Вы находитесь на странице: 1из 8

JOB SAFETY ANALYSIS

Tangguh Expansion Project

WORK ACTIVITY (JOB) TITLE: Pemasangan,Pembongkaran Dan Modifikasi Scaffolding DATE : 07/09/2017
LOCATION EARLY CAMP PTW NO : JSA NO :
WORK TEAM REVIEWED BY: JSA PREPARED BY:
1. Mujib Mustain Signature:_____________
1. Yatimiran 7. CSTS Construction 2. Iwan Kurnia Signature:_____________
2. Ronny Susanto 8. Name :__________________ 3. Marjuki Signature:_____________
3. Rohman 9. Signature:__________________ 4. Signature:_____________
4. 10. 5. Signature:_____________
5. 11. CSTS HSSE 6. Signature:_____________
6. 12. Name :__________________ 7. Signature:_____________
Signature:__________________ 8. Signature:_____________
CRITICAL QUESTIONS:
Everyone Ready/Capable To Work? Potential Spill/Gas Release Addressed? Worst Case Discussed?

REQUIRED SAFETY EQUIPMENT

Hard Hats Goggles Safety Harness Hearing Protection Barricades Other (List):___ hi visibility vest__________________
Safety Shoes Face Shield Cotton Gloves Flame Resistant Clothing LEL Monitor
Safety Glasses Work Vests Leather Gloves Fire Extinguisher H2S Monitor
APPLICABLE SAFE WORK PRACTICES/SPECIAL PRECAUTIONS

Hot Work Permit Special Pre-Job Safety Discussions Confined Space Entry Permit Pollution Prevention Measures
Energy Isolation Review Emergency Action Plans Use of Specialized PPE Redundant Protection Measures
Written Procedure Site/Job Orientation Overhead/Underground Utility Lines Simultaneous Operations
POTENTIAL HAZARDS

Lifting Hazards Short Service Employees Elec. Shock/ Flash (includes utility lines) Dropped/Falling Objects Low Lighting Ionizing
Fall Potential Water/Drowning Hazard Haz. Chemical Exposure (includes H2S) Tripping/Slipping Breathing Hazard Radiation
Skin Irritants Mech. Equip. Hazards Sharp Edges or Hot/Cold surfaces Excavation Hazard Environmental Other:_________
Confined Spaces Fire/Explosion Potential Pinch/Crush/Striking Hazards Confined spaces Extremes ________________
Elev. Load/Work High Noise Levels Potential Release of Energy Elevated load or work Vehicle Operations ________________
BASIC JOB STEPS POTENTIAL INCIDENTS OR WAYS TO ELIMINATE OR CONTROL HAZARDS PIC
HAZARDS
*Lakukan koordinasi dengan pihak terkait dilokasi kerja.
*Perform coordination based on work scope location.
*Lakukan peninjauan lapangan sebelum pekerjaan yang sebenarnya
dikerjakan.
PH/Supervisor,
1.1. Tidak mengenal lokasi /loading area *Perform site visit before the actual works being carry out.
Unfamiliar with the location/loading area *pekerja telah mendapatkan inducsi local project. Operator, All
*Insure all manpower received induction local project. Crew
*Tool box talk & instruksi pekerjaan harus disampaikan dengan jelas
kepada team.
*Tool box talk & job instruction to be clear to the team.
*Lakukan prestart check kendaraan regularly dan pastikan tidak
mengalami kerusakan.
*Conduct vehicle prestart checkup regularly and make sure so defects
with the vehicle.
*Pastikan mematuhi aturan rambu lalu lintas (batas kecepatan & Sign).
*Obey the traffic regulation (Speed limit & Signs).
1. Mobilisasi material *Pastikan kondisi driver fit dan tidak dalam pengaruh alcohol.
1.2. Kendaraan tertabrak/ ditabrak kendaraan lain PH/Supervisor,
Material Mobilization *Driver must be in fit condition and must not be driving under the
/ alat berat
Vehicle incident/hit by another vehicle/heavy
influence of alcohol. Operator, All
*Sebelum berkendara di lokasi proyek TEP pengemudi harus hadir Crew
equipment
mengikuti DDT dan dinyatakan lulus
*Driver must attended and passed the TEP Defensive Driving
Training before driving at site / on Project.
*Hanya orang yang berwenang dan memiliki sertifikat yang masih
berlaku yang diperbolehkan untuk mengoperasikan kendaraan / truck.
*Only authorized personal allowed to operated the vehicle / truck with
valid certificate.
*Pastikan material tidak melebihi kapasitas bak yang ada pada
kendaraan.
*Make sure the material does not exceed the capacity of the existing tub
1.3. Material terjatuh saat mobilisasi ke lokasi on the vehicle. PH/Supervisor,
kerja *Lakukan pengikatan material dengan kuat dan benar.
Material dropped/fallen during mobilization *Insure binding of material strongly and correctly. Operator, All
to work site *Pastikan material sudah diamankan dan semua benda kecil yang mudah Crew
hilang harus ditempatkan didalam semuah keranjang atau tas
*Ensured that the materials have been secured and small / lose items to
be place in basket or bags.
BASIC JOB STEPS POTENTIAL INCIDENTS OR WAYS TO ELIMINATE OR CONTROL HAZARDS PIC
HAZARDS
*Tempat penyimpanan harus rata & sesuaikan beban angkat dengan
kemampuan pekerja.
*Storage space should be flat & adjust the lifting load to the worker's
ability.
*Untuk penyimpanan material tidak melebihi dari 3 tingkat untuk pipa
dan tidak lebih dari 2 tingkat untuk papan.
*Storage area must be flat and materials stacking must not be more than
3 layers for tube and 2 layers for boards.
*Lakukan pengganjalan pada tempat penumpukan pipa.
*Perform an overload on the pipe stack.
*Tanah dimana material itu akan disimpan harus padat
*Ground where the materials to be store must be compacted.
*Pasang garis peringatan disekitar area kerja.
*Install barricade on the affected area.
*Dilarang masuk bagi yang tidak berkentingan (pasang rambu peringtan)
*NO entry for unauthorized personal (plot safety sign).
*Gunakan PPE yang telah direkomendasikan dengan benar pada saat PH/Supervisor,
2.1. Ketimpa material atau peralatan yang jatuh melakukan / berada diareal pengangkatan.
Hit by falling materials or tools. *Use PPE that has been recommended correctly when doing/is in the Operator, All
appointment area and lifting area. Crew
*Komunikasi sesama pekerja saat pekerjaan pengangkatan dilakukan.
2. Menurunkan dan menempatkan pipa pada *Communicate to all personals involve at the area during the lifting
tempat penyimpanan process.
Lowering and placing pipe in the storage *Hanya material dan peralatan yang dibutuhkan yang dibawa ke area
accordingly kerja.
*Mobilize only required materials to the work area.
*Pastikan material disimpan pada areal yang tidak mengganggu pekerja
lainnya.
*Make sure the material is stored in an area that does not interfere with
other workers.
*Lakukan pengangkatan dengan prosedur manual handling/lifting
dengan benar.
*Perform lifting with manual handling/lifting procedure accordingly.
*Semua peralatan harus menggunakan pengikat pencegah jatuh
*All tools to be secured using approved tools tie / line.
*Pastikan pekerja mengetahui titik jepit pada saat melakukan
pengangkatan.
*Make sure the worker knows the pinch point at the time of
appointment. PH/Supervisor,
2.2. Terjepit/cidera tangan & jari serta cidera otot
*Jangan menempatkan tangan/jari dan anggota tubuh lainnya pada titik
Clamped / injured hands & fingers and
jepit. Operator, All
muscle injuries Crew
*Do not place hands/fingers and other body parts at the point of the pin.
*Avoid the line of fire for pinch point hazards.
*Tidak melakukan pengangkatan seorang diri dengan beban lebih dari
20kg..
BASIC JOB STEPS POTENTIAL INCIDENTS OR WAYS TO ELIMINATE OR CONTROL HAZARDS PIC
HAZARDS
*Do not perform any lifting load at more than 20kg manually and
unattended.
*Lapisi permukaan yang tajam jika diperlukan.
*Cover sharp edges object if necessarily during the event.
*Pastikan sole board dari material yang kuat/tahan lama dan tidak licin
*Ensured the Sole Board are made from strong/durable materials and not
slippery
*Pasang base plate diatas sole plate.
*Place the base plate on top of the sole plate.
*Lakukan pemasangan scaffolding dimulai dari bawah dan sampai pada
lift berikutnya sesuai dengan scaffolding plan dan diawasi oleh
inspektor.
3.1. Struktur tidak dapat menahan beban *Perform scaffolding starting from the bottom and up to the next lift PH/Supervisor,
scaffolding roboh according to the scaffolding plan and supervised by the inspector.
The structure cannot withstand the load of *Pastikan pemasangan pipa awal dilakukan penahanan oleh pekerja Operator, All
scaffolding collapse lainnya sampai beberapa pipa menghubung terpasang dan dalam Crew
kondisi kokoh.
*Make sure the initial pipe installation is held by another worker until
several connecting pipes are installed and in solid condition.
*Lakukan pemasangan brace pada lift pertama sebelum penambahan lift
berikutnya.
*Perform first lift brace before the next lift.
*Lakukan pemasangan toetie /batang penguat jika diperlukan.
3. Mendirikan/memasang scaffolding *perform the toetie/reinforcement installation if necessary.
Erection/Scaffolding Installation *Orang yang tidak berkepentingan dilarang mendekati areal kerja/pasang
rambu rambu pembatas dan rambu rambu peringatan.
*Unauthorized persons are prohibited from entering the working area/
install barricade dan warning sign.
*Pastikan kunci scaffold dan level telah diikatkan pada pekerja /
structure dengan aman.
*Insure the scaffold and level locks are securely tied to the worker /
structure.
3.2. Peralatan/material pipa jatuh saat dilakukan *All tools to be secured with safety line to the worker.
pemasangan *Pastikan penempatan material pipa dan clamp pada tempat yang aman PH/Supervisor,
Pipe equipment / material crashed during jika perlu lakukan pengikatan.
*Make sure the placement of pipe materials and clamps is secure in case
Operator, All
installation Crew
of binding.
*Dilarang berada dibawah langsung areal pemasangan.
*Strictly prohibited under direct installation area.
*Nobody allowed under the scaffolding working area.
*Pemasangan pipa scaffolding minimal dilakukan oleh 2 orang
scaffolder pada kedua ujung pipa.
*Installation of scaffolding pipe must at least be done by 2 persons at
scaffold on both ends of the pipe.
*Pasang safety clip pada bagian ujung pipa jika diperlukan.
*Install the safety clip at the end of the pipe if necessary.
BASIC JOB STEPS POTENTIAL INCIDENTS OR WAYS TO ELIMINATE OR CONTROL HAZARDS PIC
HAZARDS
*Pastikan telah melakukan pengencangan pada setiap clamp scaffold
yang terpasang. PH/Supervisor,
*Be sure to make tightening on every clamp scaffold attached. Operator, All
*Lakukan pemasangan lantai kerja dan ikat sesuai dengan standard. Crew
*Perform floor workings and tie in accordance with the standard.
*Semua scaffolder sudah mengikuti training bekerja ketinggian dan
sudah memiliki (LOA)
*All Scaffolders must have letter of approval (LOA), attended the work
at height training and fit for the the works.
*Periksa sebelum menggunakan safety harness dan gunakan safety
harness double lanyard yang baik & benar dan pastikan lanyard/hook
telah dicantolkan pada unchor point yang cukup kuat.
*Inspection before using safety harness and wear safety harness double
lanyard properly & make sure lanyard/hookis attached to the anchor
point firmly.
*100% tie of selama bekerja diketinggian.
*100% tie of while working at height.
*Hook harness harus dicantolkan pada anchor point yang tepat.
*To hook the harness hook on the proper anchorage point. PH/Supervisor,
3.3. Pekerja jatuh dari ketinggian *Pastikan tetap mencantolkan satu lanyard pada saat berpindah posisi.
Worker fall from a height
Operator, All
*Make sure to keep one lanyard attached at the time of switching
position. Crew
*Letakkan minimal tiga papan kerja untuk membantu menyelesaikan lift
berikutnya.
*Place minimum tree work board to assist completion and to the next
lift.
*Placed a minimum of 3 boards as the temporary working platform.
*Alas kaki dalam kondisi bersih ( bebas dari lumpur & oil ).
*Footwear must be clean (free from mud & oil).
*Hentikan pekerjaan saat turun hujan.
*Stop working when it rains.
*Works to be STOP if it rain, strong wind and lightning (adverse
weather).
*Pekerja tidak fobia pada ketinggian serta dalam kondisi fit.
*Workers are not phobic at high altitude and in fit condition.
*Pastiakan pekerja mengetahui titik jepit saat melakukan pekerjaan.
*Make sure the worker knows the pinch point at the time of
appointment.
3.4. Cidera tangan, jari dan otot *Tidak menempatkan tangan jari dan anggota tubuh lainnya pada titik PH/Supervisor,
Hand injury, fingers and muscle jepit.
*Do not place hands / fingers and other body parts at the point of the pin.
Operator, All
*Menghindari area benda jatuh dan titik jepit. Crew
*Prevent any part of the body from line of fire for pinch point.
*Gunakan PPE yang direkomendasikan dengan benar.
*Use PPE that has been recommended correctly when doing/is in the.
BASIC JOB STEPS POTENTIAL INCIDENTS OR WAYS TO ELIMINATE OR CONTROL HAZARDS PIC
HAZARDS
*Pastikan posisi pekerja nyaman saat beraktifitas.
*Make sure the worker's position is comfortable during the activity.
*Lapisi permukaan yang tajam jika diperlukan.
*Cover sharp edges object if necessary.
*Pasang pipa pada struktur scaffold dan lakukan pengikatan
menggunakan clamp dengan kuat dan benar.
*Attach the pipe to the scaffold structure and fasten and clamp using
clamp accordingly.
*Pasang safety clips pada kedua sisi roller.
*Install safety clips on both sides of the Gin Wheel
*Gunakan tali dengan diameter minimal 12 mm dan tidak menaikkan
beban diatas 20 kg.
*Use a rope with a diameter of at least 12 mm and not to raise the load
above 20 kg.
4.1. Pondasi kerekan bergeser dan jatuh (tidak *Dan selalu check tali sebelum digunakan. PH/Supervisor,
kuat menahan beban) *And always check the rope prior to used.
Foundation hoist shifted and fell (load *Gunakan catrol dan catrol harus diperiksa.
Operator, All
exceeding requirement) *Use gin wheel and gin wheel inspected. Crew
4. Pengangkatan/menaikkan material scaffold *Lakukan pengikatan dengan kuat dan benar sebelum material
dengan tali dan roll dinaikkan.
Lifting/ Lifting/Raising scaffolding *Tightly tight and correctly before the material is lifted.
material using rope and roll. *Komunikasi dengan pekerja yang berada dibawah.
*Communicate with the worker below.
*Pasang barricade pada areal kerja.
*Install barricade with in the working area.
*Tidak menumpuk terlalu banyak material diatas jika tidak diperlukan.
*Do not stack many materials on top of each other if not need or
necessary.
*Pastikan mendapat permit untuk bekerja didekat jaringan dan mematuhi
jarak minimum dengan live power.
4.2. Mengenai material lain existing overhead *Make sure to get permit to work near the network and adhere to PH/Supervisor,
etc minimum distance with live power.
Regarding other materials Existing *Lakukan pemasangan guard pada bagian yang terexpose dengan
Operator, All
overheads etc. material scaffolding. Crew
*Perform guard installation on the part that are expose with scaffolding
material.
BASIC JOB STEPS POTENTIAL INCIDENTS OR WAYS TO ELIMINATE OR CONTROL HAZARDS PIC
HAZARDS
*Pastikan saat scaffolding di check,inspector telah menggunakan
persyaratan bekerja diatas ketinggian menggunakan safety full bady
harness.
*During scaffolding inspection, Inspector are wearing full body safety
harness working at height.
*Inspektor menggunakan safety full body harness, dan 100% tie off
sesuai dengan peraturan yang ditentukan.
*The scaffolding Inspector to used full body harness and comply to the
100% tie off procedure.
*Lakukan pengecekan visual dengan random check kekencangan
beberapa clamp.
*Perform visual checks with multiple clamp tight random checks.
*Pastikan secara keseluruhan kondisi scaffolding tidak goyang serta kuat
dan kokoh.
5. Pemeriksaan dan pemasangan scaffolding *Make sure the overall condition of scaffolding is not shaking, strong
and sturdy. PH/Supervisor,
tag 5.1. Jatuh dari ketinggian scaffolding roboh
Inspection & Installing Scaffolding Tag Fall from height Collapse Scaffolding
*Lakukan perubahan/penambahan serta perbaikan bila diperlukan. Operator, All
*Make changes / additions and improvements as needed. Crew
*Berilah tag sesuai dengan kondisi real . hijau boleh digunakan dan
merah dilarang menggunakan.
*Tag according to real conditions. Green may be used and red is
prohibited to use.
*Persyaratan pembangunan scaffolding harus menyertakan gambar
sketsa, dan inspeksi gambar perencanaan ketika scaffolding dibangun.
*Erection of scaffold which required design must follow the design
drawing, and to be inspect by the design engineer once erected.
*Lakukan pemeriksaan secara regular untuk beberapa scaffolding yang
masih terpasang.
*Perform regular checkup at on progress scaffolding installation.
*Inspektor harus menginspeksi ulang secara berkala setelah 7 hari sesuai
dengan prosedur, dan sesudah terjadi hujan
*Inspector to perform the 7 days inspection rotation as per the
procedure, and after an adverse weather.
*Pembongkaran hendaknya dilakukan oleh personal yang memasang
scaffolding.
*Dismantling scaffolding should be done by the person who installed the
scaffolding.
6. Pembongkaran scaffolding 6.1. Jatuh dari ketinggian *Pembongkaran scaffold hendaknya disetujui oleh inspektor dan lakukan PH/Supervisor,
Dismantling Scaffolding Fall from heights oleh scaffolder yang berpengalaman. Operator, All
*The scaffold dismantling should be done by approved and experiences Crew
Scaffolders.
*Gunakan safety full body harness dan cantolkan pada structur yang
kokoh.
*Wear safety full harness body and attached to sturdy structure.
BASIC JOB STEPS POTENTIAL INCIDENTS OR WAYS TO ELIMINATE OR CONTROL HAZARDS PIC
HAZARDS
*Full body harness harus 100% tie off .
*Full body harness to be wear and 100% tie off procedure to be adhere
to.
*Prioritaskan pembongkaran dari arah paling luar dari structure.
*Prioritize dismantling scaffolds from the outermost direction of the PH/Supervisor,
structure. Operator, All
*Lakukan pembongkaran dengan perlahan dan turunkan pipa Crew
/accessories dengan benar.
*Perform disassembly slowly and lower the pipe / accessories correctly.
*Pastikan alas kaki tidak licin / lumpur.
*Make sure the footwear is not slippery/muddy.
*Pasang demarkasi dan sign tanda orang bekerja diatas ketinggian.
*Post demarcation and sign people working at height.
*Pastikan dan tidak ada orang/rekan kerja yang berada dibawah areal
pembongkaran.
*Be sure and no people / co-workers are under the dismantling area. PH/Supervisor,
6.2. Material terjatuh dan mengenai pekerja *Lakukan pengikatan pada material dan turunkan dengan menggunakan
Fallen materials and hits worker tali secara perlahan.
Operator, All
*Apply the binding to the material and lower it by using the rope slowly. Crew
*Tidak melempar material scaffolding dari atas ketinggian.
*Do not throw scaffolding material from above height.
*Lakukan komunikasi dan kerjasama antar sesama pekerja.
*Make communication and cooperate with fellow worker.
*Pastikan tidak melakukan pekerjaan diatas ketinggian bila kondisi
6.3. Bahaya petir saat melakukan pemasangan cuaca mendung dan hujan. PH/Supervisor,
dan pembongkaran scaffolding diketinggian *Be sure not to work at high height during cloudy clouds and rainy
Risk of thunderstorm during installation and
Operator, All
weather conditions.
dismantling scaffolding (Nature) Crew

*Pastikan menggunakan APD yang sesuai sebagaimana yang telah


direkomendasikan untuk melakukan pembersihan.
*Make sure to use the appropriate PPE as recommended for cleaning.
*Terapkan procedure manual handling yang benar pada saat menangani
material scaffolding.
*Apply the correct manual handling procedure when handling the
7. Pembersiahan area kerja 7.1. Cidera otot tangan dan jari saat melakukan scaffolding material. PH/Supervisor,
Clean working area pembersihan dan merapikan tempat kerja *Mintalah bantuan pada rekan kerja lainnya bila diperluakan.
Hand and finger muscle injury while *Ask for help with other co-workers when required.
Operator, All
cleaning and tidying the workplace *Tempatkan material sesuai dengan jenis dan klasifikasinya. Crew
*Place the material according to its type and classification.
*Buanglah sampah kerja pada tempat yang telah disediakan.
*Dispose of garbage in the space provided.
*Kumpulkan dan buanglah sampan sesuai dangan jenisnya sesuai
sesuai dengan peraturan proyek.
*Garbage to be segregate and dispose as per the project procedure.

Вам также может понравиться