Вы находитесь на странице: 1из 7

Description

Room
Emergency Light Exit Light Smoke Detector Heat Detector
CTO Office 1 - 1 -
CSO Office 1 - 1 -
CFO Office 1 - 1 -
Board Room 1 - 1 -
Majlis 1 - 1 -
EVC Office 1 - 1 -
Secretary 1 - 1 -
Secretary 1 - 1 -
MD Office 1 - 1 -
Pantry 1 - - 1
Gents Toilet 1 - - -
Ladies Toilet 1 - - -
Record Room 1 - 1 -
Server Room 1 - 1 1
Meeting Room-1 1 - 1 -
SPM office 1 - 1 -
HR Department 1 - 1 -
Workstation 1 - 1 -
Manager 1 - 1 -
Manager 1 - 1 -
Manager 1 - 1 -
Manager 1 - 1 -
Manager 1 - 1 -
Manager 1 - 1 -
Workstations 1 - 1 -
Workstations 2 - 2 -
Manager 1 - 1 -
Manager 1 - 1 -
Manager 1 - 1 -
Manager 1 - 1 -
Manager 1 - 1 -
Meeting Room-2 1 - 1 -
Manager 1 - 1 -
Manager 1 - 1 -
Cashier 1 - 1 -
Corridor - 8 - -
Total 36 8 33 2
Description
Dry Powder Fire Extinguisher CO2 Fire Extinguisher Fire Hose Reel Cabinet
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
2 2 1
2 2 1
Fire Alarm Control Panel
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
1
1
Supply of A/C Installation of
Sr. No. Descriptipn Machines A/C machines
1 FCU - 1 8,500.00
2 FCU - 2 8,500.00
3 FCU - 3 8,500.00
4 FCU - 4 8,500.00
5 FCU - 5 8,500.00
6 FCU - 6 Units placed 8,500.00
7 FCU - 7 but not 8,500.00
Indoor connected
8 FCU - 8 8,500.00
Unit
9 FCU - 9 8,500.00
10 FCU - 10 8,500.00
11 FCU - 11 8,500.00
12 FCU - 12 8,500.00
13 FCU - 13 8,500.00
14 FCU - 14 Units to be 8,500.00 250
15 FCU - 15 supplied 8,500.00 250
16 CU - 1 250
17 CU - 2 250
18 CU - 3 250
19 CU - 4 250
20 CU - 5 250
21 CU - 6 250
Units to be
22 CU - 7 supplied, 250
Outdoor
23 CU - 8 installed & 250
Unit
24 CU - 9 commissione 250
d
25 CU - 10 250
26 CU - 11 250
27 CU - 12 250
28 CU - 13 250
29 CU - 14 250
30 CU - 15 250
127,500.00 4250

Supply &
installatio
n of
Mouth
piece
connectio
ns

1
Supply & installation of Mouth Roof copper piping and Supply & Installation of
piece connections Machine connections Diffusers
350
350
350
350
350
350
350
350
350
350
350
350
350
350
350
500
500
500
500
500
500
500
500
500
500
500
500
500
500
500
5250 7500 0 0
Sl.No Plumbing Works Make
Qty

2 S-Trap bowl set with dual flush tank, WC floor flange


with wax seal, Seat & cover & heavy duty flexible hose & RAK Ceramics /
angle valve. Color White, Model CST 940 Kludi RAK 8

Oval under counter wash basin with Manual Single lever


3 mixer faucet, P-trap, angle valve and brackets complete. RAK Ceramics /
Colour: White. Model: LW587J Kludi RAK 11

4 Supply and fixing of water heaters in gents, ladies toilets


and pantry area complete with all plumbing undertaken. Ariston 4

5 Supply and installation of S/S single sink and bowl with


manual single lever mixer faucet in the pantry area Blanko & Kludi 1
6 Supply and fixing of mixer (taps) for ablution area, for
gents & ladies areas complete Kludi RAK 1
7 Supply and fixing of SS floor trap grating Cosmoplast 13
8 Supply and fixing of complete toilet accessories such as RAK Ceramics /
soap holders, rob holders, dustbins, etc. Kludi RAK 13
10 Supply & installation of 1000 gallons water tank Polycon 1
11 Supply & Installation of 110 uPvc pipes & fittings Cosmoplast 50
12 Supply & Installation of 50 uPvc pipes & fittings Cosmoplast 20
13 PN-20 PPR pipes and fittings Cosmoplast 50
HVAC WORKS
Sl.No Units Qty
Description

Supply & Istallation of Ductable split A/C


1 Machines. Indoor Units: YE1HD70 & No's 15
Outdoor Units: YE1SD70
2 Supply & installation of Mouth piece No's 15
connections as per site measurements

3 Supply & installation of copper pipe and Coils 10


connections as per site requirement
4 No's 15
Insulation and foster for roof copper piping
5 Supply & installation of 2.2 m - 3 slot leniar No's 30
diffuser
6 No's 110
Supply & installation of 300x300 diffusers
7 Supply & Installation of Pleanum box for No's 110
diffusers
8 Supply & Installation of 8" flexiable duct 10 rmts 30
9 Supply & installation of GI Duct sqmt 50
10 Supply & installation of exhaust fan No's 1

11 Supply & installation of drier filter and sight No's 15


glass
11 Dx Units SUPPORTS Vibration bad 15
12 Condensate Drain for AC units 15
13 Refrigerant Gas R410A 21.5 Tr 15
14 Maintenance Testing & Commisioning 15
15 Supply & installation of PI Duct Sqf 500