b. Short circuit b. Arc flash g. Persons to be monitor While the Medium A. Dont touch any Site Supervisor /
cable testing (IR test and Hi-pot equipment while QC / 3rd party
test)from point A to point B testing in progress. testing
h. Working area shall be B. Discharge of
barricaded and adequate storage voltage after
signages to be in placed completion of IR test.
11 Housekeeping Slip and trip Bodily Injury a. Materials shall be placed in safe Minimum a. Highlight during Site Supervisor /
manner that should not be toolbox meeting on Foreman / QC / 3rd
obstruction any access and housekeeping safety party testing
egress. b. Supervisor to be
b. Removed all the loose materials followed up all the
from the ground and elevation housekeeping issues
level after immediate completion rise on site.
of work.
c. Housekeeping to be maintained
at all time & daily Basics
Risk Assessment Briefing Form
Location of Work:
Nature of Work:
NRIC /
S/N NAME DESIGNATION SIGNATURE
WP /EP NO.
DECLARATION:
This is to certify that I have explained all the safety precautions outlined in the Risk
Assessment to the above personnel.
DESIGNATION: COMPANY: