Shaping plywood Painting Attaching
panels battens
6 5 4
Gluing carpet Mounting Riveting,
hinges inserting studs
7 8
Attaching metal & Assembly of
plastic fixture L& R units
Capacity Analysis
Sr Run # of # of Workers
Batch Set up Set up Std Capacity/
No Parts time/unit shift operators shift
Size (min) time/unit time/unit week
(min)
Shaping plywood
1 3.15 2500 230 0.092 3.242 3 1 3 2260
panels
2 Painting 2.6 1500 2.6 2 2 4 3757
3 Attaching battens
Riveting,inserting
4 6.85 1000 6.85 1 1 1 356
studs
5 Mounting hinges 2.85 1500 60 0.04 2.89 1 3 3 2535
6 Gluing carpet 13 500 200 0.4 13.4 1.5 2 3 547
Attaching metal
7 22 500 0 0 22 1 10 10 1110
and plastic fixtures
9.5 19 24
1
28-12-2015
2.6 Min 2
6.85 Min 4
Kanban
2.85 Min 5
8.5 Min 6
22 Min 7
2
28-12-2015
= 2.376
N= 2.376 Round up to 3 (allow some slack) or Round down to 2 (to force
improvement)
37 units 37 units
37 units 37 units