psi)


(in)
039 -5.91 41.2 50 12.96 120 29.1
038 -5.91 166.8 2.067 0 0.2422 0
12.96 3.1
038 -5.91 6 50 12.96 120 32.3
037 -5.91 172.7 2.067 0 0.2585 0
12.96 3.3
037 -5.91 2.5 50 12.96 120 35.6
036 -5.91 175.2 2.067 0 0.2655 0
12.96 3.4
036 -5.91 0.7 50 12.96 120 39.1
035 -5.91 175.9 2.067 0 0.2673 0
12.96 3.5
035 -5.91 0.1 50 12.96 120 42.5
034 -5.91 176 2.067 0 0.2675 0
12.96 3.5
034 -5.91 -0.1 50 1x(us.90)=5 96.87 120 46
026 -5.91 175.9 2.067 5 0.2672 0
101.87 27.2
026 -5.91 0 50 1x(us.Tee)=10 41.51 120 73.2
025 -5.91 175.9 2.067 10 0.2672 0
51.51 13.8
P05 -5.25 5.6 24.3 25 1x(us.Tee)=5 0.66 120 18.9
163 -5.91 24.3 1.049 5 0.1865 0.3
5.66 1.1
P09 -5.25 5.6 24.3 25 1x(us.Tee)=5 0.66 120 18.9
046 -5.91 24.3 1.049 5 0.1867 0.3
5.66 1.1
046 -5.91 -3.6 32 9.24 120 20.3
047 -5.91 20.8 1.38 0 0.0365 0
9.24 0.3
047 -5.91 24.6 32 9.35 120 20.6
048 -5.91 45.3 1.38 0 0.1551 0
9.35 1.5
048 -5.91 25.4 32 1x(us.Tee)=6 6.48 120 22
009 -5.91 70.7 1.38 6 0.3538 0
12.48 4.4
P11 -5.25 5.6 24.4 25 1x(us.Tee)=5 0.66 120 18.9
045 -5.91 24.4 1.049 5 0.1868 0.3
5.66 1.1
045 -5.91 3.6 32 9.13 120 20.3
044 -5.91 27.9 1.38 0 0.0634 0
9.13 0.6
044 -5.91 24.7 32 1x(us.Tee)=6 25.4 120 20.8
040 -5.91 52.7 1.38 6 0.2048 0
31.4 6.4
P13 -5.25 5.6 24.5 25 1x(us.Tee)=5 0.66 120 19.1
001 -5.91 24.5 1.049 5 0.1883 0.3
5.66 1.1
P06 -5.25 5.6 24.6 25 1x(us.Tee)=5 0.66 120 19.2
047 -5.91 24.6 1.049 5 0.1896 0.3
5.66 1.1
P14 -5.25 5.6 24.7 25 1x(us.Tee)=5 0.66 120 19.5
044 -5.91 24.7 1.049 5 0.1918 0.3
5.66 1.1
P02 -5.25 5.6 25.2 25 1x(us.Tee)=5 0.66 120 20.3
162 -5.91 25.2 1.049 5 0.1992 0.3
5.66 1.1

2006 National Fire Protection Association Page 9


Job name: Stano 1 Sheet number:___________________

PIPE INFORMATION
Node 1 Elev 1 K-Factor 1 Flow added(q)* Nominal ID Fittings L C Factor total (Pt)
Node 2 Elev 2 K-Factor 2 Total flow (Q) Actual ID quantity x (name) = length F Pf per ft elev (Pe) NOTES
T frict (Pf)

(ft) (gpm/psi) (gpm) (ft) (ft) (psi) (psi)


(in)
P03 -5.25 5.6 25.4 25 1x(us.Tee)=5 0.66 120 20.6
048 -5.91 25.4 1.049 5 0.2022 0.3
5.66 1.1
P07 -5.25 5.6 26.4 25 1x(us.Tee)=5 0.66 120 22.2
054 -5.91 26.4 1.049 5 0.2163 0.3
5.66 1.2
054 -5.91 -11.6 32 9.13 120 23.7
053 -5.91 14.8 1.38 0 0.0195 0
9.13 0.2
053 -5.91 26.5 32 1x(us.Tee)=6 34.53 120 23.9
039 -5.91 41.2 1.38 6 0.1303 0
40.53 5.3
P04 -5.25 5.6 26.4 25 1x(us.Tee)=5 0.66 120 22.3
055 -5.91 26.4 1.049 5 0.2174 0.3
5.66 1.2
055 -5.91 11.6 32 9.35 120 23.8
056 -5.91 38 1.38 0 0.1121 0
9.35 1
056 -5.91 27 32 1x(us.Tee)=6 4.92 120 24.9
010 -5.91 65.1 1.38 6 0.303 0
10.92 3.3
P12 -5.25 5.6 26.5 25 1x(us.Tee)=5 0.66 120 22.3
053 -5.91 26.5 1.049 5 0.2178 0.3
5.66 1.2
P01 -5.25 5.6 27 25 1x(us.Tee)=5 0.66 120 23.3
056 -5.91 27 1.049 5 0.2264 0.3
5.66 1.3
his1 -42.65 249.9 100 6.56 120 117.5
150 -49.21 249.9 4.026 0 0.0199 2.8
6.56 0.1
164 -5.91 0 32 9.13 120 19.9
165 -5.91 2.9 1.38 0 0.0009 0
9.13 0
008 -5.91 0 50 1x(us.90)=5 4.63 120 26.1
007 -5.91 21.4 2.067 5 0.0054 0
9.63 0.1
007 -5.91 0 50 1x(us.90)=5 68.73 120 26.2
006 -5.91 21.4 2.067 5 0.0054 0
73.73 0.4
006 -5.91 0 50 4.63 120 26.6
005 -5.91 21.4 2.067 0 0.0054 0
4.63 0.0
011 -5.91 0 32 2x(us.Tee)=12 68.73 120 32
038 -5.91 6 1.38 12 0.0036 0
80.73 0.3
012 -5.91 0 32 2x(us.Tee)=12 68.73 120 35.6
037 -5.91 2.5 1.38 12 0.0007 0
80.73 0.1
013 -5.91 0 32 2x(us.Tee)=12 68.73 120 39.1
036 -5.91 0.7 1.38 12 0.0001 0
80.73 0
014 -5.91 0 32 2x(us.Tee)=12 68.73 120 42.5
035 -5.91 0.1 1.38 12 0 0
80.73 0
034 -5.91 0 32 2x(us.Tee)=12 68.73 120 46
015 -5.91 0.1 1.38 12 0 0
80.73 0

2006 National Fire Protection Association Page 10


Job name: Stano 1 Sheet number:___________________

PIPE INFORMATION
Node 1 Elev 1 K-Factor 1 Flow added(q)* Nominal ID Fittings L C Factor total (Pt)
Node 2 Elev 2 K-Factor 2 Total flow (Q) Actual ID quantity x (name) = length F Pf per ft elev (Pe) NOTES
T frict (Pf)

(ft) (gpm/psi) (gpm) (ft) (ft) (psi) (psi)


(in)
046 -5.91 0 32 9.13 120 20.3
045 -5.91 3.6 1.38 0 0.0014 0
9.13 0.0
054 -5.91 0 32 10.8 120 23.7
055 -5.91 11.6 1.38 0 0.0124 0
10.8 0.1

* Discharge shown for flowing nodes only

2006 National Fire Protection Association Page 11