Holiday Inn Hanoi -MEP design review dated 22-Jun-2017

S/N Service Description


1 ACMV To add Flow meter for cold water make up at cooling tower
2 ACMV To provide VSD FOR Condensing pumps
Boiler to be provided with CO detection system and linked to the main fire alarm
3
ACMV panel for notification
4 ACMV Carbon monoxide detector required for generator
Why is reheating for AHU/PAU provided? Please remove reheating for these
5
ACMV systems as Vietnam is tropical climate. Reduce cost
We have heat pumps for hot water. What is the boiler used for? Please remove
6
ACMV to reduce cost.
7 ACMV Ensure exhaust is 5m distance from all general intakes
8 ACMV Suggest to provide Test port at fan side for major fans
9 ACMV Toilets, lockers to have lourve doors or provide mechanical ventilation
Guestrooms to be provided with room control unit to allow interlocking of light
10
ACMV switches, resetting of fan coil unit speed.
11 ACMV Staircase pressurization; Max 110N on door handle
Staircase pressurization; Is VSD provided? Require 2 speed, normal and fire
12
ACMV mode. Main control panel at security office.
13 BMS BMS to have 30min UPS
14 BMS To provide points schedule list
AHU require interface to fire alarm
15
BMS PAU require interface to fire alarm
16 ELEC Power factor correction 0.98
17 ELEC Electrical sub meters linked to BMS
18 ELEC Individual lighting control for lobby, meeting rooms, F&B space
19 ELEC Time control & motion sensors for BOH corridors, offices
IT provisions. Backbone shall be fibre. Horizontal distribution shall be CAT6 UTP.
To refer to Technology Standards. Require consultant team to obtain prior
20
approval from IHG IT department before procurement/installation. CAT 7 is more
ELEC costly.
21 ELEC To review access point provision. -65dBm for wifi throughout hotel
CCTV to be 30days storage and provide coverage to the following areas:
Entry point to the property (vehicular) and final exits
Parking levels
Loading dock
Lobby
Hotel front desk
Hotel guest elevator lobby and guest room corridors
22
Public areas
Employee entrance
Shopping level corridors (where applicable)
Exit stairs with motion detectors
Cashiers room
Alcohol and beverage store
ELEC - no cctv in swimming pool area
Guestroom door lock to be card reader RFID instead of EM lock type. See
23
ELEC attached list.
Card access RFID required for
Entry to accounts department
Safe deposit room
Computer room
General cashier
24 Employees entrance (to be used for time and attendance)
Entry to front office
Alcohol beverage store
Swimming pool
gym
ELEC Luggage room
No early streamers. To utilize Faraday cage/Franklyn rode for lightning
25
ELEC protection. Compliance to NFPA, insurance liabilities.
Fire alarm
- main panel at security office
- mimic panel at telephone operator
- GSM modem connected to fire alarm
PA EVACUATION
- main panel at security office
-mic at telephone operator
BGM
26 - main control at front office
CCTV
- Panel at Security office
Lift supervisory panel with intercom
- Panel at Security office
BMS, Lighting control
- ENGINEERING OFFICE
Panic alarm (alarm to security office)
ELEC - reception, cashier room, GM office
To confirm that the generator fuel storage is able to provide for all essential
27
ELEC equipment as listed in IHG Annex 38
28 FIRE To provide Two stage, addressable fire alarm system with 1hour operation.
29 FIRE Strobe light for disable guestrooms and disabled toilets.
Background music to be on separate system from PA Evacuation system. PA Evac
30
FIRE system unable to meet AV system specification.
Public announcement should be provided throughout the building such that min
31 65dBA and 75dBA at the bedhead. Announcement shall be made in 2 languages.
FIRE Local language and english
32 FIRE Voice alarm to be 30min fire rated
33 FIRE Dry sprinkler required for walk in chillers
Smoke detector are required throughout the building. Heat detectors are
34 allowed in kitchens, carpark and generator room. Guestrooms to be provided
FIRE with audible based smoke detectors.
To provide sprinkler point at top of lift shaft
35
FIRE To provide sprinkler point at top and bottom of fire stairs landing.
36 LIFT Lift traffic analysis required
37 LIFT Lift homing to ground floor or at a floor unaffected by fire.
Clean water to achieve WHO standards. To provide suitable water filtration
38
PLUMBING system
Water storage is too low. For hotel without laundry 750l/room. 14l per cover for
banquet and restaurant, 15l per staff. Hot water storage 30l/ guestroom. Historic
39
data for similar climate; HI Bangkok: 0.83m3/room. To provide calculation for
PLUMBING cold water and hot water system.
40 PLUMBING To provide water meters for kitchen, restaurants, swimming pool
41 PLUMBING Too many sensors provided for water tank, high and low sensors sufficient.
To provide 2 storage compartment with bypass valve for both clean water and
42
PLUMBING fire storage tank. To facilitate maintenance.
Hot water to kept at 60 deg C and delivered at water point at max 52deg C. Hot
43
PLUMBING water delivered to guest room within 5secs
Pressure at any fitting in the development shall not exceed 5.5bar and a
44
PLUMBING minimum of 1.5 bar
Heat pumps with 2 hour recovery, hot water storage to provide 30l per room, 14l
45
PLUMBING per cover for restaurant and banquet, 15l per staff
Please advice hot water reticulation is correct as schematic indicate hot water
46
PLUMBING supply with no return in guestroom. Resulting in dead legs.
Locate package grease interceptor in BOH common area to avoid disturbances to
47
PLUMBING kitchen operations.
Swimming pool-
48 Infant/Shallow section of Pools - Refreshed Every 30 minutes
PLUMBING Adult/Deep Section of Pools - Refreshed Every 150minutes

49 Swimming pool- to remove connection to fire protection system. Pressure is not


PLUMBING sufficient for fire protection. Possibility of having pool water contamination
50 PLUMBING STP- Too low capacity. To calculate base on 0.8 of total water.
Is the gas storage room naturally ventilated?
Please ensure 3m distance from escape and any intake grilles.
To provide Vent at top and bottom for gas riser.
51 Gas riser to be through shaft with steel grating on each floor.
Sprinkler and smoke detector required
Isolation valve at each floor level
GAS To provide gas service valve in gas storage room