Вы находитесь на странице: 1из 3

N Partida. Cod. Part. Cod.

Covenin Descripcin de partida:

"C-01 Preliminary work"

1 C-01.1 Provisional installations

2 C-01.2 Mobilization

3 C-01.3 Demobilization

4 C-01.4 Stakeout and Leveling

5 C-01.5 light deforestation

"C-02 EARTH MOVEMENT"

6 C-02.1 Demolition and Removal of Armed Concrete Elements, using Pneumatic


Hammer and / or Loading Equipment. Includes Transport, Loading and Final Disposal.

7 C-02.2 Machine Earth Excavation, for Seat of Foundations, Trenches and Others;
to Depths between 0,00 and 2,50 mts.

8 C-02.3 Hand Earth Excavation for Foundations seats, Trenches and others; to
Depths between 0.00 and 2.50 meters.

9 C-02.4 Backfilling and compacting with Site Material, use of Machinery and
Percussion Equipment.

10 C-02.5 Canister of Disposable Material from Excavations.

11 C-02.6 Supply, Transport and Positioning washed sand up to 100 km, in dump
trucks, to be used as mattress in the pipe

12 C-02.7 Demolition of existing asphalt pavement

"C-03 CONCRETE WORKS"

13 C-03.1 Supply, transportation and concreting of fc = 250 kg / cm at 28 days,


current finishing, for building foundations, beams Pedestals Sleepers and bracings. It includes
transportation Cement, Aggregates, Formwork and Reinforcement.

14 C-03.2 Supply, transport, concreting and Preparation of fc = 100 kg / cm2 at 28


days for foundations seat supports.

15 C-03.3 Supply, transport, concreting and Preparation of fc = 280 kg / cm2 at 28


days for replacement of asphalt pavement, include transportation of cement, aggregates,
Formwork and electrowelded mesh.
"MECHANICAL DISCIPLINE M-01 TRANSPORT, MANUFACTURE, ASSEMBLY, ALIGNMENT,
WELDING AND INSTALLING AIR PIPES"

16 M-01.1 Pipe 6 ", Sch- STD A-53 Gr. B Beveled End

"M-02 INSTALLATION OF VALVES"

17 M-02.1 Valve 6 "A216 Gr WCB body fitting 13% chromium, seating Hardened,
Class 150-300 #, Flanged RF, HAMA finish Flanges 125-200.

"M-03 TRANSPORT, MANUFACTURE, ASSEMBLY, ALIGNMENT, WELDING AND INSTALLATION OF


BURIED PIPES"

18 M-03.1 Pipe 10 ", SCH STD-53 Gr. B beveled end

19 M-03.2 Pipe 6 ", SCH STD-53 Gr. B beveled end

"M-04 GAMMA RAYS ON FIELD FOR PIPELINES"

20 M-04.1 Pipe 6 ", SCH STD-53 Gr. B beveled end

"M-05 HYDROSTATIC TESTING"

21 M-05.1 Pipe 6 ", SCH STD-53 Gr. B beveled end

"M-06 SANDBLASTING CLEANING ON PIPE"

22 M-06.1 Pipe 10 ", SCH STD-53 Gr. B beveled end

23 M-06.2 Pipe 6 ", SCH STD-53 Gr. B beveled end

"M-07 BACKGROUND PAINTING AND FINAL FINISH IN PIPES"

24 M-07.1 Pipe 6 ", SCH STD-53 Gr. B beveled end

"M-08 SURFACE PREPARATION AND COATING OF BURIED PIPES."

25 M-08.1 Pipe 10 ", SCH STD-53 Gr. B beveled end

26 M-08.2 Pipe 6 ", SCH STD-53 Gr. B beveled end

"M-09 FACILITIES FOR HOT TAPPING ON EXISTING LINES"

27 M-09.1 Pipe 10 "SCH STD

28 M-09.2 Pipe 8 "SCH STD

"M-10 TESTING, COMMISSIONING AND START UP"

29 M-10.1 Tests, Starting and Commissioning of Gas Supply Line.


"M-11 REIMBURSABLE EXPENSES"

30 M-11.1 Reimbursable expenses

"M-12 ENGINEERING PHASE"

31 M-12.1 Drawings As Built (As BUILT)