Вы находитесь на странице: 1из 5

Engr.

Muhammad Awais
House # C-16, WAPDA COLONY, Thermal Power Station,
District Muzaffargarh
Mobile: (+92)-333-6867453
Home: (+92)-66-2512125
Email: mawaistps@gmail.com

Profile

Master of Science in Electrical Engineering with majors in Power.

Career Objective

Seeking a challenging and responsible position in an organization where I can contribute to


the growth of both a prospective employer & myself in an excellent environment providing
opportunities of learning, growth and carrier development.

Personal Information

Date of Birth : 13th July, 1992


Marital Status : Single
Religion : Islam
Domicile : Rahim Yar Khan
CNIC No : 32304-4305128-3
Nationality : Pakistani

Education

M.Sc Electrical Engineering (Power) (2014-2017)


University of Gujrat
CGPA: 2.93/4.00

B.Sc Electrical Engineering (Power) (2010-2014)


The Islamia University of Bahawalpur Pakistan
CGPA: 3.24/4.00
PEC Reg. No. ELECT/48792

Intermediate (FSc Pre-Engg:) (2008-2010)


Board of Intermediate and Secondary Education Dera Ghazi Khan
Percentage: 80.09%

Matriculation (with Science) (2006-2008)


Board of Intermediate and Secondary Education Dera Ghazi Khan
Percentage: 84.58%
Work Experience

1. i. I have been working as Switchyard/Plant Operator with M/s. Albario


Engineering Pvt Limited at NPGCL, 425 W CCPP Nandipur w.e.f. 5th
May 2016 today.

SCOPE OF WORK:

3*95.4 MW Gas Turbines Model (PG 9171E GE France)


1*138.8 MW Steam Turbines. Model (N200-8.54/522)
Gas Turbine Control System MARK VIe (G.E
3 Heat Recovery Steam Generators

In addition to my assignments of Trainee Engineer, I, at my own, also


perform my duties as Plant Operator for execution of daily operations of
the following Equipment/ Systems, under the consent of my Employer, only to
enhance my skills.

i. Reading the log sheet to ascertain the demand & to detect equipment
malfunctions and observing pressure, temperature, level and flow gauges
to ensure standard operation.
ii. Performed Daily tasks to assume normal safe operations of gas turbine.
iii. Knowledge of pumps, transmitters, valves, gauges, etc
iv. Monitor all pressures and Temperatures on the plant.
v. Operational Knowledge of Gas Turbine System.
vi. Remarkable experience operating Gas Turbine in Combined Cycle Power
Plant.
vii. Smooth Start-up & Shut down of the Gas Turbine as per Requirement.
viii. Synchronizing the Generator with National Grid.
ix. Off-line & On-line washing of Gas Turbine
x. Normalize the System after Emergency.
xi. Maintained accurate accountability for auxiliary equipment including air
compressors, cooling water pumps, pre lube pumps and fuel oil pumps
xii. Check components for any leakages, malfunctioning, defects, damages etc
xiii. Start-up, Shutdown and troubleshooting of the continuous process plant of
having capacity 425-525 MW.
xiv. Follow up of normal startup and shutdown procedures.

Gas turbine operator is responsible for running machinery efficiently. They need
to set and monitor temperature, pressure levels and flow of fuel to make sure
energy is released accurately.
I also got practical field experience of Testing and Commissioning of Electrical
Equipment as under:

i) Maintenance of 11kV Switchgear, 132kV Breakers and Isolators.


ii) Testing of CTs, PTs and 132kV SF6 Circuit Breakers Contact resistance
and opening/closing timing.
iii) Maintenance, Operation & Troubleshooting of 132kV Grid station i.e.
Current Transformers, Potential Transformers and SF6 Circuit Breakers.
iv) Testing of Power Transformers e.g. Transformer Turn Ratio (TTR) test
and Short Circuit Tests, Capacitance & Tan Delta Test, DC High Pot Test,
Megger Test and Winding Resistance Test.
v) Worked on Protection Relays for Transformer and 132kV Transmission
lines.
vi) Testing of 11kV Motors Protections e.g. over-current, single phase earth
fault protection, short circuit protection.
vii) Testing of Generator Protections e.g. differential protection, negative
phase sequence, symmetrical 3 phase short circuit protection, loss of
excitation, single phase earth fault protection, rotor single point earth fault
protection etc.
viii) Transformer Protection Differential protection, Over fluxing protection,
gas protection.
ix) Maintenance of 220V (D.C) Control Supply System and 104 + 104.
x) 132kV Feeder Distance Relay Testing.
xi) Testing & Commissioning of 132kV Switchyard.
xii) 132kV Switchyard having five bays using one and half Circuit Breaker
Scheme.
xiii) Commissioning of 3*170 MVA and 1 *240 MVA Transformers
xiv) Fully expert in operation of One and half circuit breaker scheme of 132kV
Switchyard and operation of local and remote control of Earth Switch,
Isolators and Circuit Breaker, and isolation procedure adopted for
Switchyard.

I independently can perform the repair and Maintenance of Relays, Circuit


Breakers, Electrical Switch Gears, CTs, PTs, Control, and Protection Circuits of
Generators, Motors, Transformers and Switchyard Equipments.
2. Organization Kot Adu Power Company Limited (KAPCO)
Designation Internee Engineer
Tenure 1st July, 2013 to 15th August, 2013
Responsibilities Learned the working of Combined Cycle Power Plant (getting
better understanding of Gas Turbine Control)

3. Organization WAPDA Thermal Power Station, NPGCL GENCO-III, Muzaffargarh


Designation Internee Engineer
Tenure i) 18th July, 2012 to 17th August, 2012
ii) 9th March, 2016 to 3rd May, 2016
Operation of Steam Turbine.
Got better understanding of Generator (Cooling mechanism,
Excitation system).
Learned about different Cycles to convert Water into Steam.
Got knowledge of 220kV Switchyard /500kV Grid Station
Responsibilities Got experience of Transformer Differential Protection,
Transmission lines Distance Relays Protection Scheme
Knowledge in Electrical Control & Protection Section.
Got fully understanding about Relays, Circuit Breaker
Operation, Control and Protection Drawings and Interlocking of
Drawings with other circuits.
Worked by Hand in 6.6 kV & 4.4 kV Switchgear

Semester Project

Speed control of DC motor


Wind Power Generation
RLC parallel circuit on zero board

BSc Final Year Project:

Speed control of three phase induction motor

A Simulation based project in which control the speed of three phase induction motor
by using vector control technique. In vector control technique we control the torque and flux
separately just like that DC motor.

MSc Final Year Project:

Power quality improvement of grid connected renewable energy system using FACTS
devices.
A Simulation based project in which AC Power system (grid) is synchronized with
wind power and improve the quality issues that occur due to fluctuations of the wind by using
Flexible AC Transmission System (FACTS) devices.

Skills:
Personal Skills:
Easily adoptable to any kind of environment.
Always willing to go an extra mile
An efficient team worker.
Hard working and dedicated.
Tools:
MS Office (Word, Excel and Power Point)

Operating System:
Window 7, Window XP, Window 98, Window 2000, Window 8
Hobbies:
Playing badminton
Doing physical exercise.
Football
Gathering knowledge

References/Doc/d///
Will be provided on demand.

Вам также может понравиться