District Sharan
Village Sharan
Phone 0795252730
Reporting Period
Month December
Year 2016
Client Questions
Province Paktika
District Sharan
Page: 1 of 22
GPS Location Photo
Photo 1 - South elevation of the building meets architectural and BoQ requirement.
Subproject Details
Sub Project Status/Type Completed Schools
MSI Project ID MSI-EQ-1349
Compliance Monitoring
Page: 2 of 22
Footings, Reinforced concrete footings
Please select Category and Subcategory Footings, Reinforced concrete footings
Percentage Completed (%) 100
Roof, Roof comprising reinforced concrete slab, with wooden trusses mounted above, and galvanized
iron sheeting laid on top
Please select Category and Subcategory Roof, Roof comprising reinforced concrete slab, with wooden trusses mounted above,
and galvanized iron sheeting laid on top
Percentage Completed (%) 100
Year 2013
How many times a month did the Infrastructure 1
Services Department (ISD) Team visit the site?
(review project log)
Page: 3 of 22
Total physical progress for Community Contract This is NCB project
(CC) work?
Infrastructure Questions
School Compound
Number of buildings in the school compound 4
Page: 4 of 22
Photo 3 - Water tank which was proivded by Afghan governoments
Photo 4 - Solar electricity system which was provided by the Afghan government.
Building by EQUIP
No. of buildings constructed (or presently being 1
constructed) under EQUIP
Page: 5 of 22
and latrine stalls constructed by EQUIP
Photo 5 - South elevation of the EQUIP II- funded building meets architectural and BoQ
requirement.
Photo 6 - North elevation of the EQUIPII- funded building meets architectural and BoQ
requirement.
Page: 6 of 22
Photo 7 - East elevation of the EQUIP II- funded building meets architectural and BoQ
requirement.
Photo 8 - West elevation of the EQUIP II - funded building meets architectural and BoQ
requirement.
Page: 7 of 22
Photo 9 - Corridor building, slabs, beams and columns meet the project design and
spec requirements.
Photo 10 - Rooms, of building's slabs, beams and columns meet the project design and
specs requirements.
Page: 8 of 22
Photo 11 - Toilet for female staff meet BoQ and project requirements
Boundary Wall
Is there a boundary wall? Yes
Page: 9 of 22
Photograph of the boundary wall
Photo 12 - Door which allows access or entry for darululum islami funded by Afghan
government according to Paktika senior engineer.
Photo 13 - Boundary wall which was funded by Afghan government according to the
Paktika senior engineer.
Electricals
Is electrical power supply available to the school? Yes
Is there electrical circuitry, control panel, lighting, Yes
switches and sockets installed in the school?
Well
Is there a water well in place with the well pump? Yes
Page: 10 of 22
Was source of water for the water well No
microbiologically and chemically tested by
accredited institution for drinking purposes?
Page: 11 of 22
Are all the necessary numbers and types of No
Sewage Holdings or Septic Tank provided in the
BOQ?
Are all the necessary numbers and types of Fenced No
Garbage Disposal Area provided in the BOQ?
Earthquake
Is the school located in earthquake prone area? No
Is the school located in earthquake impacted area? No
Is the school building earthquake resilient Yes
building?
Did the building design include DRM? Yes
Were the DRM measures executed at site? Yes
Are the door and gate of the school wide enough Yes
for evacuation in event of earthquake?
Does the school have evacuation route and the Yes
assembly point in the event of earthquake?
Did the school implement drill and simulation for No
earthquake disaster event?
Landslide
Is the school located at steep slope and prone to No
land slide?
Flood
Is the school located in a flood prone area? No
Is the school located near the river with potential No
to inundate the surrounding area?
Page: 12 of 22
Are there any flood protection measures No
implemented (retaining walls for protection
against floods etc)?
Fire
Is the school located in densely populated area No
and prone to fire?
Structure, Concrete and steel reinforcement (foundation, slab, columns, beams, load bearing walls,
stairwells)
Category and feature of work Structure, Concrete and steel reinforcement (foundation, slab, columns, beams, load
bearing walls, stairwells)
Grade features 4
Grade features 4
Grade features 3
Page: 13 of 22
Architecture, Building dimensions, floor plan and site plan
Category and feature of work Architecture, Building dimensions, floor plan and site plan
Grade features 4
Grade features 4
Grade features 4
Percentage Completed (%) 100
Grade features 4
Page: 14 of 22
Is there a School Management Shura (SMS) or Yes
Committee at this school?
Please provide a list of gender mixed membership The darululum Islami has 15 male members no female included.
committees operating at the school?
Approximately how many school age children are there in the community?
Girls- School Age #: 0
Page: 15 of 22
If overall female attendance is 80% or less give This is boys darululum Islami, therefore female students less than 80%.
possible reasons as to why female attendance is
low
What are the main reasons the school was closed? Examination holidays
Date school last visited by the MoEd 2015-12-12
Environmental Questions
Is there a proper Environmental Management Plan No
(EMP) in place?
Does the distance between the dry latrine and the Yes
water well comply with EQUIP
drawing/specifications?
What are the components which need Doors, windows insect screen,side walk.
maintenance as observed during the monitoring
visits?
Photograph of the components which need
maintenance as observed during the monitoring
visits
Page: 16 of 22
Photo 15 - Some part of side walk concrete is damaged and need repair and
maintenance.
Page: 17 of 22
Photo 17 - Windows insect screen were torn away, needs to be reinstalled.
Photo 18 - Classroom door handle lock end escutcheon was broken, needs to be
replaced.
Page: 18 of 22
Photo 19 - Corridor door insect screen were torn away, needs to be reinstalled.
Task 07 - Assess teacher and student attendance and compare data with the Education Management
System (EMIS) and payroll data
Page: 19 of 22
Teacher absenteeism and numbers
Task 08 - Assess the availability and use of Textbooks/Learning Materials and Quality Enhancement
Grants
Learning Materials
How many textbooks have arrived in school? 800
Does every student have the appropriate number No
of textbooks according to the curriculum?
Page: 20 of 22
Please write if there is any variance in the list NA
provided by MoEd Publication Department and
text books actually received and the reasons for
variance (narrative)
The EQUIP II-funded darululum islami project construction activities were started on
24/02/2012 and completed on 23/02/2013.
2 Quality:
Darululum islami EQUIP II -funded building same time 24/02/2012 was transferred to
Paktika University and is now currently used for university students.
The EQUIP II- funded darululum building is single story building 8 classrooms, latrine
bloc and eight set latrine stall, laboratory and office room.
Some parts of the schools were worn out which required repair and replace
including, windows, doors lock, insect screen .sidewalk see photo (15 to 19)
The EQUIP II- funded darululum building was reported as being of above average
construction quality and workmanship, receiving an overall grade above 3.8 with no
minor deviation in the school during the time of monitoring.
3. QEG:
The darululum ismlami EQUIP II - funded building has not received Quality Education
Grant (QEG) QEG-1,and QEG-2 at the time of monitoring.
4 Incomplete items:
No incomplete items in the darululum islami EQUIP II funded building during the time
of monitoring.
.
5 Annexes for CC:
6 Missing Component:
7 Environmental/Social Safeguard/Safety :
a. Community was consulted at the planning and implementation phase but it does not
include female. However, no documentation was available to validate it.
b. There are three committees men were not female member of three committees (1-
Cultural committee,2- Assurance committee,3 - Academic council committee).
Page: 21 of 22
c. 8 jeriebs land was donated by the afghan governments no community towards
contribution for the project.
d. There was GRM available on the site, but no logbook for GRM was
available on the site. The principal verbally addressed the grievances.
e. ESMP was not available. However, there was not negative impact noted on the site.
Missing Components as per ISD No Missing component items in the darululum islami
Missing Components as per SA (Supervisory Agent) No Missing component items in the darululum islami
Incomplete Items as per ISD No incomplete items in the darululum islami
Incomplete Items as per SA (Supervisory Agent) No incomplete items in the darululum islami
Page: 22 of 22