Вы находитесь на странице: 1из 177
PART B SECTION D VOLUME 2 TECHNICAL REQUIREMENT CIVIL, STRUCTURAL & GEOTECHNICAL WORKS CIVIL ENGINEERING REQUIREMENTS CYBERJAYA HOSPITAL 10 20 30 40 50 60 70 bo 30 109 0 120 10 140 15.0 160 wo 18.0 190 200 20 10 20 Civil Engineering Requirements Contents Description GENERAL Scope of Works Speciat Requirements Design entera Standard and Codes of Practice Independent Checker Soil Investigation Anti-Terize Treatment Materials and Workmanship Contractr's Proposal Samples Complisnce to Roles and Regulations Suriciency of Propasat. Standard Specification aterial Testing Laboratory sd Statt Superson, inspection and Test Covering up of Werks Quality Assurance Pan Fomiterzation with Site and Local Condition btizatin of Contractor and Consultant on Safety on Site and Adjoining Properties As-Built Orawings EARTHWOK Generai Site Clearing and Earchworks Turing Earth Retaining Structures Slope Stabiny DRAINAGE SYSTEM General Design Consieration 2 BR a B “4 4 10 20 30 40 50 60 70 90 10.0 no 0 130 tao 150 16.9 70. 120 10 20 30 40 50. 60 80 3.0 woo 10 120 130 * 40 ‘lvl Engineering Requirements Contents Description ROAD Work General Design Consideration Sufficiency of Proposat Land acauistion, Relocation / Protection of Utity Services Works under Water Auber, Subsurface Exploration and Design Reaurements Roads Design Criteria Pavement Intersection and access Temporary Control Devices and Signs Carriageseay Marking Guardraits i require) Humps it required) Temporary Works o Diversions Tratic Contra Oewices Design Standorss Slopes EXTERNALAWATER SUPPLY system, General Design Consideration Seeking of Approvals Distribution Pipes Storage and Suction Tank Pumping Staton and Mae Works Instruments and Meters Location Valves, Testing Points and Manholes ‘Aacilery Works Testing nd Commissioning Operation ane Maintenance Defect and Lisbitty Period FReRty Supply for Pumping Station instalation and Instrumentation brtison of Proposal, Calculation, Drawings and Cott for Aaproval is 15 is 6 7 w 7 18 20 20 20 20 20 20 n a Bb a ue 2% % a4 a 3 5 3 vil Engineering Requirements Contents Description Pages F, SEWERAGE system 10 Genera 2% ZO Dest Consideration % 3.0 Pivework 7 4.0 dates i 5.0 Standard of Ertuen Dichorse 2 60 Sewage and Wastewater Treatment Plant & 7.0 Testing and Commusoning of the Stem » 6. WASTE DISPOSAL sysTEM 1.0 Genet » APPENDIX APPENDIK 1 SCHEDULE FOR DOCUMENT To GE SURAITTED IN RFP DOCUMENT FEOTOSED DEVELOPMENT OF CVBERJAYA HOSPITAL (288 BEDS) ON LOT 47686 AND 15.0) 28779 PY 10 20 2a 22 23 24 as SO, AiS6t AT PERSURAM MULTMLDIA, CYBER 11, CYOERIAVA, RURIN BENGAL, Buel era, SELANGOR DARUL ENSAN (“DESIGN @ BUILD") SENERAL Scope of Works The Works salt cover inclusive all the planning, design, construction apervsion, testing, commisioning and maintenance there fer the period on the lonavitg wonton GENERAL EARTHWORKS DRAINAGE SYSTEM, ROADWORKS EXTERNAL WATER SUPPLY SYSTEM. EXTERNAL SEWERAGE SYSTEM WASTE DISPOSAL SYSTEM, The hasta complex as well as al che supporting services including the required car barking, engincring scrvices and future expansion of the hospial GedMoe Toe pea Ih supporting MEE services and ifrastrvcure) must be cortained eit Be sence ofthe ste, lebung 3 acres of the ate fr future arvatation component ewesee ‘artwork ang hoarding must he caried out for the while T2821 soeere Special Roguirements Alt Wore with vospact to investigations, desig, contruction and maintenance shall comply with all the Govecneent Requirements Regulation, Lacat hppwoning alone Fequirements and By ows ‘AU engineering investigations, design, construction, and supervision shat te eared out, developed and refined by the Contractor who shall engase qualified Coen ee Engineers, Malaysia (PEPC) and License Surveyor for the relevant disiginn at Oe, Morks. The Contractor sell undertake to do alt detailed drawings and clteetins ns {39d when necessary at no cast variation te Ue accepted Tent Se Prior to the engagement of 2 quilted Consultant or PEPC ae the Independent Ghecking Engineer referred to as the Checker hereinater) for ins prose the Contractor shall submit and propose a minimum of 3 names to Projet Diector te approval. The Checker shall take full responsibity for Integy roughness acd ampetence of tie sport and recommendation, It's adequatcly corte sat nt Accordance with the accepted engineering practice and to ersine the recut {nteaity and stability ofthe proposed construction. The Checkers criterteandseope ct services shall be referred to he relevant clauses below AL desis sal optimally saisy the requirement of the atest standard engineering bactice in respect of functional adequacy, safety, robustness sual at etfectiveness. The designs shll be approved by the (cet and the central mtnorings and be in the best layout with most suitable material to gle the best crema and good aestetie values, ‘AL bulling dimensions shall apply the concept of Modular Co-ordination System, ReoRgSED OCVELOPRENT OF CYBERLAYA HOSPITAL (288 BEDS) OM LOT 47686 AND 5.0) 28779 OT SELAMSEE AT PeRSuen mucruueDa,cvaER 11, cYBERIA¥A, MUKIRDENGHL,Dustal Pane, SELANGOR DARUL NSA 26 ay 2a 29 2 ait 25: 3.0 a2 sign UK Zhe Contractor shat include the Design Development Plan (Q0P) in the critical Path ethod {CF} to be submitted (othe Project Director The DDP sll incon a he design phases in deta [hs Contractor stall submit detailed designs far all aspects of the Works mentioned i Clause 1.0. Any changes in the design shall be supported with design records noc subjected tothe Project Director's approval All engceerng and shop drawings prepared and signed by PEPC engaged inthe design 4 swpenvnon of the works shall be submitied to Project Diestors ences ae ‘approved by the Local Approving authorities Tons of obtaining timely approval (rom each relevant Lecal Approving Ahorty foe foc design drowing shall be the Contractor's responsi. Uneimely second of Sporovals which, may affect the Contractor's design/comstuction progam seit oe ot any ay be a bass/cause for cosideation of tine extension or vara tee contract All Gesian caleulations and drawings sali be propored and signed by the respective PERC 2nd endorsed by indepencent Checking Enginger. ‘The caleaatiow, den oe submitted tothe Project Director for approval. ‘Approval er acceptance bythe Project Director ofthe Local Approving Authority of the Consultants cravings and design calculations shall nol relieve the Contisiee of We ‘Fesponsiities ard abilities inthe dsisn The, sCantactor shall submit his deta design plan indenting progestin {Mersetive submission ane approval within 2 weeks fram tie cate ot feeaeeeS Ne Letter of feceptance (aj, pacha ox junction box of any services shall be allowed tn the circulation areas: ride the bling and isthe mide of the ros Ais Contactor to submit detited designs involved other services suchas protection to MEE services for example from the folate MAE plant tothe hospital beck ae to, Underground nee or via trenches any Hem whic isnot specially stated tn the Scope of Works but necessary forthe SEpbletion ofthe project shall deem tobe inued sn provided forint ot Sees ‘nd pring, Design Criteria ‘Al design criteria shall be subjected to the acceptance of the Project Decor with the submision ofthe necessary juntication-mptication by the Cores oO os sree or MAge MENT OF CYBERIAYA HOSPITAL (288 AOS) ON LOT 47686 AND SELANCON Oe SARAN MULTAEDA, CYBER 1, CHBERSKYA, helenae, SELANGOR OARUL EHSAN ("DESH E SOIL Seaman, ™ $6" consent sal achere to Eat shown in drantngs and ator relevant beumeat, 4.0 Standards and Codes of Practice AF erat ace, Manual and Standards sdopted ta cover design, raters Ineraton cReraarce, et. shall "be felevant_ to. Aalosg Tana e and sade neg PACH OF Stands an must clendy see he nd use! In the design, “OBS Gaga cotton of the Warts stall be proesoaliyurertkan by Wayans ey TREO Sal Como te rae a OL “etalon Starde-es and Han or Internation Cader of Pract eon eg 10S Ta PR eens of Codes of Pacts an Sandee sta be Halon, British rere bncietennr Ns Abprved Inteatinl Codes ef Praceee oy ae eet Tee temational Codes of Practice of Standards are qecnee tee Spaciicatons, Sanat we ceed By euatnt Halon Codes Pre nests, Stans hee cHaNe. Shou tere be any cant te Cer md themore naalfements, and then unless otherwise approved by Gorse Director, "he more stringent ertena ave co be adosten nee cat Sal ade the atest acon ofeach Stade, Maul nd Cove of edition oat ne sad of Tener notwtetandeg tree ac Cinna oF iat, seted inthe Standards, Nant and Codes ot Pegs fon ensuing {Clauses ofthis Specification “8 esi get be hed nthe bing dacrer. Cope of al code ed must be Provided and made avaliable at the Project Drcctors ove 5.0 Independent chocker 5.1 Professional criteria Ind a areteione and tee aalicaorsof test one nti exet for the econ sate feet dcr ascplnes respecte Rae me fr by ‘he Contractor for Project Director's speck” Facets Sell not Rave ony thant ot professional interes the project he arene het eleed materials. The cepare may include te she suggestion, solatonn MeTatWe soon and ‘desis tor arencimens cede ae selutions,

Вам также может понравиться