Presentado por:
Docente:
MEDELLN
Agosto de 2017
Planeamiento con Flujos de Carga y 2
Anlisis de Corto Circuito
TABLA DE CONTENIDO
1. INTRODUCCIN ............................................................................................................ 4
2. OBJETIVOS .................................................................................................................... 4
2.1 OBJETIVO GENERAL ............................................................................................. 4
2.2 OBJETIVOS ESPECFICOS .................................................................................... 4
3. REA DE TRABAJO ....................................................................................................... 5
4. CARACTERSTICAS ELEMENTOS DEL REA DE ESTUDIO: ZONA 1 ........................ 5
4.1 Caractersticas de los Generadores ......................................................................... 5
4.2 Caractersticas de las Lneas de Transmisin .......................................................... 6
4.3 Caractersticas de los Transformadores ................................................................... 6
4.4 Caractersticas de las Cargas .................................................................................. 6
5. FLUJO DE CARGA EN EL CASO BASE ......................................................................... 7
6. PLAN DE EXPANSIN Y ANLISIS DE CONTINGENCIAS N-1 .................................... 9
6.1 CONTINGENCIAS AO 2019 .................................................................................. 9
6.1.1 Plan de Expansin Propuesto Ao 2019 ......................................................... 10
6.2 CONTINGENCIAS AO 2020 ................................................................................ 11
6.2.1 Plan de Expansin Propuesto Ao 2020 ......................................................... 11
6.3 CONTINGENCIAS AO 2021 ................................................................................ 11
6.3.1 Plan de Expansin Propuesto Ao 2021 ......................................................... 13
6.4 CONTINGENCIAS AO 2022 ................................................................................ 13
6.5 CONTINGENCIAS AO 2023 ................................................................................ 14
6.5.1 Plan de Expansin Propuesto Ao 2023 ......................................................... 15
7. ENTRADA EN OPERACIN NUEVO PROYECTO AO 2024 ..................................... 15
7.1 CONEXIN DEL NUEVO PROYECTO .................................................................. 16
7.2 CARACTERSTICAS ELEMENTOS QUE COMPONEN EL NUEVO PROYECTO . 16
7.3 ANLISIS DE CALIDAD DE LA POTENCIA AO 2024 ......................................... 17
7.4 ANLISIS DE CONFIABILIDAD AO 2024 ........................................................... 20
8. ESCENARIOS DE OPERACIN EN EL REA DEL PROYECTO (2024) ..................... 21
8.1 ESCENARIO DE GENERACIN MNIMA .............................................................. 21
8.2 ESCENARIO DE GENERACIN MXIMA ............................................................ 23
9. ANLISIS DE CORRIENTES DE CORTOCIRCUITO ................................................... 26
10. CONCLUSIONES.......................................................................................................... 29
Planeamiento con Flujos de Carga y 3
Anlisis de Corto Circuito
LISTADO DE FIGURAS
LISTADO DE TABLAS
1. INTRODUCCIN
Los sistemas de potencia actualmente enfrentan desafos para mantener su confiabilidad, debido
al crecimiento no controlado de la demanda a causa de mercados no regulados, lo que implica
depresiones en la tensin, y sobrecarga de las lneas y transformadores. Debido a que
regulatoriamente se definen los lmites de operacin (Niveles de tensin y cargabilidad), se deben
tener en cuenta posibles intervenciones para la construccin de nueva infraestructura elctrica a
corto, mediano y largo plazo, que permitan atender la creciente demanda y as evitar que el
sistema colapse ante alguna contingencia, permitiendo su operacin segura en estado estable y
ante condiciones de falla o mantenimientos.
En este trabajo se elaborar un plan de expansin para el sistema de potencia de 39 barras IEEE
en DigSILENT, dividiendo el sistema en tres zonas y realizando contingencias solo en las lneas
de la zona 1, verificando los parmetros de operacin del sistema y garantizando que no haya
problemas en el resto de la red. Los problemas que se presenten, pueden dar seal temprana de
las obras de infraestructura necesaria entre los aos 2019 a 2023, segn el crecimiento de
demanda anual del 1%, de manera que para el 2024 se instale una nueva carga con un total de
300 MW en el rea seleccionada, y se pueda realizar un anlisis de desempeo de esta zona
respecto a la calidad y confiabilidad, observando las restricciones y generaciones mnimas
requeridas en el rea para dos escenarios de generacin, considerando la misma demanda.
2. OBJETIVOS
3. REA DE TRABAJO
App.Pow. Nom.Volt.
Name Terminal Pow.Fact. Connection
[MVA] [kV]
Gen 01 Bus 39 10000 0.85 345 YN
Gen 08 Bus 37 700 0.85 16.5 YN
Gen 10 Bus 30 1000 0.85 16.5 YN
Tabla 1. Caractersticas de los Generadores Zona 1.
Planeamiento con Flujos de Carga y 6
Anlisis de Corto Circuito
En la Tabla 2, se muestran las caractersticas de las lneas de transmisin del rea de estudio.
HV- LV-
Srat Irat(HV) Irat(LV) Loading
Name rtd.Volt. Rtd.Volt.
[MVA] [kA] [kA] [%]
[kV] [kV]
Trf 25 - 37 700 1.171435 24.49365 345 16.5 75.05632
Trf 02 - 30 1000 1.673479 34.99092 345 16.5 27.6458
Para conocer el funcionamiento del sistema en estado estable, se realiza un flujo de carga.
Regulatoriamente, el lmite de tensin en las barras es el 10% por encima o por debajo del valor
nominal, es decir, el voltaje en las barras no podr ser menor al 90% ni mayor al 110% del voltaje
nominal. En la Tabla 5 se muestran las tensiones en las barras del sistema al correr el flujo de
caga en el caso base.
Voltage, Voltage,
Terminal i Terminal j Loading Losses
Name Magnitude Magnitude
Busbar Busbar Terminal i in p.u. Terminal j in p.u. % kW
Line 01 - 02 Bus 01 Bus 02 1.047356352 1.048736257 21.04781 496.4651
Line 01 - 39 Bus 01 Bus 39 1.047356352 1.029999971 26.3778 184.9073
Line 02 - 03 Bus 02 Bus 03 1.048736257 1.03017286 61.10635 1702.064
Line 02 - 25 Bus 02 Bus 25 1.048736257 1.057567616 41.25247 4161.954
Line 03 - 04 Bus 03 Bus 04 1.03017286 1.003862753 26.43798 289.0071
Line 03 - 18 Bus 03 Bus 18 1.03017286 1.030931256 8.748926 28.40759
Line 04 - 05 Bus 04 Bus 05 1.003862753 1.005310848 22.8787 148.9889
Line 04 - 14 Bus 04 Bus 14 1.003862753 1.011733197 45.75156 593.147
Line 05 - 06 Bus 05 Bus 06 1.005310848 1.007672441 76.21613 414.3663
Line 05 - 08 Bus 05 Bus 08 1.005310848 0.996019867 54.17676 831.5726
Line 06 - 07 Bus 06 Bus 07 1.007672441 0.997001247 71.88248 1101.381
Line 06 - 11 Bus 06 Bus 11 1.007672441 1.01269368 60.66505 917.076
Line 07 - 08 Bus 07 Bus 08 0.997001247 0.996019867 31.21089 138.9385
Line 08 - 09 Bus 08 Bus 09 0.996019867 1.028226105 18.11237 184.993
Line 09 - 39 Bus 09 Bus 39 1.028226105 1.029999971 11.83627 4.232503
Line 10 - 11 Bus 10 Bus 11 1.017150595 1.01269368 61.43435 537.0182
Line 10 - 13 Bus 10 Bus 13 1.017150595 1.014307089 47.45456 320.4528
Line 13 - 14 Bus 13 Bus 14 1.014307089 1.011733197 45.68793 670.5351
Line 14 - 15 Bus 14 Bus 15 1.011733197 1.015383587 6.043283 5.813168
Line 15 - 16 Bus 15 Bus 16 1.015383587 1.031773793 57.59912 1043.528
Line 16 - 17 Bus 16 Bus 17 1.031773793 1.033555281 37.97528 356.6994
Line 16 - 19 Bus 16 Bus 19 1.031773793 1.049860894 81.90312 3813.03
Line 16 - 21 Bus 16 Bus 21 1.031773793 1.03176045 53.76161 821.6703
Line 16 - 24 Bus 16 Bus 24 1.031773793 1.037311113 17.37334 30.36581
Line 17 - 18 Bus 17 Bus 18 1.033555281 1.030931256 34.30695 292.6298
Line 17 - 27 Bus 17 Bus 27 1.033555281 1.037741296 7.699145 12.8871
Line 21 - 22 Bus 21 Bus 22 1.03176045 1.049794929 99.08445 2787.729
Planeamiento con Flujos de Carga y 9
Anlisis de Corto Circuito
Voltage, Voltage,
Terminal i Terminal j Loading Losses
Name Magnitude Magnitude
Busbar Busbar Terminal i in p.u. Terminal j in p.u. % kW
Line 22 - 23 Bus 22 Bus 23 1.049794929 1.044788662 12.04065 24.77164
Line 23 - 24 Bus 23 Bus 24 1.044788662 1.037311113 56.67618 2531.601
Line 25 - 26 Bus 25 Bus 26 1.057567616 1.052075422 12.8422 148.4797
Line 26 - 27 Bus 26 Bus 27 1.052075422 1.037741296 44.40484 959.4406
Line 26 - 28 Bus 26 Bus 28 1.052075422 1.050122182 24.25713 788.3627
Line 26 - 29 Bus 26 Bus 29 1.052075422 1.049942376 32.43954 1913.75
Line 28 - 29 Bus 28 Bus 29 1.050122182 1.049942376 55.99728 1556.388
Los resultados obtenidos mostrados en las Tablas 5 y 6, evidencian que en estado estable se
cumplen los parmetros regulatoriamente exigidos.
En este estudio se realiza el anlisis de contingencias para los aos 2019, 2020, 2021, 2022 y
2023, previos a la entrada del nuevo proyecto, considerando que la demanda aumenta 1% cada
ao. Segn necesidades de confiabilidad, se propone un plan de expansin para cada ao.
Para el ao 2019 crece la demanda (carga) en un 1%. Las variaciones en la carga se muestran
en la Tabla 7.
Tabla 7. Aumento de la demanda en 1% para el ao 2019
Segn los datos de la Tabla 8, puede concluirse que en el rea de estudio (Zona 1) no se
presentan problemas de sobrecarga o sobretensin, sin embargo, en el resto del sistema, se
encuentran dos lneas sobrecargadas en 109,1% y 100.48%; para ello, se proponen obras de
infraestructura para eliminar las restricciones que se presentaron.
Se propone un plan de expansin en las zonas 2 y 3 segn los resultados obtenidos en el anlisis
de la contingencia, teniendo en cuenta la cargabilidad de las lneas en estado estacionario que
se encuentra por encima del 99% y considerando un crecimiento anual de la demanda del 1%. El
Plan de expansin Incluye:
Con esta nueva infraestructura, no hay elementos fuera de los lmites de operacin establecidos
regulatoriamente.
Planeamiento con Flujos de Carga y 11
Anlisis de Corto Circuito
AO 2019 AO 2020
Terminal Active Power Reactive Power Active Power Reactive Power Scaling
Name
Busbar MW Mvar MW Mvar Factor(act.)
Load 03 Bus 03 325.220 2.424 328.472 2.448 1.020
Load 04 Bus 04 505.000 185.840 510.050 187.698 1.020
Load 07 Bus 07 236.138 84.840 238.499 85.688 1.020
Load 08 Bus 08 527.220 177.760 532.492 179.538 1.020
Load 12 Bus 12 7.575 88.880 7.651 89.769 1.020
Load 15 Bus 15 323.200 154.530 326.432 156.075 1.020
Load 16 Bus 16 332.290 32.623 335.613 32.949 1.020
Load 18 Bus 18 159.580 30.300 161.176 30.603 1.020
Load 20 Bus 20 634.280 104.030 640.623 105.070 1.020
Load 21 Bus 21 276.740 116.150 279.507 117.312 1.020
Load 23 Bus 23 249.975 85.446 252.475 86.300 1.020
Load 24 Bus 24 311.686 -93.122 314.803 -94.053 1.020
Load 25 Bus 25 226.240 47.672 228.502 48.149 1.020
Load 26 Bus 26 140.390 17.170 141.794 17.342 1.020
Load 27 Bus 27 283.810 76.255 286.648 77.018 1.020
Load 28 Bus 28 208.060 27.876 210.141 28.155 1.020
Load 29 Bus 29 286.335 27.169 289.198 27.441 1.020
Load 31 Bus 31 9.292 4.646 9.385 4.692 1.020
Load 39 Bus 39 1115.040 252.500 1126.190 255.025 1.020
Al hacer las contingencias N-1 en el rea de estudio (Zona 1), los perfiles de tensin ante dicha
situacin estn dentro de sus lmites regulatorios y los diferentes elementos no se cargan por
encima del 100%; por ello no es necesario establecer un plan de expansin para el ao 2020. Se
define no realizar obras este ao ya que los diferentes elementos de la red estn por dentro de
los parmetros exigidos por la regulacin a pesar del aumento de la demanda, como se debe
realizar un anlisis tcnico econmico en la expansin se tiene en cuenta que nuevas obras
aumentara el costo del servicio de la energa.
AO 2020 AO 2021
Active
Terminal Active Power Reactive Power Reactive Power Scaling
Name Power
Factor(act.)
Busbar MW Mvar MW Mvar
Load 03 Bus 03 328.472 2.448 331.660 2.472 1.030
Load 04 Bus 04 510.050 187.698 515.000 189.520 1.030
Load 07 Bus 07 238.499 85.688 240.814 86.520 1.030
Load 08 Bus 08 532.492 179.538 537.660 181.280 1.030
Load 12 Bus 12 7.651 89.769 7.725 90.640 1.030
Load 15 Bus 15 326.432 156.075 329.600 157.590 1.030
Load 16 Bus 16 335.613 32.949 338.870 33.269 1.030
Load 18 Bus 18 161.176 30.603 162.740 30.900 1.030
Load 20 Bus 20 640.623 105.070 646.840 106.090 1.030
Load 21 Bus 21 279.507 117.312 282.220 118.450 1.030
Load 23 Bus 23 252.475 86.300 254.925 87.138 1.030
Load 24 Bus 24 314.803 -94.053 317.858 -94.966 1.030
Load 25 Bus 25 228.502 48.149 230.720 48.616 1.030
Load 26 Bus 26 141.794 17.342 143.170 17.510 1.030
Load 27 Bus 27 286.648 77.018 289.430 77.765 1.030
Load 28 Bus 28 210.141 28.155 212.180 28.428 1.030
Load 29 Bus 29 289.198 27.441 292.005 27.707 1.030
Load 31 Bus 31 9.385 4.692 9.476 4.738 1.030
Load 39 Bus 39 1126.190 255.025 1137.120 257.500 1.030
Loading Loading
Contingency Contingency
Name continuous Base Case
Number Name
[%] [%]
Trf 06-31 106.81 106.17 21 Line 01 - 02
Trf 06-31 106.62 106.17 27 Line 01 - 39
Trf 06-31 108.56 106.17 26 Line 02 - 03
Trf 06-31 106.51 106.17 20 Line 02 - 25
Trf 06-31 108.76 106.17 25 Line 03 - 04
Trf 06-31 106.4 106.17 14 Line 03 - 18
Trf 06-31 106.59 106.17 13 Line 04 - 05
Trf 06-31 107.48 106.17 24 Line 04 - 14
Trf 06-31 107.28 106.17 23 Line 17 - 18
Trf 06-31 106.81 106.17 22 Line 25 - 26
Tabla 11. Contingencias Ao 2021.
La condicin de sobrecarga del transformador que se observa en la Tabla 11, puede solucionarse
con maniobras en el sistema. Adicionalmente, dos generadores de la zona 1 no estn
Planeamiento con Flujos de Carga y 13
Anlisis de Corto Circuito
despachados al 100% y esta rea transmite energa a las dems zonas del sistema, por ello, para
mitigar el impacto de la sobrecarga del transformador TRF 06-31, se aumenta el despacho de
250 MW a 400 MW del Generador 10 asociado a la barra 30 y de esta manera se evita la
construccin de obras de infraestructura adicionales en el 2012.
AO 2021 AO 2022
Active
Terminal Active Power Reactive Power Reactive Power Scaling
Name Power
Factor(act.)
Busbar MW Mvar MW Mvar
Load 03 Bus 03 331.660 2.472 334.977 2.497 1.040
Load 04 Bus 04 515.000 189.520 520.150 191.415 1.040
Load 07 Bus 07 240.814 86.520 243.222 87.385 1.040
Load 08 Bus 08 537.660 181.280 543.037 183.093 1.040
Load 12 Bus 12 7.725 90.640 7.802 91.546 1.040
Load 15 Bus 15 329.600 157.590 332.896 159.166 1.040
Load 16 Bus 16 338.870 33.269 342.259 33.602 1.040
Load 18 Bus 18 162.740 30.900 164.367 31.209 1.040
Load 20 Bus 20 646.840 106.090 653.308 107.151 1.040
Load 21 Bus 21 282.220 118.450 285.042 119.634 1.040
Load 23 Bus 23 254.925 87.138 257.474 88.009 1.040
Load 24 Bus 24 317.858 -94.966 321.037 -95.916 1.040
Load 25 Bus 25 230.720 48.616 233.027 49.102 1.040
Load 26 Bus 26 143.170 17.510 144.602 17.685 1.040
Load 27 Bus 27 289.430 77.765 292.324 78.543 1.040
Load 28 Bus 28 212.180 28.428 214.302 28.712 1.040
Load 29 Bus 29 292.005 27.707 294.925 27.984 1.040
Load 31 Bus 31 9.476 4.738 9.571 4.785 1.040
Load 39 Bus 39 1137.120 257.500 1148.491 260.075 1.040
AO 2022 AO 2023
Active
Terminal Active Power Reactive Power Reactive Power Scaling
Name Power
Factor(act.)
Busbar MW Mvar MW Mvar
Load 03 Bus 03 334.977 2.497 338.326 2.522 1.050
Load 04 Bus 04 520.150 191.415 525.351 193.329 1.050
Load 07 Bus 07 243.222 87.385 245.654 88.259 1.050
Load 08 Bus 08 543.037 183.093 548.467 184.924 1.050
Load 12 Bus 12 7.802 91.546 7.880 92.462 1.050
Load 15 Bus 15 332.896 159.166 336.225 160.758 1.050
Load 16 Bus 16 342.259 33.602 345.681 33.938 1.050
Load 18 Bus 18 164.367 31.209 166.011 31.521 1.050
Load 20 Bus 20 653.308 107.151 659.841 108.222 1.050
Load 21 Bus 21 285.042 119.634 287.893 120.831 1.050
Load 23 Bus 23 257.474 88.009 260.049 88.889 1.050
Load 24 Bus 24 321.037 -95.916 324.247 -96.875 1.050
Load 25 Bus 25 233.027 49.102 235.357 49.593 1.050
Load 26 Bus 26 144.602 17.685 146.048 17.862 1.050
Load 27 Bus 27 292.324 78.543 295.248 79.328 1.050
Load 28 Bus 28 214.302 28.712 216.445 28.999 1.050
Load 29 Bus 29 294.925 27.984 297.874 28.264 1.050
Load 31 Bus 31 9.571 4.785 9.666 4.833 1.050
Load 39 Bus 39 1148.491 260.075 1159.976 262.676 1.050
Loading Loading
Contingency Contingency
Name continuous Base Case
Number Name
[%] [%]
Trf 06-31 103.18 102.18 21 Line 01 - 02
Trf 06-31 102.98 102.18 27 Line 01 - 39
Trf 06-31 105.52 102.18 26 Line 02 - 03
Trf 06-31 102.41 102.18 20 Line 02 - 25
Trf 06-31 104.91 102.18 25 Line 03 - 04
Trf 06-31 102.34 102.18 14 Line 03 - 18
Trf 06-31 104.9 102.18 13 Line 04 - 05
Planeamiento con Flujos de Carga y 15
Anlisis de Corto Circuito
Loading Loading
Contingency Contingency
Name continuous Base Case
Number Name
[%] [%]
Trf 06-31 103.48 102.18 24 Line 04 - 14
Trf 06-31 103.08 102.18 23 Line 17 - 18
Trf 06-31 103.02 102.18 22 Line 25 - 26
Al igual que en los aos anteriores, en el 2024 crece la demanda 1% respecto al ao 2023. Los
resultados se observan en la Tabla 15.
AO 2023 AO 2024
Reactive Reactive
Terminal Active Power Active Power
Name Power Power
Busbar MW Mvar MW Mvar
Load 03 Bus 03 338.326 2.522 341.320 2.544
Load 04 Bus 04 525.351 193.329 530.000 195.040
Load 07 Bus 07 245.654 88.259 247.828 89.040
Load 08 Bus 08 548.467 184.924 553.320 186.560
Load 12 Bus 12 7.880 92.462 7.950 93.280
Load 15 Bus 15 336.225 160.758 339.200 162.180
Load 16 Bus 16 345.681 33.938 348.740 34.238
Load 18 Bus 18 166.011 31.521 167.480 31.800
Load 20 Bus 20 659.841 108.222 665.680 109.180
Load 21 Bus 21 287.893 120.831 290.440 121.900
Load 23 Bus 23 260.049 88.889 262.350 89.676
Load 24 Bus 24 324.247 -96.875 327.116 -97.732
Load 25 Bus 25 235.357 49.593 237.440 50.032
Load 26 Bus 26 146.048 17.862 147.340 18.020
Load 27 Bus 27 295.248 79.328 297.860 80.030
Load 28 Bus 28 216.445 28.999 218.360 29.256
Load 29 Bus 29 297.874 28.264 300.510 28.514
Load 31 Bus 31 9.666 4.833 9.752 4.876
Load 39 Bus 39 1159.976 262.676 1170.240 265.000
Planeamiento con Flujos de Carga y 16
Anlisis de Corto Circuito
El nuevo proyecto consiste en una carga de 300 MW con un FP de 0.95 atrasado que se
pega a una barra de 230 kV, que a su vez se le conecta un transformador 230/34,5 kV que
alimenta una carga de 100MW con un FP de 0.95 en atraso. La barra de 230 kV se conecta
al Sistema de Potencia de estudio por medio de dos lneas y dos transformadores de 230
kV/345 kV, para aumentar la confiabilidad en la nueva carga.
Para la conexin del proyecto, se eligi la Barra 25 dentro de la zona 1 que corresponde al
rea de estudio, ya que en ella est ubicado el Generador 1 que tiene una potencia nominal
de 10000 MVA, con lo que se puede atender la nueva demanda del proyecto que entra en
operacin en el 2024 y as evitar sobrecargas en las dems zonas del sistema. El nuevo
proyecto se observa en la Figura 2.
En las Tablas 16, 17 y 18 se muestran las caractersticas tcnicas de los elementos que
componen el nuevo proyecto.
Nominal
Length Losses R1 X1 R0 X0 Loading
Name Current
[km] [kW] [Ohm] [Ohm] [Ohm] [Ohm] [%]
[kA]
Line 40 1.5 855.5535 1.02436 12 0 0 35.36762
Line (1) 40 1.5 855.5535 1.02436 12 0 0 35.36762
Planeamiento con Flujos de Carga y 17
Anlisis de Corto Circuito
HV-
Srat Irat(HV) Irat(LV) LV-Rtd.Volt. Loading
Name rtd.Volt.
[MVA] [kA] [kA] [kV] [%]
[kV]
TRF 345/230 1000 1.67348 1.673479 345 230 20.89352
TRF 345/230_1 1000 1.67348 1.673479 345 230 20.89352
Trf 230/34.5 300 0.75307 0.7530656 230 34.5 35.75176
Line-Line
Nominal Nominal
Apparent Positive- Current,
Active Reactive Power
Name Power Sequence- Magnitude
Power Power Factor
[MVA] Voltage, [kA]
[MW] [Mvar]
Magnitude [kV]
Load New 230 300 98.6 315.7878397 230.1758228 0.792090985 0.95
Load New 34.5 100 32.86842 105.2631607 33.85920886 1.79489469 0.95
Con el nuevo proyecto en servicio, se ejecuta el flujo de carga para validar que no existan
sobrecargas en circuitos o transformadores y si se requieren maniobras o nueva infraestructura
para mantener la confiabilidad del sistema y que la operacin nuevo proyecto no afecte la
estructura existente. En las Tablas 19, 20 y 21 se muestran los resultados obtenidos luego de
correr el flujo de carga, para las lneas, los transformadores y las barras.
Voltage, Voltage,
Terminal i Terminal j Magnitude Magnitude
Loading Losses
Name
Busbar Busbar Terminal i in p.u. Terminal j in p.u. % kW
Line 01 - 02 Bus 01 Bus 02 1.0446 1.0451 53.9959 3576.1020
Line 01 - 39 Bus 01 Bus 39 1.0446 1.0300 56.7911 1091.4610
Line 02 - 03 Bus 02 Bus 03 1.0451 1.0280 85.7810 3395.7260
Line 02 - 25 Bus 02 Bus 25 1.0451 1.0266 34.4515 2904.6390
Line 03 - 04 Bus 03 Bus 04 1.0280 1.0064 27.2881 317.3737
Line 03 - 18 Bus 03 Bus 18 1.0280 1.0288 9.5000 31.5848
Line 04 - 05 Bus 04 Bus 05 1.0064 1.0121 29.9836 252.9685
Line 04 - 14 Bus 04 Bus 14 1.0064 1.0144 38.7180 422.8701
Line 05 - 06 Bus 05 Bus 06 1.0121 1.0142 26.5754 49.8372
Line 05 -
Bus 05 Bus 06 1.0121 1.0142 26.5754 49.8372
06(1)
Line 05 - 08 Bus 05 Bus 08 1.0121 0.9982 27.9454 209.0192
Line 06 - 07 Bus 06 Bus 07 1.0142 1.0005 40.9625 350.2306
Line 06 - 11 Bus 06 Bus 11 1.0142 1.0171 58.5245 855.6662
Planeamiento con Flujos de Carga y 18
Anlisis de Corto Circuito
Voltage, Voltage,
Terminal i Terminal j Magnitude Magnitude
Loading Losses
Name
Busbar Busbar Terminal i in p.u. Terminal j in p.u. % kW
Line 07 - 08 Bus 07 Bus 08 1.0005 0.9982 12.4438 20.3716
Line 08 - 09 Bus 08 Bus 09 0.9982 1.0202 81.6602 5479.7010
Line 09 - 39 Bus 09 Bus 39 1.0202 1.0300 81.2684 2331.4520
Line 10 - 11 Bus 10 Bus 11 1.0206 1.0171 59.2353 499.7275
Line 10 - 13 Bus 10 Bus 13 1.0206 1.0175 48.8292 339.1708
Line 13 - 14 Bus 13 Bus 14 1.0175 1.0144 47.0531 710.4869
Line 14 - 15 Bus 14 Bus 15 1.0144 1.0166 11.0069 61.8943
Line 15 - 16 Bus 15 Bus 16 1.0166 1.0332 53.2317 886.8628
Line 16 - 17 Bus 16 Bus 17 1.0332 1.0316 25.7682 165.0832
Line 16 - 19 Bus 16 Bus 19 1.0332 1.0501 75.7932 3262.4570
Line 16 - 21 Bus 16 Bus 21 1.0332 1.0389 59.6691 1013.0700
Line 16 - 24 Bus 16 Bus 24 1.0332 1.0392 19.2080 37.3061
Line 17 - 18 Bus 17 Bus 18 1.0316 1.0288 19.1656 89.2129
Line 17 - 27 Bus 17 Bus 27 1.0316 1.0291 8.5851 26.0282
Line 21 - 22 Bus 21 Bus 22 1.0389 1.0498 54.2237 827.1566
Line 21 -
Bus 21 Bus 22 1.0389 1.0498 54.2237 827.1566
22(1)
Line 22 - 23 Bus 22 Bus 23 1.0498 1.0452 9.8955 14.7935
Line 23 - 24 Bus 23 Bus 24 1.0452 1.0392 45.7485 1646.5110
Line 25 - 26 Bus 25 Bus 26 1.0266 1.0388 20.2466 368.9652
Line 26 - 27 Bus 26 Bus 27 1.0388 1.0291 42.0243 867.5593
Line 26 - 28 Bus 26 Bus 28 1.0388 1.0428 21.2226 623.6027
Line 26 - 29 Bus 26 Bus 29 1.0388 1.0449 29.8626 1668.8140
Line 28 - 29 Bus 28 Bus 29 1.0428 1.0449 55.4491 1531.4190
Bus New
Line Terminal 1.0151 0.9954 35.5618 865.0703
230
Bus New
Line(1) Terminal(1) 1.0151 0.9954 35.5618 865.0703
230
Voltage, Voltage,
Current, Current,
Srat Magnitude Magnitude Loading
Name Magnitude Magnitude
[MVA] HV-Side LV-Side [%]
HV-Side [kA] LV-Side [kA]
[p.u.] [p.u.]
Trf 29 - 38 1000 1.3230 28.3550 1.0449 1.0265 81.0353
Trf 25 - 37 700 0.8842 18.9496 1.0266 1.0278 77.3655
Trf 23 - 36 700 0.8951 18.7149 1.0452 1.0635 76.4072
Trf 22 - 35 800 1.0641 22.8061 1.0498 1.0493 81.4717
Trf 20 - 34 600 1.3156 18.5042 0.9906 1.0123 88.1380
Trf 19 - 33 800 1.0056 22.4981 1.0501 0.9972 80.3714
Trf 19 - 20 1000 0.2557 0.4066 1.0501 0.9906 16.1989
Trf 13 - 12 300 0.0797 0.1981 1.0175 1.0029 15.8754
Planeamiento con Flujos de Carga y 19
Anlisis de Corto Circuito
De acuerdo a los resultados del flujo de carga mostrados en las Tablas 19, 20 y 21, puede
concluirse que el sistema de potencia bajo estudio cumple con todos los criterios de calidad,
respecto a la tensin en barras y cargabilidad en elementos de transmisin y transformacin de
energa.
Se realizan contingencias tipo N-1 en el rea de estudio (Zona 1) incluyendo el nuevo proyecto,
con el objetivo de conocer la confiabilidad del sistema validando su desempeo ante eventos de
falla.
Haciendo dicho estudio, se encuentran restricciones de operacin (sobrecarga) en lneas de
transmisin. Los resultados se muestran en las Tablas 22.
Loading Loading
Contingency
Name continuous Base Case
Name
[%] [%]
Line 09-39 139.52 81.27 Line 01 - 02
Line 08-09 139.52 81.66 Line 01 - 02
Line 09-39 139.44 81.27 Line 01 - 39
Line 08-09 139.4 81.66 Line 01 - 39
Line 09-39 111.92 81.27 Line 02 - 03
Line 08-09 112.08 81.66 Line 02 - 03
Line 02-03 114.74 85.78 Line 02 - 25
Con la construccin de las nuevas lneas 01-02 y 01-39, se verifican nuevamente las
contingencias N-1 en la zona 1 y se comprueba que no existen sobrecargas en lneas ni
transformadores y los niveles de tensin permanecen dentro de los lmites regulatorios exigidos.
Se plantean dos escenarios de operacin los cuales consideran la misma demanda, pero tienen
generacin mxima y mnima en el rea del proyecto, de esta manera se busca identificar
restricciones y las mnimas generaciones requeridas en el rea para el anlisis estacionario. En
la Tabla 23, e presentan los diferentes escenarios de generacin y la potencia despachada para
cada unidad.
En este escenario de mnima generacin, se presenta una sobrecarga del 32.12% de los
transformadores TRF 06-31, asociados a la unidad de generacin 2; esto significa que la
demanda de potencia en la zona 1, intenta suplirse por el generador 2, localizado en otra zona
del sistema de potencia; igualmente, por la misma razn hay una sobrecarga del 18.1% de la
lnea 04-05. Como solucin a estas restricciones operativas, una posible rpida solucin consiste
en aumentar la generacin en la zona 1 con el fin de disminuir flujo de potencia proveniente del
Generador 2 para evitar la sobrecarga de lneas y trasformadores. Por otro lado, para mitigar las
contingencias, puede proponerse construir una nueva central de generacin en la Zona 1, para
evitar importar potencia desde otras zonas del sistema, sin embargo, esto puede ser una solucin
mucho ms costosa.
Voltage, Voltage,
Terminal i Terminal j Magnitude Magnitude Loading Losses
Name
Terminal i Terminal j
Busbar Busbar in p.u. in p.u.
% kW
Line 01 - 02 Bus 01 Bus 02 1.04872 1.04774 9.29327 58.96234
Line 01 - 02(1) Bus 01 Bus 02 1.04872 1.04774 9.29327 58.96234
Planeamiento con Flujos de Carga y 24
Anlisis de Corto Circuito
Voltage, Voltage,
Terminal i Terminal j Magnitude Magnitude Loading Losses
Name
Terminal i Terminal j
Busbar Busbar in p.u. in p.u.
% kW
Line 01 - 39 Bus 01 Bus 39 1.04872 1.03 20.46793 75.73267
Line 01 - 39(1) Bus 01 Bus 39 1.04872 1.03 20.46793 75.73267
Line 02 - 03 Bus 02 Bus 03 1.04774 1.029 74.39406 2541.6192
Line 02 - 25 Bus 02 Bus 25 1.04774 1.0331 23.32181 1236.9512
Line 03 - 04 Bus 03 Bus 04 1.029 1.00718 33.1692 483.24276
Line 03 - 18 Bus 03 Bus 18 1.029 1.02821 11.24252 45.68665
Line 04 - 05 Bus 04 Bus 05 1.00718 1.01395 14.61715 55.43124
Line 04 - 14 Bus 04 Bus 14 1.00718 1.01417 48.54828 669.42346
Line 05 - 06 Bus 05 Bus 06 1.01395 1.01581 28.01638 55.52329
Line 05 - 06(1) Bus 05 Bus 06 1.01395 1.01581 28.01638 55.52329
Line 05 - 08 Bus 05 Bus 08 1.01395 1.00247 43.84896 539.1294
Line 06 - 07 Bus 06 Bus 07 1.01581 1.00391 55.29707 647.77665
Line 06 - 11 Bus 06 Bus 11 1.01581 1.01763 77.97062 1518.3432
Line 07 - 08 Bus 07 Bus 08 1.00391 1.00247 11.88505 19.31256
Line 08 - 09 Bus 08 Bus 09 1.00247 1.02918 41.87662 1389.4858
Line 09 - 39 Bus 09 Bus 39 1.02918 1.03 40.87119 559.0571
Line 10 - 11 Bus 10 Bus 11 1.02084 1.01763 76.99836 845.92947
Line 10 - 13 Bus 10 Bus 13 1.02084 1.01764 41.58663 245.45999
Line 13 - 14 Bus 13 Bus 14 1.01764 1.01417 38.35863 470.36182
Line 14 - 15 Bus 14 Bus 15 1.01417 1.01438 10.38129 60.74954
Line 15 - 16 Bus 15 Bus 16 1.01438 1.03068 69.5987 1535.8538
Line 16 - 17 Bus 16 Bus 17 1.03068 1.03015 44.2683 488.34539
Line 16 - 19 Bus 16 Bus 19 1.03068 1.04822 93.77543 5012.6557
Line 16 - 21 Bus 16 Bus 21 1.03068 1.03618 72.28131 1490.4292
Line 16 - 24 Bus 16 Bus 24 1.03068 1.03645 16.98457 28.80525
Line 17 - 18 Bus 17 Bus 18 1.03015 1.02821 37.91897 358.85552
Line 17 - 27 Bus 17 Bus 27 1.03015 1.02865 7.26612 18.45629
Line 21 - 22 Bus 21 Bus 22 1.03618 1.04755 60.51038 1033.3487
Line 21 - 22(1) Bus 21 Bus 22 1.03618 1.04755 60.51038 1033.3487
Line 22 - 23 Bus 22 Bus 23 1.04755 1.04274 10.92424 19.06319
Line 23 - 24 Bus 23 Bus 24 1.04274 1.03645 52.65035 2182.1446
Line 25 - 26 Bus 25 Bus 26 1.0331 1.03916 8.98614 33.98414
Line 26 - 27 Bus 26 Bus 27 1.03916 1.02865 43.23567 917.47385
Line 26 - 28 Bus 26 Bus 28 1.03916 1.04102 27.76771 1096.5033
Line 26 - 29 Bus 26 Bus 29 1.03916 1.04315 36.34501 2527.7933
Line 28 - 29 Bus 28 Bus 29 1.04102 1.04315 62.11806 1922.8758
Bus New
Line Terminal 1.02173 1.00217 35.31758 853.11003
230
Bus New
Line(1) Terminal(1) 1.02173 1.00217 35.31758 853.11003
230
Planeamiento con Flujos de Carga y 25
Anlisis de Corto Circuito
Se realiza cortocircuito trifsico y monofsico para escenario de mxima generacin en el sistema de potencia de estudio (Sistema de 39
barras IEEE DigSILENT) con el proyecto implementado y todos los cambios realizados en el trabajo 2.2 (Planeamiento con Flujos de
carga), se utiliza la Norma IEC 60909 con factor de 1.1 para cortocircuito trifsico y monofsico.
Se puede observar que el valor del cortocircuito en cada una de las barras presenta gran diferencia entre el cortocircuito monofsico y
trifsico, donde se destaca la diferencia del nivel de cortocircuito en las barras asociadas a generacin, en estas barras el nivel de
cortocircuito es mayor, adicional se puede observar que el cortocircuito monofsico es cero en las barras que estn en el lado delta de
los transformadores. En las Tablas 28 y 29 se presentan los resultados de la simulacin de cortocircuito monofsico y trifsico
respectivamente. Es importante tener en cuenta que se hicieron fallas francas (impedancia de falla cero), para conocer el desempeo del
sistema en condiciones crticas.
Tabla 28. Cortocircuito monofsico en Sistema de Potencia Proyecto Nuevo ao 2024
10. CONCLUSIONES
Los perfiles de tensin de la red se observaron dentro de los parmetros establecidos por
la regulacin, no fue necesario instalar compensacin como medio de control de tensin,
incluso con la entrada del nuevo proyecto en el ao 2024.
En el ao 2024 con la puesta en servicio del nuevo proyecto, cuando se tiene el caso
de estudio de demanda mnima, se tiene como restriccin elctrica la sobrecarga en
lneas de transmisin y transformadores fuera de la zona 1, por lo que es necesario
aumentar la generacin en esta rea, con el objetivo de que no se importe energa de
las otras zonas del sistema de potencia, con el objetivo de mitigar impactos negativos
en el sistema como la sobrecarga.