Mineta Transportation Institute SJSU

Research Center 210 N. 4th


Monthly Project Status Report Street, 4th Flr San Jose, CA
95112 (408)924-7560 Office
(408)924-7565 Fax

From: (Name, Address) Date: Principal Investigators: Use this form to detail the progress made on your
Project Number: project since the last Monthly Project Status Report. Indicate the
completion of tasks. Indicate any issues of concern. Attach additional
Project Title: sheets, if necessary.

Project Start and End Dates:

Month being Reported:


% of project completion to date:

Indicate any Tasks completed during the month:


Task # Task Title Plans for Next Month:
Task # Briefly describe the work planned for next month, any projected deviations
from the work plan, and anticipated modifications to the cost estimate or
the work schedule:
Task #

Task #

Task #

Task #

Task #
Recent Progress: Explain what was done this month and how it compares with what was projected. Describe any unanticipated problems that arose.
on Institute SJSU
210 N. 4th
San Jose, CA
(408)924-7560 Office
(408)924-7565 Fax

this form to detail the progress made on your


ly Project Status Report. Indicate the
e any issues of concern. Attach additional

tion to date:

h:
anned for next month, any projected deviations
icipated modifications to the cost estimate or
Monthly Project Status Report
(Sample) Mineta Transportation Institute
College of
Business -- BT550
This is a sample. You may copy a blank Summary Report (Sheet 1) to complete San Jos State University
electronically or by hand. Principal Investigators complete this form at the eind of each San Jose,
month.
From: (Name, Address) Date: November 30, 2002 Principal Investigators: Use this form to detail the progress made on your
project since the last Monthly Project Status Report. Indicate the
Dr. Research Associate Project Number: 2250 completion of tasks. Indicate any issues of concern. Attach additional
1234 Sample Drive Project Title: The Future of TOD sheets, if necessary.
San Jose,
CA 95111
Project Start and End Dates: October 15, 2002 - June 30, 2003

Month being Reported: November 2002


% of project completion to date: 15%

Indicate any Tasks completed during the month:


Task # Task Title Plans for Next Month:
Task # 1 Lit Search Completed Web search and began annotation for bibilography Briefly describe the work planned for next month, any projected deviations
from the work plan, and anticipated modifications to the cost estimate or
the work schedule: Will begin survey design and
Task
structure database for mailing. Plan to hire second student
to do the database work.
Task #

Task #

Task #

Task #
Recent Progress: Explain what was done this month and how it compares with what was projected. Describe any unanticipated problems that arose.
Task 1 is nearly complete. Student researcher was hired. The project is on schedule.

Principal Investigator Signature


Revised 6/02
Principal Investigator Signature
Revised 6/02
eta Transportation Institute
College of
ness -- BT550
San Jos State University
San Jose,

his form to detail the progress made on your


y Project Status Report. Indicate the
any issues of concern. Attach additional

on to date: 15%

nned for next month, any projected deviations


ipated modifications to the cost estimate or
Will begin survey design and
mailing. Plan to hire second student
k.

se.

Date
Date