PREDIMENSIONAMIENTO DE VIGAS:
Base = 0.25 m (dato)
h= ; Luz ms crtica = 4.88 m ; h< 2.5 b
14
h =0.3485 m ; 0.3485 < 0.625 (CUMPLE)
h=0.30 m
DISTRIBUCION DE VIGAS Y COLUMNAS EN PLANTA (VER DETALLES EN PLANOS)
DISTRIBUCION ARQUITECTONICA (VER DETALLES EN PLANOS)
Primer piso
Segundo y tercer piso:
3) TERCER PASO HALLAMOS LAS RIGIDECES E INIRCEIAS EN LAS
COLUMNAS:
Rigidez total en x:
Kx= (
)
Ky= ( )
VIGAS EN X
VIGAS EN Y
N DE
L(m) AREA(m2) VOLUMEN P.E. PESO
VECES
4.88 0.25 0.3 0.366 4 2.4 3.5136
4.5 0.25 0.3 0.3375 4 2.4 3.24
4.36 0.25 0.3 0.327 1 2.4 0.7848
4.48 0.25 0.3 0.336 3 2.4 2.4192
3.66 0.25 0.3 0.2745 3 2.4 1.9764
11.934
COLUMNAS
A.
A.CONSTRUIDA A. VIGAS EN X A. VIGAS EN Y COLUMNAS (TN/m2) PESO
222.3 17.045 16.575 1.5 0.3 56.154
TABIQUERIA
ACABADOS
PESO POR
SOBRECARGA
VIGAS EN X
VIGAS EN Y:
ALIGERADO
A.
A.CONSTRUIDA A. VIGAS EN X A. VIGAS EN Y COLUMNAS (TN/m2) PESO
222.3 17.045 16.575 1.5 0.3 56.154
TABIQUERIA
ACABADOS
VIGAS EN X
VIGAS EN Y
L(m) AREA(m2) VOLUMEN N DE VECES P.E. PESO
4.88 0.25 0.3 0.366 4 2.4 3.5136
4.5 0.25 0.3 0.3375 4 2.4 3.24
4.36 0.25 0.3 0.327 1 2.4 0.7848
4.48 0.25 0.3 0.336 3 2.4 2.4192
3.66 0.25 0.3 0.2745 3 2.4 1.9764
11.934
COLUMNAS
ALIGERADO
TABIQUERIA
ACABADOS
PESOS MASAS
h = 9.3 m
= 35 para prticos.
=0.2657
Matriz de masas:
.
M= [ . ]
.
Matriz de rigideces:
+
K= [ + ]
+
K= [ + ]
. .
K= [ . . . ]
. .
[[K] [ ]x [M] ] = 0
. . .
[ . . . . ]=0
. . .
DE LA ECUACION RESOLVEMOS:
w1^2= 1228.930000
w2^2= 527.98
w3^2= 56.85
PRIMER PISO
EN EL EJE X:
10.15 3
= =0.0421875 m4
12
10.153
= =0.000422 m4
12
1221881980.000422
= x 6=1425.03 tn/ m
3.63
1221881980.0421875
= x 6 =142462.49 tn/ m
3.63
e= 0.15
Lyy= 1.5
Ixx= 0.042188 m4
Iyy= 0.000422 m4
# placas= 6
Kplxx= 1425.03 tn/m
Kplyy= 142462.49 tn/m
EN EL EJE Y:
10. 0.153
= =0.0421875 m4
12
10.15 3
= =0.000422 m4
12
1221881980.042188
= x 8 =189949.99 tn/ m
3.63
1221881980.000422
= x 8 =1900.04tn/ m
3.63
e= 0.15
Lyy= 1.5
Ixx= 0.000422 m4
Iyy= 0.042188 m4
# placas= 8
Kplxx= 189949.99 tn/m
Kplyy= 1900.004 tn/m
EN EL EJE X:
10.15 3
= =0.0421875 m4
12
10.153
= =0.000422 m4
12
e= 0.15
Lyy= 1.5
Ixx= 0.042188 m4
Iyy= 0.000422 m4
# placas= 6
Kplxx= 2462.45 tn/m
Kplyy= 246175.19 tn/m
EN EL EJE Y:
10. 0.153
= =0.0421875 m4
12
10.15 3
= =0.000422 m4
12
e= 0.15
Lyy= 1.5
Ixx= 0.000422 m4
Iyy= 0.042188 m4
# placas= 8
Kplxx= 338233.59 tn/m
Kplyy= 3282.30tn/m
RIGIDES TOTAL:
Rigides en x Rigides en y
191375.02 144362.53
330696.04 249457.49
330696.04 249457.49
COLOCANDO 6 PLACAS DE 1.5 m EN x y 8 PLACAS DE 1.5 m en y.
METRADO:
PLACAS EN W1:
(e x L x h) x 2.4 x # Placas =
PLACAS EN W2:
(e x L x h) x 2.4 x # Placas =
PLACAS EN W3:
(e x L x h) x 2.4 x # Placas =
h = 9.3 m
= 35 para prticos.
.
= =0.155
9) NOVENO PASO PERIODO EN LA DIRECCION X-X EJE MENOS RIGIDO:
Matriz de masas:
.
M= [ . ]
.
Matriz de rigideces:
+
K= [ + ]
+
K= [ + ]
. .
K= [. . . ]
. .
[[K] [ ]x [M] ] = 0
. . .
[ .
. . . ]=0
. . .
DE LA ECUACION RESOLVEMOS:
-9248.84 + 673512992.6 -1.1205E+13 + 2.24047E+16= 0
w1^2= 2310.134
w2^2= 21314.773
w3^2= 49196.439
< 0.155
DE LA ECUACION:
Con :
W1=48.06
. .
[. . . ] x [ ] =0
. .
[ ] = [. ]
.
W1=145.99
. .
[. . . ] x [ ] =0
. .
[ ] = [ . ]
.
W1=221.80
. .
[ . . . ] x [ ] =0
. .
[ ] = [. ]
.
a = [. . . ]
. . .
11) ONCEAVO PASO NORMALIZANDO []:
= [ ]
=
=
= = + +
= = + +
= = + +
r1 -7.799
r2 -1.494
r3 -0.490
12) DOCEAVO PASO ACELERACION EN LA BASE:
t1= 0.1307
t2= 0.043
t3= 0.028
Td=0.06
1
= 1.15
1
2
= 1.42
2
3
=1
3
1 =
21
2 =
22
3 =
23
F= 2.4525
g1max 0.001220818
g2max= 0.000163366
g3max= 4.98422E-05
13) TRECEAVO PASO VERIFICACION DE DESPLAZAMIENTOS:
u1 max= 0.00088338 m
u2max= 0.00125315 m
u3max= 0.001430049 m
U1 max = 0.088338 cm
u2max = 0.125315 cm
u3max = 0.1430049 cm
Multiplicaremos los Ui hallados por (0.75R), para poder comparar con la Norma
E030 y comparando con los desplazamientos mximos dados por la Norma
tenemos:
Dnorma = 0.007 x ALTURA DEL Entrepiso
D norma= 6.51 cm
< .
CONSIDERANDO R= 7
VERIFICANDO DESPLAZAMIENTO 1:
. = 0.4637
VERIFICANDO DESPLAZAMIENTO 2:
. = 0.4637
. = 0.75