PREVENTION PLAN
Todays Date
STATEMENT OF CERTIFICATION
I certify under penalty of law that the Stormwater Pollution Prevention Plan (SWP2 Plan) has
been completed, retained on site and implemented at this facility. The SWP2 Plan and
attachments were completed under my direction or supervision in accordance with a system
designed to assure that qualified personnel properly gather and evaluate the information
contained in the SWP2 Plan. Based on my inquiry of the person, or persons, who manage the
site, or those persons directly responsible for gathering the information, the information
contained in the SWP2 Plan is, to the best of my knowledge and belief, true, accurate and
complete. I am aware that there are significant penalties for providing false information,
including the possibility of fine and imprisonment.
Signature: _____________________________
Date:___________________________ _______
TABLE OF CONTENTS
1. Statement of Purpose
2. Objectives of the Plan
3. Stormwater Pollution Prevention Team
4. Facility Description
5. Maps
6. Materials Used/Stored On-Site
7. Inspections
8. Employee Training
9. Spills
10. Emergency Contacts
APPENDIX
A. The purpose of the SWP2 Plan is to design, implement, manage and maintain Best
Management Practices to reduce the amount of pollutants in stormwater discharges
from this site.
D. Identify the persons responsible for implementing and complying with the Stormwater
Pollution Prevention Plan.
Who is responsible for implementation and compliance with the Stormwater Pollution
Prevention Plan?
Company Contact:
Office: 620.222.5555
FAX: 620.222.6666
Cell: 620.333.1111
Site Contact:
Office: 620.222.5556
FAX: 620.222.6667
4. FACILITY DESCRIPTION
The facility is a permanent dry batch concrete plant. Makeup water is from the city of Anywhere =s potable water
supply system. Wastewater is generated by the washing of the inside of the truck mixer drums and the outside of the
trucks. The wash water is collected in an earthen basin. There is generally no discharge from the basin. Settled
solids are periodically removed and used as road / subgrade base material. Domestic wastewater is routed to a septic
tank / lateral field.
Process water will be contained in the centrally located pond located in the area east of the batch plant facility. The
process water pond is dependent upon both evaporation and percolation to maintain current conservation level. As
can be expected, the accumulation of fines in the process water pond will have to be excavated from time to time and
the resulting material will be hauled to an acceptable landfill. The pond is complete with a berm to allow for a two-
foot freeboard in case of excessive rainfall.
Storm water has been analyzed and one potential discharge point has been considered. The point is located in the
extreme Northwest corner of the property. This location takes advantage of natural drainage and will cause the least
amount of disturbance to the site. The improvement in the Northwest property corner consists of a grass barrier strip
bounded on the downstream side by an earthen berm. The outfall consists of an 18 reinforced concrete pipe with a
4 weir installed for sampling purposes. The barrier strips will be sprigged with drought tolerant Northern Bermuda
grass with a straw/hay cover until the grass is established. Monitoring will be as required by the permit.
The base drainage map with proposed improvements along with the process water pond is complete. The log of
admixture usage is ongoing and is logged monthly.
5. MAPS
A. A general location map of the site near the city of Anywhere is provided.
B. A Site map showing location of storage piles, storage silos, fuel storage areas,
buildings, entrances/exits, berms to keep stormwater off the site, water pollution
control structures, Best Management Practices needed to implement the SWP2 Plan,
waste concrete piles, warehouses, any areas where left over concrete is dumped,
where trucks are washed, etc and the normal stormwater flow direction across the site
is provided.
6. MATERIALS USED/STORED ON-SITE
Materials and types of storage (Open or covered storage such as buildings, bins and
tanks)
7. INSPECTIONS
A. What is to be inspected?
1. See form in Appendix B.
B. Frequency of Inspections
1. After every rainfall event above 2 inches
2. Every calendar quarter REQUIRED
3. Annually Complete facility evaluation - REQUIRED
A. Frequency of Training
1. MSDS information needs to be kept on-site and as part of the SWP2 Plan for
admixture chemicals.
APPENDIX B
1. Inspection form
Company Name:
Facility Name:
Date of Inspection:
Company Name:
Items Discussed
1) Reasons for stormwater pollution prevention
1A) Company policies and practices to comply with the SWP2 Plan
1B) What activities are required to comply with the SWP2 Plan (For New Hires)
2) Results of recent inspections
3) Corrective actions made or needing to be made
4) Others as necessary
Personnel in Attendance
SPILL
1. Spill forms
2. Spill reports
STORMWATER POLLUTION PREVENTION PLAN (SWP2) PLAN
SPILL REPORTING FORM (EXAMPLE)
Company Name:
Material Spilled:
Amount of Spill:
Review the Stormwater Pollution Prevention Plan or such other information the company may have available for
telephone and/or written notification requirements for local, state and federal authorities.
Continued on Page 2
STORMWATER POLLUTION PREVENTION PLAN (SWP2) PLAN
SPILL REPORTING FORM (EXAMPLE)
Page 2
Reported to:
(Local, State, Federal, person)
Reported by:
(Name)
Reported by:
(means-telephone, written, etc.)
Signature Position