Академический Документы
Профессиональный Документы
Культура Документы
C. LAND AVAILABILITY
1 Area of the plot 170 Acres
2 Shape of Land Irregular
3 Type of Land Revenue/ Private/Forest Private
4 Earlier use of Site (Waste/Agricultural/Barren etc.) Barren
5 Existing Structures/ shrines, wells, ponds etc. No
6 Requirement of site clearing for making it ready for construction. Clearing & cutting required & 3m to 4m Leveling required
H. ENVIRONMENTAL CONSIDERATIONS
Industries in neighbouring areas, any toxic effluents or
1 No
atmospheric emission from these industries.
2 Any major river/ canal passing in the vicinity No
3 Community and social factors : Rural or Urban Rural
For disposal of effluent, what is the arrangement? Any regulations
and laws prevailing? In absence of any regulations whether this
4 NA
can be disposed along with sewage into any industrial drainage or
nallah?
5 Existence of any corals for coastal plants. NA
Present industrial concentration and future expansion in the
6 NA
neighbourhood
7 Rehabilitation & Resettlement of persons required. NA
I. GENERAL
1 Source of start-up power. Near by Villages / DG
Availability of communication/internet facilities e.g. A hotel in the
2 Near town.
nearest town may have telex, telephone or fax facility.
Existing high voltage power supply lines crossing the plot which
3 No
requires shifting before Construction start up.
https://www.dropbox.com/sh/ggs605f3el8aghy/AADPumIDMquQuP
L For Site Pics
dSAencxylsa?dl=0
Report Prepared By Prakasha & Swapnil Kotwal
Report reviewed by Ravi kumar & Shivakumar kinni
Date 06-04-17
Issued/Circulated to -Tendering/BD/Design