VALORIZACION DE OBRA N 10
FRMULA 01
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
: OBRAS PROVISIONALES - INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE
FORMULA 01
AYAVIRI, PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR REFERENCIAL : S/. 7,529,454.25 (INCLUYE IGV)
MONTO DEL CONTRATO : S/. 7,529,454.25 (INCLUYE IGV)
ADELANTO DIRECTO : S/. 752,945.43 (INCLUYE IGV) 10.00%
ADELANTO PARA MATERIALES : S/. 1,505,890.85 (INCLUYE IGV) 20.00%
FECHA VALOR REFERENCIAL May-16

PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANTERIOR AVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N
UND CANT. P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADOVALORIZADO % METRADO VALORIZADO
1 OBRAS PROVISIONALES
1.01 ALMACEN PARA OBRA
01.01.01 INSTALACION DE ALMACEN DE OBRA UND 1.00 1,043.19 1,043.19 0.00 1.00 1,043.19 100.00 1.00 1,043.19 100.00 0.00 0.00000
1.02 CASETA PARA GUARDIANIA
01.02.01 CASETA ADICIONAL P/GUARDIANIA Y/O DEPOSITO GLB 1.00 3,000.00 3,000.00 0.00 1.00 3,000.00 100.00 1.00 3,000.00 100.00 0.00 0.00000
1.03 CAMINO DE ACCESO TRAMO: CAPTACION RESERVORIO
01.03.01 CAMINOS DE ACCESO- MEJORAMIENTO DE TROCHA CARROZABLE km 4.00 2,465.08 9,860.32 0.00 4.00 9,860.32 100.00 4.00 9,860.32 100.00 0.00 0.00000
1.04 CARTEL DE OBRA
01.04.01 CARTEL DE OBRA GLB 1.00 703.69 703.69 0.00 1.00 703.69 100.00 1.00 703.69 100.00 0.00 0.00000
1.05 FLETES
01.05.01 FLETE TERRESTRE GLB 1.00 95,150.97 95,150.97 0.00 1.00 95,150.97 100.00 1.00 95,150.97 100.00 0.00 0.00000
01.05.02 ACARREO DE AGREGADO A CAPTACION Y RESERVORIOS GLB 1.00 10,000.00 10,000.00 0.00 1.00 10,000.00 100.00 1.00 10,000.00 100.00 0.00 0.00000
01.05.03 ACARREO DE MATERIALES PARA LA CONSTRUCION DE LETRINAS GLB 0.99 45,000.00 44,753.42000 0.00 0.99 44,753.42000 100.00 0.99 44,753.42 100.00 0.00 0.00000
01.05.04 ACARREO DE MATERIALES PARA LA CONSTRUCION DE PILETAS GLB 0.99 15,000.00 14,917.81 0.00 0.99 14,917.81 100.00 0.99 14,917.81 100.00 0.00 0.00000
2 SOCIO - AMBIENTAL
2.01 PLAN DE MITIGACION AMBIENTAL
02.01.01 LETRINAS PROVISIONALES DURANTE LA EJECUCION DE LA OBRA GLB 1.00 1,800.00 1,800.00 0.00 1.00 1,800.00 100.00 1.00 1,800.00 100.00 0.00 0.00000
02.01.02 PROGRAMA DE CAPACITACION EXTENCION E INFORMACION GLB 1.00 1,050.38 1,050.38 0.00 1.00 1,050.38 100.00 1.00 1,050.38 100.00 0.00 0.00000
02.01.03 REVEGETACION DE AREAS AFECTADAS CON ESPECIES DELA ZONA ha 1.00 4,875.36 4,875.36 1.00 4,875.36 0.00 0.00 0.00 1.00 4,875.36 100.00 0.00 0.00000
02.01.04 PROGRAMA DE ABANDONO DE OBRA Y RESTAURACION GLB 1.00 8,000.00 8,000.00 0.00 1.00 8,000.00 100.00 1.00 8,000.00 100.00 0.00 0.00000
3 CAPACITACION
3.01 ACCIONES PRELIMINARES
03.01.01 ACTIVIDADES DE PROMOCION
03.01.01.01 ELABORACION LINEA DE BASE GLB 1.00 1,200.00 1,200.00 0.00 1.00 1,200.00 100.00 1.00 1,200.00 100.00 0.00 0.00000
03.01.01.02 TALLER IMPORTANCIA DE LA ORGANIZACION Y PARTICIPACION COMUNITARIA GLB 1.00 1,300.00 1,300.00 0.00 1.00 1,300.00 100.00 1.00 1,300.00 100.00 0.00 0.00000
03.01.01.03 CONSTITUCION DE LA JASS Y PADRON DE USUARIOS GLB 1.00 800.00 800.00 0.00 1.00 800.00 100.00 1.00 800.00 100.00 0.00 0.00000
03.01.02 ACTIVIDADES DE CAPACITACION
03.01.02.01 ESTATUTOS Y RAGLAMENTOS GLB 1.00 1,800.00 1,800.00 0.00 1.00 1,800.00 100.00 1.00 1,800.00 100.00 0.00 0.00000
03.01.03 EDUCACION PARA LA HIGIENE
03.01.03.01 PLAN DE TRABAJO EN LA COMUNIDAD Y LA II.EE GLB 1.00 1,500.00 1,500.00 0.00 1.00 1,500.00 100.00 1.00 1,500.00 100.00 0.00 0.00000
3.02 ACCIONES DURANTE
Pgina 2 de 81

VALORIZACION DE OBRA N 10
FRMULA 01
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
: OBRAS PROVISIONALES - INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE
FORMULA 01
AYAVIRI, PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR REFERENCIAL : S/. 7,529,454.25 (INCLUYE IGV)
MONTO DEL CONTRATO : S/. 7,529,454.25 (INCLUYE IGV)
ADELANTO DIRECTO : S/. 752,945.43 (INCLUYE IGV) 10.00%
ADELANTO PARA MATERIALES : S/. 1,505,890.85 (INCLUYE IGV) 20.00%
FECHA VALOR REFERENCIAL May-16

PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANTERIOR AVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N
UND CANT. P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADOVALORIZADO % METRADO VALORIZADO
03.02.01 ACTIVIDADES PRELIMINARES
03.02.01.01 CONVOCATORIA PARA LOS TALLERES DE LA JASS GLB 1.00 2,000.00 2,000.00 0.00 1.00 2,000.00 100.00 1.00 2,000.00 100.00 0.00 0.00000
03.02.01.02 REALIZACION DE PASANTIA (FAMILIAS Y JASS) GLB 1.00 4,500.00 4,500.00 0.00 1.00 4,500.00 100.00 1.00 4,500.00 100.00 0.00 0.00000
03.02.02 ACTIVIDADES PROMOCION
03.02.02.01 GENERO GLB 1.00 1,200.00 1,200.00 0.00 1.00 1,200.00 100.00 1.00 1,200.00 100.00 0.00 0.00000
03.02.02.02 AUTOESTIMA GLB 1.00 1,200.00 1,200.00 0.00 1.00 1,200.00 100.00 1.00 1,200.00 100.00 0.00 0.00000
03.02.02.03 IMPORTANCIA DEL AGUA PARA LA VIDA Y LA SALUD GLB 1.00 1,200.00 1,200.00 0.00 1.00 1,200.00 100.00 1.00 1,200.00 100.00 0.00 0.00000
03.02.02.04 IMPORTANCIA DE LA ADECUADA ELIMINACION DE EXCRETAS GLB 1.00 1,200.00 1,200.00 0.00 1.00 1,200.00 100.00 1.00 1,200.00 100.00 0.00 0.00000
03.02.02.05 HABITOS DE HIGIENE PERSONAL GLB 1.00 1,200.00 1,200.00 0.00 1.00 1,200.00 100.00 1.00 1,200.00 100.00 0.00 0.00000
03.02.02.06 DISPOSICION DE RESIDUOS SOLIDOS Y RECICLAJE DE PLASTICOS GLB 1.00 1,200.00 1,200.00 0.00 1.00 1,200.00 100.00 1.00 1,200.00 100.00 0.00 0.00000
03.02.03 ACTIVIDADES DE CAPACITACION
03.02.03.01 ADMINISTRACION CONTABILIDAD Y CALCULO DE LA CUOTA FAMILIAR GLB 1.00 1,200.00 1,200.00 0.00 1.00 1,200.00 100.00 1.00 1,200.00 100.00 0.00 0.00000
03.02.03.02 GASFITERIA Y REPARACIONES GLB 1.00 1,200.00 1,200.00 0.00 1.00 1,200.00 100.00 1.00 1,200.00 100.00 0.00 0.00000
03.02.03.03 OPERACION Y MANTENIMIENTO DEL SISTEMA DE AGUA Y MODULOS GLB 1.00 1,200.00 1,200.00 0.00 1.00 1,200.00 100.00 1.00 1,200.00 100.00 0.00 0.00000
03.02.03.04 CLORACION Y DESINFECCION GLB 1.00 1,200.00 1,200.00 0.00 1.00 1,200.00 100.00 1.00 1,200.00 100.00 0.00 0.00000
03.02.04 EDUCACION PARA LA HIGIENE EN LA II.EE
03.02.04.01 CONSTITUCION Y FUNCIONAMIENTO DEL COMITE DE SALUD E HIGIENE GLB 1.00 1,200.00 1,200.00 0.00 1.00 1,200.00 100.00 1.00 1,200.00 100.00 0.00 0.00000
03.02.04.02 VERIFICACION DE LOS HABITOS DE HIGIENE DE LOS NIOS/AS GLB 1.00 1,200.00 1,200.00 0.00 1.00 1,200.00 100.00 1.00 1,200.00 100.00 0.00 0.00000
3.03 ACCIONES DESPUES
03.03.01 ACTIVIDADES DE PROMOCION Y EDUCACION SANITARIA
03.03.01.01 REFORZAMIENTO DE LOS TALLERES DE PROMOCION GLB 1.00 800.00 800.00 0.00 1.00 800.00 100.00 1.00 800.00 100.00 0.00 0.00000
03.03.01.02 SEGUIMIENTO A LAS FAMILIAS APLICANDO EL SID, PARTICIPA C.D DE LA JASS GLB 1.00 1,200.00 1,200.00 0.00 1.00 1,200.00 100.00 1.00 1,200.00 100.00 0.00 0.00000
03.03.01.03 CONVOCATORIA Y ACOMPAAMIENTO PARA EL INTERCAMBIO DE LA JASS GLB 1.00 1,200.00 1,200.00 0.00 1.00 1,200.00 100.00 1.00 1,200.00 100.00 0.00 0.00000
03.03.02 ACTIVIDADES DE CAPACITACION
03.03.02.01 HABITOS DE HIGIENE Y SEGUIMIENTO A LAS FAMILIAS SID GLB 1.00 1,200.00 1,200.00 0.00 1.00 1,200.00 100.00 1.00 1,200.00 100.00 0.00 0.00000
03.03.02.02 CONSERVACION DEL AGUA DE LA MICROCUENCA (GESTION Y DESASTRES) GLB 1.00 1,200.00 1,200.00 0.00 1.00 1,200.00 100.00 1.00 1,200.00 100.00 0.00 0.00000
03.03.02.03 REFORZAMIENTO DE LOS TALLERES DE CAPACITACION GLB 1.00 1,200.00 1,200.00 0.00 1.00 1,200.00 100.00 1.00 1,200.00 100.00 0.00 0.00000
03.03.03 EDUCACION PARA LA HIGIENE
03.03.03.01 CONCURSO SOBRE HIGIENE EN LA PARCIALIDAD, PARA LOGRAR UNA PARCIA GLB 1.00 2,500.00 2,500.00 0.00 1.00 2,500.00 100.00 1.00 2,500.00 100.00 0.00 0.00000
4 PLAN DE MONITOREO ARQUEOLOGICO
4.01 ELABORACION DEL PLAN DE MONITOREO ARQUEOLOGICO E INFORME FINAL GLB 1.00 4,000.00 4,000.00 0.00 1.00 4,000.00 100.00 1.00 4,000.00 100.00 0.00 0.00000
Pgina 3 de 81

VALORIZACION DE OBRA N 10
FRMULA 01
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
: OBRAS PROVISIONALES - INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE
FORMULA 01
AYAVIRI, PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR REFERENCIAL : S/. 7,529,454.25 (INCLUYE IGV)
MONTO DEL CONTRATO : S/. 7,529,454.25 (INCLUYE IGV)
ADELANTO DIRECTO : S/. 752,945.43 (INCLUYE IGV) 10.00%
ADELANTO PARA MATERIALES : S/. 1,505,890.85 (INCLUYE IGV) 20.00%
FECHA VALOR REFERENCIAL May-16

PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANTERIOR AVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N
UND CANT. P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADOVALORIZADO % METRADO VALORIZADO
4.02 IMPLEMENTACION DE PLAN DE MONITOREO GLB 1.00 28,000.00 28,000.00 0.00 1.00 28,000.00 100.00 1.00 28,000.00 100.00 0.00 0.00000
4.03 MATERIAL DE CAMPO GLB 1.00 1,500.00 1,500.00 0.00 1.00 1,500.00 100.00 1.00 1,500.00 100.00 0.00 0.00000
4.04 MATERIAL DE OFICINA GLB 1.00 1,000.00 1,000.00 0.00 1.00 1,000.00 100.00 1.00 1,000.00 100.00 0.00 0.00000
4.05 PRESENTACION Y APROBACION DE PLAN DE MONITOREO ARQUEOLOGICO GLB 1.00 2,500.00 2,500.00 0.00 1.00 2,500.00 100.00 1.00 2,500.00 100.00 0.00 0.00000
4.06 APROBACION DE INFORME FINAL GLB 1.00 1,500.00 1,500.00 0.00 1.00 1,500.00 100.00 1.00 1,500.00 100.00 0.00 0.00000
COSTO DIRECTO 270,455.14 4,875.36 265,579.78 270,455.14 0.00
GASTOS GENERALES 6.60% 17,850.04 321.77 17,528.27 17,850.04 0.00
UTILIDAD 8.00% 21,636.41 390.03 21,246.38 21,636.41 0.00
TOTAL 309,941.59 5,587.16 304,354.43 98.20% 309,941.59 100.00% 0.00
IGV 18% 55,789.49 1,005.69 54,783.80 55,789.49 -
TOTAL VALORIZADO 365,731.08 6,592.85 359,138.23 365,731.08 -
% VALORIZADO 1.80% 98.20% 100.00% 0.00%
Pgina 4 de 81

VALORIZACION DE OBRA N 10
FRMULA 02
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
: SISTEMA ALCCAMARINE - INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE
FORMULA 02
AYAVIRI, PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR REFERENCIAL : S/. 7,529,454.25 (INCLUYE IGV)
MONTO DEL CONTRATO : S/. 7,529,454.25 (INCLUYE IGV)
ADELANTO DIRECTO : S/. 752,945.43 (INCLUYE IGV) 10.00%
ADELANTO PARA MATERIALES : S/. 1,505,890.85 (INCLUYE IGV) 20.00%
FECHA VALOR REFERENCIAL May-16

PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANTERIOR AVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N
UND CANT. P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADOVALORIZADO % METRADO VALORIZADO
01 CAPTACION DE LADERA 0.70MX0.70M ( 01 UND)
01.01 TRABAJOS PRELIMINARES
01.01.01 LIMPIEZA DE TERRENO MANUAL M2 9.00 1.32 11.88 0.00 9.00 11.88 100.00 9.00 11.88 100.00 0.00 0.00
01.01.02 TRAZO Y REPLANTEO M2 3.54 0.99 3.50 0.00 3.54 3.50 100.00 3.54 3.50 100.00 0.00 0.00
01.02 MOVIMIENTO DE TIERRAS
01.02.01 EXCAVACION MANUAL EN TERRENO ARCILLOSO M3 0.98 33.36 32.69 0.00 0.98 32.69 100.00 0.98 32.69 100.00 0.00 0.00
01.02.02 REFINE Y NIVELACION - COMPACTADO M2 0.47 3.94 1.85 0.00 0.47 1.85 100.00 0.47 1.85 100.00 0.00 0.00
01.02.03 ACARREO DE MATERIAL EXCEDENTE (D=30 M) M3 1.64 23.35 38.29 0.00 1.64 38.29 100.00 1.64 38.29 100.00 0.00 0.00
01.03 OBRAS DE CONCRETO SIMPLE
01.03.01 CONCRETO f'c = 140 kg/cm2 CUBIERTA DE FILTRO S/M M3 0.18 318.93 57.41 0.00 0.18 57.41 100.00 0.18 57.41 100.00 0.00 0.00
01.03.02 CONCRETO f'c = 100 kg/cm2 BAJO FILTRO S/M M3 0.27 209.73 56.63 0.00 0.27 56.63 100.00 0.27 56.63 100.00 0.00 0.00
01.04 OBRAS DE CONCRETO ARMADO
01.04.01 CONCRETO F'C=175 KG/CM2, LOSA DE FONDO Y DENTELLENOS M3 0.37 297.70 110.15 0.00 0.37 110.15 100.00 0.37 110.15 100.00 0.00 0.00
01.04.02 CONCRETO F'C=175 KG/CM2, MUROS M3 0.67 297.70 199.46 0.00 0.67 199.46 100.00 0.67 199.46 100.00 0.00 0.00
01.04.03 ENCOFRADO Y DESENCOFRADO MUROS M2 9.23 36.40 335.97 0.00 9.23 335.97 100.00 9.23 335.97 100.00 0.00 0.00
01.04.04 CONCRETO F'C=210 KG/CM2, LOSA Y TAPA M3 0.04 371.85 14.87 0.00 0.04 14.87 100.00 0.04 14.87 100.00 0.00 0.00
01.04.05 ENCOFRADO Y DESENCOFRADO - P/TAPA M2 0.58 33.63 19.51 0.00 0.58 19.51 100.00 0.58 19.51 100.00 0.00 0.00
01.04.06 ACERO ESTRUCTURAL TRABAJADO fy=4200 kg/cm2 GRADO 60 KG 13.25 5.88 77.91 0.00 13.25 77.91 100.00 13.25 77.91 100.00 0.00 0.00
01.05 TARRAJEOS
01.05.01 TARRAJEO C/IMPER. INT. 1:5, e=1.5cm M2 3.43 40.27 138.13 0.00 3.43 138.13 100.00 3.43 138.13 100.00 0.00 0.00
01.05.02 TARRAJEO EN EXTERIORES MORTERO 1:5, e=1.5cm M2 6.74 37.29 251.33 0.00 6.74 251.33 100.00 6.74 251.33 100.00 0.00 0.00
01.06 FILTROS
01.06.01 FILTRO DE ARENA M3 0.35 125.73 44.01 0.00 0.35 44.01 100.00 0.35 44.01 100.00 0.00 0.00
01.06.02 FILTRO DE GRAVA (1) M3 0.53 125.24 66.38 0.00 0.53 66.38 100.00 0.53 66.38 100.00 0.00 0.00
01.07 VALVULAS Y ACCESORIOS
01.07.01 VALVULA Y ACCESORIOS EN CAPTACIN P/LADERA GLB 1.00 376.84 376.84 0.00 1.00 376.84 100.00 1.00 376.84 100.00 0.00 0.00
01.07.02 COLOCACION DE ACCESORIOS CAPTACIN Und 1.00 54.21 54.21 0.00 1.00 54.21 100.00 1.00 54.21 100.00 0.00 0.00
01.08 CERCO PERIMETRICO
01.08.01 COLOCADO DEL CERCO DE PROTECCION ML 9.00 26.35 237.15 0.00 9.00 237.15 100.00 9.00 237.15 100.00 0.00 0.00
01.09 PINTURA
01.09.01 PINTURA EN EXTERIORES EN CAPTACIN M2 5.60 10.25 57.40 0.00 5.60 57.40 100.00 5.60 57.40 100.00 0.00 0.00
Pgina 5 de 81

VALORIZACION DE OBRA N 10
FRMULA 02
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
: SISTEMA ALCCAMARINE - INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE
FORMULA 02
AYAVIRI, PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR REFERENCIAL : S/. 7,529,454.25 (INCLUYE IGV)
MONTO DEL CONTRATO : S/. 7,529,454.25 (INCLUYE IGV)
ADELANTO DIRECTO : S/. 752,945.43 (INCLUYE IGV) 10.00%
ADELANTO PARA MATERIALES : S/. 1,505,890.85 (INCLUYE IGV) 20.00%
FECHA VALOR REFERENCIAL May-16

PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANTERIOR AVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N
UND CANT. P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADOVALORIZADO % METRADO VALORIZADO
02 LINEA DE CONDUCCION ( 10.44 ML)
02.01 TRABAJOS PRELIMINARES
02.01.01 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS ML 10.44 0.45 4.70 0.00 10.44 4.70 100.00 10.44 4.70 100.00 0.00 0.00
02.02 MOVIMIENTO DE TIERRAS
02.02.01 EXCAVACION MANUAL EN MATERIAL SUELTO Y REFINE M3 1.67 29.19 48.75 0.00 1.67 48.75 100.00 1.67 48.75 100.00 0.00 0.00
02.02.02 CAMA DE APOYO PARA TUBERIA C/MAT. PROP. e=0.10m y b = 0.50m ML 10.44 3.35 34.97 0.00 10.44 34.97 100.00 10.44 34.97 100.00 0.00 0.00
02.02.03 RELLENO C/ MAT. PROP. b =0.40m, H=0.60m SOBRE LA CLAVE DE TUB. ML 10.44 5.08 53.04 0.00 10.44 53.04 100.00 10.44 53.04 100.00 0.00 0.00
02.03 SUMINISTRO E INSTALACION DE TUB.
02.03.01 TUBERIA PVC SAP CLASE-10 D= 2", NTP 399.002 ML 10.44 6.41 66.92 0.00 10.44 66.92 100.00 10.44 66.92 100.00 0.00 0.00
02.03.02 PRUEBA HIDRAULICA EN TUBERIAS ML 10.44 0.78 8.14 0.00 10.44 8.14 100.00 10.44 8.14 100.00 0.00 0.00
03 RESERVORIO CAP. (1 M3 = 01 UND)
03.01 TRABAJOS PRELIMINARES
03.01.01 LIMPIEZA DE TERRENO MANUAL M2 2.25 1.32 2.97 0.00 2.25 2.97 100.00 2.25 2.97 100.00 0.00 0.00
03.01.02 TRAZO Y REPLANTEO M2 2.25 0.99 2.23 0.00 2.25 2.23 100.00 2.25 2.23 100.00 0.00 0.00
03.02 MOVIMIENTO DE TIERRAS
03.02.01 EXCAVACION EN ZONA PEDREGOSA M3 0.45 59.51 26.78 0.00 0.45 26.78 100.00 0.45 26.78 100.00 0.00 0.00
03.02.02 REFINE Y NIVELACION - COMPACTADO M2 2.25 3.94 8.87 0.00 2.25 8.87 100.00 2.25 8.87 100.00 0.00 0.00
03.02.03 ACARREO DE MATERIAL EXCEDENTE (D=30 M) M3 0.68 23.35 15.88 0.00 0.68 15.88 100.00 0.68 15.88 100.00 0.00 0.00
03.03 OBRAS DE CONCRETO SIMPLE
03.03.01 SOLADO CONCRETO f'c=100kg/cm2, E=10CM M2 2.25 51.42 115.70 0.00 2.25 115.70 100.00 2.25 115.70 100.00 0.00 0.00
03.04 OBRAS DE CONCRETO ARMADO
03.04.01 CONCRETO f'c=210 kg/cm2 M3 0.68 403.95 274.69 0.00 0.68 274.69 100.00 0.68 274.69 100.00 0.00 0.00
03.04.02 ENCOFRADO Y DESENCOFRADO P/LOSA DE FONDO M2 1.80 39.86 71.75 0.00 1.80 71.75 100.00 1.80 71.75 100.00 0.00 0.00
03.04.03 ACERO ESTRUCTURAL TRABAJADO fy=4200 kg/cm2 GRADO 60 P/LOSA DE FONDOKG 21.66 5.81 125.84 0.00 21.66 125.84 100.00 21.66 125.84 100.00 0.00 0.00
03.04.04 CONCRETO f'c=210 kg/cm2 M3 1.04 403.95 420.11 0.00 1.04 420.11 100.00 1.04 420.11 100.00 0.00 0.00
03.04.05 ENCOFRADO Y DESENCOFRADO P/MURO M2 5.20 61.39 319.23 0.00 5.20 319.23 100.00 5.20 319.23 100.00 0.00 0.00
03.04.06 ACERO ESTRUCTURAL TRABAJADO fy=4200 kg/cm2 GRADO 60 P/MURO KG 36.97 5.81 214.79 0.00 36.97 214.79 100.00 36.97 214.79 100.00 0.00 0.00
03.04.07 CONCRETO f'c=210 kg/cm2 M3 0.24 403.95 96.95 0.00 0.24 96.95 100.00 0.24 96.95 100.00 0.00 0.00
03.04.08 ENCOFRADO Y DESENCOFRADO P/LOSA DE TECHO M2 0.84 54.34 45.65 0.00 0.84 45.65 100.00 0.84 45.65 100.00 0.00 0.00
03.04.09 ACERO ESTRUCTURAL TRABAJADO fy=4200 kg/cm2 GRADO 60 P/LOSA DE TEC KG 11.47 6.28 72.03 0.00 11.47 72.03 100.00 11.47 72.03 100.00 0.00 0.00
03.05 TARRAJEOS
Pgina 6 de 81

VALORIZACION DE OBRA N 10
FRMULA 02
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
: SISTEMA ALCCAMARINE - INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE
FORMULA 02
AYAVIRI, PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR REFERENCIAL : S/. 7,529,454.25 (INCLUYE IGV)
MONTO DEL CONTRATO : S/. 7,529,454.25 (INCLUYE IGV)
ADELANTO DIRECTO : S/. 752,945.43 (INCLUYE IGV) 10.00%
ADELANTO PARA MATERIALES : S/. 1,505,890.85 (INCLUYE IGV) 20.00%
FECHA VALOR REFERENCIAL May-16

PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANTERIOR AVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N
UND CANT. P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADOVALORIZADO % METRADO VALORIZADO
03.05.01 TARRAJEO C/IMPER. INT. 1:1, e=2cm M2 6.00 48.51 291.06 0.00 6.00 291.06 100.00 6.00 291.06 100.00 0.00 0.00
03.05.02 TARRAJEO FROTACHADO EXT. 1:5, e=1.5cm M2 7.84 42.03 329.52 0.00 7.84 329.52 100.00 7.84 329.52 100.00 0.00 0.00
03.05.03 MORTERO PARA DAR PENDIENTE DE FONDO M2 1.00 17.96 17.96 0.00 1.00 17.96 100.00 1.00 17.96 100.00 0.00 0.00
03.06 VALVULAS Y ACCESORIOS
03.06.01 VALVULAS Y ACCESORIOS P/RESERV. GLB 1.00 315.20 315.20 0.00 1.00 315.20 100.00 1.00 315.20 100.00 0.00 0.00
03.06.02 COLOCADO DE ACCESORIOS P/RESERV. GLB 1.00 366.96 366.96 0.00 1.00 366.96 100.00 1.00 366.96 100.00 0.00 0.00
03.07 PRUEBAS HIDRAULICAS Y DESINFECCION
03.07.01 PRUEBA HIDRAULICA M3 1.40 0.87 1.22 0.00 1.40 1.22 100.00 1.40 1.22 100.00 0.00 0.00
03.07.02 PRUEBA DESINFECCION M3 1.40 4.38 6.13 0.00 1.40 6.13 100.00 1.40 6.13 100.00 0.00 0.00
03.08 PINTURA
03.08.01 PINTADO DE MURO EXTERIOR C/LATEX LAVABLE M2 6.80 6.74 45.83 0.00 6.80 45.83 100.00 6.80 45.83 100.00 0.00 0.00
03.09 CASETA DE VALVULAS
03.09.01 LIMPIEZA DE TERRENO MANUAL M2 1.00 1.32 1.32 0.00 1.00 1.32 100.00 1.00 1.32 100.00 0.00 0.00
03.09.02 TRAZO Y REPLANTEO M2 1.00 0.99 0.99 0.00 1.00 0.99 100.00 1.00 0.99 100.00 0.00 0.00
03.09.03 EXCAVACION EN ZONA PEDREGOSA M3 0.30 59.51 17.85 0.00 0.30 17.85 100.00 0.30 17.85 100.00 0.00 0.00
03.09.04 REFINE Y NIVELACION - COMPACTADO M2 1.00 3.94 3.94 0.00 1.00 3.94 100.00 1.00 3.94 100.00 0.00 0.00
03.09.05 ACARREO DE MATERIAL EXCEDENTE (D=30 M) M3 0.30 23.35 7.01 0.00 0.30 7.01 100.00 0.30 7.01 100.00 0.00 0.00
03.09.06 CONCRETO f 'c=175 kg/cm2, P/LOSA DE FONDO, MURO LOSA DE TECHO M3 0.70 263.16 184.21 0.00 0.70 184.21 100.00 0.70 184.21 100.00 0.00 0.00
03.09.07 ENCOFRADO Y DESENCOFRADO M2 7.00 36.12 252.84 0.00 7.00 252.84 100.00 7.00 252.84 100.00 0.00 0.00
03.09.08 ACERO ESTRUCTURAL TRABAJADO fy=4200 kg/cm2 GRADO 60 KG 16.70 8.75 146.13 0.00 16.70 146.13 100.00 16.70 146.13 100.00 0.00 0.00
03.09.09 TARRAJEO FROTACHADO EXTERIOR Y INTERIOR 1:5, E=1.5cm M2 5.72 28.22 161.42 0.00 5.72 161.42 100.00 5.72 161.42 100.00 0.00 0.00
03.09.10 VALVULAS Y ACCESORIOS P/RESERVORIO 01 M3 GLB 1.00 793.19 793.19 0.00 1.00 793.19 100.00 1.00 793.19 100.00 0.00 0.00
03.09.11 COLOCADO DE ACCESORIOS EN CASETA DE VALVULAS Und 1.00 55.04 55.04 0.00 1.00 55.04 100.00 1.00 55.04 100.00 0.00 0.00
03.09.12 PINTADO DE MURO EXTERIOR C/LATEX LAVABLE M2 4.00 6.74 26.96 0.00 4.00 26.96 100.00 4.00 26.96 100.00 0.00 0.00
03.10 CERCO PERIMETRICO
03.10.01 COLOCADO DEL CERCO DE PROTECCION ML 30.00 26.35 790.50 0.00 30.00 790.50 100.00 30.00 790.50 100.00 0.00 0.00
04 RED DE ADUCCION Y DISTRIBUCION (L=644.44 ML)
04.01 TRABAJOS PRELIMINARES
04.01.01 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS ML 644.44 0.45 290.00 0.00 644.44 290.00 100.00 644.44 290.00 100.00 0.00 0.00
04.02 MOVIMIENTO DE TIERRAS
04.02.01 EXCAVACION MANUAL EN TERRENO NORMAL M3 112.00 33.36 3,736.32 0.00 112.00 3,736.32 100.00 112.00 3,736.32 100.00 0.00 0.00
Pgina 7 de 81

VALORIZACION DE OBRA N 10
FRMULA 02
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
: SISTEMA ALCCAMARINE - INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE
FORMULA 02
AYAVIRI, PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR REFERENCIAL : S/. 7,529,454.25 (INCLUYE IGV)
MONTO DEL CONTRATO : S/. 7,529,454.25 (INCLUYE IGV)
ADELANTO DIRECTO : S/. 752,945.43 (INCLUYE IGV) 10.00%
ADELANTO PARA MATERIALES : S/. 1,505,890.85 (INCLUYE IGV) 20.00%
FECHA VALOR REFERENCIAL May-16

PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANTERIOR AVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N
UND CANT. P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADOVALORIZADO % METRADO VALORIZADO
04.02.02 EXCAVACION MANUAL DE ZANJA, MATERIAL ROCA SUELTA M3 20.98 38.92 816.54 0.00 20.98 816.54 100.00 20.98 816.54 100.00 0.00 0.00
04.02.03 EXCAVACION MANUAL EN MATERIAL SUELTO Y REFINE M3 4.78 29.19 139.53 -10.33 -301.53 15.11 441.06 316.10 4.78 139.53 100.00 0.00 0.00
04.02.04 CAMA DE APOYO PARA TUBERIA C/MAT. PROP. e=0.10m ML 644.44 2.34 1,507.99 0.00 644.44 1,507.99 100.00 644.44 1,507.99 100.00 0.00 0.00
04.02.05 RELLENO C/ MAT. PROP. b =0.40m, H=0.60m SOBRE LA CLAVE DE TUB. ML 644.44 5.08 3,273.76 0.00 644.44 3,273.76 100.00 644.44 3,273.76 100.00 0.00 0.00
04.03 SUMINISTRO E INSTALACION DE TUB.
04.03.01 TUBERIA PVC SAP CLASE-10 D= 1", NTP 399.002 ML 30.84 3.80 117.19 0.00 30.84 117.19 100.00 30.84 117.19 100.00 0.00 0.00
04.03.02 TUBERIA PVC SAP CLASE-10 D= 3/4", NTP 399.002 ML 491.93 3.30 1,623.37 0.00 491.93 1,623.37 100.00 491.93 1,623.37 100.00 0.00 0.00
04.03.03 TUBERIA PVC SAP CLASE-10 D= 1/2", NTP 399.002 ML 121.67 2.46 299.31 0.00 121.67 299.31 100.00 121.67 299.31 100.00 0.00 0.00
04.03.04 PRUEBA HIDRAULICA EN TUBERIAS ML 644.44 0.78 502.66 0.00 644.44 502.66 100.00 644.44 502.66 100.00 0.00 0.00
04.04 SUMINISTRO Y COLOCACION DE ACCESORIOS
04.04.01 SUMINISTRO DE ACCESORIOS PARA RED DE DISTRIBUCION GLB 1.00 36.84 36.84 0.00 1.00 36.84 100.00 1.00 36.84 100.00 0.00 0.00
04.04.02 COLOCACION DE ACCESORIOS PARA RED DE DISTRIBUCION GLB 1.00 316.91 316.91 0.00 1.00 316.91 100.00 1.00 316.91 100.00 0.00 0.00
04.05 CAJA VALV. DE PURGA (01 UND), D= 3/4"
04.05.01 TRABAJOS PRELIMINARES
04.05.01.01 LIMPIEZA DE TERRENO MANUAL M2 0.64 1.32 0.84 0.00 0.64 0.84 100.00 0.64 0.84 100.00 0.00 0.00
04.05.01.02 TRAZO Y REPLANTEO M2 0.64 0.99 0.63 0.00 0.64 0.63 100.00 0.64 0.63 100.00 0.00 0.00
04.05.02 MOVIMIENTO DE TIERRAS
04.05.02.01 EXCAVACION MANUAL EN MATERIAL SUELTO M3 0.51 29.19 14.89 0.00 0.51 14.89 100.00 0.51 14.89 100.00 0.00 0.00
04.05.02.02 REFINE Y NIVELACION - COMPACTADO M2 0.64 3.94 2.52 0.00 0.64 2.52 100.00 0.64 2.52 100.00 0.00 0.00
04.05.02.03 ACARREO DE MATERIAL EXCEDENTE (D=30 M) M3 0.60 23.35 14.01 0.00 0.60 14.01 100.00 0.60 14.01 100.00 0.00 0.00
04.05.03 OBRAS DE CONCRETO ARMADO
04.05.03.01 CONCRETO f'c = 140 kg/cm2 M3 0.20 221.03 44.21 0.00 0.20 44.21 100.00 0.20 44.21 100.00 0.00 0.00
04.05.03.02 ENCOFRADO Y DESENCOFRADO M2 2.80 50.66 141.85 0.00 2.80 141.85 100.00 2.80 141.85 100.00 0.00 0.00
04.05.04 TARRAJEOS
04.05.04.01 TARRAJEO EN EXTERIORES MORTERO 1:5, e=1.5cm M2 2.80 37.29 104.41 0.00 2.80 104.41 100.00 2.80 104.41 100.00 0.00 0.00
04.05.05 ACCESORIOS Y ACCESORIOS
04.05.05.01 VALVULA Y ACCESORIOS EN CAJA VALV. DE AIRE DN 3/4" Und 1.00 52.35 52.35 0.00 1.00 52.35 100.00 1.00 52.35 100.00 0.00 0.00
04.05.05.02 COLOCADO DE ACCESORIOS EN CAJA VALV. DE PURGA Und 1.00 108.42 108.42 0.00 1.00 108.42 100.00 1.00 108.42 100.00 0.00 0.00
04.05.05.03 TAPA METALICA INSPECCION DE 50X50CM UND 1.00 176.00 176.00 0.00 1.00 176.00 100.00 1.00 176.00 100.00 0.00 0.00
04.05.06 PINTURA
04.05.06.01 PINTURA EN EXTERIOR M2 2.24 10.64 23.83 0.00 2.24 23.83 100.00 2.24 23.83 100.00 0.00 0.00
Pgina 8 de 81

VALORIZACION DE OBRA N 10
FRMULA 02
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
: SISTEMA ALCCAMARINE - INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE
FORMULA 02
AYAVIRI, PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR REFERENCIAL : S/. 7,529,454.25 (INCLUYE IGV)
MONTO DEL CONTRATO : S/. 7,529,454.25 (INCLUYE IGV)
ADELANTO DIRECTO : S/. 752,945.43 (INCLUYE IGV) 10.00%
ADELANTO PARA MATERIALES : S/. 1,505,890.85 (INCLUYE IGV) 20.00%
FECHA VALOR REFERENCIAL May-16

PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANTERIOR AVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N
UND CANT. P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADOVALORIZADO % METRADO VALORIZADO
05 INSTALACION DE LETRINAS Y TRATAMIENTO DE AGUAS SERVIDAS
05.01 MODULO DE LETRINAS (05 und)
05.01.01 TRABAJOS PRELIMINARES
05.01.01.01 LIMPIEZA DE TERRENO MANUAL M2 24.50 1.32 32.34 0.00 24.50 32.34 100.00 24.50 32.34 100.00 0.00 0.00
05.01.01.02 TRAZO Y REPLANTEO M2 24.50 0.99 24.26 0.00 24.50 24.26 100.00 24.50 24.26 100.00 0.00 0.00
05.01.02 MOVIMIENTO DE TIERRAS
05.01.02.01 EXCAVACION EN TERRENO NORMAL P/ CIMIENTOS M3 7.50 29.19 218.93 0.00 7.50 218.93 100.00 7.50 218.93 100.00 0.00 0.00
05.01.02.02 RELLENO CON MATERIAL PROPIO M3 0.45 16.68 7.51 0.00 0.45 7.51 100.00 0.45 7.51 100.00 0.00 0.00
05.01.02.03 REFINE Y NIVELACION - COMPACTADO M2 60.00 3.94 236.40 0.00 60.00 236.40 100.00 60.00 236.40 100.00 0.00 0.00
05.01.02.04 ACARREO DE MATERIAL EXCEDENTE (D=30 M) M3 9.38 23.35 219.02 0.00 9.38 219.02 100.00 9.38 219.02 100.00 0.00 0.00
05.01.03 OBRAS DE CONCRETO SIMPLE
05.01.03.01 CIMIENTO CORRIDO MEZCLA 1:10+30 % PM) M3 6.00 166.39 998.34 0.00 6.00 998.34 100.00 6.00 998.34 100.00 0.00 0.00
05.01.03.02 SOBRECIMIENTO CONCRETO MEZCLA 1:8+25% PM M3 1.52 247.18 375.71 0.00 1.52 375.71 100.00 1.52 375.71 100.00 0.00 0.00
05.01.03.03 ENCOFRADO Y DESENCOFRADO P/SOBRECIMIENTOS M2 20.25 43.87 888.37 0.00 20.25 888.37 100.00 20.25 888.37 100.00 0.00 0.00
05.01.04 OBRAS DE CONCRETO ARMADO
05.01.04.01 CONCRETO f'c=175 kg/cm2 P/Losa Sanitaria M3 1.35 342.40 462.24 0.00 1.35 462.24 100.00 1.35 462.24 100.00 0.00 0.00
05.01.04.02 CONCRETO f'c=175 kg/cm2 P/VIGUETAS M3 0.34 342.40 115.56 0.00 0.34 115.56 100.00 0.34 115.56 100.00 0.00 0.00
05.01.04.03 ACERO ESTRUCTURAL TRABAJADO fy=4200 kg/cm2 GRADO 60 P/VIGUETA KG 35.08 6.03 211.53 0.00 35.08 211.53 100.00 35.08 211.53 100.00 0.00 0.00
05.01.04.04 ENCOFRADO Y DESENCOFRADO P/VIGUETA M2 5.06 54.21 274.30 0.00 5.06 274.30 100.00 5.06 274.30 100.00 0.00 0.00
05.01.05 MUROS Y TABIQUES DE ALBAILERIA
05.01.05.01 MURO DE LADRILLO K.K. DE SOGA CARAVISTA MEZC. C:A 1:4, E=1.5 CM M2 69.61 77.44 5,390.60 0.00 69.61 5,390.60 100.00 69.61 5,390.60 100.00 0.00 0.00
05.01.06 REVOQUES Y PISO
05.01.06.01 TARRAJEO INTERIORES C/MORTERO 1:5 E=1.5CM M2 61.56 17.35 1,068.07 0.00 61.56 1,068.07 100.00 61.56 1,068.07 100.00 0.00 0.00
05.01.06.02 PISO DE CONCRETO COLOREADO FROTACHADO E=2.5CM M2 13.50 25.27 341.15 0.00 13.50 341.15 100.00 13.50 341.15 100.00 0.00 0.00
05.01.07 CONTRAZOCALOS
05.01.07.01 CONTRAZOCALO DE CEMENTO H=0.40 m., 1:5 ML 34.00 15.88 539.92 0.00 34.00 539.92 100.00 34.00 539.92 100.00 0.00 0.00
05.01.08 CARPINTERIA DE MADERA
05.01.08.01 VIGA DE MADERA 2"x3"x2.05 M. UND 20.00 14.28 285.60 0.00 20.00 285.60 100.00 20.00 285.60 100.00 0.00 0.00
05.01.08.02 CORREAS DE MADERA 2"x2"x10' ML 43.95 8.63 379.29 0.00 43.95 379.29 100.00 43.95 379.29 100.00 0.00 0.00
05.01.08.03 SUMINISTRO Y COLOCADO DE VENTANA METALICA INC/VIDRIOS UND 5.00 76.14 380.70 0.00 5.00 380.70 100.00 5.00 380.70 100.00 0.00 0.00
05.01.08.04 SUMINISTRO Y COLOCADO DE PUERTA METALICA INC/VIDRIOS UND 5.00 224.21 1,121.05 0.00 5.00 1,121.05 100.00 5.00 1,121.05 100.00 0.00 0.00
Pgina 9 de 81

VALORIZACION DE OBRA N 10
FRMULA 02
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
: SISTEMA ALCCAMARINE - INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE
FORMULA 02
AYAVIRI, PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR REFERENCIAL : S/. 7,529,454.25 (INCLUYE IGV)
MONTO DEL CONTRATO : S/. 7,529,454.25 (INCLUYE IGV)
ADELANTO DIRECTO : S/. 752,945.43 (INCLUYE IGV) 10.00%
ADELANTO PARA MATERIALES : S/. 1,505,890.85 (INCLUYE IGV) 20.00%
FECHA VALOR REFERENCIAL May-16

PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANTERIOR AVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N
UND CANT. P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADOVALORIZADO % METRADO VALORIZADO
05.01.09 CUBERTURA
05.01.09.01 COBERTURA IMPERMEABILIZANTE ONDULINE 2.00 X 0.95 X 0.26 MM M2 29.30 48.60 1,423.98 0.00 29.30 1,423.98 100.00 29.30 1,423.98 100.00 0.00 0.00
05.01.10 PINTURA
05.01.10.01 PINTURA LATEX 2 MANOS EN LETRINAS M2 58.05 8.30 481.82 0.00 58.05 481.82 100.00 58.05 481.82 100.00 0.00 0.00
05.01.10.02 PINTURA ESMALTE EN ZOCALOS EXTERIOR LETRINAS M2 10.50 13.10 137.55 0.00 10.50 137.55 100.00 10.50 137.55 100.00 0.00 0.00
05.01.11 INSTALACIONES SANITARIAS
05.01.11.01 SUMINISTRO Y COLOCADO DE LAVATORIO DE LOSA VITRIFICADA (INC ACCESORIOS)
UND 5.00 268.64 1,343.20 0.00 5.00 1,343.20 100.00 5.00 1,343.20 100.00 0.00 0.00
05.01.11.02 SUMINISTRO Y COLOCADO DE INODORO UND 5.00 259.90 1,299.50 0.00 5.00 1,299.50 100.00 5.00 1,299.50 100.00 0.00 0.00
05.01.11.03 SUMINISTRO Y COLOCADO DE DUCHA UND 5.00 53.13 265.65 0.00 5.00 265.65 100.00 5.00 265.65 100.00 0.00 0.00
05.01.11.04 SUMIDERO DE 2", PARA DUCHA UND 5.00 51.50 257.50 0.00 5.00 257.50 100.00 5.00 257.50 100.00 0.00 0.00
05.01.12 INSTALACIONES SANITARIAS
05.01.12.01 TENDIDO DE TUBERIA PVC SAL DE 4" ML 20.00 6.57 131.40 0.00 20.00 131.40 100.00 20.00 131.40 100.00 0.00 0.00
05.01.12.02 TENDIDO DE TUBERIA PVC SAL DE 2" ML 20.00 3.82 76.40 0.00 20.00 76.40 100.00 20.00 76.40 100.00 0.00 0.00
05.01.13 INSTALACIONES ELECTRICAS
05.01.13.01 SALIDA DE TECHO C/CABLE AWG TW 2.5MM(14)+D PVC SEL 16MM(5/8) pto 5.00 57.52 287.60 0.00 5.00 287.60 100.00 5.00 287.60 100.00 0.00 0.00
5.02 TRATAMIENTO AGUAS RESIDUALES DOMESTICAS (36 UND)
05.02.01 TRABAJOS PRELIMINARES
05.02.01.01 LIMPIEZA DE TERRENO MANUAL M2 50.00 1.32 66.00 0.00 50.00 66.00 100.00 50.00 66.00 100.00 0.00 0.00
05.02.01.02 TRAZO Y REPLANTEO M2 50.00 0.99 49.50 0.00 50.00 49.50 100.00 50.00 49.50 100.00 0.00 0.00
05.02.02 MOVIMIENTO DE TIERRAS
05.02.02.01 EXCAVACION MANUAL EN TERRENO NORMAL P/CAJA DE REGISTRO M3 2.84 29.19 82.90 0.00 2.84 82.90 100.00 2.84 82.90 100.00 0.00 0.00
05.02.02.02 EXCAVACION MANUAL EN TERRENO NORMAL P/COLECTOR M3 18.15 29.19 529.80 0.00 18.15 529.80 100.00 18.15 529.80 100.00 0.00 0.00
05.02.02.03 EXCAVACION MANUAL EN TERRENO NORMAL P/BIODIGESTOR M3 4.97 29.19 145.07 0.00 4.97 145.07 100.00 4.97 145.07 100.00 0.00 0.00
05.02.02.04 EXCAVACION MANUAL EN TERRENO NORMAL P/CAJA DE LODOS M3 3.04 29.19 88.74 0.00 3.04 88.74 100.00 3.04 88.74 100.00 0.00 0.00
05.02.02.05 EXCAVACION MANUAL EN TERRENO NORMAL P/ZANJA DE INFILTACION M3 7.00 29.19 204.33 0.00 7.00 204.33 100.00 7.00 204.33 100.00 0.00 0.00
05.02.02.06 REFINE Y NIVELACION DE FONDOS ML 90.00 1.98 178.20 0.00 90.00 178.20 100.00 90.00 178.20 100.00 0.00 0.00
05.02.02.07 REFINE Y NIVELACION P/BIODIGESTOR M2 8.50 4.76 40.46 0.00 8.50 40.46 100.00 8.50 40.46 100.00 0.00 0.00
05.02.02.08 ACARREO DE MATERIAL EXCEDENTE (D=30 M) M3 4.91 23.35 114.65 0.00 4.91 114.65 100.00 4.91 114.65 100.00 0.00 0.00
05.02.03 CAMA DE APOYO (TUBERIA Y BIODIGESTOR)
05.02.03.01 CAMA DE APOYO C/MAT. PROP. ML 90.00 2.91 261.90 0.00 90.00 261.90 100.00 90.00 261.90 100.00 0.00 0.00
Pgina 10 de 81

VALORIZACION DE OBRA N 10
FRMULA 02
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
: SISTEMA ALCCAMARINE - INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE
FORMULA 02
AYAVIRI, PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR REFERENCIAL : S/. 7,529,454.25 (INCLUYE IGV)
MONTO DEL CONTRATO : S/. 7,529,454.25 (INCLUYE IGV)
ADELANTO DIRECTO : S/. 752,945.43 (INCLUYE IGV) 10.00%
ADELANTO PARA MATERIALES : S/. 1,505,890.85 (INCLUYE IGV) 20.00%
FECHA VALOR REFERENCIAL May-16

PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANTERIOR AVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N
UND CANT. P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADOVALORIZADO % METRADO VALORIZADO
05.02.03.02 CAMA DE APOYO C/MAT. PROP. (BIODIGESTOR) M2 22.49 3.90 87.71 0.00 22.49 87.71 100.00 22.49 87.71 100.00 0.00 0.00
05.02.04 RELLENO
05.02.04.01 PRIMER RELLENO C/ MATERIAL PROP. A=0.50, H=0.15CM ML 90.00 2.63 236.70 0.00 90.00 236.70 100.00 90.00 236.70 100.00 0.00 0.00
05.02.04.02 RELLENO COMPACATDO C/MATERIAL PROPIO - BIODIGESTOR M3 90.00 19.46 1,751.40 0.00 90.00 1,751.40 100.00 90.00 1,751.40 100.00 0.00 0.00
05.02.05 CONCRETO SIMPLE (CAJAS DE REGISTRO, LODOS Y DIST.)
05.02.05.01 SOLADO DE CONCRETO f'c=100kg/cm2 (CAJAS Y BIODIGESTOR) M2 7.10 42.90 304.59 0.00 7.10 304.59 100.00 7.10 304.59 100.00 0.00 0.00
05.02.05.02 CONCRETO f'c = 140 kg/cm2 P/CAJA DE LODOS M3 0.38 256.31 97.40 0.00 0.38 97.40 100.00 0.38 97.40 100.00 0.00 0.00
05.02.05.03 ENCOFRADO Y DESENCOFRADO M2 15.00 31.21 468.15 0.00 15.00 468.15 100.00 15.00 468.15 100.00 0.00 0.00
05.02.05.04 CONCRETO f'c = 175 kg/cm2 P/CAJAS DE DIST. Y REGISTRO M3 1.51 289.99 437.88 0.00 1.51 437.88 100.00 1.51 437.88 100.00 0.00 0.00
05.02.05.05 ENCOFRADO Y DESENCOFRADO M2 13.05 31.21 407.29 0.00 13.05 407.29 100.00 13.05 407.29 100.00 0.00 0.00
05.02.06 CONCRETO ARMADO (TAPAS DE CAJAS)
05.02.06.01 CONCRETO f'c = 175 kg/cm2 - (TAPAS DE CAJAS) M3 0.02 289.99 5.80 -0.39 -113.10 0.41 118.90 2,050.00 0.02 5.80 100.00 0.00 0.00
05.02.06.02 ENCOFRADO Y DESENCOFRADO M2 1.80 31.21 56.18 0.00 1.80 56.18 100.00 1.80 56.18 100.00 0.00 0.00
05.02.06.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 KG 22.36 6.23 139.30 0.00 22.36 139.30 100.00 22.36 139.30 100.00 0.00 0.00
05.02.07 BIODIGESTOR AUTOLIMPIABLE
05.02.07.01 SUMINISTRO E INST. DE BIODIGESTOR CLARIFICADOR DE 600LTS UND 5.00 1034.07 5,170.35 0.00 5.00 5,170.35 100.00 5.00 5,170.35 100.00 0.00 0.00
05.02.08 TUBERIA DE RED COLECTOR
05.02.08.01 SUMINISTRO E INSTALACION DE TUBERIAS NTP 399.003 ML 25.00 9.98 249.50 0.00 25.00 249.50 100.00 25.00 249.50 100.00 0.00 0.00
05.02.08.02 SUMINISTRO E INSTALACION DE TUB. NTP 4435 DN 110MM ML 30.00 16.32 489.60 0.00 30.00 489.60 100.00 30.00 489.60 100.00 0.00 0.00
05.02.09 ZANJAS DE INFILTRACION
05.02.09.01 CRIBADO DE TUB. ML 25.00 3.29 82.25 0.00 25.00 82.25 100.00 25.00 82.25 100.00 0.00 0.00
05.02.09.02 SUMINISTRO E INSTALACION DE TUBERIAS NTP 399.003 ML 35.00 7.04 246.40 0.00 35.00 246.40 100.00 35.00 246.40 100.00 0.00 0.00
05.02.09.03 SUMINISTRO E INSTALACION DE ACCESORIOS GLB 5.00 49.02 245.10 0.00 5.00 245.10 100.00 5.00 245.10 100.00 0.00 0.00
05.02.09.04 COLOCADO DE GRAVA S M3 2.00 75.21 150.42 0.00 2.00 150.42 100.00 2.00 150.42 100.00 0.00 0.00
06 PILETAS FAMILIARES (36 UND)
06.01 TRABAJOS PRELIMINARES
06.01.01 LIMPIEZA DE TERRENO MANUAL M2 10.00 1.32 13.20 0.00 10.00 13.20 100.00 10.00 13.20 100.00 0.00 0.00
06.01.02 TRAZO Y REPLANTEO M2 4.50 0.99 4.46 0.00 4.50 4.46 100.00 4.50 4.46 100.00 0.00 0.00
06.02 MOVIMIENTO DE TIERRAS
06.02.01 EXCAVACION MASIVA MANUAL - POZO PERCOLADOR M3 0.14 33.36 4.50 0.00 0.14 4.50 100.00 0.14 4.50 100.00 0.00 0.00
Pgina 11 de 81

VALORIZACION DE OBRA N 10
FRMULA 02
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
: SISTEMA ALCCAMARINE - INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE
FORMULA 02
AYAVIRI, PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR REFERENCIAL : S/. 7,529,454.25 (INCLUYE IGV)
MONTO DEL CONTRATO : S/. 7,529,454.25 (INCLUYE IGV)
ADELANTO DIRECTO : S/. 752,945.43 (INCLUYE IGV) 10.00%
ADELANTO PARA MATERIALES : S/. 1,505,890.85 (INCLUYE IGV) 20.00%
FECHA VALOR REFERENCIAL May-16

PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANTERIOR AVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N
UND CANT. P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADOVALORIZADO % METRADO VALORIZADO
06.02.02 ACARREO DE MATERIAL EXCEDENTE (D=30 M) M3 0.17 23.35 3.94 0.00 0.17 3.94 100.00 0.17 3.94 100.00 0.00 0.00
06.03 OBRAS DE CONCRETO SIMPLE
06.03.01 CONCRETO f'c = 140 kg/cm2 M3 0.77 221.03 171.08 0.00 0.77 171.08 100.00 0.77 171.08 100.00 0.00 0.00
06.04 OBRAS DE CONCRETO ARMADO
06.04.01 CONCRETO f'c=175 kg/cm2, losa, muros y soporte pileta M3 0.82 288.56 235.18 0.00 0.82 235.18 100.00 0.82 235.18 100.00 0.00 0.00
06.04.02 ENCOFRADO Y DESENCOFRADO M2 19.34 50.66 979.51 0.00 19.34 979.51 100.00 19.34 979.51 100.00 0.00 0.00
06.04.03 ACERO ESTRUCTURAL TRABAJDO fy=4200 kg/cm2 GRADO 60 KG 47.92 6.11 292.77 0.00 47.92 292.77 100.00 47.92 292.77 100.00 0.00 0.00
06.05 TARRAJEOS
06.05.01 TARRAJEO EN INTERIORES Y EXTERIORES MORTERO 1:5, e=1.5cm M2 27.12 38.55 1,045.48 0.00 27.12 1,045.48 100.00 27.12 1,045.48 100.00 0.00 0.00
06.06 SUMINISTRO E INSTALACION DE TUB.
06.06.01 SUMINISTRO Y COLOCACION DE ACCESORIO DE PILETAS DOMICILIARIAS UND 5.00 70.30 351.50 0.00 5.00 351.50 100.00 5.00 351.50 100.00 0.00 0.00
06.07 ACCESORIOS
06.07.01 VALVULA Y ACCESORIOS GLB 5.00 35.65 178.25 0.00 5.00 178.25 100.00 5.00 178.25 100.00 0.00 0.00
06.08 PINTURA
06.08.01 PINTURA EN EXTERIOR M2 27.12 12.63 342.53 0.00 27.12 342.53 100.00 27.12 342.53 100.00 0.00 0.00
COSTO DIRECTO 56,660.68 -414.63 57,075.31 56,660.68 0.00
GASTOS GENERALES 6.60% 3,739.60 -27.37 3,766.97 3,739.60 0.00
UTILIDAD 8.00% 4,532.85 -33.17 4,566.02 4,532.85 0.00
TOTAL 64,933.13 -475.17 65,408.30 100.73% 64,933.13 100.00% 0.00
IGV 18% 11,687.96 - 85.53 11,773.49 11,687.96 -
TOTAL VALORIZADO 76,621.09 - 560.70 77,181.79 76,621.09 -
% VALORIZADO -0.73% 100.73% 100.00% 0.00%
VALORIZACION DE OBRA N 10
FRMULA 03
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
: SISTEMA CALUYO - INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE
FORMULA 03
AYAVIRI, PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR REFERENCIAL : S/. 7,529,454.25 (INCLUYE IGV)
MONTO DEL CONTRATO : S/. 7,529,454.25 (INCLUYE IGV)
ADELANTO DIRECTO : S/. 752,945.43 (INCLUYE IGV) 10.00%
ADELANTO PARA MATERIALES : S/. 1,505,890.85 (INCLUYE IGV) 20.00%
FECHA VALOR REFERENCIAL May-16

PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANTERIOR AVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N
UND CANT. P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADOVALORIZADO % METRADO VALORIZADO
01 CAPTACION DE LADERA 0.70MX0.70M ( 01 UND)
01.01 TRABAJOS PRELIMINARES
01.01.01 LIMPIEZA DE TERRENO MANUAL M2 9.00 1.32 11.88 0.00 9.00 11.88 100.00 9.00 11.88 100.00 0.00 0.00
01.01.02 TRAZO Y REPLANTEO M2 3.54 0.99 3.50 0.00 3.54 3.50 100.00 3.54 3.50 100.00 0.00 0.00
01.02 MOVIMIENTO DE TIERRAS 0.00 0.00
01.02.01 EXCAVACION MANUAL EN TERRENO ARCILLOSO M3 0.98 33.36 32.69 0.00 0.10 0.98 32.59 99.69 0.98 32.69 100.00 0.00 0.00
01.02.02 REFINE Y NIVELACION - COMPACTADO M2 0.47 3.94 1.85 0.00 0.47 1.85 100.00 0.47 1.85 100.00 0.00 0.00
01.02.03 ACARREO DE MATERIAL EXCEDENTE (D=30 M) M3 1.64 23.35 38.29 0.00 1.64 38.29 100.00 1.64 38.29 100.00 0.00 0.00
01.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00
01.03.01 CONCRETO f'c = 140 kg/cm2 CUBIERTA DE FILTRO S/M M3 0.18 318.93 57.41 0.00 0.18 57.41 100.00 0.18 57.41 100.00 0.00 0.00
01.03.02 CONCRETO f'c = 100 kg/cm2 BAJO FILTRO S/M M3 0.27 209.73 56.63 0.00 0.27 56.63 100.00 0.27 56.63 100.00 0.00 0.00
01.04 OBRAS DE CONCRETO ARMADO 0.00 0.00
01.04.01 CONCRETO F'C=175 KG/CM2, LOSA DE FONDO Y DENTELLENOS M3 0.37 297.70 110.15 0.00 0.37 110.15 100.00 0.37 110.15 100.00 0.00 0.00
01.04.02 CONCRETO F'C=175 KG/CM2, MUROS M3 0.67 297.70 199.46 0.00 0.67 199.46 100.00 0.67 199.46 100.00 0.00 0.00
01.04.03 ENCOFRADO Y DESENCOFRADO MUROS M2 9.23 36.40 335.97 0.00 9.23 335.97 100.00 9.23 335.97 100.00 0.00 0.00
01.04.04 CONCRETO F'C=210 KG/CM2, LOSA Y TAPA M3 0.04 371.85 14.87 0.00 0.04 14.87 100.00 0.04 14.87 100.00 0.00 0.00
01.04.05 ENCOFRADO Y DESENCOFRADO - P/TAPA M2 0.58 33.63 19.51 0.00 0.58 19.51 100.00 0.58 19.51 100.00 0.00 0.00
01.04.06 ACERO ESTRUCTURAL TRABAJADO fy=4200 kg/cm2 GRADO 60 KG 13.25 5.88 77.91 0.00 13.25 77.91 100.00 13.25 77.91 100.00 0.00 0.00
01.05 TARRAJEOS 0.00 0.00
01.05.01 TARRAJEO C/IMPER. INT. 1:5, e=1.5cm M2 3.43 40.27 138.13 0.00 3.43 138.13 100.00 3.43 138.13 100.00 0.00 0.00
01.05.02 TARRAJEO EN EXTERIORES MORTERO 1:5, e=1.5cm M2 6.74 37.29 251.33 0.00 6.74 251.33 100.00 6.74 251.33 100.00 0.00 0.00
01.06 FILTROS 0.00 0.00
01.06.01 FILTRO DE ARENA M3 0.35 125.73 44.01 0.00 0.35 44.01 100.00 0.35 44.01 100.00 0.00 0.00
01.06.02 FILTRO DE GRAVA (1) M3 0.53 125.24 66.38 0.00 0.53 66.38 100.00 0.53 66.38 100.00 0.00 0.00
01.07 VALVULAS Y ACCESORIOS 0.00 0.00
01.07.01 VALVULA Y ACCESORIOS EN CAPTACIN P/LADERA GLB 1.00 376.84 376.84 0.00 1.00 376.84 100.00 1.00 376.84 100.00 0.00 0.00
01.07.02 COLOCACION DE ACCESORIOS CAPTACIN Und 1.00 54.21 54.21 0.00 1.00 54.21 100.00 1.00 54.21 100.00 0.00 0.00
01.08 CERCO PERIMETRICO 0.00 0.00
01.08.01 COLOCADO DEL CERCO DE PROTECCION ML 9.00 26.35 237.15 0.00 9.00 237.15 100.00 9.00 237.15 100.00 0.00 0.00
01.09 PINTURA 0.00 0.00
01.09.01 PINTURA EN EXTERIORES EN CAPTACIN M2 5.60 10.25 57.40 0.00 5.60 57.40 100.00 5.60 57.40 100.00 0.00 0.00
VALORIZACION DE OBRA N 10
FRMULA 03
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
: SISTEMA CALUYO - INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE
FORMULA 03
AYAVIRI, PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR REFERENCIAL : S/. 7,529,454.25 (INCLUYE IGV)
MONTO DEL CONTRATO : S/. 7,529,454.25 (INCLUYE IGV)
ADELANTO DIRECTO : S/. 752,945.43 (INCLUYE IGV) 10.00%
ADELANTO PARA MATERIALES : S/. 1,505,890.85 (INCLUYE IGV) 20.00%
FECHA VALOR REFERENCIAL May-16

PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANTERIOR AVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N
UND CANT. P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADOVALORIZADO % METRADO VALORIZADO
02 LINEA DE CONDUCCION ( 21,931.23 ML) 0.00 0.00
02.01 TRABAJOS PRELIMINARES 0.00 0.00
02.01.01 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS ML 204.81 0.45 92.16 0.00 204.81 92.16 100.00 204.81 92.16 100.00 0.00 0.00
02.02 MOVIMIENTO DE TIERRAS 0.00 0.00
02.02.01 EXCAVACION MANUAL EN TERRENO NORMAL M3 44.10 33.36 1,471.18 (5.18) -172.80 49.28 1,643.98 111.75 44.10 1,471.18 100.00 0.00 0.00
02.02.02 EXCAVACION MANUAL DE ZANJA, MATERIAL ROCA SUELTA M3 5.60 46.70 261.52 0.00 5.60 261.52 100.00 5.60 261.52 100.00 0.00 0.00
02.02.03 EXCAVACION MANUAL EN MATERIAL SUELTO Y REFINE M3 1.41 29.19 41.16 0.00 1.41 41.16 100.00 1.41 41.16 100.00 0.00 0.00
02.02.04 CAMA DE APOYO PARA TUBERIA C/MAT. PROP. e=0.10m y b = 0.50m ML 204.81 3.35 686.11 0.00 204.81 686.11 100.00 204.81 686.11 100.00 0.00 0.00
02.02.05 RELLENO C/ MAT. PROP. b =0.40m, H=0.60m SOBRE LA CLAVE DE TUB. ML 204.81 5.08 1,040.43 0.00 204.81 1,040.43 100.00 204.81 1,040.43 100.00 0.00 0.00
02.03 SUMINISTRO E INSTALACION DE TUB. 0.00 0.00
02.03.01 TUBERIA PVC SAP CLASE-10 D= 2", NTP 399.002 ML 204.81 6.41 1,312.83 0.00 204.81 1,312.83 100.00 204.81 1,312.83 100.00 0.00 0.00
02.03.02 PRUEBA HIDRAULICA EN TUBERIAS ML 204.81 0.78 159.75 0.00 204.81 159.75 100.00 204.81 159.75 100.00 0.00 0.00
03 RESERVORIO CAP. (5 M3 = 01 UND) 0.00 0.00
03.01 TRABAJOS PRELIMINARES 0.00 0.00
03.01.01 LIMPIEZA DE TERRENO MANUAL M2 7.29 1.32 9.62 0.00 7.29 9.62 100.00 7.29 9.62 100.00 0.00 0.00
03.01.02 TRAZO Y REPLANTEO M2 7.29 0.99 7.22 0.00 7.29 7.22 100.00 7.29 7.22 100.00 0.00 0.00
03.02 MOVIMIENTO DE TIERRAS 0.00 0.00
03.02.01 EXCAVACION EN ZONA PEDREGOSA M3 2.19 59.51 130.33 0.00 2.19 130.33 100.00 2.19 130.33 100.00 0.00 0.00
03.02.02 REFINE Y NIVELACION - COMPACTADO M2 7.29 3.94 28.72 0.00 7.29 28.72 100.00 7.29 28.72 100.00 0.00 0.00
03.02.03 ACARREO DE MATERIAL EXCEDENTE (D=30 M) M3 2.19 23.35 51.14 0.00 2.19 51.14 100.00 2.19 51.14 100.00 0.00 0.00
03.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00
03.03.01 SOLADO CONCRETO f'c=100kg/cm2, E=10CM M2 7.29 51.42 374.85 0.00 7.29 374.85 100.00 7.29 374.85 100.00 0.00 0.00
03.04 OBRAS DE CONCRETO ARMADO 0.00 0.00
03.04.01 CONCRETO f'c=210 kg/cm2 M3 1.46 403.95 589.77 0.00 1.46 589.77 100.00 1.46 589.77 100.00 0.00 0.00
03.04.02 ENCOFRADO Y DESENCOFRADO P/LOSA DE FONDO M2 2.16 39.86 86.10 0.00 2.16 86.10 100.00 2.16 86.10 100.00 0.00 0.00
03.04.03 ACERO ESTRUCTURAL TRABAJADO fy=4200 kg/cm2 GRADO 60 P/LOSA DE FONDOKG 57.53 5.81 334.25 0.00 57.53 334.25 100.00 57.53 334.25 100.00 0.00 0.00
03.04.04 CONCRETO f'c=210 kg/cm2 M3 2.00 403.95 807.90 0.00 2.00 807.90 100.00 2.00 807.90 100.00 0.00 0.00
03.04.05 ENCOFRADO Y DESENCOFRADO P/MURO M2 26.66 61.39 1,636.66 0.00 26.66 1,636.66 100.00 26.66 1,636.66 100.00 0.00 0.00
03.04.06 ACERO ESTRUCTURAL TRABAJADO fy=4200 kg/cm2 GRADO 60 P/MURO KG 89.12 5.81 517.79 0.00 89.12 517.79 100.00 89.12 517.79 100.00 0.00 0.00
03.04.07 CONCRETO f'c=210 kg/cm2 M3 0.54 403.95 218.13 0.00 0.54 218.13 100.00 0.54 218.13 100.00 0.00 0.00
03.04.08 ENCOFRADO Y DESENCOFRADO P/LOSA DE TECHO M2 5.43 54.34 295.07 0.00 5.43 295.07 100.00 5.43 295.07 100.00 0.00 0.00
VALORIZACION DE OBRA N 10
FRMULA 03
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
: SISTEMA CALUYO - INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE
FORMULA 03
AYAVIRI, PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR REFERENCIAL : S/. 7,529,454.25 (INCLUYE IGV)
MONTO DEL CONTRATO : S/. 7,529,454.25 (INCLUYE IGV)
ADELANTO DIRECTO : S/. 752,945.43 (INCLUYE IGV) 10.00%
ADELANTO PARA MATERIALES : S/. 1,505,890.85 (INCLUYE IGV) 20.00%
FECHA VALOR REFERENCIAL May-16

PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANTERIOR AVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N
UND CANT. P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADOVALORIZADO % METRADO VALORIZADO
03.04.09 ACERO ESTRUCTURAL TRABAJADO fy=4200 kg/cm2 GRADO 60 P/LOSA DE TECHO KG 30.86 6.28 193.80 0.00 30.86 193.80 100.00 30.86 193.80 100.00 0.00 0.00
03.05 TARRAJEOS 0.00 0.00
03.05.01 TARRAJEO C/IMPER. INT. 1:1, e=2cm M2 20.40 48.51 989.60 0.00 20.40 989.60 100.00 20.40 989.60 100.00 0.00 0.00
03.05.02 TARRAJEO FROTACHADO EXT. 1:5, e=1.5cm M2 21.09 42.03 886.41 0.00 21.09 886.41 100.00 21.09 886.41 100.00 0.00 0.00
03.05.03 MORTERO PARA DAR PENDIENTE DE FONDO M2 4.00 17.96 71.84 0.00 4.00 71.84 100.00 4.00 71.84 100.00 0.00 0.00
03.06 VALVULAS Y ACCESORIOS 0.00 0.00
03.06.01 VALVULAS Y ACCESORIOS P/RESERV. GLB 1.00 315.20 315.20 0.00 1.00 315.20 100.00 1.00 315.20 100.00 0.00 0.00
03.06.02 COLOCADO DE ACCESORIOS P/RESERV. GLB 1.00 366.96 366.96 0.00 1.00 366.96 100.00 1.00 366.96 100.00 0.00 0.00
03.07 PRUEBAS HIDRAULICAS Y DESINFECCION 0.00 0.00
03.07.01 PRUEBA HIDRAULICA M3 5.00 0.87 4.35 0.00 5.00 4.35 100.00 5.00 4.35 100.00 0.00 0.00
03.07.02 PRUEBA DESINFECCION M3 5.00 4.38 21.90 0.00 5.00 21.90 100.00 5.00 21.90 100.00 0.00 0.00
03.08 PINTURA 0.00 0.00
03.08.01 PINTADO DE MURO EXTERIOR C/LATEX LAVABLE M2 21.09 6.74 142.15 0.00 21.09 142.15 100.00 21.09 142.15 100.00 0.00 0.00
03.09 CASETA DE VALVULAS 0.00 0.00
03.09.01 LIMPIEZA DE TERRENO MANUAL M2 1.56 1.32 2.06 0.00 1.56 2.06 100.00 1.56 2.06 100.00 0.00 0.00
03.09.02 TRAZO Y REPLANTEO M2 1.56 0.99 1.54 0.00 1.56 1.54 100.00 1.56 1.54 100.00 0.00 0.00
03.09.03 EXCAVACION EN ZONA PEDREGOSA M3 0.47 59.51 27.97 0.00 0.47 27.97 100.00 0.47 27.97 100.00 0.00 0.00
03.09.04 REFINE Y NIVELACION - COMPACTADO M2 1.56 3.94 6.15 0.00 1.56 6.15 100.00 1.56 6.15 100.00 0.00 0.00
03.09.05 ACARREO DE MATERIAL EXCEDENTE (D=30 M) M3 0.47 23.35 10.97 0.00 0.47 10.97 100.00 0.47 10.97 100.00 0.00 0.00
03.09.06 CONCRETO f 'c=175 kg/cm2, P/LOSA DE FONDO, MURO LOSA DE TECHO M3 0.72 263.16 189.48 0.00 0.72 189.48 100.00 0.72 189.48 100.00 0.00 0.00
03.09.07 ENCOFRADO Y DESENCOFRADO M2 6.67 36.12 240.92 0.00 6.67 240.92 100.00 6.67 240.92 100.00 0.00 0.00
03.09.08 ACERO ESTRUCTURAL TRABAJADO fy=4200 kg/cm2 GRADO 60 KG 41.07 8.75 359.36 0.00 41.07 359.36 100.00 41.07 359.36 100.00 0.00 0.00
03.09.09 TARRAJEO FROTACHADO EXTERIOR Y INTERIOR 1:5, E=1.5cm M2 7.17 28.22 202.34 0.00 7.17 202.34 100.00 7.17 202.34 100.00 0.00 0.00
03.09.10 VALVULAS Y ACCESORIOS P/RESERVORIO 05 M3 GLB 1.00 793.19 793.19 0.00 1.00 793.19 100.00 1.00 793.19 100.00 0.00 0.00
03.09.11 COLOCADO DE ACCESORIOS EN CASETA DE VALVULAS Und 1.00 55.04 55.04 0.00 1.00 55.04 100.00 1.00 55.04 100.00 0.00 0.00
03.09.12 PINTADO DE MURO EXTERIOR C/LATEX LAVABLE M2 4.47 6.74 30.13 0.00 4.47 30.13 100.00 4.47 30.13 100.00 0.00 0.00
03.10 CERCO PERIMETRICO 0.00 0.00
03.10.01 COLOCADO DEL CERCO DE PROTECCION ML 42.00 26.35 1,106.70 0.00 42.00 1,106.70 100.00 42.00 1,106.70 100.00 0.00 0.00
04 RED DE ADUCCION Y DISTRIBUCION (L=5,810.68 ML) 0.00 0.00
04.01 TRABAJOS PRELIMINARES 0.00 0.00
04.01.01 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS ML 5,585.72 0.45 2,513.57 (37.13) -16.71 5,622.85 2,530.28 100.66 5,585.72 2,513.57 100.00 0.00 0.00
VALORIZACION DE OBRA N 10
FRMULA 03
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
: SISTEMA CALUYO - INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE
FORMULA 03
AYAVIRI, PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR REFERENCIAL : S/. 7,529,454.25 (INCLUYE IGV)
MONTO DEL CONTRATO : S/. 7,529,454.25 (INCLUYE IGV)
ADELANTO DIRECTO : S/. 752,945.43 (INCLUYE IGV) 10.00%
ADELANTO PARA MATERIALES : S/. 1,505,890.85 (INCLUYE IGV) 20.00%
FECHA VALOR REFERENCIAL May-16

PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANTERIOR AVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N
UND CANT. P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADOVALORIZADO % METRADO VALORIZADO
04.02 MOVIMIENTO DE TIERRAS 0.00 . 0.00
04.02.01 EXCAVACION MANUAL EN TERRENO NORMAL M3 504.00 33.36 16,813.44 0.00 504.00 16,813.44 100.00 504.00 16,813.44 100.00 0.00 0.00
04.02.02 EXCAVACION MANUAL DE ZANJA, MATERIAL ROCA SUELTA M3 691.60 46.70 32,297.72 0.00 691.60 32,297.72 100.00 691.60 32,297.72 100.00 0.00 0.00
04.02.03 EXCAVACION MANUAL EN MATERIAL SUELTO Y REFINE M3 33.50 29.19 977.87 6.86 200.20 26.64 777.67 79.53 33.50 977.87 100.00 0.00 0.00
04.02.04 CAMA DE APOYO PARA TUBERIA C/MAT. PROP. e=0.10m ML 5,585.72 2.34 13,070.58 (37.13) -86.88 5,622.85 13,157.47 100.66 5,585.72 13,070.58 100.00 0.00 0.00
04.02.05 RELLENO C/ MAT. PROP. b =0.40m, H=0.60m SOBRE LA CLAVE DE TUB. ML 5,585.72 5.08 28,375.46 (37.13) -188.62 5,622.85 28,564.08 100.66 5,585.72 28,375.46 100.00 0.00 0.00
04.03 SUMINISTRO E INSTALACION DE TUB. 0.00 0.00
04.03.01 TUBERIA PVC SAP CLASE-10 D= 2", NTP 399.002 ML 1,553.50 6.41 9,957.94 0.00 1,553.50 9,957.94 100.00 1,553.50 9,957.94 100.00 0.00 0.00
04.03.02 TUBERIA PVC SAP CLASE-10 D= 1 1/2", NTP 399.002 ML 129.12 4.64 599.12 0.00 129.12 599.12 100.00 129.12 599.12 100.00 0.00 0.00
04.03.03 TUBERIA PVC SAP CLASE-10 D= 1", NTP 399.002 ML 1,227.92 3.80 4,666.10 0.00 1,227.92 4,666.10 100.00 1,227.92 4,666.10 100.00 0.00 0.00
04.03.04 TUBERIA PVC SAP CLASE-10 D= 3/4", NTP 399.002 ML 1,107.48 3.30 3,654.68 36.48 120.38 1,071.00 3,534.30 96.71 1,107.48 3,654.68 100.00 0.00 0.00
04.03.05 TUBERIA PVC SAP CLASE-10 D= 1/2", NTP 399.002 ML 1,484.51 2.46 3,651.89 1.31 3.22 1,483.20 3,648.67 99.91 1,484.51 3,651.89 100.00 0.00 0.00
04.03.06 PRUEBA HIDRAULICA EN TUBERIAS ML 5,661.07 0.78 4,415.63 38.22 29.81 5,622.85 4,385.82 99.32 5,661.07 4,415.63 100.00 0.00 0.00
04.04 SUMINISTRO Y COLOCACION DE ACCESORIOS 0.00 0.00
04.04.01 SUMINISTRO DE ACCESORIOS PARA RED DE DISTRIBUCION GLB 1.00 270.87 270.87 0.00 1.00 270.87 100.00 1.00 270.87 100.00 0.00 0.00
04.04.02 COLOCACION DE ACCESORIOS PARA RED DE DISTRIBUCION GLB 1.00 316.91 316.91 0.00 1.00 316.91 100.00 1.00 316.91 100.00 0.00 0.00
04.05 CAJA VALV. DE PURGA (01 UND), D= 3/4" 0.00 0.00
04.05.01 TRABAJOS PRELIMINARES 0.00 0.00
04.05.01.01 LIMPIEZA DE TERRENO MANUAL M2 0.64 1.32 0.84 0.00 0.64 0.84 100.00 0.64 0.84 100.00 0.00 0.00
04.05.01.02 TRAZO Y REPLANTEO M2 0.64 0.99 0.63 0.00 0.64 0.63 100.00 0.64 0.63 100.00 0.00 0.00
04.05.02 MOVIMIENTO DE TIERRAS 0.00 0.00
04.05.02.01 EXCAVACION MANUAL EN MATERIAL SUELTO M3 0.51 29.19 14.89 0.00 0.51 14.89 100.00 0.51 14.89 100.00 0.00 0.00
04.05.02.02 REFINE Y NIVELACION - COMPACTADO M2 0.64 3.94 2.52 0.00 0.64 2.52 100.00 0.64 2.52 100.00 0.00 0.00
04.05.02.03 ACARREO DE MATERIAL EXCEDENTE (D=30 M) M3 0.60 23.35 14.01 0.00 0.60 14.01 100.00 0.60 14.01 100.00 0.00 0.00
04.05.03 OBRAS DE CONCRETO ARMADO 0.00 0.00
04.05.03.01 CONCRETO f'c = 140 kg/cm2 M3 0.20 221.03 44.21 0.00 0.20 44.21 100.00 0.20 44.21 100.00 0.00 0.00
04.05.03.02 ENCOFRADO Y DESENCOFRADO M2 2.80 50.66 141.85 0.00 2.80 141.85 100.00 2.80 141.85 100.00 0.00 0.00
04.05.04 TARRAJEOS 0.00 0.00
04.05.04.01 TARRAJEO EN EXTERIORES MORTERO 1:5, e=1.5cm M2 2.80 37.29 104.41 0.00 2.80 104.41 100.00 2.80 104.41 100.00 0.00 0.00
04.05.05 ACCESORIOS Y ACCESORIOS 0.00 0.00
04.05.05.01 VALVULA Y ACCESORIOS EN CAJA VALV. DE AIRE DN 3/4" Und 1.00 52.35 52.35 0.00 1.00 52.35 100.00 1.00 52.35 100.00 0.00 0.00
VALORIZACION DE OBRA N 10
FRMULA 03
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
: SISTEMA CALUYO - INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE
FORMULA 03
AYAVIRI, PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR REFERENCIAL : S/. 7,529,454.25 (INCLUYE IGV)
MONTO DEL CONTRATO : S/. 7,529,454.25 (INCLUYE IGV)
ADELANTO DIRECTO : S/. 752,945.43 (INCLUYE IGV) 10.00%
ADELANTO PARA MATERIALES : S/. 1,505,890.85 (INCLUYE IGV) 20.00%
FECHA VALOR REFERENCIAL May-16

PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANTERIOR AVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N
UND CANT. P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADOVALORIZADO % METRADO VALORIZADO
04.05.05.02 COLOCADO DE ACCESORIOS EN CAJA VALV. DE PURGA Und 1.00 108.42 108.42 0.00 1.00 108.42 100.00 1.00 108.42 100.00 0.00 0.00
04.05.05.03 TAPA METALICA INSPECCION DE 50X50CM UND 1.00 176.00 176.00 0.00 1.00 176.00 100.00 1.00 176.00 100.00 0.00 0.00
04.05.06 PINTURA 0.00 0.00
04.05.06.01 PINTURA EN EXTERIOR M2 2.24 10.64 23.83 0.00 2.24 23.83 100.00 2.24 23.83 100.00 0.00 0.00
04.06 CAJA VALV. DE CONTROL (1 UND) 0.00 0.00
04.06.01 TRABAJOS PRELIMINARES 0.00 0.00
04.06.01.01 LIMPIEZA DE TERRENO MANUAL M2 1.00 1.32 1.32 0.00 1.00 1.32 100.00 1.00 1.32 100.00 0.00 0.00
04.06.01.02 TRAZO Y REPLANTEO M2 1.00 0.99 0.99 0.00 1.00 0.99 100.00 1.00 0.99 100.00 0.00 0.00
04.06.02 MOVIMIENTO DE TIERRAS 0.00 0.00
04.06.02.01 EXCAVACION MANUAL EN MATERIAL SUELTO M3 0.90 29.19 26.27 0.00 0.90 26.27 100.00 0.90 26.27 100.00 0.00 0.00
04.06.02.02 REFINE Y NIVELACION - COMPACTADO M2 1.00 3.94 3.94 0.00 1.00 3.94 100.00 1.00 3.94 100.00 0.00 0.00
04.06.02.03 ACARREO DE MATERIAL EXCEDENTE (D=30 M) M3 1.50 23.35 35.03 0.00 1.50 35.03 100.00 1.50 35.03 100.00 0.00 0.00
04.06.03 OBRAS DE CONCRETO ARMADO 0.00 0.00
04.06.03.01 CONCRETO F'C=175 KG/CM2 M3 0.30 390.85 117.26 0.00 0.30 117.26 100.00 0.30 117.26 100.00 0.00 0.00
04.06.03.02 ENCOFRADO Y DESENCOFRADO M2 6.67 50.66 337.90 0.00 6.67 337.90 100.00 6.67 337.90 100.00 0.00 0.00
04.06.03.03 ACERO ESTRUCTURAL TRABAJDO fy=4200 kg/cm2 GRADO 60 KG 7.98 6.11 48.76 0.00 7.98 48.76 100.00 7.98 48.76 100.00 0.00 0.00
04.06.04 TARRAJEOS 0.00 0.00
04.06.04.01 TARRAJEO EN EXTERIORES MORTERO 1:5, e=1.5cm M2 6.48 37.29 241.64 0.00 6.48 241.64 100.00 6.48 241.64 100.00 0.00 0.00
04.06.05 ACCESORIOS Y ACCESORIOS 0.00 0.00
04.06.05.01 VALVULA Y ACCESORIOS EN CAJA VALV. DE CONTROL DN 2" Und 1.00 118.77 118.77 0.00 1.00 118.77 100.00 1.00 118.77 100.00 0.00 0.00
04.06.05.02 COLOCADO DE ACCESORIOS EN CAJA DE VALV. DE CONTROL Und 1.00 108.42 108.42 0.00 1.00 108.42 100.00 1.00 108.42 100.00 0.00 0.00
04.06.05.03 TAPA METALICA INSPECCION DE 60X60M UND 1.00 190.53 190.53 0.00 1.00 190.53 100.00 1.00 190.53 100.00 0.00 0.00
04.06.06 PINTURA 0.00 0.00
04.06.06.01 PINTURA EN EXTERIOR M2 4.80 10.64 51.07 0.00 4.80 51.07 100.00 4.80 51.07 100.00 0.00 0.00
04.07 VALVULA REGULADORA DE PRESIONES 0.00 0.00
04.07.01 TRABAJOS PRELIMINARES 0.00 0.00
04.07.01.01 LIMPIEZA DE TERRENO MANUAL M2 5.94 1.32 7.84 0.00 5.94 7.84 100.00 5.94 7.84 100.00 0.00 0.00
04.07.01.02 TRAZO Y REPLANTEO M2 5.94 0.99 5.88 0.00 5.94 5.88 100.00 5.94 5.88 100.00 0.00 0.00
04.07.02 MOVIMIENTO DE TIERRAS 0.00 0.00
04.07.02.01 EXCAVACION MANUAL EN MATERIAL SUELTO M3 3.92 29.19 114.42 0.00 3.92 114.42 100.00 3.92 114.42 100.00 0.00 0.00
04.07.02.02 REFINE Y NIVELACION - COMPACTADO M2 6.00 3.94 23.64 0.00 6.00 23.64 100.00 6.00 23.64 100.00 0.00 0.00
VALORIZACION DE OBRA N 10
FRMULA 03
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
: SISTEMA CALUYO - INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE
FORMULA 03
AYAVIRI, PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR REFERENCIAL : S/. 7,529,454.25 (INCLUYE IGV)
MONTO DEL CONTRATO : S/. 7,529,454.25 (INCLUYE IGV)
ADELANTO DIRECTO : S/. 752,945.43 (INCLUYE IGV) 10.00%
ADELANTO PARA MATERIALES : S/. 1,505,890.85 (INCLUYE IGV) 20.00%
FECHA VALOR REFERENCIAL May-16

PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANTERIOR AVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N
UND CANT. P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADOVALORIZADO % METRADO VALORIZADO
04.07.02.03 ACARREO DE MATERIAL EXCEDENTE (D=30 M) M3 4.68 23.35 109.28 0.00 4.68 109.28 100.00 4.68 109.28 100.00 0.00 0.00
04.07.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00
04.07.03.01 CONCRETO f 'c=175 kg/cm2, P/LOSA DE FONDO, TAPA Y MUROS M3 1.70 279.23 474.69 0.00 1.70 474.69 100.00 1.70 474.69 100.00 0.00 0.00
04.07.03.02 ENCOFRADO Y DESENCOFRADO M2 23.82 50.66 1,206.72 0.00 23.82 1,206.72 100.00 23.82 1,206.72 100.00 0.00 0.00
04.07.04 TARRAJEOS 0.00 0.00
04.07.04.01 TARRAJEO EN EXTERIORES MORTERO 1:5, e=1.5cm M2 15.18 37.29 566.06 0.00 15.18 566.06 100.00 15.18 566.06 100.00 0.00 0.00
04.07.05 ACCESORIOS Y ACCESORIOS 0.00 0.00
04.07.05.01 VALVULA Y ACCESORIOS EN CAJA VALV. REGULADORA DE PRESION 2" GLB 3.00 392.02 1,176.06 0.00 3.00 1,176.06 100.00 3.00 1,176.06 100.00 0.00 0.00
04.07.05.02 COLOCADO DE ACCESORIOS EN CAJA VALV . REDUCTORA DE PRESION UND 3.00 72.28 216.84 0.00 3.00 216.84 100.00 3.00 216.84 100.00 0.00 0.00
04.07.06 PINTURA 0.00 0.00
04.07.06.01 PINTURA EN EXTERIOR M2 15.18 10.64 161.52 0.00 15.18 161.52 100.00 15.18 161.52 100.00 0.00 0.00
05 INSTALACION DE LETRINAS Y TRATAMIENTO DE AGUAS SERVIDAS 0.00 0.00
05.01 MODULO DE LETRINAS (36 und) 0.00 0.00
05.01.01 TRABAJOS PRELIMINARES 0.00 0.00
05.01.01.01 LIMPIEZA DE TERRENO MANUAL M2 176.40 1.32 232.85 0.00 176.40 232.85 100.00 176.40 232.85 100.00 0.00 0.00
05.01.01.02 TRAZO Y REPLANTEO M2 176.40 0.99 174.64 0.00 176.40 174.64 100.00 176.40 174.64 100.00 0.00 0.00
05.01.02 MOVIMIENTO DE TIERRAS 0.00 0.00
05.01.02.01 EXCAVACION EN TERRENO NORMAL P/ CIMIENTOS M3 54.00 29.19 1,576.26 0.00 54.00 1,576.26 100.00 54.00 1,576.26 100.00 0.00 0.00
05.01.02.02 RELLENO CON MATERIAL PROPIO M3 3.27 16.68 54.54 0.00 3.27 54.54 100.00 3.27 54.54 100.00 0.00 0.00
05.01.02.03 REFINE Y NIVELACION - COMPACTADO M2 432.00 3.94 1,702.08 0.00 432.00 1,702.08 100.00 432.00 1,702.08 100.00 0.00 0.00
05.01.02.04 ACARREO DE MATERIAL EXCEDENTE (D=30 M) M3 67.50 23.35 1,576.13 0.00 67.50 1,576.13 100.00 67.50 1,576.13 100.00 0.00 0.00
05.01.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00
05.01.03.01 CIMIENTO CORRIDO MEZCLA 1:10+30 % PM) M3 43.20 166.39 7,188.05 0.00 43.20 7,188.05 100.00 43.20 7,188.05 100.00 0.00 0.00
05.01.03.02 SOBRECIMIENTO CONCRETO MEZCLA 1:8+25% PM M3 10.94 247.18 2,704.15 0.00 10.94 2,704.15 100.00 10.94 2,704.15 100.00 0.00 0.00
05.01.03.03 ENCOFRADO Y DESENCOFRADO P/SOBRECIMIENTOS M2 145.80 43.87 6,396.25 0.00 0.01 145.80 6,396.24 100.00 145.80 6,396.25 100.00 0.00 0.00
05.01.04 OBRAS DE CONCRETO ARMADO 0.00 0.00
05.01.04.01 CONCRETO f'c=175 kg/cm2 P/Losa Sanitaria M3 9.72 342.40 3,328.13 0.00 9.72 3,328.13 100.00 9.72 3,328.13 100.00 0.00 0.00
05.01.04.02 CONCRETO f'c=175 kg/cm2 P/VIGUETAS M3 2.43 342.40 832.03 0.00 2.43 832.03 100.00 2.43 832.03 100.00 0.00 0.00
05.01.04.03 ACERO ESTRUCTURAL TRABAJADO fy=4200 kg/cm2 GRADO 60 P/VIGUETA KG 252.54 6.03 1,522.82 0.00 252.54 1,522.82 100.00 252.54 1,522.82 100.00 0.00 0.00
05.01.04.04 ENCOFRADO Y DESENCOFRADO P/VIGUETA M2 36.45 54.21 1,975.95 0.00 36.45 1,975.95 100.00 36.45 1,975.95 100.00 0.00 0.00
05.01.05 MUROS Y TABIQUES DE ALBAILERIA 0.00 0.00
VALORIZACION DE OBRA N 10
FRMULA 03
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
: SISTEMA CALUYO - INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE
FORMULA 03
AYAVIRI, PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR REFERENCIAL : S/. 7,529,454.25 (INCLUYE IGV)
MONTO DEL CONTRATO : S/. 7,529,454.25 (INCLUYE IGV)
ADELANTO DIRECTO : S/. 752,945.43 (INCLUYE IGV) 10.00%
ADELANTO PARA MATERIALES : S/. 1,505,890.85 (INCLUYE IGV) 20.00%
FECHA VALOR REFERENCIAL May-16

PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANTERIOR AVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N
UND CANT. P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADOVALORIZADO % METRADO VALORIZADO
05.01.05.01 MURO DE LADRILLO K.K. DE SOGA CARAVISTA MEZC. C:A 1:4, E=1.5 CM M2 501.21 77.44 38,813.70 0.01 0.39 501.20 38,813.31 100.00 501.21 38,813.70 100.00 0.00 0.00
05.01.06 REVOQUES Y PISO 0.00 0.00
05.01.06.01 TARRAJEO INTERIORES C/MORTERO 1:5 E=1.5CM M2 443.25 17.35 7,690.39 0.00 443.25 7,690.39 100.00 443.25 7,690.39 100.00 0.00 0.00
05.01.06.02 PISO DE CONCRETO COLOREADO FROTACHADO E=2.5CM M2 97.20 25.27 2,456.24 0.00 97.20 2,456.24 100.00 97.20 2,456.24 100.00 0.00 0.00
05.01.07 CONTRAZOCALOS 0.00
05.01.07.01 CONTRAZOCALO DE CEMENTO H=0.40 m., 1:5 ML 244.80 15.88 3,887.42 0.00 244.80 3,887.42 100.00 244.80 3,887.42 100.00 0.00 0.00
05.01.08 CARPINTERIA DE MADERA 0.00
05.01.08.01 VIGA DE MADERA 2"x3"x2.05 M. UND 144.00 14.28 2,056.32 0.00 144.00 2,056.32 100.00 144.00 2,056.32 100.00 0.00 0.00
05.01.08.02 CORREAS DE MADERA 2"x2"x10' ML 316.44 8.63 2,730.88 (0.00) 0.00 316.44 2,730.88 100.00 316.44 2,730.88 100.00 0.00 0.00
05.01.08.03 SUMINISTRO Y COLOCADO DE VENTANA METALICA INC/VIDRIOS UND 36.00 76.14 2,741.04 0.00 36.00 2,741.04 100.00 36.00 2,741.04 100.00 0.00 0.00
05.01.08.04 SUMINISTRO Y COLOCADO DE PUERTA METALICA INC/VIDRIOS UND 36.00 224.21 8,071.56 0.00 36.00 8,071.56 100.00 36.00 8,071.56 100.00 0.00 0.00
05.01.09 CUBERTURA 0.00
05.01.09.01 COBERTURA IMPERMEABILIZANTE ONDULINE 2.00 X 0.95 X 0.26 MM M2 210.96 48.60 10,252.56 0.00 210.96 10,252.56 100.00 210.96 10,252.56 100.00 0.00 0.00
05.01.10 PINTURA 0.00
05.01.10.01 PINTURA LATEX 2 MANOS EN LETRINAS M2 417.96 8.30 3,469.07 0.00 417.96 3,469.07 100.00 417.96 3,469.07 100.00 0.00 0.00
05.01.10.02 PINTURA ESMALTE EN ZOCALOS EXTERIOR LETRINAS M2 75.60 13.10 990.36 0.00 75.60 990.36 100.00 75.60 990.36 100.00 0.00 0.00
05.01.11 INSTALACIONES SANITARIAS 0.00
05.01.11.01 SUMINISTRO Y COLOCADO DE LAVATORIO DE LOSA VITRIFICADA (INC ACCESORIOS)
UND 36.00 268.64 9,671.04 0.00 36.00 9,671.04 100.00 36.00 9,671.04 100.00 0.00 0.00
05.01.11.02 SUMINISTRO Y COLOCADO DE INODORO UND 36.00 259.90 9,356.40 0.00 36.00 9,356.40 100.00 36.00 9,356.40 100.00 0.00 0.00
05.01.11.03 SUMINISTRO Y COLOCADO DE DUCHA UND 36.00 53.22 1,915.92 0.00 36.00 1,915.92 100.00 36.00 1,915.92 100.00 0.00 0.00
05.01.11.04 SUMIDERO DE 2", PARA DUCHA UND 36.00 51.50 1,854.00 0.00 36.00 1,854.00 100.00 36.00 1,854.00 100.00 0.00 0.00
05.01.12 INSTALACIONES SANITARIAS 0.00
05.01.12.01 TENDIDO DE TUBERIA PVC SAL DE 4" ML 144.00 6.57 946.08 0.00 144.00 946.08 100.00 144.00 946.08 100.00 0.00 0.00
05.01.12.02 TENDIDO DE TUBERIA PVC SAL DE 2" ML 144.00 3.82 550.08 0.00 144.00 550.08 100.00 144.00 550.08 100.00 0.00 0.00
05.01.13 INSTALACIONES ELECTRICAS 0.00
05.01.13.01 SALIDA DE TECHO C/CABLE AWG TW 2.5MM(14)+D PVC SEL 16MM(5/8) pto 36.00 57.52 2,070.72 0.00 36.00 2,070.72 100.00 36.00 2,070.72 100.00 0.00 0.00
06 TRATAMIENTO AGUAS RESIDUALES DOMESTICAS (36 UND) 0.00
06.01 TRABAJOS PRELIMINARES 0.00
06.01.01 LIMPIEZA DE TERRENO MANUAL M2 360.00 1.32 475.20 0.00 360.00 475.20 100.00 360.00 475.20 100.00 0.00 0.00
06.01.02 TRAZO Y REPLANTEO M2 360.00 0.99 356.40 0.00 360.00 356.40 100.00 360.00 356.40 100.00 0.00 0.00
06.02 MOVIMIENTO DE TIERRAS 0.00
VALORIZACION DE OBRA N 10
FRMULA 03
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
: SISTEMA CALUYO - INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE
FORMULA 03
AYAVIRI, PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR REFERENCIAL : S/. 7,529,454.25 (INCLUYE IGV)
MONTO DEL CONTRATO : S/. 7,529,454.25 (INCLUYE IGV)
ADELANTO DIRECTO : S/. 752,945.43 (INCLUYE IGV) 10.00%
ADELANTO PARA MATERIALES : S/. 1,505,890.85 (INCLUYE IGV) 20.00%
FECHA VALOR REFERENCIAL May-16

PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANTERIOR AVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N
UND CANT. P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADOVALORIZADO % METRADO VALORIZADO
06.02.01 EXCAVACION MANUAL EN TERRENO NORMAL P/CAJA DE REGISTRO M3 20.41 29.19 595.77 0.00 20.41 595.77 100.00 20.41 595.77 100.00 0.00 0.00
06.02.02 EXCAVACION MANUAL EN TERRENO NORMAL P/COLECTOR M3 130.68 29.19 3,814.55 0.00 130.68 3,814.55 100.00 130.68 3,814.55 100.00 0.00 0.00
06.02.03 EXCAVACION MANUAL EN TERRENO NORMAL P/BIODIGESTOR M3 35.79 29.19 1,044.71 0.00 35.79 1,044.71 100.00 35.79 1,044.71 100.00 0.00 0.00
06.02.04 EXCAVACION MANUAL EN TERRENO NORMAL P/CAJA DE LODOS M3 21.87 29.19 638.39 0.00 21.87 638.39 100.00 21.87 638.39 100.00 0.00 0.00
06.02.05 EXCAVACION MANUAL EN TERRENO NORMAL P/ZANJA DE INFILTACION M3 50.40 29.19 1,471.18 0.00 0.01 50.40 1,471.17 100.00 50.40 1,471.18 100.00 0.00 0.00
06.02.06 REFINE Y NIVELACION DE FONDOS ML 648.00 1.98 1,283.04 0.00 648.00 1,283.04 100.00 648.00 1,283.04 100.00 0.00 0.00
06.02.07 REFINE Y NIVELACION P/BIODIGESTOR M2 61.20 4.76 291.31 0.00 61.20 291.31 100.00 61.20 291.31 100.00 0.00 0.00
06.02.08 ACARREO DE MATERIAL EXCEDENTE (D=30 M) M3 35.36 23.35 825.66 0.00 35.36 825.66 100.00 35.36 825.66 100.00 0.00 0.00
06.03 CAMA DE APOYO (TUBERIA Y BIODIGESTOR) 0.00
06.03.01 CAMA DE APOYO C/MAT. PROP. ML 648.00 2.91 1,885.68 0.00 648.00 1,885.68 100.00 648.00 1,885.68 100.00 0.00 0.00
06.03.02 CAMA DE APOYO C/MAT. PROP. (BIODIGESTOR) M2 161.96 3.90 631.64 0.00 161.96 631.64 100.00 161.96 631.64 100.00 0.00 0.00
06.04 RELLENO 0.00
06.04.01 PRIMER RELLENO C/ MATERIAL PROP. A=0.50, H=0.15CM ML 648.00 2.63 1,704.24 0.00 648.00 1,704.24 100.00 648.00 1,704.24 100.00 0.00 0.00
06.04.02 RELLENO COMPACATDO C/MATERIAL PROPIO - BIODIGESTOR M3 648.00 19.46 12,610.08 0.00 648.00 12,610.08 100.00 648.00 12,610.08 100.00 0.00 0.00
06.05 CONCRETO SIMPLE (CAJAS DE REGISTRO, LODOS Y DIST.) 0.00
06.05.01 SOLADO DE CONCRETO f'c=100kg/cm2 (CAJAS Y BIODIGESTOR) M2 51.12 42.90 2,193.05 0.00 51.12 2,193.05 100.00 51.12 2,193.05 100.00 0.00 0.00
06.05.02 CONCRETO f'c = 140 kg/cm2 P/CAJA DE LODOS M3 2.70 256.31 692.04 0.00 2.70 692.04 100.00 2.70 692.04 100.00 0.00 0.00
06.05.03 ENCOFRADO Y DESENCOFRADO M2 108.00 31.21 3,370.68 0.00 108.00 3,370.68 100.00 108.00 3,370.68 100.00 0.00 0.00
06.05.04 CONCRETO f'c = 175 kg/cm2 P/CAJAS DE DIST. Y REGISTRO M3 10.85 289.99 3,146.39 0.00 10.85 3,146.39 100.00 10.85 3,146.39 100.00 0.00 0.00
06.05.05 ENCOFRADO Y DESENCOFRADO M2 93.96 31.21 2,932.49 0.00 93.96 2,932.49 100.00 93.96 2,932.49 100.00 0.00 0.00
06.06 CONCRETO ARMADO (TAPAS DE CAJAS) 0.00
06.06.01 CONCRETO f'c = 175 kg/cm2 - (TAPAS DE CAJAS) M3 2.84 289.99 823.57 (0.08) -23.20 2.92 846.77 102.82 2.84 823.57 100.00 0.00 0.00
06.06.02 ENCOFRADO Y DESENCOFRADO M2 53.57 31.21 1,671.92 (1,242.43) -38,776.24 1,296.00 40,448.16 2,419.26 53.57 1,671.92 100.00 0.00 0.00
06.06.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 KG 160.99 6.23 1,002.97 0.00 160.99 1,002.97 100.00 160.99 1,002.97 100.00 0.00 0.00
06.07 BIODIGESTOR AUTOLIMPIABLE 0.00
06.07.01 SUMINISTRO E INST. DE BIODIGESTOR CLARIFICADOR DE 600LTS UND 36.00 1,034.07 37,226.52 0.00 36.00 37,226.52 100.00 36.00 37,226.52 100.00 0.00 0.00
06.08 TUBERIA DE RED COLECTOR 0.00
06.08.01 SUMINISTRO E INSTALACION DE TUBERIAS NTP 399.003 ML 180.00 9.98 1,796.40 0.00 180.00 1,796.40 100.00 180.00 1,796.40 100.00 0.00 0.00
06.08.02 SUMINISTRO E INSTALACION DE TUB. NTP 4435 DN 110MM ML 216.00 16.32 3,525.12 0.00 216.00 3,525.12 100.00 216.00 3,525.12 100.00 0.00 0.00
06.09 ZANJAS DE INFILTRACION 0.00
06.09.01 CRIBADO DE TUB. ML 180.00 3.29 592.20 0.00 180.00 592.20 100.00 180.00 592.20 100.00 0.00 0.00
VALORIZACION DE OBRA N 10
FRMULA 03
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
: SISTEMA CALUYO - INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE
FORMULA 03
AYAVIRI, PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR REFERENCIAL : S/. 7,529,454.25 (INCLUYE IGV)
MONTO DEL CONTRATO : S/. 7,529,454.25 (INCLUYE IGV)
ADELANTO DIRECTO : S/. 752,945.43 (INCLUYE IGV) 10.00%
ADELANTO PARA MATERIALES : S/. 1,505,890.85 (INCLUYE IGV) 20.00%
FECHA VALOR REFERENCIAL May-16

PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANTERIOR AVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N
UND CANT. P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADOVALORIZADO % METRADO VALORIZADO
06.09.02 SUMINISTRO E INSTALACION DE TUBERIAS NTP 399.003 ML 252.00 7.04 1,774.08 0.00 252.00 1,774.08 100.00 252.00 1,774.08 100.00 0.00 0.00
06.09.03 SUMINISTRO E INSTALACION DE ACCESORIOS GLB 36.00 49.02 1,764.72 0.00 36.00 1,764.72 100.00 36.00 1,764.72 100.00 0.00 0.00
06.09.04 COLOCADO DE GRAVA S M3 14.40 75.21 1,083.02 0.00 14.40 1,083.02 100.00 14.40 1,083.02 100.00 0.00 0.00
07 PILETAS FAMILIARES (36 UND) 0.00
07.01 TRABAJOS PRELIMINARES 0.00
07.01.01 LIMPIEZA DE TERRENO MANUAL M2 72.00 1.32 95.04 0.00 72.00 95.04 100.00 72.00 95.04 100.00 0.00 0.00
07.01.02 TRAZO Y REPLANTEO M2 32.40 0.99 32.08 0.01 0.01 32.40 32.07 99.97 32.40 32.08 100.00 0.00 0.00
07.02 MOVIMIENTO DE TIERRAS 0.00
07.02.01 EXCAVACION MASIVA MANUAL - POZO PERCOLADOR M3 0.97 33.36 32.36 0.00 -0.01 0.97 32.37 100.03 0.97 32.36 100.00 0.00 0.00
07.02.02 ACARREO DE MATERIAL EXCEDENTE (D=30 M) M3 1.22 23.35 28.49 0.00 0.01 1.22 28.48 99.96 1.22 28.49 100.00 0.00 0.00
07.03 OBRAS DE CONCRETO SIMPLE 0.00
07.03.01 CONCRETO f'c = 140 kg/cm2 M3 5.57 221.03 1,231.14 0.00 5.57 1,231.14 100.00 5.57 1,231.14 100.00 0.00 0.00
07.04 OBRAS DE CONCRETO ARMADO 0.00
07.04.01 CONCRETO f'c=175 kg/cm2, losa, muros y soporte pileta M3 5.87 288.56 1,693.85 0.00 0.58 5.87 1,693.27 99.97 5.87 1,693.85 100.00 0.0000 0.00
07.04.02 ENCOFRADO Y DESENCOFRADO M2 139.21 50.66 7,052.38 0.00 139.21 7,052.38 100.00 139.21 7,052.38 100.00 0.00 0.00
07.04.03 ACERO ESTRUCTURAL TRABAJDO fy=4200 kg/cm2 GRADO 60 KG 344.36 6.11 2,104.04 0.00 0.02 344.36 2,104.02 100.00 344.36 2,104.04 100.00 0.00 0.00
07.05 TARRAJEOS 0.00
07.05.01 TARRAJEO EN INTERIORES Y EXTERIORES MORTERO 1:5, e=1.5cm M2 195.26 38.55 7,527.27 0.00 195.26 7,527.27 100.00 195.26 7,527.27 100.00 0.00 0.00
07.06 SUMINISTRO E INSTALACION DE TUB. 0.00
07.06.01 SUMINISTRO Y COLOCACION DE ACCESORIO DE PILETAS DOMICILIARIAS UND 36.00 70.30 2,530.80 0.00 36.00 2,530.80 100.00 36.00 2,530.80 100.00 0.00 0.00
07.07 ACCESORIOS 0.00
07.07.01 VALVULA Y ACCESORIOS GLB 36.00 35.65 1,283.40 0.00 36.00 1,283.40 100.00 36.00 1,283.40 100.00 0.00 0.00
07.08 PINTURA 0.00
07.08.01 PINTURA EN EXTERIOR M2 195.26 12.63 2,466.13 0.00 195.26 2,466.13 100.00 195.26 2,466.13 100.00 0.00 0.00
COSTO DIRECTO 402,054.57 -38,909.72 440,964.30 402,054.57 0.00
GASTOS GENERALES 6.60% 26,535.60 -2,568.04 29,103.64 26,535.60 0.00
UTILIDAD 8.00% 32,164.37 -3,112.78 35,277.14 32,164.37 0.00
TOTAL 460,754.54 -44,590.54 505,345.08 109.68% 460,754.54 100.00% 0.00
IGV 18% 82,935.82 - 8,026.30 90,962.11 82,935.82 -
TOTAL VALORIZADO 543,690.36 - 52,616.84 596,307.19 543,690.36 -
VALORIZACION DE OBRA N 10
FRMULA 03
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
: SISTEMA CALUYO - INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE
FORMULA 03
AYAVIRI, PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR REFERENCIAL : S/. 7,529,454.25 (INCLUYE IGV)
MONTO DEL CONTRATO : S/. 7,529,454.25 (INCLUYE IGV)
ADELANTO DIRECTO : S/. 752,945.43 (INCLUYE IGV) 10.00%
ADELANTO PARA MATERIALES : S/. 1,505,890.85 (INCLUYE IGV) 20.00%
FECHA VALOR REFERENCIAL May-16

PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANTERIOR AVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N
UND CANT. P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADOVALORIZADO % METRADO VALORIZADO
% VALORIZADO -9.68% 109.68% 100.00% 0.00%
VALORIZACION DE OBRA N 10
FRMULA 04
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
: SISTEMA KALLACALLANI - INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE
FORMULA 04
AYAVIRI, PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR REFERENCIAL : S/. 7,529,454.25 (INCLUYE IGV)
MONTO DEL CONTRATO : S/. 7,529,454.25 (INCLUYE IGV)
ADELANTO DIRECTO : S/. 752,945.43 (INCLUYE IGV) 0.10
ADELANTO PARA MATERIALES : S/. 1,505,890.85 (INCLUYE IGV) 0.20
FECHA VALOR REFERENCIAL May-16

PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANTERIOR AVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N
UND CANT. P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADO VALORIZADO % METRADO
01 CAPTACIONES: BOCATOMA Y LADERA
01.01 CAPTACION BOCATOMA - GALERIAS FILTRANTES (01 UND)
01.01.01 TRABAJOS PRELIMINARES
01.01.01.01 LIMPIEZA DE TERRENO MANUAL M2 75.08 1.32 99.11 0.00 75.08 99.11 100.00 75.08 99.11 100.00 0.00
01.01.01.02 TRAZO Y REPLANTEO M2 77.11 0.99 76.34 0.00 77.11 76.34 100.00 77.11 76.34 100.00 0.00
01.01.02 MOVIMIENTO DE TIERRAS 0.00 0.00
01.01.02.01 PERFILADO DE LOSA BOCATOMA EN ROCA FIJA M2 47.80 19.46 930.19 0.00 47.80 930.19 100.00 47.80 930.19 100.00 0.00
01.01.02.02 ACARREO DE MATERIAL EXCEDENTE (D=30 M) M3 21.92 23.35 511.83 0.00 21.92 511.83 100.00 21.92 511.83 100.00 0.00
01.01.03 OBRAS DE CONCRETO SIMPLE CICLOPEO 0.00 0.00
01.01.03.01 CONCRETO f 'c=175 kg/cm2 + 30% PG M3 15.20 241.04 3,663.81 0.00 15.20 3,663.81 100.00 15.20 3,663.81 100.00 0.00
01.01.03.02 ENCOFRADO Y DESENCOFRADO MUROS M2 19.00 36.40 691.60 0.00 19.00 691.60 100.00 19.00 691.60 100.00 0.00
01.01.04 OBRAS DE CONCRETO SIMPLE 0.00 0.00
01.01.04.01 CONCRETO F'C=175 KG/CM2-CAJA DE RECEPCIN Y VALVULAS M3 0.73 332.49 242.72 0.00 0.73 242.72 100.00 0.73 242.72 100.00 0.00
01.01.04.02 ENCOFRADO Y DESENCOFRADO MUROS M2 10.92 36.40 397.49 0.00 10.92 397.49 100.00 10.92 397.49 100.00 0.00
01.01.04.03 CONCRETO f 'c=210 kg/cm2 - CAJA DE RECEPCION Y VALVULAS M3 0.50 400.68 200.34 0.00 0.50 200.34 100.00 0.50 200.34 100.00 0.00
01.01.04.04 ENCOFRADO Y DESENCOFRADO - P/TAPA M2 0.83 33.63 27.91 0.00 0.83 27.91 100.00 0.83 27.91 100.00 0.00
01.01.04.05 ACERO ESTRUCTURAL TRABAJADO fy=4200 kg/cm2 GRADO 60 KG 3.99 5.88 23.46 0.00 3.99 23.46 100.00 3.99 23.46 100.00 0.00
01.01.05 OBRAS DE PROTECCIN 0.00 0.00
01.01.05.01 ACARREO DE PIEDRA MANUAL Dp=30m M3 15.20 23.35 354.92 0.00 15.20 354.92 100.00 15.20 354.92 100.00 0.00
01.01.05.02 SUMINISTRO y COLOCADO DE GAVIONES UND 1.62 127.11 205.92 0.00 1.62 205.92 100.00 1.62 205.92 100.00 0.00
01.01.06 TARRAJEOS 0.00 0.00
01.01.06.01 TARRAJEO EN MUROS M2 35.04 46.08 1,614.64 0.00 35.04 1,614.64 100.00 35.04 1,614.64 100.00 0.00
01.01.07 VALVULAS Y ACCESORIOS 0.00 0.00
01.01.07.01 ACCESORIO EN CAPTACION-BOCATOMA Y CAJA DE RECEPCION GLB 1.00 1,319.28 1,319.28 0.00 1.00 1,319.28 100.00 1.00 1,319.28 100.00 0.00
01.01.07.02 COLOCADO DE ACCESORIOS CAPTACION-BOCATOMA Y CAJA DE DE RECEPCIN GLB 1.00 433.67 433.67 0.00 1.00 433.67 100.00 1.00 433.67 100.00 0.00
01.02 CAPTACION DE LADERA 0.70MX0.70M ( 01 UND) 0.00 0.00
01.02.01 TRABAJOS PRELIMINARES 0.00 0.00
01.02.01.01 LIMPIEZA DE TERRENO MANUAL M2 9.00 1.32 11.88 0.00 9.00 11.88 100.00 9.00 11.88 100.00 0.00
01.02.01.02 TRAZO Y REPLANTEO M2 3.54 0.99 3.50 0.00 3.54 3.50 100.00 3.54 3.50 100.00 0.00
01.02.02 MOVIMIENTO DE TIERRAS 0.00 0.00
01.02.02.01 EXCAVACION MANUAL EN TERRENO ARCILLOSO M3 0.98 33.36 32.59 0.00 0.98 32.59 100.00 0.98 32.59 100.00 0.00
01.02.02.02 REFINE Y NIVELACION - COMPACTADO M2 0.47 3.94 1.85 0.00 0.47 1.85 100.00 0.47 1.85 100.00 0.00
01.02.02.03 ACARREO DE MATERIAL EXCEDENTE (D=30 M) M3 1.64 23.35 38.25 0.00 1.64 38.25 100.00 1.64 38.25 100.00 0.00
01.02.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00
01.02.03.01 CONCRETO f'c = 140 kg/cm2 CUBIERTA DE FILTRO S/M M3 0.18 318.93 57.41 0.00 0.18 57.41 100.00 0.18 57.41 100.00 0.00
VALORIZACION DE OBRA N 10
FRMULA 04
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
: SISTEMA KALLACALLANI - INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE
FORMULA 04
AYAVIRI, PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR REFERENCIAL : S/. 7,529,454.25 (INCLUYE IGV)
MONTO DEL CONTRATO : S/. 7,529,454.25 (INCLUYE IGV)
ADELANTO DIRECTO : S/. 752,945.43 (INCLUYE IGV) 0.10
ADELANTO PARA MATERIALES : S/. 1,505,890.85 (INCLUYE IGV) 0.20
FECHA VALOR REFERENCIAL May-16

PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANTERIOR AVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N
UND CANT. P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADO VALORIZADO % METRADO
01.02.03.02 CONCRETO f'c = 100 kg/cm2 BAJO FILTRO S/M M3 0.27 209.73 56.63 0.00 0.27 56.63 100.00 0.27 56.63 100.00 0.00
01.02.04 OBRAS DE CONCRETO ARMADO 0.00 0.00
01.02.04.01 CONCRETO F'C=175 KG/CM2, LOSA DE FONDO Y DENTELLENOS M3 0.37 297.70 110.15 0.00 0.37 110.15 100.00 0.37 110.15 100.00 0.00
01.02.04.02 CONCRETO F'C=175 KG/CM2, MUROS M3 0.67 297.70 199.46 0.00 0.67 199.46 100.00 0.67 199.46 100.00 0.00
01.02.04.03 ENCOFRADO Y DESENCOFRADO MUROS M2 9.23 36.40 335.97 0.00 9.23 335.97 100.00 9.23 335.97 100.00 0.00
01.02.04.04 CONCRETO F'C=210 KG/CM2, LOSA Y TAPA M3 0.04 371.85 14.87 0.00 0.04 14.87 100.00 0.04 14.87 100.00 0.00
01.02.04.05 ENCOFRADO Y DESENCOFRADO - P/TAPA M2 0.58 33.63 19.51 0.00 0.58 19.51 100.00 0.58 19.51 100.00 0.00
01.02.04.06 ACERO ESTRUCTURAL TRABAJADO fy=4200 kg/cm2 GRADO 60 KG 13.25 5.88 77.91 0.00 13.25 77.91 100.00 13.25 77.91 100.00 0.00
01.02.05 TARRAJEOS 0.00 0.00
01.02.05.01 TARRAJEO C/IMPER. INT. 1:5, e=1.5cm M2 3.43 40.27 138.13 0.00 3.43 138.13 100.00 3.43 138.13 100.00 0.00
01.02.05.02 TARRAJEO EN EXTERIORES MORTERO 1:5, e=1.5cm M2 6.74 37.29 251.33 0.00 6.74 251.33 100.00 6.74 251.33 100.00 0.00
01.02.06 FILTROS 0.00 0.00
01.02.06.01 FILTRO DE ARENA M3 0.35 125.73 44.01 0.00 0.35 44.01 100.00 0.35 44.01 100.00 0.00
01.02.06.02 FILTRO DE GRAVA (1) M3 0.53 125.24 66.38 0.00 0.53 66.38 100.00 0.53 66.38 100.00 0.00
01.02.07 VALVULAS Y ACCESORIOS 0.00 0.00
01.02.07.01 VALVULA Y ACCESORIOS EN CAPTACIN P/LADERA GLB 1.00 376.84 376.84 0.00 1.00 376.84 100.00 1.00 376.84 100.00 0.00
01.02.07.02 COLOCACION DE ACCESORIOS CAPTACIN Und 1.00 54.21 54.21 0.00 1.00 54.21 100.00 1.00 54.21 100.00 0.00
01.02.08 CERCO PERIMETRICO 0.00 0.00
01.02.08.01 COLOCADO DEL CERCO DE PROTECCION ML 9.00 26.35 237.15 0.00 9.00 237.15 100.00 9.00 237.15 100.00 0.00
01.02.09 PINTURA 0.00 0.00
01.02.09.01 PINTURA EN EXTERIORES EN CAPTACIN M2 5.60 10.25 57.40 0.00 5.60 57.40 100.00 5.60 57.40 100.00 0.00
02 PLANTA DE TRATAMIENTO PRIMARIO DE AGUA (01 UND) 0.00 0.00
02.01 SEDIMENTADOR (01 UND) 0.00 0.00
02.01.01 TRABAJOS PRELIMINARES 0.00 0.00
02.01.01.01 LIMPIEZA DE TERRENO MANUAL M2 15.00 1.32 19.80 0.00 15.00 19.80 100.00 15.00 19.80 100.00 0.00
02.01.01.02 TRAZO Y REPLANTEO M2 15.00 0.99 14.85 0.00 15.00 14.85 100.00 15.00 14.85 100.00 0.00
02.01.02 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00
02.01.02.01 EXCAVACION MANUAL EN MATERIAL SUELTO M3 19.29 29.19 563.08 0.00 19.29 563.08 100.00 19.29 563.08 100.00 0.00
02.01.02.02 REFINE Y NIVELACION - COMPACTADO M2 10.05 3.94 39.60 0.00 10.05 39.60 100.00 10.05 39.60 100.00 0.00
02.01.02.03 ACARREO DE MATERIAL EXCEDENTE (D=30 M) M3 15.39 23.35 359.36 0.00 15.39 359.36 100.00 15.39 359.36 100.00 0.00
02.01.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00
02.01.03.01 SOLADO DE 4" CONCRETO 1:10 C:H M2 9.66 26.11 252.22 0.00 9.66 252.22 100.00 9.66 252.22 100.00 0.00
02.01.04 OBRAS DE CONCRETO ARMADO 0.00 0.00
02.01.04.01 CONCRETO f'c=210 kg/cm2 M3 3.37 403.95 1,361.31 0.00 3.37 1,361.31 100.00 3.37 1,361.31 100.00 0.00
02.01.04.02 ENCOFRADO Y DESENCOFRADO -(MURO) M2 48.28 50.66 2,445.86 0.00 48.28 2,445.86 100.00 48.28 2,445.86 100.00 0.00
VALORIZACION DE OBRA N 10
FRMULA 04
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
: SISTEMA KALLACALLANI - INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE
FORMULA 04
AYAVIRI, PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR REFERENCIAL : S/. 7,529,454.25 (INCLUYE IGV)
MONTO DEL CONTRATO : S/. 7,529,454.25 (INCLUYE IGV)
ADELANTO DIRECTO : S/. 752,945.43 (INCLUYE IGV) 0.10
ADELANTO PARA MATERIALES : S/. 1,505,890.85 (INCLUYE IGV) 0.20
FECHA VALOR REFERENCIAL May-16

PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANTERIOR AVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N
UND CANT. P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADO VALORIZADO % METRADO
02.01.04.03 ACERO ESTRUCTURAL TRABAJADO fy=4200 kg/cm2 GRADO 60 (MURO) KG 332.05 6.11 2,028.80 0.00 332.05 2,028.80 100.00 332.05 2,028.80 100.00 0.00
02.01.05 REVOQUES ENLUCIDOS Y MOLDURAS 0.00 0.00
02.01.05.01 TARRAJEO EN LOSAS DE SUPERFICIE/PISO M2 28.80 35.90 1,033.92 0.00 28.80 1,033.92 100.00 28.80 1,033.92 100.00 0.00
02.01.05.02 TARRAJEO EN INTERIORES Y EXTERIORES M2 28.22 39.32 1,109.61 0.00 28.22 1,109.61 100.00 28.22 1,109.61 100.00 0.00
02.01.06 VALVULAS Y ACCESORIOS 0.00 0.00
02.01.06.01 SUMINISTRO DE ACCESORIOS Y VALVULAS EN SEDIMENTADOR GLB 1.00 968.73 968.73 0.00 1.00 968.73 100.00 1.00 968.73 100.00 0.00
02.01.06.02 COLOCACION DE ACCESORIOS EN SEDIMENTADOR Und 1.00 275.22 275.22 0.00 1.00 275.22 100.00 1.00 275.22 100.00 0.00
02.01.07 PINTURA 0.00 0.00
02.01.07.01 PINTURA EN EXTERIOR M2 17.10 10.64 181.94 0.00 17.10 181.94 100.00 17.10 181.94 100.00 0.00
02.01.08 CERCO PERIMETRICO 0.00 0.00
02.01.08.01 COLOCADO DEL CERCO DE PROTECCION ML 45.00 26.35 1,185.75 0.00 45.00 1,185.75 100.00 45.00 1,185.75 100.00 0.00
02.02 CAMARA DE LLEGADA Y DISTRIBUCION 0.00 0.00
02.02.01 CONCRETO ARMADO 0.00 0.00
02.02.01.01 CONCRETO EN MUROS LOSA/PISO f'c=210 kg/cm2 M3 0.61 471.14 287.40 0.00 0.61 287.40 100.00 0.61 287.40 100.00 0.00
02.02.01.02 CONCRETO EN LOSAS MACIZAAS f'c=210 kg/cm2 M3 0.27 376.84 101.75 0.00 0.27 101.75 100.00 0.27 101.75 100.00 0.00
02.02.01.03 ENCOFRADO Y DESENCOFRADO LOSA DE FONDO Y MURO M2 5.81 50.14 291.31 0.00 5.81 291.31 100.00 5.81 291.31 100.00 0.00
02.02.01.04 ENCOFRADO Y DESENCOFRADO LOSA Y TAPA M2 2.82 50.14 141.39 0.00 2.82 141.39 100.00 2.82 141.39 100.00 0.00
02.02.01.05 ACERO ESTRUCTURAL TRABAJADO fy=4200 kg/cm2 GRADO 60 KG 69.34 8.75 606.73 0.00 69.34 606.73 100.00 69.34 606.73 100.00 0.00
02.02.02 REVOQUES ENLUCIDOS Y MOLDURAS 0.00 0.00
02.02.02.01 TARRAJEO EN INTERIORES Y EXTERIORES M2 4.68 39.32 184.02 0.00 4.68 184.02 100.00 4.68 184.02 100.00 0.00
02.02.02.02 TARRAJEO EN LOSAS DE SUPERFICIE/PISO M2 4.56 35.90 163.70 0.00 4.56 163.70 100.00 4.56 163.70 100.00 0.00
02.02.03 VALVULAS Y ACCESORIOS 0.00 0.00
02.02.03.01 SUMINISTRO DE ACCESORIOS EN FILTRO LENTO GLB 1.00 65.30 65.30 0.00 1.00 65.30 100.00 1.00 65.30 100.00 0.00
02.03 FILTRO LENTO - ARENA 0.00 0.00
02.03.01 TRABAJOS PRELIMINARES 0.00 0.00
02.03.01.01 LIMPIEZA DE TERRENO MANUAL M2 65.49 1.32 86.45 0.00 65.49 86.45 100.00 65.49 86.45 100.00 0.00
02.03.01.02 TRAZO Y REPLANTEO M2 42.24 0.99 41.82 0.00 42.24 41.82 100.00 42.24 41.82 100.00 0.00
02.03.02 MOVIMIENTO DE TIERRAS 0.00 0.00
02.03.02.01 EXCAVACION MANUAL EN TERRENO NORMAL M3 37.44 37.89 1,418.60 0.00 37.44 1,418.60 100.00 37.44 1,418.60 100.00 0.00
02.03.02.02 REFINE Y NIVELACION - COMPACTADO M2 37.44 3.94 147.51 0.00 37.44 147.51 100.00 37.44 147.51 100.00 0.00
02.03.02.03 ACARREO DE MATERIAL EXCEDENTE (D=30 M) M3 49.67 23.35 1,159.79 - 0.00 -0.05 49.67 1,159.84 100.00 49.67 1,159.79 100.00 0.00
02.03.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00
02.03.03.01 SOLADO DE 4" CONCRETO 1:10 C:H M2 8.87 26.11 231.60 0.00 8.87 231.60 100.00 8.87 231.60 100.00 0.00
02.03.04 OBRAS DE CONCRETO ARMADO 0.00 0.00
02.03.04.01 CONCRETO f 'c=210 kg/cm2 - FILTRO LENTO M3 24.02 379.20 9,108.38 0.00 24.02 9,108.38 100.00 24.02 9,108.38 100.00 0.00
VALORIZACION DE OBRA N 10
FRMULA 04
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
: SISTEMA KALLACALLANI - INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE
FORMULA 04
AYAVIRI, PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR REFERENCIAL : S/. 7,529,454.25 (INCLUYE IGV)
MONTO DEL CONTRATO : S/. 7,529,454.25 (INCLUYE IGV)
ADELANTO DIRECTO : S/. 752,945.43 (INCLUYE IGV) 0.10
ADELANTO PARA MATERIALES : S/. 1,505,890.85 (INCLUYE IGV) 0.20
FECHA VALOR REFERENCIAL May-16

PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANTERIOR AVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N
UND CANT. P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADO VALORIZADO % METRADO
02.03.04.02 ENCOFRADO Y DESENCOFRADO -(MURO) M2 130.00 50.66 6,585.80 0.00 130.00 6,585.80 100.00 130.00 6,585.80 100.00 0.00
02.03.04.03 ACERO ESTRUCTURAL TRABAJADO fy=4200 kg/cm2 GRADO 60 (MURO) KG 1,875.73 6.11 11,460.71 0.00 1,875.73 11,460.71 100.00 1,875.73 11,460.71 100.00 0.00
02.03.05 REVOQUES ENLUCIDOS Y MOLDURAS 0.00 0.00
02.03.05.01 TARRAJEO CON IMPERMEABILIZANTES M2 159.20 30.25 4,815.80 0.00 159.20 4,815.80 100.00 159.20 4,815.80 100.00 0.00
02.03.06 FILTROS 0.00 0.00
02.03.06.01 LECHO DE ARENA FINA SELECCIONADA M3 8.60 89.76 771.94 0.00 8.60 771.94 100.00 8.60 771.94 100.00 0.00
02.03.06.02 LECHO FILTRANTE CON MATERIAL SELECCIONADO (CAPA DE SOPORTE) M2 24.00 48.56 1,165.44 0.00 24.00 1,165.44 100.00 24.00 1,165.44 100.00 0.00
02.03.06.03 SUMINISTRO Y COLOCADO DE DRENES EN FILTRO LENTO GLB 1.00 4,361.82 4,361.82 0.00 1.00 4,361.82 100.00 1.00 4,361.82 100.00 0.00
02.04 CAMARA DE SALIDA Y CASETA DE VALVULAS 0.00 0.00
02.04.01 TRABAJOS PRELIMINARES 0.00 0.00
02.04.01.01 LIMPIEZA DE TERRENO MANUAL M2 5.02 1.32 6.63 0.00 5.02 6.63 100.00 5.02 6.63 100.00 0.00
02.04.01.02 TRAZO Y REPLANTEO M2 5.02 0.99 4.97 0.00 5.02 4.97 100.00 5.02 4.97 100.00 0.00
02.04.02 MOVIMIENTO DE TIERRAS 0.00 0.00
02.04.02.01 EXCAVACION MANUAL EN TERRENO NORMAL M3 5.02 37.89 190.21 0.00 5.02 190.21 100.00 5.02 190.21 100.00 0.00
02.04.03 CONCRETO SIMPLE 0.00 0.00
02.04.03.01 SOLADO DE 4" CONCRETO 1:10 C:H M2 1.25 26.11 32.64 0.00 1.25 32.64 100.00 1.25 32.64 100.00 0.00
02.04.03.02 CONCRETO SIMPLE f'c=175 kg/cm2 M3 0.46 354.47 163.06 0.00 0.46 163.06 100.00 0.46 163.06 100.00 0.00
02.04.04 CONCRETO ARMADO 0.00 0.00
02.04.04.01 CONCRETO EN MUROS LOSA/PISO f'c=210 kg/cm2 M3 1.63 471.14 767.96 0.00 1.63 767.96 100.00 1.63 767.96 100.00 0.00
02.04.04.02 CONCRETO EN LOSAS MACIZAAS f'c=210 kg/cm2 M3 0.74 376.84 278.86 0.00 0.74 278.86 100.00 0.74 278.86 100.00 0.00
02.04.04.03 ACERO ESTRUCTURAL TRABAJADO fy=4200 kg/cm2 GRADO 60 KG 99.17 8.75 867.74 0.00 99.17 867.74 100.00 99.17 867.74 100.00 0.00
02.04.04.04 ENCOFRADO Y DESENCOFRADO LOSA DE FONDO Y MURO M2 23.30 50.14 1,168.26 0.00 23.30 1,168.26 100.00 23.30 1,168.26 100.00 0.00
02.04.04.05 ENCOFRADO Y DESENCOFRADO LOSA Y TAPA M2 4.87 50.14 244.18 0.00 4.87 244.18 100.00 4.87 244.18 100.00 0.00
02.04.05 REVOQUES ENLUCIDOS Y MOLDURAS 0.00 0.00
02.04.05.01 TARRAJEO EN INTERIORES Y EXTERIORES M2 26.11 39.32 1,026.65 0.00 26.11 1,026.65 100.00 26.11 1,026.65 100.00 0.00
02.04.05.02 TARRAJEO EN LOSAS DE SUPERFICIE/PISO M2 4.87 35.90 174.83 0.00 4.87 174.83 100.00 4.87 174.83 100.00 0.00
02.04.06 VALVULAS Y ACCESORIOS 0.00 0.00
02.04.06.01 SUMINISTRO E INSTALACION DE ACCESORIOS PVC GLB 1.00 733.07 733.07 - 0.00 -0.01 1.00 733.08 100.00 1.00 733.07 100.00 0.00
02.04.07 TAPA SANITARIA 0.00 0.00
02.04.07.01 TAPA SANITARIA DE 0.60X.60 MTS UND 1.00 122.36 122.36 0.00 1.00 122.36 100.00 1.00 122.36 100.00 0.00
02.04.07.02 TAPA SANITARIA DE 0.50X0.50 MTS UND 1.00 123.55 123.55 0.00 1.00 123.55 100.00 1.00 123.55 100.00 0.00
02.05 LAVADERO DE ARENA 0.00 0.00
02.05.01 TRABAJOS PRELIMINARES 0.00 0.00
02.05.01.01 LIMPIEZA DE TERRENO MANUAL M2 12.60 1.32 16.63 0.00 12.60 16.63 100.00 12.60 16.63 100.00 0.00
02.05.01.02 TRAZO Y REPLANTEO M2 8.31 0.99 8.23 0.00 8.31 8.23 100.00 8.31 8.23 100.00 0.00
VALORIZACION DE OBRA N 10
FRMULA 04
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
: SISTEMA KALLACALLANI - INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE
FORMULA 04
AYAVIRI, PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR REFERENCIAL : S/. 7,529,454.25 (INCLUYE IGV)
MONTO DEL CONTRATO : S/. 7,529,454.25 (INCLUYE IGV)
ADELANTO DIRECTO : S/. 752,945.43 (INCLUYE IGV) 0.10
ADELANTO PARA MATERIALES : S/. 1,505,890.85 (INCLUYE IGV) 0.20
FECHA VALOR REFERENCIAL May-16

PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANTERIOR AVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N
UND CANT. P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADO VALORIZADO % METRADO
02.05.02 MOVIMIENTO DE TIERRAS 0.00 0.00
02.05.02.01 EXCAVACION MANUAL EN TERRENO NORMAL M3 3.32 37.89 125.79 0.00 3.32 125.79 100.00 3.32 125.79 100.00 0.00
02.05.02.02 REFINE Y NIVELACION - COMPACTADO M2 8.31 3.94 32.74 0.00 8.31 32.74 100.00 8.31 32.74 100.00 0.00
02.05.02.03 ACARREO DE MATERIAL EXCEDENTE (D=30 M) M3 4.32 23.35 100.87 0.00 4.32 100.87 100.00 4.32 100.87 100.00 0.00
02.05.03 CONCRETO SIMPLE 0.00 0.00
02.05.03.01 SOLADO DE 4" CONCRETO 1:10 C:H M2 1.25 26.11 32.64 0.00 1.25 32.64 100.00 1.25 32.64 100.00 0.00
02.05.03.02 CONCRETO CICLOPEO f'c=175 kg/cm2 + 75 % PM.(PISO) M3 0.07 181.02 12.67 0.00 0.07 12.67 100.00 0.07 12.67 100.00 0.00
02.05.04 CONCRETO ARMADO 0.00 0.00
02.05.04.01 CONCRETO EN MUROS LOSA/PISO f'c=210 kg/cm2 M3 0.83 471.14 391.05 0.00 0.83 391.05 100.00 0.83 391.05 100.00 0.00
02.05.04.02 CONCRETO SIMPLE f'c=175 kg/cm2 M3 1.90 354.47 673.49 0.00 1.90 673.49 100.00 1.90 673.49 100.00 0.00
02.05.04.03 ENCOFRADO Y DESENCOFRADO LOSA DE FONDO Y MURO M2 11.49 50.14 576.11 0.00 11.49 576.11 100.00 11.49 576.11 100.00 0.00
02.05.04.04 ENCOFRADO Y DESENCOFRADO LOSA Y TAPA M2 0.32 50.14 16.04 0.00 0.32 16.04 100.00 0.32 16.04 100.00 0.00
02.05.04.05 ACERO ESTRUCTURAL TRABAJADO fy=4200 kg/cm2 GRADO 60 KG 82.86 8.75 725.03 0.00 82.86 725.03 100.00 82.86 725.03 100.00 0.00
02.05.05 REVOQUES ENLUCIDOS Y MOLDURAS 0.00 0.00
02.05.05.01 TARRAJEO EN INTERIORES Y EXTERIORES M2 10.72 39.32 421.51 0.00 10.72 421.51 100.00 10.72 421.51 100.00 0.00
02.05.05.02 TARRAJEO EN LOSAS DE SUPERFICIE/PISO M2 1.92 35.90 68.93 0.00 1.92 68.93 100.00 1.92 68.93 100.00 0.00
02.05.06 VALVULAS Y ACCESORIOS 0.00 0.00
02.05.06.01 SUMINISTRO E INSTALACION DE ACCESORIOS PVC/LAVADERO GLB 1.00 212.06 212.06 0.00 1.00 212.06 100.00 1.00 212.06 100.00 0.00
02.06 DEPOSITO DE ARENA LAVADA 0.00 0.00
02.06.01 TRABAJOS PRELIMINARES 0.00 0.00
02.06.01.01 LIMPIEZA DE TERRENO MANUAL M2 9.00 1.32 11.88 0.00 9.00 11.88 100.00 9.00 11.88 100.00 0.00
02.06.01.02 TRAZO Y REPLANTEO M2 7.29 0.99 7.22 0.00 7.29 7.22 100.00 7.29 7.22 100.00 0.00
02.06.02 MOVIMIENTO DE TIERRAS 0.00 0.00
02.06.02.01 EXCAVACION MANUAL EN TERRENO NORMAL M3 2.37 37.89 89.80 0.00 2.37 89.80 100.00 2.37 89.80 100.00 0.00
02.06.02.02 REFINE Y NIVELACION - COMPACTADO M2 7.29 3.94 28.72 0.00 7.29 28.72 100.00 7.29 28.72 100.00 0.00
02.06.02.03 ACARREO DE MATERIAL EXCEDENTE (D=30 M) M3 3.08 23.35 71.92 0.00 3.08 71.92 100.00 3.08 71.92 100.00 0.00
02.06.03 CONCRETO SIMPLE 0.00 0.00
02.06.03.01 SOLADO DE 4" CONCRETO 1:10 C:H M2 0.49 26.11 12.79 0.00 0.49 12.79 100.00 0.49 12.79 100.00 0.00
02.06.03.02 CONCRETO CICLOPEO f'c=175 kg/cm2 + 75 % PM.(PISO) M2 1.13 122.20 138.09 0.00 1.13 138.09 100.00 1.13 138.09 100.00 0.00
02.06.03.03 CONCRETO CICLOPEO f'c=140 kg/cm2 + 70 % PG. (CIMENTACION) M3 1.40 199.28 278.99 0.00 1.40 278.99 100.00 1.40 278.99 100.00 0.00
02.06.04 CONCRETO ARMADO 0.00 0.00
02.06.04.01 CONCRETO SIMPLE f'c=175 kg/cm2 M3 0.50 354.47 177.24 0.00 0.50 177.24 100.00 0.50 177.24 100.00 0.00
02.06.04.02 ENCOFRADO Y DESENCOFRADO LOSA DE FONDO Y MURO M2 7.52 50.14 377.05 0.00 7.52 377.05 100.00 7.52 377.05 100.00 0.00
02.06.04.03 ACERO ESTRUCTURAL TRABAJADO fy=4200 kg/cm2 GRADO 60 KG 161.16 8.75 1,410.15 0.00 161.16 1,410.15 100.00 161.16 1,410.15 100.00 0.00
02.06.05 MUROS Y TABIQUES DE ALBAILERIA 0.00 0.00
VALORIZACION DE OBRA N 10
FRMULA 04
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
: SISTEMA KALLACALLANI - INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE
FORMULA 04
AYAVIRI, PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR REFERENCIAL : S/. 7,529,454.25 (INCLUYE IGV)
MONTO DEL CONTRATO : S/. 7,529,454.25 (INCLUYE IGV)
ADELANTO DIRECTO : S/. 752,945.43 (INCLUYE IGV) 0.10
ADELANTO PARA MATERIALES : S/. 1,505,890.85 (INCLUYE IGV) 0.20
FECHA VALOR REFERENCIAL May-16

PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANTERIOR AVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N
UND CANT. P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADO VALORIZADO % METRADO
02.06.05.01 MURO DE LADRILLO K.K. DE SOGA CARAVISTA MEZC. C:A 1:4, E=1.5 CM M2 6.72 77.44 520.40 0.00 6.72 520.40 100.00 6.72 520.40 100.00 0.00
02.06.06 REVOQUES ENLUCIDOS Y MOLDURAS 0.00 0.00
02.06.06.01 TARRAJEO MEZCLA INTERIOR 1:5 P/MUROS DE LADRILLO M2 13.77 46.43 639.34 0.00 13.77 639.34 100.00 13.77 639.34 100.00 0.00
02.06.07 COBERTURAS 0.00 0.00
02.06.07.01 VIGA P/TIJERALES CON MADERA 3" X 3" X 3.05 M UND 4.00 67.77 271.08 0.00 4.00 271.08 100.00 4.00 271.08 100.00 0.00
02.06.07.02 CORREAS DE MADERA 3"x1"x3.225 MP/CUBIERTA DE CALAMINA UND 6.00 25.56 153.36 0.00 6.00 153.36 100.00 6.00 153.36 100.00 0.00
02.06.07.03 TIJERALES DE MADERA 3" X 2" X 3.O25 M UND 4.00 107.96 431.84 0.00 4.00 431.84 100.00 4.00 431.84 100.00 0.00
02.06.07.04 COLUMNA DE MADERA 3"x3"x 1.80 M UND 4.00 44.18 176.72 0.00 4.00 176.72 100.00 4.00 176.72 100.00 0.00
02.06.07.05 COBERTURA IMPERMEABILIZANTE ONDULINE 2.00 X 0.95 X 0.26 MM M2 11.89 48.60 577.85 0.00 11.89 577.85 100.00 11.89 577.85 100.00 0.00
02.06.07.06 CUMBRERA IMPERMEABILIZANTE ONDULINE ML 3.23 42.24 136.44 0.00 3.23 136.44 100.00 3.23 136.44 100.00 0.00
03 LINEA DE CONDUCCION ( 21726.98 ML) 0.00 0.00
03.01 TRABAJOS PRELIMINARES 0.00 0.00
03.01.01 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS ML 21,718.13 0.45 9,773.16 - 8.85 -3.98 21,726.98 9,777.14 100.04 21,718.13 9,773.16 100.00 0.00
03.02 MOVIMIENTO DE TIERRAS 0.00 0.00
03.02.01 EXCAVACION EN TERRENO NORMAL CON EQUIPO RETROEXCAVADOR M3 3,814.17 6.95 26,508.48 18.48 128.41 3,795.69 26,380.07 99.52 3,814.17 26,508.48 100.00 0.00
03.02.02 EXCAVACION MANUAL DE ZANJA, MATERIAL ROCA SUELTA M3 124.74 38.92 4,854.88 - 0.00 0.00 124.74 4,854.88 100.00 124.74 4,854.88 100.00 0.00
03.02.03 EXCAVACION MANUAL EN MATERIAL SUELTO Y REFINE M3 1,224.09 29.19 35,731.19 - 21.25 -620.22 1,245.34 36,351.40 101.74 1,224.09 35,731.19 100.00 0.00
03.02.04 CAMA DE APOYO PARA TUBERIA C/MAT. PROP. e=0.10m y b = 0.50m ML 21,718.13 3.35 72,755.74 - 8.85 -29.65 21,726.98 72,785.38 100.04 21,718.13 72,755.73 100.00 0.00
03.02.05 RELLENO C/ MAT. PROP. b =0.40m, H=0.60m SOBRE LA CLAVE DE TUB. ML 21,718.13 5.08 110,328.10 - 8.85 -44.96 21,726.98 110,373.06 100.04 21,718.13 110,328.10 100.00 0.00
03.03 SUMINISTRO E INSTALACION DE TUB. 0.00 0.00
03.03.01 SUMINISTRO E INSTALACION DE TUBERIAS HDPE D= 90 MM PN 10 0E 80 ML 14,840.75 11.60 172,152.70 0.00 14,840.75 172,152.70 100.00 14,840.75 172,152.70 100.00 0.00
03.03.02 SUMINISTRO E INSTALACION DE TUBERIAS HDPE D= 75 MM PN 10 PE 80 ML 5,822.87 9.20 53,570.40 0.00 5,822.87 53,570.40 100.00 5,822.87 53,570.40 100.00 0.00
03.03.03 SUMINISTRO E INSTALACION DE TUBERIAS HDPE D= 63 MM PN 10 PE 80 ML 1,063.36 8.98 9,548.97 0.00 1,063.36 9,548.97 100.00 1,063.36 9,548.97 100.00 0.00
03.03.04 PRUEBA HIDRAULICA EN TUBERIAS ML 21,726.98 0.78 16,947.04 0.00 21,726.98 16,947.04 100.00 21,726.98 16,947.04 100.00 0.00
03.04 CRUCE DE AEREO L=10M, TUB.DE 2 1/2" (02 UND) 0.00 0.00
03.04.01 TRABAJOS PRELIMINARES 0.00 0.00
03.04.01.01 LIMPIEZA DE TERRENO MANUAL M2 0.00 1.32 0.00 0.00 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00
03.04.01.02 TRAZO Y REPLANTEO M2 0.00 0.99 0.00 0.00 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00
03.04.02 MOVIMIENTO DE TIERRAS 0.00 0.00
03.04.02.01 EXCAVACION MANUAL DE ZANJA, MATERIAL COMPACTADO M3 0.00 58.38 0.00 0.00 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00
03.04.02.02 REFINE Y NIVELACION DE FONDOS ML 0.00 1.98 0.00 0.00 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00
03.04.02.03 ACARREO DE MATERIAL EXCEDENTE (D=30 M) M3 0.00 23.35 0.00 0.00 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00
03.04.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00
03.04.03.01 SOLADO CONCRETO f'c=100kg/cm2, E=10CM M2 0.00 51.42 0.00 0.00 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00
03.04.04 OBRAS DE CONCRETO ARMADO 0.00 0.00
VALORIZACION DE OBRA N 10
FRMULA 04
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
: SISTEMA KALLACALLANI - INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE
FORMULA 04
AYAVIRI, PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR REFERENCIAL : S/. 7,529,454.25 (INCLUYE IGV)
MONTO DEL CONTRATO : S/. 7,529,454.25 (INCLUYE IGV)
ADELANTO DIRECTO : S/. 752,945.43 (INCLUYE IGV) 0.10
ADELANTO PARA MATERIALES : S/. 1,505,890.85 (INCLUYE IGV) 0.20
FECHA VALOR REFERENCIAL May-16

PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANTERIOR AVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N
UND CANT. P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADO VALORIZADO % METRADO
03.04.04.01 CONCRETO f'c=175 kg/cm2 P/ZAPATAS M3 0.00 377.87 0.00 0.00 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00
03.04.04.02 CONCRETO f'c=210 kg/cm2 M3 0.00 403.95 0.00 0.00 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00
03.04.04.03 ENCOFRADO Y DESENCOFRADO M2 0.00 36.12 0.00 0.00 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00
03.04.04.04 ACERO ESTRUCTURAL TRABAJADO fy=4200 kg/cm2 GRADO 60 KG 0.00 5.81 0.00 0.00 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00
03.04.05 TARRAJEOS 0.00 0.00
03.04.05.01 TARRAJEO FROTACHADO MURO EXTERIOR 1:5, e=1.5cm M2 0.00 17.96 0.00 0.00 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00
03.04.06 ACCESORIOS 0.00 0.00
03.04.06.01 COLOCADO -CRUCE AEREO D=2" X L=10M GLB 0.00 1,006.89 0.00 0.00 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00
03.04.06.02 COLOCADO DE ACCESORIOS-CRUCE AEREO GLB 0.00 783.95 0.00 0.00 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00
03.04.07 PINTURA 0.00 0.00
03.04.07.01 PINTADO DE MURO EXTERIOR C/LATEX LAVABLE M2 0.00 6.74 0.00 0.00 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00
03.04.08 ANCLAJE PARA TUBERIAS Y ACCESORIOS 0.00 0.00
03.04.08.01 CONCRETO f'c = 100 kg/cm2 PARA ANCLAJES M3 0.00 255.96 0.00 0.00 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00
03.05 CRUCE POR PUENTE TUB. HDPE 75MM 12M (3 UND) 0.00 0.00
03.05.01 SUMINISTRO Y COLOCACION DE ACCESORIOS 0.00 0.00
03.05.01.01 SUMINISTRO DE ACCESORIOS PARA CRUCE DE PUENTE UND 0.00 114.00 0.00 0.00 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00
03.05.01.02 COLOCADO DE ACCESORIOS EN CRUCE DE RIO POR PUENTE UND 0.00 550.43 0.00 0.00 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00
03.06 CAMARA REPARTIDORA DE CAUDALES (2 UND) 0.00 0.00
03.06.01 TRABAJOS PRELIMINARES 0.00 0.00
03.06.01.01 LIMPIEZA DE TERRENO MANUAL M2 5.78 1.32 7.63 0.00 5.78 7.63 100.00 5.78 7.63 100.00 0.00
03.06.01.02 TRAZO Y REPLANTEO M2 5.78 0.99 5.72 0.00 5.78 5.72 100.00 5.78 5.72 100.00 0.00
03.06.02 MOVIMIENTO DE TIERRAS 0.00 0.00
03.06.02.01 EXCAVACION MANUAL EN TERRENO NORMAL M3 5.78 36.49 210.91 0.00 5.78 210.91 100.00 5.78 210.91 100.00 0.00
03.06.02.02 REFINE Y NIVELACION EN TERRENO NORMAL M2 5.78 5.84 33.76 0.00 5.78 33.76 100.00 5.78 33.76 100.00 0.00
03.06.02.03 ACARREO DE MATERIAL EXCEDENTE (D=30 M) M3 5.78 23.35 134.96 0.00 5.78 134.96 100.00 5.78 134.96 100.00 0.00
03.06.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00
03.06.03.01 SOLADO DE 4" CONCRETO 1:10 C:H M2 5.78 26.11 150.92 0.00 5.78 150.92 100.00 5.78 150.92 100.00 0.00
03.06.04 OBRAS DE CONCRETO ARMADO 0.00 0.00
03.06.04.01 CONCRETO f 'c=175 kg/cm2, P/LOSA DE FONDO, TAPA Y MUROS M3 2.83 279.23 790.22 0.00 2.83 790.22 100.00 2.83 790.22 100.00 0.00
03.06.04.02 ENCOFRADO Y DESENCOFRADO M2 49.00 50.66 2,482.34 0.00 49.00 2,482.34 100.00 49.00 2,482.34 100.00 0.00
03.06.04.03 ACERO ESTRUCTURAL TRABAJDO fy=4200 kg/cm2 GRADO 60 KG 138.74 6.11 847.70 0.00 138.74 847.70 100.00 138.74 847.70 100.00 0.00
03.06.05 TARRAJEOS 0.00 0.00
03.06.05.01 TARRAJEO C/IMPER. INT. 1:5, e=1.5cm M2 18.98 40.27 764.32 0.00 18.98 764.32 100.00 18.98 764.32 100.00 0.00
03.06.05.02 TARRAJEO EN EXTERIORES MORTERO 1:5, e=1.5cm M2 9.00 37.29 335.61 0.00 9.00 335.61 100.00 9.00 335.61 100.00 0.00
03.06.06 SUMINISTRO E COLOCACION DE ACCESORIOS 0.00 0.00
VALORIZACION DE OBRA N 10
FRMULA 04
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
: SISTEMA KALLACALLANI - INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE
FORMULA 04
AYAVIRI, PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR REFERENCIAL : S/. 7,529,454.25 (INCLUYE IGV)
MONTO DEL CONTRATO : S/. 7,529,454.25 (INCLUYE IGV)
ADELANTO DIRECTO : S/. 752,945.43 (INCLUYE IGV) 0.10
ADELANTO PARA MATERIALES : S/. 1,505,890.85 (INCLUYE IGV) 0.20
FECHA VALOR REFERENCIAL May-16

PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANTERIOR AVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N
UND CANT. P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADO VALORIZADO % METRADO
03.06.06.01 ACCESORIO PVC PARA CAJA REPARTIDORA DE CAUDALES UND 2.00 202.98 405.96 0.00 2.00 405.96 100.00 2.00 405.96 100.00 0.00
03.06.07 CARPINTERIA METALICA 0.00 0.00
03.06.07.01 TAPA METALICA INSPECCION DE 60X60M UND 2.00 190.53 381.06 0.00 2.00 381.06 100.00 2.00 381.06 100.00 0.00
03.06.08 PINTURA 0.00 0.00
03.06.08.01 PINTURA EN EXTERIOR M2 5.53 10.64 58.84 0.00 5.53 58.84 100.00 5.53 58.84 100.00 0.00
04 RESERVORIOS 0.00 0.00
04.01 RESERVORIO CAP. (20 M3 = 02 und) 0.00 0.00
04.01.01 TRABAJOS PRELIMINARES 0.00 0.00
04.01.01.01 LIMPIEZA DE TERRENO MANUAL M2 40.50 1.32 53.46 0.00 40.50 53.46 100.00 40.50 53.46 100.00 0.00
04.01.01.02 TRAZO Y REPLANTEO M2 40.50 0.99 40.10 0.00 40.50 40.10 100.00 40.50 40.10 100.00 0.00
04.01.02 MOVIMIENTO DE TIERRAS 0.00 0.00
04.01.02.01 EXCAVACION EN ZONA PEDREGOSA M3 17.64 59.51 1,049.76 0.00 17.64 1,049.76 100.00 17.64 1,049.76 100.00 0.00
04.01.02.02 REFINE Y NIVELACION - COMPACTADO M2 35.28 3.94 139.00 0.00 35.28 139.00 100.00 35.28 139.00 100.00 0.00
04.01.02.03 ACARREO DE MATERIAL EXCEDENTE (D=30 M) M3 35.28 23.35 823.79 0.00 0.01 35.28 823.78 100.00 35.28 823.79 100.00 0.00
04.01.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00
04.01.03.01 SOLADO CONCRETO f'c=100kg/cm2, E=10CM M2 35.28 51.42 1,814.10 0.00 35.28 1,814.10 100.00 35.28 1,814.10 100.00 0.00
04.01.04 OBRAS DE CONCRETO ARMADO 0.00 0.00
04.01.04.01 CONCRETO f'c=210 kg/cm2 M3 10.58 403.95 4,273.79 0.00 10.58 4,273.79 100.00 10.58 4,273.79 100.00 0.00
04.01.04.02 ENCOFRADO Y DESENCOFRADO P/LOSA DE FONDO M2 10.08 39.86 401.79 0.00 0.01 10.08 401.78 100.00 10.08 401.79 100.00 0.00
04.01.04.03 ACERO ESTRUCTURAL TRABAJADO fy=4200 kg/cm2 GRADO 60 P/LOSA DE FONDO KG 263.42 5.81 1,530.47 0.00 263.42 1,530.47 100.00 263.42 1,530.47 100.00 0.00
04.01.04.04 CONCRETO f'c=210 kg/cm2 M3 6.19 403.95 2,500.45 0.00 6.19 2,500.45 100.00 6.19 2,500.45 100.00 0.00
04.01.04.05 ENCOFRADO Y DESENCOFRADO P/MURO M2 61.92 61.39 3,801.27 0.00 61.92 3,801.27 100.00 61.92 3,801.27 100.00 0.00
04.01.04.06 ACERO ESTRUCTURAL TRABAJADO fy=4200 kg/cm2 GRADO 60 P/MURO KG 348.51 5.81 2,024.84 0.00 348.51 2,024.84 100.00 348.51 2,024.84 100.00 0.00
04.01.04.07 CONCRETO f'c=210 kg/cm2 M3 2.35 403.95 949.28 0.00 2.35 949.28 100.00 2.35 949.28 100.00 0.00
04.01.04.08 ENCOFRADO Y DESENCOFRADO P/LOSA DE TECHO M2 13.96 54.34 758.59 0.00 13.96 758.59 100.00 13.96 758.59 100.00 0.00
04.01.04.09 ACERO ESTRUCTURAL TRABAJADO fy=4200 kg/cm2 GRADO 60 P/LOSA DE TECHO KG 103.49 6.28 649.92 0.00 103.49 649.92 100.00 103.49 649.92 100.00 0.00
04.01.05 TARRAJEOS 0.00 0.00
04.01.05.01 TARRAJEO C/IMPER. INT. 1:1, e=2cm M2 104.72 48.51 5,079.97 0.00 0.00 104.72 5,079.96 100.00 104.72 5,079.97 100.00 0.00
04.01.05.02 TARRAJEO FROTACHADO EXT. 1:5, e=1.5cm M2 60.80 42.03 2,555.42 0.00 60.80 2,555.42 100.00 60.80 2,555.42 100.00 0.00
04.01.05.03 MORTERO PARA DAR PENDIENTE DE FONDO M2 11.56 17.96 207.62 0.00 11.56 207.62 100.00 11.56 207.62 100.00 0.00
04.01.06 VALVULAS Y ACCESORIOS 0.00 0.00
04.01.06.01 VALVULAS Y ACCESORIOS P/RESERV. GLB 2.00 315.20 630.40 0.00 2.00 630.40 100.00 2.00 630.40 100.00 0.00
04.01.06.02 COLOCADO DE ACCESORIOS P/RESERV. GLB 2.00 366.96 733.92 0.00 2.00 733.92 100.00 2.00 733.92 100.00 0.00
04.01.07 PRUEBAS HIDRAULICAS Y DESINFECCION 0.00 0.00
04.01.07.01 PRUEBA HIDRAULICA M3 20.81 0.87 18.10 0.00 20.81 18.10 100.00 20.81 18.10 100.00 0.00
VALORIZACION DE OBRA N 10
FRMULA 04
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
: SISTEMA KALLACALLANI - INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE
FORMULA 04
AYAVIRI, PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR REFERENCIAL : S/. 7,529,454.25 (INCLUYE IGV)
MONTO DEL CONTRATO : S/. 7,529,454.25 (INCLUYE IGV)
ADELANTO DIRECTO : S/. 752,945.43 (INCLUYE IGV) 0.10
ADELANTO PARA MATERIALES : S/. 1,505,890.85 (INCLUYE IGV) 0.20
FECHA VALOR REFERENCIAL May-16

PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANTERIOR AVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N
UND CANT. P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADO VALORIZADO % METRADO
04.01.07.02 PRUEBA DESINFECCION M3 20.81 4.38 91.15 0.00 20.81 91.15 100.00 20.81 91.15 100.00 0.00
04.01.08 PINTURA 0.00 0.00
04.01.08.01 PINTADO DE MURO EXTERIOR C/LATEX LAVABLE M2 57.76 6.74 389.30 0.00 57.76 389.30 100.00 57.76 389.30 100.00 0.00
04.01.09 CASETA DE VALVULAS 0.00 0.00
04.01.09.01 LIMPIEZA DE TERRENO MANUAL M2 5.94 1.32 7.84 0.00 5.94 7.84 100.00 5.94 7.84 100.00 0.00
04.01.09.02 TRAZO Y REPLANTEO M2 5.94 0.99 5.88 0.00 5.94 5.88 100.00 5.94 5.88 100.00 0.00
04.01.09.03 EXCAVACION EN ZONA PEDREGOSA M3 2.38 59.51 141.63 0.00 2.38 141.63 100.00 2.38 141.63 100.00 0.00
04.01.09.04 REFINE Y NIVELACION - COMPACTADO M2 5.94 3.94 23.40 0.00 5.94 23.40 100.00 5.94 23.40 100.00 0.00
04.01.09.05 ACARREO DE MATERIAL EXCEDENTE (D=30 M) M3 2.38 23.35 55.57 0.00 2.38 55.57 100.00 2.38 55.57 100.00 0.00
04.01.09.06 CONCRETO f 'c=175 kg/cm2, P/LOSA DE FONDO, MURO LOSA DE TECHO M3 3.06 263.16 805.27 0.00 3.06 805.27 100.00 3.06 805.27 100.00 0.00
04.01.09.07 ENCOFRADO Y DESENCOFRADO M2 29.46 36.12 1,064.10 0.00 29.46 1,064.10 100.00 29.46 1,064.10 100.00 0.00
04.01.09.08 ACERO ESTRUCTURAL TRABAJADO fy=4200 kg/cm2 GRADO 60 KG 88.56 8.75 774.90 0.00 88.56 774.90 100.00 88.56 774.90 100.00 0.00
04.01.09.09 TARRAJEO FROTACHADO EXTERIOR Y INTERIOR 1:5, E=1.5cm M2 29.49 28.22 832.21 0.00 29.49 832.21 100.00 29.49 832.21 100.00 0.00
04.01.09.10 VALVULAS Y ACCESORIOS P/RESERVORIO 20 M3 GLB 2.00 944.47 1,888.94 0.00 2.00 1,888.94 100.00 2.00 1,888.94 100.00 0.00
04.01.09.11 COLOCADO DE ACCESORIOS EN CASETA DE VALVULAS Und 2.00 55.04 110.08 0.00 2.00 110.08 100.00 2.00 110.08 100.00 0.00
04.01.09.12 PINTADO DE MURO EXTERIOR C/LATEX LAVABLE M2 16.98 6.74 114.45 0.00 16.98 114.45 100.00 16.98 114.45 100.00 0.00
04.01.10 CERCO PERIMETRICO 0.00 0.00
04.01.10.01 COLOCADO DEL CERCO DE PROTECCION ML 53.00 26.35 1,396.55 0.00 53.00 1,396.55 100.00 53.00 1,396.55 100.00 0.00
04.02 RESERVORIO CAP. (15 M3 = 01 und) 0.00 0.00
04.02.01 TRABAJOS PRELIMINARES 0.00 0.00
04.02.01.01 LIMPIEZA DE TERRENO MANUAL M2 16.00 1.32 21.12 0.00 16.00 21.12 100.00 16.00 21.12 100.00 0.00
04.02.01.02 TRAZO Y REPLANTEO M2 16.00 0.99 15.84 0.00 16.00 15.84 100.00 16.00 15.84 100.00 0.00
04.02.02 MOVIMIENTO DE TIERRAS 0.00 0.00
04.02.02.01 EXCAVACION EN ZONA PEDREGOSA M3 8.00 59.51 476.08 0.00 8.00 476.08 100.00 8.00 476.08 100.00 0.00
04.02.02.02 REFINE Y NIVELACION - COMPACTADO M2 16.00 3.94 63.04 0.00 16.00 63.04 100.00 16.00 63.04 100.00 0.00
04.02.02.03 ACARREO DE MATERIAL EXCEDENTE (D=30 M) M3 19.20 23.35 448.32 0.00 19.20 448.32 100.00 19.20 448.32 100.00 0.00
04.02.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00
04.02.03.01 SOLADO CONCRETO f'c=100kg/cm2, E=10CM M2 16.00 51.42 822.72 0.00 16.00 822.72 100.00 16.00 822.72 100.00 0.00
04.02.04 OBRAS DE CONCRETO ARMADO 0.00 0.00
04.02.04.01 CONCRETO f'c=210 kg/cm2 M3 4.80 403.95 1,938.96 0.00 4.80 1,938.96 100.00 4.80 1,938.96 100.00 0.00
04.02.04.02 ENCOFRADO Y DESENCOFRADO P/LOSA DE FONDO M2 4.80 39.86 191.33 0.00 4.80 191.33 100.00 4.80 191.33 100.00 0.00
04.02.04.03 ACERO ESTRUCTURAL TRABAJADO fy=4200 kg/cm2 GRADO 60 P/LOSA DE FONDO KG 127.05 5.81 738.16 0.00 127.05 738.16 100.00 127.05 738.16 100.00 0.00
04.02.04.04 CONCRETO f'c=210 kg/cm2 M3 5.17 403.95 2,088.42 0.00 5.17 2,088.42 100.00 5.17 2,088.42 100.00 0.00
04.02.04.05 ENCOFRADO Y DESENCOFRADO P/MURO M2 51.68 61.39 3,172.64 0.00 51.68 3,172.64 100.00 51.68 3,172.64 100.00 0.00
04.02.04.06 ACERO ESTRUCTURAL TRABAJADO fy=4200 kg/cm2 GRADO 60 P/MURO KG 312.51 5.81 1,815.68 0.00 312.51 1,815.68 100.00 312.51 1,815.68 100.00 0.00
VALORIZACION DE OBRA N 10
FRMULA 04
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
: SISTEMA KALLACALLANI - INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE
FORMULA 04
AYAVIRI, PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR REFERENCIAL : S/. 7,529,454.25 (INCLUYE IGV)
MONTO DEL CONTRATO : S/. 7,529,454.25 (INCLUYE IGV)
ADELANTO DIRECTO : S/. 752,945.43 (INCLUYE IGV) 0.10
ADELANTO PARA MATERIALES : S/. 1,505,890.85 (INCLUYE IGV) 0.20
FECHA VALOR REFERENCIAL May-16

PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANTERIOR AVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N
UND CANT. P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADO VALORIZADO % METRADO
04.02.04.07 CONCRETO f'c=210 kg/cm2 M3 2.11 403.95 852.33 0.00 2.11 852.33 100.00 2.11 852.33 100.00 0.00
04.02.04.08 ENCOFRADO Y DESENCOFRADO P/LOSA DE TECHO M2 13.84 54.34 752.07 0.00 13.84 752.07 100.00 13.84 752.07 100.00 0.00
04.02.04.09 ACERO ESTRUCTURAL TRABAJADO fy=4200 kg/cm2 GRADO 60 P/LOSA DE TECHO KG 87.81 6.28 551.45 0.00 87.81 551.45 100.00 87.81 551.45 100.00 0.00
04.02.05 TARRAJEOS 0.00 0.00
04.02.05.01 TARRAJEO C/IMPER. INT. 1:1, e=2cm M2 44.80 48.51 2,173.25 0.00 44.80 2,173.25 100.00 44.80 2,173.25 100.00 0.00
04.02.05.02 TARRAJEO FROTACHADO EXT. 1:5, e=1.5cm M2 44.80 42.03 1,882.94 0.00 44.80 1,882.94 100.00 44.80 1,882.94 100.00 0.00
04.02.05.03 MORTERO PARA DAR PENDIENTE DE FONDO M2 11.56 17.96 207.62 0.00 11.56 207.62 100.00 11.56 207.62 100.00 0.00
04.02.06 VALVULAS Y ACCESORIOS 0.00 0.00
04.02.06.01 VALVULAS Y ACCESORIOS P/RESERV. GLB 1.00 315.20 315.20 0.00 1.00 315.20 100.00 1.00 315.20 100.00 0.00
04.02.06.02 COLOCADO DE ACCESORIOS P/RESERV. GLB 1.00 366.96 366.96 0.00 1.00 366.96 100.00 1.00 366.96 100.00 0.00
04.02.07 PRUEBAS HIDRAULICAS Y DESINFECCION 0.00 0.00
04.02.07.01 PRUEBA HIDRAULICA M3 20.81 0.87 18.10 0.00 20.81 18.10 100.00 20.81 18.10 100.00 0.00
04.02.07.02 PRUEBA DESINFECCION M3 20.81 4.38 91.15 0.00 20.81 91.15 100.00 20.81 91.15 100.00 0.00
04.02.08 PINTURA 0.00 0.00
04.02.08.01 PINTADO DE MURO EXTERIOR C/LATEX LAVABLE M2 44.08 6.74 297.10 0.00 44.08 297.10 100.00 44.08 297.10 100.00 0.00
04.02.09 CASETA DE VALVULAS 0.00 0.00
04.02.09.01 LIMPIEZA DE TERRENO MANUAL M2 2.97 1.32 3.92 0.00 2.97 3.92 100.00 2.97 3.92 100.00 0.00
04.02.09.02 TRAZO Y REPLANTEO M2 2.97 0.99 2.94 0.00 2.97 2.94 100.00 2.97 2.94 100.00 0.00
04.02.09.03 EXCAVACION EN ZONA PEDREGOSA M3 1.19 59.51 70.82 0.00 1.19 70.82 100.00 1.19 70.82 100.00 0.00
04.02.09.04 REFINE Y NIVELACION - COMPACTADO M2 2.97 3.94 11.70 0.00 2.97 11.70 100.00 2.97 11.70 100.00 0.00
04.02.09.05 ACARREO DE MATERIAL EXCEDENTE (D=30 M) M3 1.19 23.35 27.79 0.00 1.19 27.79 100.00 1.19 27.79 100.00 0.00
04.02.09.06 CONCRETO f 'c=175 kg/cm2, P/LOSA DE FONDO, MURO LOSA DE TECHO M3 1.53 263.16 402.63 0.00 1.53 402.63 100.00 1.53 402.63 100.00 0.00
04.02.09.07 ENCOFRADO Y DESENCOFRADO M2 14.73 36.12 532.05 0.00 14.73 532.05 100.00 14.73 532.05 100.00 0.00
04.02.09.08 ACERO ESTRUCTURAL TRABAJADO fy=4200 kg/cm2 GRADO 60 KG 44.28 8.75 387.45 0.00 44.28 387.45 100.00 44.28 387.45 100.00 0.00
04.02.09.09 TARRAJEO FROTACHADO EXTERIOR Y INTERIOR 1:5, E=1.5cm M2 14.73 28.22 415.68 0.00 14.73 415.68 100.00 14.73 415.68 100.00 0.00
04.02.09.10 VALVULAS Y ACCESORIOS P/RESERVORIO 15 M3 GLB 1.00 796.49 796.49 0.00 1.00 796.49 100.00 1.00 796.49 100.00 0.00
04.02.09.11 COLOCADO DE ACCESORIOS EN CASETA DE VALVULAS Und 1.00 55.04 55.04 0.00 1.00 55.04 100.00 1.00 55.04 100.00 0.00
04.02.09.12 PINTADO DE MURO EXTERIOR C/LATEX LAVABLE M2 8.49 6.74 57.22 0.00 8.49 57.22 100.00 8.49 57.22 100.00 0.00
04.02.10 CERCO PERIMETRICO 0.00 0.00 0.00
04.02.10.01 COLOCADO DEL CERCO DE PROTECCION ML 25.70 26.35 677.20 0.00 25.70 677.20 100.00 25.70 677.20 100.00 0.00
05 RED DE ADUCCION Y DISTRIBUCION (L=68,077.43 ML) 0.00 0.00
05.01 TRABAJOS PRELIMINARES 0.00 0.00
05.01.01 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS ML 68,077.43 0.45 30,634.84 0.00 68,077.43 30,634.84 100.00 68,077.43 30,634.84 100.00 0.00
05.02 MOVIMIENTO DE TIERRAS 0.00 0.00
05.02.01 EXCAVACION EN TERRENO NORMAL CON EQUIPO RETROEXCAVADOR M3 14,000.00 6.95 97,300.00 0.00 14,000.00 97,300.00 100.00 14,000.00 97,300.00 100.00 0.00
VALORIZACION DE OBRA N 10
FRMULA 04
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
: SISTEMA KALLACALLANI - INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE
FORMULA 04
AYAVIRI, PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR REFERENCIAL : S/. 7,529,454.25 (INCLUYE IGV)
MONTO DEL CONTRATO : S/. 7,529,454.25 (INCLUYE IGV)
ADELANTO DIRECTO : S/. 752,945.43 (INCLUYE IGV) 0.10
ADELANTO PARA MATERIALES : S/. 1,505,890.85 (INCLUYE IGV) 0.20
FECHA VALOR REFERENCIAL May-16

PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANTERIOR AVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N
UND CANT. P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADO VALORIZADO % METRADO
05.02.02 EXCAVACION MANUAL DE ZANJA, MATERIAL ROCA SUELTA M3 1,334.32 38.92 51,931.73 0.00 0.01 1,334.32 51,931.72 100.00 1,334.32 51,931.73 100.00 0.00
05.02.03 EXCAVACION MANUAL EN MATERIAL SUELTO Y REFINE M3 693.89 29.19 20,254.65 74.08 2,162.41 619.81 18,092.24 89.32 693.89 20,254.65 100.00 0.00
05.02.04 CAMA DE APOYO PARA TUBERIA C/MAT. PROP. e=0.10m ML 68,077.43 2.34 159,301.20 0.00 68,077.43 159,301.20 100.00 68,077.43 159,301.20 100.00 0.00
05.02.05 RELLENO C/ MAT. PROP. b =0.40m, H=0.60m SOBRE LA CLAVE DE TUB. ML 68,077.43 5.08 345,833.34 0.00 68,077.43 345,833.34 100.00 68,077.43 345,833.34 100.00 0.00
05.03 SUMINISTRO E INSTALACION DE TUB. 0.00 0.00
05.03.01 TUBERIA PVC SAP CLASE-10 D= 2 1/2"", NTP 399.002 ML 442.25 6.84 3,024.99 - 0.65 -4.45 442.90 3,029.44 100.15 442.25 3,024.99 100.00 0.00
05.03.02 TUBERIA PVC SAP CLASE-10 D= 2", NTP 399.002 ML 21,874.78 6.41 140,217.34 0.00 21,874.78 140,217.34 100.00 21,874.78 140,217.34 100.00 0.00
05.03.03 TUBERIA PVC SAP CLASE-10 D= 1 1/2", NTP 399.002 ML 11,993.64 4.64 55,650.49 0.00 11,993.64 55,650.49 100.00 11,993.64 55,650.49 100.00 0.00
05.03.04 TUBERIA PVC SAP CLASE-10 D= 1", NTP 399.002 ML 14,758.42 3.80 56,082.00 0.00 14,758.42 56,082.00 100.00 14,758.42 56,082.00 100.00 0.00
05.03.05 TUBERIA PVC SAP CLASE-10 D= 3/4", NTP 399.002 ML 14,512.39 3.30 47,890.89 - 70.31 -232.02 14,582.70 48,122.91 100.48 14,512.39 47,890.89 100.00 0.00
05.03.06 TUBERIA PVC SAP CLASE-10 D= 1/2", NTP 399.002 ML 3,418.84 2.46 8,410.35 0.00 3,418.84 8,410.35 100.00 3,418.84 8,410.35 100.00 0.00
05.03.07 PRUEBA HIDRAULICA EN TUBERIAS ML 68,077.43 0.78 53,100.40 0.00 68,077.43 53,100.40 100.00 68,077.43 53,100.40 100.00 0.00
05.04 SUMINISTRO Y COLOCACION DE ACCESORIOS 0.00 0.00
05.04.01 SUMINISTRO DE ACCESORIOS PARA RED DE DISTRIBUCION GLB 1.00 1,675.58 1,675.59 - 0.00 1.00 1,675.59 100.00 1.00 1,675.59 100.00 0.00
05.04.02 COLOCACION DE ACCESORIOS PARA RED DE DISTRIBUCION GLB 1.00 316.91 316.91 0.00 1.00 316.91 100.00 1.00 316.91 100.00 0.00
05.05 VALVULA DE AIRE 2" Y 1 1/2" (12 UND) 0.00 0.00
05.05.01 TRABAJOS PRELIMINARES 0.00 0.00
05.05.01.01 LIMPIEZA DE TERRENO MANUAL M2 7.68 1.32 10.14 0.00 7.68 10.14 100.00 7.68 10.14 100.00 0.00
05.05.01.02 TRAZO Y REPLANTEO M2 7.68 0.99 7.60 0.00 7.68 7.60 100.00 7.68 7.60 100.00 0.00
05.05.02 MOVIMIENTO DE TIERRAS 0.00 0.00
05.05.02.01 EXCAVACION MANUAL EN MATERIAL SUELTO M3 6.14 29.19 179.23 0.00 6.14 179.23 100.00 6.14 179.23 100.00 0.00
05.05.02.02 REFINE Y NIVELACION - COMPACTADO M2 7.68 3.94 30.26 0.00 7.68 30.26 100.00 7.68 30.26 100.00 0.00
05.05.02.03 ACARREO DE MATERIAL EXCEDENTE (D=30 M) M3 5.76 23.35 134.50 0.00 5.76 134.50 100.00 5.76 134.50 100.00 0.00
05.05.03 OBRAS DE CONCRETO ARMADO 0.00 0.00
05.05.03.01 CONCRETO f'c = 140 kg/cm2 M3 2.45 221.03 541.52 0.00 2.45 541.52 100.00 2.45 541.52 100.00 0.00
05.05.03.02 ENCOFRADO Y DESENCOFRADO M2 33.60 50.66 1,702.18 0.00 33.60 1,702.18 100.00 33.60 1,702.18 100.00 0.00
05.05.04 TARRAJEOS 0.00 0.00
05.05.04.01 TARRAJEO EN EXTERIORES MORTERO 1:5, e=1.5cm M2 33.60 37.29 1,252.94 0.00 33.60 1,252.94 100.00 33.60 1,252.94 100.00 0.00
05.05.05 ACCESORIOS Y ACCESORIOS 0.00 0.00
05.05.05.01 VALVULA Y ACCESORIOS EN CAJA VALV. DE AIRE DN 2" Und 10.00 60.37 603.70 0.00 10.00 603.70 100.00 10.00 603.70 100.00 0.00
05.05.05.02 VALVULA Y ACCESORIOS EN CAJA VALV. DE AIRE DN 1 1/2" Und 2.00 67.49 134.98 0.00 2.00 134.98 100.00 2.00 134.98 100.00 0.00
05.05.05.03 COLOCADO DE ACCESORIOS EN CAJA VALV. DE AIRE Und 12.00 72.28 867.36 0.00 12.00 867.36 100.00 12.00 867.36 100.00 0.00
05.05.05.04 TAPA METALICA INSPECCION DE 50X50CM UND 12.00 176.00 2,112.00 0.00 12.00 2,112.00 100.00 12.00 2,112.00 100.00 0.00
05.05.06 PINTURA 0.00 0.00
05.05.06.01 PINTURA EN EXTERIOR M2 42.00 10.64 446.88 0.00 42.00 446.88 100.00 42.00 446.88 100.00 0.00
VALORIZACION DE OBRA N 10
FRMULA 04
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
: SISTEMA KALLACALLANI - INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE
FORMULA 04
AYAVIRI, PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR REFERENCIAL : S/. 7,529,454.25 (INCLUYE IGV)
MONTO DEL CONTRATO : S/. 7,529,454.25 (INCLUYE IGV)
ADELANTO DIRECTO : S/. 752,945.43 (INCLUYE IGV) 0.10
ADELANTO PARA MATERIALES : S/. 1,505,890.85 (INCLUYE IGV) 0.20
FECHA VALOR REFERENCIAL May-16

PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANTERIOR AVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N
UND CANT. P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADO VALORIZADO % METRADO
05.06 CAJA VALV. DE PURGA (12 UND), D= 3/4" 0.00 0.00
05.06.01 TRABAJOS PRELIMINARES 0.00 0.00
05.06.01.01 LIMPIEZA DE TERRENO MANUAL M2 7.68 1.32 10.14 0.00 7.68 10.14 100.00 7.68 10.14 100.00 0.00
05.06.01.02 TRAZO Y REPLANTEO M2 7.68 0.99 7.60 0.00 7.68 7.60 100.00 7.68 7.60 100.00 0.00
05.06.02 MOVIMIENTO DE TIERRAS 0.00 0.00
05.06.02.01 EXCAVACION MANUAL EN MATERIAL SUELTO M3 6.14 29.19 179.23 0.00 0.12 6.14 179.11 99.93 6.14 179.23 100.00 0.00
05.06.02.02 REFINE Y NIVELACION - COMPACTADO M2 7.68 3.94 30.26 0.00 7.68 30.26 100.00 7.68 30.26 100.00 0.00
05.06.02.03 ACARREO DE MATERIAL EXCEDENTE (D=30 M) M3 7.20 23.35 168.12 0.00 7.20 168.12 100.00 7.20 168.12 100.00 0.00
05.06.03 OBRAS DE CONCRETO ARMADO 0.00 0.00
05.06.03.01 CONCRETO f'c = 140 kg/cm2 M3 2.45 221.03 541.52 0.00 2.45 541.52 100.00 2.45 541.52 100.00 0.00
05.06.03.02 ENCOFRADO Y DESENCOFRADO M2 33.60 50.66 1,702.18 0.00 33.60 1,702.18 100.00 33.60 1,702.18 100.00 0.00
05.06.04 TARRAJEOS 0.00 0.00
05.06.04.01 TARRAJEO EN EXTERIORES MORTERO 1:5, e=1.5cm M2 33.60 37.29 1,252.94 0.00 33.60 1,252.94 100.00 33.60 1,252.94 100.00 0.00
05.06.05 ACCESORIOS Y ACCESORIOS 0.00 0.00
05.06.05.01 VALVULA Y ACCESORIOS EN CAJA VALV. DE AIRE DN 3/4" Und 12.00 52.35 628.20 0.00 12.00 628.20 100.00 12.00 628.20 100.00 0.00
05.06.05.02 COLOCADO DE ACCESORIOS EN CAJA VALV. DE PURGA Und 12.00 108.42 1,301.04 0.00 12.00 1,301.04 100.00 12.00 1,301.04 100.00 0.00
05.06.05.03 TAPA METALICA INSPECCION DE 50X50CM UND 12.00 176.00 2,112.00 0.00 12.00 2,112.00 100.00 12.00 2,112.00 100.00 0.00
05.06.06 PINTURA 0.00 0.00
05.06.06.01 PINTURA EN EXTERIOR M2 26.88 10.64 286.00 0.00 26.88 286.00 100.00 26.88 286.00 100.00 0.00
05.07 CAJA VALV. DE CONTROL 2" Y 1 1/2" (12 UND) 0.00 0.00
05.07.01 TRABAJOS PRELIMINARES 0.00 0.00
05.07.01.01 LIMPIEZA DE TERRENO MANUAL M2 11.00 1.32 14.52 0.00 11.00 14.52 100.00 11.00 14.52 100.00 0.00
05.07.01.02 TRAZO Y REPLANTEO M2 11.00 0.99 10.89 0.00 11.00 10.89 100.00 11.00 10.89 100.00 0.00
05.07.02 MOVIMIENTO DE TIERRAS 0.00 0.00
05.07.02.01 EXCAVACION MANUAL EN MATERIAL SUELTO M3 9.90 29.19 288.98 0.00 9.90 288.98 100.00 9.90 288.98 100.00 0.00
05.07.02.02 REFINE Y NIVELACION - COMPACTADO M2 11.00 3.94 43.34 0.00 11.00 43.34 100.00 11.00 43.34 100.00 0.00
05.07.02.03 ACARREO DE MATERIAL EXCEDENTE (D=30 M) M3 16.50 23.35 385.28 0.00 16.50 385.28 100.00 16.50 385.28 100.00 0.00
05.07.03 OBRAS DE CONCRETO ARMADO 0.00 0.00
05.07.03.01 CONCRETO F'C=175 KG/CM2 M3 3.28 390.85 1,281.99 0.00 3.28 1,281.99 100.00 3.28 1,281.99 100.00 0.00
05.07.03.02 ENCOFRADO Y DESENCOFRADO M2 87.82 50.66 4,448.96 0.00 87.82 4,448.96 100.00 87.82 4,448.96 100.00 0.00
05.07.03.03 ACERO ESTRUCTURAL TRABAJDO fy=4200 kg/cm2 GRADO 60 KG 65.41 6.11 399.66 0.00 65.41 399.66 100.00 65.41 399.66 100.00 0.00
05.07.04 TARRAJEOS 0.00 0.00
05.07.04.01 TARRAJEO EN EXTERIORES MORTERO 1:5, e=1.5cm M2 71.28 37.29 2,658.03 0.00 71.28 2,658.03 100.00 71.28 2,658.03 100.00 0.00
05.07.05 ACCESORIOS Y ACCESORIOS 0.00 0.00
VALORIZACION DE OBRA N 10
FRMULA 04
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
: SISTEMA KALLACALLANI - INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE
FORMULA 04
AYAVIRI, PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR REFERENCIAL : S/. 7,529,454.25 (INCLUYE IGV)
MONTO DEL CONTRATO : S/. 7,529,454.25 (INCLUYE IGV)
ADELANTO DIRECTO : S/. 752,945.43 (INCLUYE IGV) 0.10
ADELANTO PARA MATERIALES : S/. 1,505,890.85 (INCLUYE IGV) 0.20
FECHA VALOR REFERENCIAL May-16

PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANTERIOR AVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N
UND CANT. P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADO VALORIZADO % METRADO
05.07.05.01 VALVULA Y ACCESORIOS EN CAJA VALV. DE CONTROL DN 2" Und 8.00 118.77 950.16 0.00 8.00 950.16 100.00 8.00 950.16 100.00 0.00
05.07.05.02 VALVULA Y ACCESORIOS EN CAJA VALV. DE CONTROL DN 1 1/2" Und 3.00 84.30 252.90 0.00 3.00 252.90 100.00 3.00 252.90 100.00 0.00
05.07.05.03 COLOCADO DE ACCESORIOS EN CAJA DE VALV. DE CONTROL Und 11.00 108.42 1,192.62 0.00 11.00 1,192.62 100.00 11.00 1,192.62 100.00 0.00
05.07.05.04 TAPA METALICA INSPECCION DE 60X60M UND 11.00 190.53 2,095.83 0.00 11.00 2,095.83 100.00 11.00 2,095.83 100.00 0.00
05.07.06 PINTURA 0.00 0.00
05.07.06.01 PINTURA EN EXTERIOR M2 52.80 10.64 561.79 0.00 52.80 561.79 100.00 52.80 561.79 100.00 0.00
05.08 VALVULA REGULADORA DE PRESIONES (11 UND) 0.00 0.00
05.08.01 TRABAJOS PRELIMINARES 0.00 0.00
05.08.01.01 LIMPIEZA DE TERRENO MANUAL M2 13.86 1.32 18.30 0.00 13.86 18.30 100.00 13.86 18.30 100.00 0.00
05.08.01.02 TRAZO Y REPLANTEO M2 13.86 0.99 13.72 0.00 13.86 13.72 100.00 13.86 13.72 100.00 0.00
05.08.02 MOVIMIENTO DE TIERRAS 0.00 0.00
05.08.02.01 EXCAVACION MANUAL EN MATERIAL SUELTO M3 9.15 29.19 267.16 0.00 9.15 267.16 100.00 9.15 267.16 100.00 0.00
05.08.02.02 REFINE Y NIVELACION - COMPACTADO M2 14.00 3.94 55.16 0.00 14.00 55.16 100.00 14.00 55.16 100.00 0.00
05.08.02.03 ACARREO DE MATERIAL EXCEDENTE (D=30 M) M3 10.92 23.35 254.98 0.00 10.92 254.98 100.00 10.92 254.98 100.00 0.00
05.08.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00
05.08.03.01 CONCRETO f 'c=175 kg/cm2, P/LOSA DE FONDO, TAPA Y MUROS M3 3.98 279.23 1,110.22 0.00 3.98 1,110.22 100.00 3.98 1,110.22 100.00 0.00
05.08.03.02 ENCOFRADO Y DESENCOFRADO M2 55.58 50.66 2,815.48 0.00 55.58 2,815.48 100.00 55.58 2,815.48 100.00 0.00
05.08.04 TARRAJEOS 0.00 0.00
05.08.04.01 TARRAJEO EN EXTERIORES MORTERO 1:5, e=1.5cm M2 35.42 37.29 1,320.81 0.00 35.42 1,320.81 100.00 35.42 1,320.81 100.00 0.00
05.08.05 ACCESORIOS Y ACCESORIOS 0.00 0.00
05.08.05.01 VALVULA Y ACCESORIOS EN CAJA VALV. REGULADORA DE PRESION 2 1/2" GLB 1.00 3,529.45 3,529.45 0.00 1.00 3,529.45 100.00 1.00 3,529.45 100.00 0.00
05.08.05.02 VALVULA Y ACCESORIOS EN CAJA VALV. REGULADORA DE PRESION 2" GLB 4.00 2,111.62 8,446.48 0.00 4.00 8,446.48 100.00 4.00 8,446.48 100.00 0.00
05.08.05.03 VALVULA Y ACCESORIOS EN CAJA VALV. REGULADORA DE PRESION 1 1/2" GLB 1.00 3,067.83 3,067.83 0.00 1.00 3,067.83 100.00 1.00 3,067.83 100.00 0.00
05.08.05.04 VALVULA Y ACCESORIOS EN CAJA VALV. REGULADORA DE PRESION 1" GLB 1.00 2,564.30 2,564.30 0.00 1.00 2,564.30 100.00 1.00 2,564.30 100.00 0.00
05.08.05.05 COLOCADO DE ACCESORIOS EN CAJA VALV . REDUCTORA DE PRESION UND 7.00 72.28 505.96 0.00 7.00 505.96 100.00 7.00 505.96 100.00 0.00
05.08.06 PINTURA 0.00 0.00
05.08.06.01 PINTURA EN EXTERIOR M2 35.42 10.64 376.87 0.00 35.42 376.87 100.00 35.42 376.87 100.00 0.00
05.09 CRUCE DE AEREO L=10M, TUB.DE 1 1/2" Y 1" (02 UND) 0.00 0.00
05.09.01 TRABAJOS PRELIMINARES 0.00 0.00
05.09.01.01 LIMPIEZA DE TERRENO MANUAL M2 0.00 1.32 0.00 0.00 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00
05.09.01.02 TRAZO Y REPLANTEO M2 0.00 0.99 0.00 0.00 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00
05.09.02 MOVIMIENTO DE TIERRAS 0.00 0.00
05.09.02.01 EXCAVACION MANUAL DE ZANJA, MATERIAL COMPACTADO M3 0.00 58.38 0.00 0.00 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00
05.09.02.02 REFINE Y NIVELACION DE FONDOS ML 0.00 1.98 0.00 0.00 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00
05.09.02.03 ACARREO DE MATERIAL EXCEDENTE (D=30 M) M3 0.00 23.35 0.00 0.00 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00
VALORIZACION DE OBRA N 10
FRMULA 04
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
: SISTEMA KALLACALLANI - INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE
FORMULA 04
AYAVIRI, PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR REFERENCIAL : S/. 7,529,454.25 (INCLUYE IGV)
MONTO DEL CONTRATO : S/. 7,529,454.25 (INCLUYE IGV)
ADELANTO DIRECTO : S/. 752,945.43 (INCLUYE IGV) 0.10
ADELANTO PARA MATERIALES : S/. 1,505,890.85 (INCLUYE IGV) 0.20
FECHA VALOR REFERENCIAL May-16

PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANTERIOR AVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N
UND CANT. P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADO VALORIZADO % METRADO
05.09.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00
05.09.03.01 SOLADO CONCRETO f'c=100kg/cm2, E=10CM M2 0.00 51.42 0.00 0.00 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00
05.09.04 OBRAS DE CONCRETO ARMADO 0.00 0.00
05.09.04.01 CONCRETO f'c=175 kg/cm2 P/ZAPATAS M3 0.00 377.87 0.00 0.00 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00
05.09.04.02 CONCRETO f'c=210 kg/cm2 M3 0.00 403.95 0.00 0.00 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00
05.09.04.03 ENCOFRADO Y DESENCOFRADO M2 0.00 36.12 0.00 0.00 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00
05.09.04.04 ACERO ESTRUCTURAL TRABAJADO fy=4200 kg/cm2 GRADO 60 KG 0.00 5.81 0.00 0.00 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00
05.09.05 TARRAJEOS 0.00 0.00
05.09.05.01 TARRAJEO FROTACHADO MURO EXTERIOR 1:5, e=1.5cm M2 0.00 17.96 0.00 0.00 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00
05.09.06 ACCESORIOS 0.00 0.00
05.09.06.01 COLOCADO -CRUCE AEREO D=1" X L=10M GLB 0.00 825.81 0.00 0.00 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00
05.09.06.02 COLOCADO -CRUCE AEREO D=1 1/2" X L=10M GLB 0.00 890.21 0.00 0.00 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00
05.09.06.03 COLOCADO DE ACCESORIOS-CRUCE AEREO GLB 0.00 783.95 0.00 0.00 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00
05.09.07 PINTURA 0.00 0.00
05.09.07.01 PINTADO DE MURO EXTERIOR C/LATEX LAVABLE M2 0.00 6.74 0.00 0.00 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00
05.10 CRUCE DE RIO POR SUBTERRANEO L=10M DE 2", 1 1/2", 1" Y 3/4" (04 UND)) 0.00 0.00
05.10.01 TRABAJOS PRELIMINARES 0.00 0.00
05.10.01.01 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS ML 72.00 0.45 32.40 0.00 72.00 32.40 100.00 72.00 32.40 100.00 0.00
05.10.02 OBRAS DE CONCRETO SIMPLE 0.00 0.00
05.10.02.01 CONCRETO f'c=140kg/cm2 + 30% PM M3 29.00 252.34 7,317.86 0.00 29.00 7,317.86 100.00 29.00 7,317.86 100.00 0.00
05.10.03 SUMINISTRO E COLOCACION DE ACCESORIOS 0.00 0.00
05.10.03.01 SUMINISTRO DE ACCESORIOS PARA CRUCE DE RIACHUELO TUB. 2" UND 1.00 483.80 483.80 0.00 1.00 483.80 100.00 1.00 483.80 100.00 0.00
05.10.03.02 SUMINISTRO DE ACCESORIOS PARA CRUCE DE RIACHUELO TUB. 1 1/2" UND 1.00 440.83 440.83 0.00 1.00 440.83 100.00 1.00 440.83 100.00 0.00
05.10.03.03 SUMINISTRO DE ACCESORIOS PARA CRUCE DE RIACHUELO TUB. 1" UND 1.00 333.46 333.46 0.00 1.00 333.46 100.00 1.00 333.46 100.00 0.00
05.10.03.04 SUMINISTRO DE ACCESORIOS PARA CRUCE DE RIACHUELO TUB. 3/4" UND 1.00 100.96 100.96 0.00 1.00 100.96 100.00 1.00 100.96 100.00 0.00
05.10.03.05 COLOCADO DE ACCESORIOS EN CRUCE DE RIO POR SUBTERRANEO UND 4.00 391.98 1,567.92 0.00 4.00 1,567.92 100.00 4.00 1,567.92 100.00 0.00
05.10.04 ANCLAJE PARA TUBERIAS Y ACCESORIOS 0.00 0.00
05.10.04.01 CONCRETO f'c = 100 kg/cm2 PARA ANCLAJES M3 1.76 255.96 450.49 0.00 1.76 450.49 100.00 1.76 450.49 100.00 0.00
06 INSTALACION DE LETRINAS Y TRATAMIENTO DE AGUAS SERVIDAS 0.00 0.00
06.01 MODULO DE LETRINAS (365 und) 0.00 0.00
06.01.01 TRABAJOS PRELIMINARES 0.00 0.00
06.01.01.01 LIMPIEZA DE TERRENO MANUAL M2 1,778.70 1.32 2,347.88 0.00 1,778.70 2,347.88 100.00 1,778.70 2,347.88 100.00 0.00
06.01.01.02 TRAZO Y REPLANTEO M2 1,778.70 0.99 1,760.91 0.00 1,778.70 1,760.91 100.00 1,778.70 1,760.91 100.00 0.00
06.01.02 MOVIMIENTO DE TIERRAS 0.00 0.00
06.01.02.01 EXCAVACION EN TERRENO NORMAL P/ CIMIENTOS M3 544.50 29.19 15,893.96 0.00 544.50 15,893.96 100.00 544.50 15,893.96 100.00 0.00
VALORIZACION DE OBRA N 10
FRMULA 04
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
: SISTEMA KALLACALLANI - INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE
FORMULA 04
AYAVIRI, PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR REFERENCIAL : S/. 7,529,454.25 (INCLUYE IGV)
MONTO DEL CONTRATO : S/. 7,529,454.25 (INCLUYE IGV)
ADELANTO DIRECTO : S/. 752,945.43 (INCLUYE IGV) 0.10
ADELANTO PARA MATERIALES : S/. 1,505,890.85 (INCLUYE IGV) 0.20
FECHA VALOR REFERENCIAL May-16

PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANTERIOR AVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N
UND CANT. P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADO VALORIZADO % METRADO
06.01.02.02 RELLENO CON MATERIAL PROPIO M3 33.00 16.68 550.38 0.00 33.00 550.38 100.00 33.00 550.38 100.00 0.00
06.01.02.03 REFINE Y NIVELACION - COMPACTADO M2 4,356.00 3.94 17,162.64 0.00 4,356.00 17,162.64 100.00 4,356.00 17,162.64 100.00 0.00
06.01.02.04 ACARREO DE MATERIAL EXCEDENTE (D=30 M) M3 638.00 23.35 14,897.31 - 0.00 -0.01 638.00 14,897.31 100.00 638.00 14,897.30 100.00 0.00
06.01.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00
06.01.03.01 CIMIENTO CORRIDO MEZCLA 1:10+30 % PM) M3 435.60 166.39 72,479.48 0.00 435.60 72,479.48 100.00 435.60 72,479.48 100.00 0.00
06.01.03.02 SOBRECIMIENTO CONCRETO MEZCLA 1:8+25% PM M3 110.26 247.18 27,254.38 0.00 110.26 27,254.38 100.00 110.26 27,254.38 100.00 0.00
06.01.03.03 ENCOFRADO Y DESENCOFRADO P/SOBRECIMIENTOS M2 1,470.15 43.87 64,495.48 0.00 1,470.15 64,495.48 100.00 1,470.15 64,495.48 100.00 0.00
06.01.04 OBRAS DE CONCRETO ARMADO 0.00 0.00
06.01.04.01 CONCRETO f'c=175 kg/cm2 P/Losa Sanitaria M3 98.55 342.40 33,743.52 0.00 98.55 33,743.52 100.00 98.55 33,743.52 100.00 0.00
06.01.04.02 CONCRETO f'c=175 kg/cm2 P/VIGUETAS M3 24.50 342.40 8,389.66 0.00 24.50 8,389.66 100.00 24.50 8,389.66 100.00 0.00
06.01.04.03 ACERO ESTRUCTURAL TRABAJADO fy=4200 kg/cm2 GRADO 60 P/VIGUETA KG 2,546.45 6.03 15,355.09 0.00 2,546.45 15,355.09 100.00 2,546.45 15,355.09 100.00 0.00
06.01.04.04 ENCOFRADO Y DESENCOFRADO P/VIGUETA M2 369.56 54.21 20,033.84 0.00 369.56 20,033.84 100.00 369.56 20,033.84 100.00 0.00
06.01.05 MUROS Y TABIQUES DE ALBAILERIA 0.00 0.00
06.01.05.01 MURO DE LADRILLO K.K. DE SOGA CARAVISTA MEZC. C:A 1:4, E=1.5 CM M2 5,053.87 77.44 391,371.50 0.00 5,053.87 391,371.50 100.00 5,053.87 391,371.50 100.00 0.00
06.01.06 REVOQUES Y PISO 0.00 0.00
06.01.06.01 TARRAJEO INTERIORES C/MORTERO 1:5 E=1.5CM M2 4,469.44 17.35 77,544.74 0.00 4,469.44 77,544.74 100.00 4,469.44 77,544.74 100.00 0.00
06.01.06.02 PISO DE CONCRETO COLOREADO FROTACHADO E=2.5CM M2 985.50 25.27 24,903.59 0.00 985.50 24,903.59 100.00 985.50 24,903.59 100.00 0.00
06.01.07 CONTRAZOCALOS 0.00 0.00
06.01.07.01 CONTRAZOCALO DE CEMENTO H=0.40 m., 1:5 ML 2,468.40 15.88 39,198.19 0.00 2,468.40 39,198.19 100.00 2,468.40 39,198.19 100.00 0.00
06.01.08 CARPINTERIA DE MADERA 0.00 0.00
06.01.08.01 VIGA DE MADERA 2"x3"x2.05 M. UND 1,452.00 14.28 20,734.56 0.00 1,452.00 20,734.56 100.00 1,452.00 20,734.56 100.00 0.00
06.01.08.02 CORREAS DE MADERA 2"x2"x10' ML 3,190.77 8.63 27,536.35 0.00 3,190.77 27,536.35 100.00 3,190.77 27,536.35 100.00 0.00
06.01.08.03 SUMINISTRO Y COLOCADO DE VENTANA METALICA INC/VIDRIOS UND 363.00 76.14 27,638.82 0.00 363.00 27,638.82 100.00 363.00 27,638.82 100.00 0.00
06.01.08.04 SUMINISTRO Y COLOCADO DE PUERTA METALICA INC/VIDRIOS UND 363.00 224.21 81,388.23 0.00 363.00 81,388.23 100.00 363.00 81,388.23 100.00 0.00
06.01.09 CUBERTURA 0.00 0.00
06.01.09.01 COBERTURA IMPERMEABILIZANTE ONDULINE 2.00 X 0.95 X 0.26 MM M2 2,127.18 48.60 103,380.80 0.00 2,127.18 103,380.80 100.00 2,127.18 103,380.80 100.00 0.00
06.01.10 PINTURA 0.00 0.00
06.01.10.01 PINTURA LATEX 2 MANOS EN LETRINAS M2 4,237.65 8.30 35,172.50 0.00 4,237.65 35,172.50 100.00 4,237.65 35,172.50 100.00 0.00
06.01.10.02 PINTURA ESMALTE EN ZOCALOS EXTERIOR LETRINAS M2 762.30 13.10 9,986.13 0.00 762.30 9,986.13 100.00 762.30 9,986.13 100.00 0.00
06.01.11 INSTALACIONES SANITARIAS 0.00 0.00
06.01.11.01 SUMINISTRO Y COLOCADO DE LAVATORIO DE LOSA VITRIFICADA (INC ACCESORIOS) UND 363.00 268.64 97,516.32 0.00 363.00 97,516.32 100.00 363.00 97,516.32 100.00 0.00
06.01.11.02 SUMINISTRO Y COLOCADO DE INODORO UND 363.00 259.90 94,343.70 0.00 363.00 94,343.70 100.00 363.00 94,343.70 100.00 0.00
06.01.11.03 SUMINISTRO Y COLOCADO DE DUCHA UND 363.00 53.22 19,318.86 0.00 363.00 19,318.86 100.00 363.00 19,318.86 100.00 0.00
06.01.11.04 SUMIDERO DE 2", PARA DUCHA UND 363.00 51.50 18,694.50 0.00 363.00 18,694.50 100.00 363.00 18,694.50 100.00 0.00
06.01.12 INSTALACIONES SANITARIAS 0.00 0.00
VALORIZACION DE OBRA N 10
FRMULA 04
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
: SISTEMA KALLACALLANI - INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE
FORMULA 04
AYAVIRI, PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR REFERENCIAL : S/. 7,529,454.25 (INCLUYE IGV)
MONTO DEL CONTRATO : S/. 7,529,454.25 (INCLUYE IGV)
ADELANTO DIRECTO : S/. 752,945.43 (INCLUYE IGV) 0.10
ADELANTO PARA MATERIALES : S/. 1,505,890.85 (INCLUYE IGV) 0.20
FECHA VALOR REFERENCIAL May-16

PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANTERIOR AVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N
UND CANT. P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADO VALORIZADO % METRADO
06.01.12.01 TENDIDO DE TUBERIA PVC SAL DE 4" ML 1,452.00 6.57 9,539.64 0.00 1,452.00 9,539.64 100.00 1,452.00 9,539.64 100.00 0.00
06.01.12.02 TENDIDO DE TUBERIA PVC SAL DE 2" ML 1,452.00 3.82 5,546.64 0.00 1,452.00 5,546.64 100.00 1,452.00 5,546.64 100.00 0.00
06.01.13 INSTALACIONES ELECTRICAS 0.00 0.00
06.01.13.01 SALIDA DE TECHO C/CABLE AWG TW 2.5MM(14)+D PVC SEL 16MM(5/8) pto 363.00 57.52 20,879.76 0.00 363.00 20,879.76 100.00 363.00 20,879.76 100.00 0.00
06.02 TRATAMIENTO AGUAS RESIDUALES DOMESTICAS (365 UND) 0.00 0.00
06.02.01 TRABAJOS PRELIMINARES 0.00 0.00
06.02.01.01 LIMPIEZA DE TERRENO MANUAL M2 3,630.00 1.32 4,791.60 0.00 3,630.00 4,791.60 100.00 3,630.00 4,791.60 100.00 0.00
06.02.01.02 TRAZO Y REPLANTEO M2 3,630.00 0.99 3,593.70 0.00 3,630.00 3,593.70 100.00 3,630.00 3,593.70 100.00 0.00
06.02.02 MOVIMIENTO DE TIERRAS 0.00 0.00
06.02.02.01 EXCAVACION MANUAL EN TERRENO NORMAL P/CAJA DE REGISTRO M3 205.82 29.19 6,007.91 0.00 205.82 6,007.91 100.00 205.82 6,007.91 100.00 0.00
06.02.02.02 EXCAVACION MANUAL EN TERRENO NORMAL P/COLECTOR M3 1,317.69 29.19 38,463.37 0.00 1,317.69 38,463.37 100.00 1,317.69 38,463.37 100.00 0.00
06.02.02.03 EXCAVACION MANUAL EN TERRENO NORMAL P/BIODIGESTOR M3 360.93 29.19 10,535.57 0.00 360.93 10,535.57 100.00 360.93 10,535.57 100.00 0.00
06.02.02.04 EXCAVACION MANUAL EN TERRENO NORMAL P/CAJA DE LODOS M3 220.52 29.19 6,437.05 0.00 220.52 6,437.05 100.00 220.52 6,437.05 100.00 0.00
06.02.02.05 EXCAVACION MANUAL EN TERRENO NORMAL P/ZANJA DE INFILTACION M3 508.20 29.19 14,834.36 0.00 508.20 14,834.36 100.00 508.20 14,834.36 100.00 0.00
06.02.02.06 REFINE Y NIVELACION DE FONDOS ML 6,534.00 1.98 12,937.32 0.00 6,534.00 12,937.32 100.00 6,534.00 12,937.32 100.00 0.00
06.02.02.07 REFINE Y NIVELACION P/BIODIGESTOR M2 617.10 4.76 2,937.40 0.00 617.10 2,937.40 100.00 617.10 2,937.40 100.00 0.00
06.02.02.08 ACARREO DE MATERIAL EXCEDENTE (D=30 M) M3 356.50 23.35 8,324.32 0.00 356.50 8,324.32 100.00 356.50 8,324.32 100.00 0.00
06.02.03 CAMA DE APOYO (TUBERIA Y BIODIGESTOR) 0.00 0.00
06.02.03.01 CAMA DE APOYO C/MAT. PROP. ML 6,534.00 2.91 19,013.94 0.00 6,534.00 19,013.94 100.00 6,534.00 19,013.94 100.00 0.00
06.02.03.02 CAMA DE APOYO C/MAT. PROP. (BIODIGESTOR) M2 1,633.07 3.90 6,368.96 0.00 1,633.07 6,368.96 100.00 1,633.07 6,368.96 100.00 0.00
06.02.04 RELLENO 0.00 0.00
06.02.04.01 PRIMER RELLENO C/ MATERIAL PROP. A=0.50, H=0.15CM ML 6,534.00 2.63 17,184.42 0.00 6,534.00 17,184.42 100.00 6,534.00 17,184.42 100.00 0.00
06.02.04.02 RELLENO COMPACATDO C/MATERIAL PROPIO - BIODIGESTOR M3 6,534.00 19.46 127,151.64 0.00 6,534.00 127,151.64 100.00 6,534.00 127,151.64 100.00 0.00
06.02.05 CONCRETO SIMPLE (CAJAS DE REGISTRO, LODOS Y DIST.) 0.00 0.00
06.02.05.01 SOLADO DE CONCRETO f'c=100kg/cm2 (CAJAS Y BIODIGESTOR) M2 515.46 42.90 22,113.23 0.00 515.46 22,113.23 100.00 515.46 22,113.23 100.00 0.00
06.02.05.02 CONCRETO f'c = 140 kg/cm2 P/CAJA DE LODOS M3 27.23 256.31 6,978.04 0.00 27.23 6,978.04 100.00 27.23 6,978.04 100.00 0.00
06.02.05.03 ENCOFRADO Y DESENCOFRADO M2 1,089.00 31.21 33,987.69 0.00 1,089.00 33,987.69 100.00 1,089.00 33,987.69 100.00 0.00
06.02.05.04 CONCRETO f'c = 175 kg/cm2 P/CAJAS DE DIST. Y REGISTRO M3 109.44 289.99 31,737.81 0.00 109.44 31,737.81 100.00 109.44 31,737.81 100.00 0.00
06.02.05.05 ENCOFRADO Y DESENCOFRADO M2 947.43 31.21 29,569.29 0.00 947.43 29,569.29 100.00 947.43 29,569.29 100.00 0.00
06.02.06 CONCRETO ARMADO (TAPAS DE CAJAS) 0.00 0.00
06.02.06.01 CONCRETO f'c = 175 kg/cm2 - (TAPAS DE CAJAS) M3 28.60 289.99 8,293.71 - 0.80 -232.86 29.40 8,526.58 102.81 28.60 8,293.71 100.00 0.00
06.02.06.02 ENCOFRADO Y DESENCOFRADO M2 131.40 31.21 4,100.99 0.72 22.46 130.68 4,078.53 99.45 131.40 4,100.99 100.00 0.00
06.02.06.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 KG 1,632.28 6.23 10,169.10 8.94 55.71 1,623.34 10,113.39 99.45 1,632.28 10,169.10 100.00 0.00
06.02.07 BIODIGESTOR AUTOLIMPIABLE 0.00 0.00
06.02.07.01 SUMINISTRO E INST. DE BIODIGESTOR CLARIFICADOR DE 600LTS UND 363.00 1,034.07 375,367.41 0.00 363.00 375,367.41 100.00 363.00 375,367.41 100.00 0.00
06.02.08 TUBERIA DE RED COLECTOR 0.00 0.00
06.02.08.01 SUMINISTRO E INSTALACION DE TUBERIAS NTP 399.003 ML 1,815.00 9.98 18,113.70 0.00 1,815.00 18,113.70 100.00 1,815.00 18,113.70 100.00 0.00
VALORIZACION DE OBRA N 10
FRMULA 04
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
: SISTEMA KALLACALLANI - INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE
FORMULA 04
AYAVIRI, PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR REFERENCIAL : S/. 7,529,454.25 (INCLUYE IGV)
MONTO DEL CONTRATO : S/. 7,529,454.25 (INCLUYE IGV)
ADELANTO DIRECTO : S/. 752,945.43 (INCLUYE IGV) 0.10
ADELANTO PARA MATERIALES : S/. 1,505,890.85 (INCLUYE IGV) 0.20
FECHA VALOR REFERENCIAL May-16

PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANTERIOR AVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N
UND CANT. P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADO VALORIZADO % METRADO
06.02.08.02 SUMINISTRO E INSTALACION DE TUB. NTP 4435 DN 110MM ML 2,178.00 16.32 35,544.96 0.00 2,178.00 35,544.96 100.00 2,178.00 35,544.96 100.00 0.00
06.02.09 ZANJAS DE INFILTRACION 0.00 0.00
06.02.09.01 CRIBADO DE TUB. ML 1,815.00 3.29 5,971.35 0.00 1,815.00 5,971.35 100.00 1,815.00 5,971.35 100.00 0.00
06.02.09.02 SUMINISTRO E INSTALACION DE TUBERIAS NTP 399.003 ML 2,541.00 7.04 17,888.64 0.00 2,541.00 17,888.64 100.00 2,541.00 17,888.64 100.00 0.00
06.02.09.03 SUMINISTRO E INSTALACION DE ACCESORIOS GLB 363.00 49.02 17,794.26 0.00 363.00 17,794.26 100.00 363.00 17,794.26 100.00 0.00
06.02.09.04 COLOCADO DE GRAVA S M3 145.20 75.21 10,920.49 0.00 145.20 10,920.49 100.00 145.20 10,920.49 100.00 0.00
07 PILETAS FAMILIARES (365 UND) 0.00 0.00
07.01 TRABAJOS PRELIMINARES 0.00 0.00
07.01.01 LIMPIEZA DE TERRENO MANUAL M2 726.00 1.32 958.32 0.00 726.00 958.32 100.00 726.00 958.32 100.00 0.00
07.01.02 TRAZO Y REPLANTEO M2 326.70 0.99 323.43 0.00 326.70 323.43 100.00 326.70 323.43 100.00 0.00
07.02 MOVIMIENTO DE TIERRAS 0.00 0.00
07.02.01 EXCAVACION MASIVA MANUAL - POZO PERCOLADOR M3 9.80 33.36 326.96 0.00 9.80 326.96 100.00 9.80 326.96 100.00 0.00
07.02.02 ACARREO DE MATERIAL EXCEDENTE (D=30 M) M3 12.25 23.35 286.06 0.00 12.25 286.06 100.00 12.25 286.06 100.00 0.00
07.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00
07.03.01 CONCRETO f'c = 140 kg/cm2 M3 56.19 221.03 12,420.20 0.00 56.19 12,420.20 100.00 56.19 12,420.20 100.00 0.00
07.04 OBRAS DE CONCRETO ARMADO 0.00 0.00
07.04.01 CONCRETO f'c=175 kg/cm2, losa, muros y soporte pileta M3 59.17 288.56 17,073.80 0.00 59.17 17,073.80 100.00 59.17 17,073.80 100.00 0.00
07.04.02 ENCOFRADO Y DESENCOFRADO M2 1,403.72 50.66 71,112.51 0.00 1,403.72 71,112.51 100.00 1,403.72 71,112.51 100.00 0.00
07.04.03 ACERO ESTRUCTURAL TRABAJDO fy=4200 kg/cm2 GRADO 60 KG 3,472.10 6.11 21,214.50 0.00 3,472.10 21,214.50 100.00 3,472.10 21,214.50 100.00 0.00
07.05 TARRAJEOS 0.00
07.05.01 TARRAJEO EN INTERIORES Y EXTERIORES MORTERO 1:5, e=1.5cm M2 1,968.91 38.55 75,901.56 0.00 1,968.91 75,901.56 100.00 1,968.91 75,901.56 100.00 0.00
07.06 SUMINISTRO E INSTALACION DE TUB. 0.00
07.06.01 SUMINISTRO Y COLOCACION DE ACCESORIO DE PILETAS DOMICILIARIAS UND 363.00 70.30 25,518.90 0.00 363.00 25,518.90 100.00 363.00 25,518.90 100.00 0.00
07.07 ACCESORIOS 0.00
07.07.01 VALVULA Y ACCESORIOS GLB 363.00 35.65 12,940.95 0.00 363.00 12,940.95 100.00 363.00 12,940.95 100.00 0.00
07.08 PINTURA 0.00
07.08.01 PINTURA EN EXTERIOR M2 1,968.91 12.63 24,867.36 0.00 1,968.91 24,867.36 100.00 1,968.91 24,867.36 100.00 0.00
COSTO DIRECTO 4,368,767.69 1,200.93 4,367,566.75 4,368,767.69
GASTOS GENERALES 6.60% 288,338.67 79.26 288,259.41 288,338.67
UTILIDAD 8.00% 349,501.42 96.07 349,405.34 349,501.42
TOTAL 5,006,607.78 1,376.26 5,005,231.50 99.97% 5,006,607.78 100.00%
IGV 18% 901,189.40 247.73 900,941.67 901,189.40
TOTAL VALORIZADO 5,907,797.18 1,623.99 5,906,173.17 5,907,797.18
% VALORIZADO 0.03% 99.97% 100.00%
RESUMEN DE VALORIZACIONES N 10
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR REFERENCIAL : S/. 7,529,454.25 (INCLUYE IGV)
MONTO DEL CONTRATO : S/. 7,529,454.25 (INCLUYE IGV)
ADELANTO DIRECTO : S/. 752,945.43 (INCLUYE IGV) 10.00%
ADELANTO PARA MATERIALES : S/. 1,505,890.85 (INCLUYE IGV) 20.00%
FECHA VALOR REFERENCIAL : MAYO DEL 2016

SALDO POR
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANTERIOR AVANCE ACUMULADO ACTUAL
FRMULA D E S C R I P C I O N VALORIZAR
UND CANT. P.U. PARCIAL VALORIZADO VALORIZADO % VALORIZADO % VALORIZADO
01 OBRAS PROVISIONALES Y CAPACITACION GLB 1.00 270,455.14 270,455.14 4,875.36 265,579.78 98.20 270,455.14 100.00 0.00
02 SISTEMA ALCCAMARINE GLB 1.00 56,660.68 56,660.68 -414.63 57,075.31 100.73 56,660.68 100.00 0.00
03 SISTEMA CALUYO GLB 1.00 402,054.57 402,054.57 -38,909.72 440,964.30 109.68 402,054.57 100.00 0.00
04 SISTEMA KALLACALLANI GLB 1.00 4,368,767.69 4,368,767.69 1,200.93 4,367,566.75 99.97 4,368,767.69 100.00 0.00
COSTO DIRECTO 5,097,938.08 -33,248.06 5,131,186.14 5,097,938.08 0.00
GASTOS GENERALES 6.60% 336,463.91 -2,194.37 338,658.29 336,463.91 0.00
UTILIDAD 8.00% 407,835.05 -2,659.84 410,494.89 407,835.05 0.00
TOTAL 5,842,237.04 -38,102.27 5,880,339.32 100.65% 5,842,237.04 100.00% 0.00
IGV 18% 1,051,602.67 - 6,858.41 1,058,461.08 1,051,602.67 -
TOTAL VALORIZADO 6,893,839.71 - 44,960.68 6,938,800.40 6,893,839.71 -
% VALORIZADO -0.65% 100.65% 100.00% 0.00%
Pgina 40 de 81

VALORIZACION DE DEDUCTIVOS OBRA N 01


FRMULA 01
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE MELGAR -
PUNO.
: OBRAS PROVISIONALES - INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI,
FORMULA 01
PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR REFERENCIAL : S/. 7,529,454.25 (INCLUYE IGV)
MONTO DEL CONTRATO : S/. 7,529,454.25 (INCLUYE IGV)
ADELANTO DIRECTO : S/. 752,945.43 (INCLUYE IGV) 10.00%
ADELANTO PARA MATERIALES : S/. 1,505,890.85 (INCLUYE IGV) 20.00%
FECHA VALOR REFERENCIAL May-16

PRESUPUESTO DEDUCTIVO AVANCE ACTUAL AVANCE ACUMULADO ANTERIOR AVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N
UND CANT. P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADOVALORIZADO % METRADO VALORIZADO
1 OBRAS PROVISIONALES
1.05 FLETES
01.05.03 ACARREO DE MATERIALES PARA LA CONSTRUCION DE LETRINAS GLB 0.01 45,000.00 246.58 0.01 246.58 0.00 0.00 0.00 0.01 246.58 100.00 0.00 0.00
01.05.04 ACARREO DE MATERIALES PARA LA CONSTRUCION DE PILETAS GLB 0.01 15,000.00 82.19 0.01 82.19 0.00 0.00 0.00 0.01 82.19 100.00 0.00 0.00
COSTO DIRECTO 328.77 328.77 0.00 328.77 0.00
GASTOS GENERALES 6.60% 21.70 21.70 0.00 21.70 0.00
UTILIDAD 8.00% 26.30 26.30 0.00 26.30 0.00
TOTAL 376.77 376.77 0.00 0.00% 376.77 100.00% 0.00
IGV 18% 67.82 67.82 - 67.82 0.00
TOTAL VALORIZADO 444.59 444.59 - 444.59 0.00
% VALORIZADO 100.00% 0.00% 100.00% 0.00%
Pgina 41 de 81

VALORIZACION DE DEDUCTIVOS DE OBRA N 01


FRMULA 02
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
: SISTEMA ALCCAMARINE - INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE
FORMULA 02
AYAVIRI, PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR REFERENCIAL : S/. 7,529,454.25 (INCLUYE IGV)
MONTO DEL CONTRATO : S/. 7,529,454.25 (INCLUYE IGV)
ADELANTO DIRECTO : S/. 752,945.43 (INCLUYE IGV) 10.00%
ADELANTO PARA MATERIALES : S/. 1,505,890.85 (INCLUYE IGV) 20.00%
FECHA VALOR REFERENCIAL May-16

DEDUCTIVO ACUMULADO DEDUCTIVO ACUMULADO


PRESUPUESTO DEDUCTIVO DE OBRA DEDUCTIVO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N ANTERIOR ACTUAL
UND CANT. P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADOVALORIZADO % METRADO VALORIZADO
04 RED DE ADUCCION Y DISTRIBUCION (L=644.44 ML)
04.02 MOVIMIENTO DE TIERRAS
04.02.02 EXCAVACION MANUAL DE ZANJA, MATERIAL ROCA SUELTA M3 21.02 38.92 818.10 21.02 818.10 0.00 0.00 0.00 21.02 818.10 100.00 0.00 0.00
04.02.03 EXCAVACION MANUAL EN MATERIAL SUELTO Y REFINE M3 10.33 29.19 301.53 10.33 301.53 0.00 0.00 0.00 10.33 301.53 100.00 0.00 0.00
05 INSTALACION DE LETRINAS Y TRATAMIENTO DE AGUAS SERVIDAS
05.01 MODULO DE LETRINAS (05 und)
05.01.04 OBRAS DE CONCRETO ARMADO
05.01.04.02 CONCRETO f'c=175 kg/cm2 P/VIGUETAS M3 0.04 342.40 14.55 0.04 14.55 0.00 0.00 0.00 0.04 14.55 100.00 0.00 0.00
05.01.08 CARPINTERIA DE MADERA
05.01.08.02 CORREAS DE MADERA 2"x2"x10' ML 1.05 8.63 9.06 1.05 9.06 0.00 0.00 0.00 1.05 9.06 100.00 0.00 0.00
05.01.09 CUBERTURA
05.01.09.01 COBERTURA IMPERMEABILIZANTE ONDULINE 2.00 X 0.95 X 0.26 MM M2 5.66 48.60 275.08 5.66 275.08 0.00 0.00 0.00 5.66 275.08 100.00 0.00 0.00
05.01.10 PINTURA
05.01.10.02 PINTURA ESMALTE EN ZOCALOS EXTERIOR LETRINAS M2 7.88 13.10 103.23 7.88 103.23 0.00 0.00 0.00 7.88 103.23 100.00 0.00 0.00
5.02 TRATAMIENTO AGUAS RESIDUALES DOMESTICAS (36 UND)
05.02.06 CONCRETO ARMADO (TAPAS DE CAJAS)
05.02.06.01 CONCRETO f'c = 175 kg/cm2 - (TAPAS DE CAJAS) M3 0.02 289.99 5.80 0.02 5.80 0.00 0.00 0.00 0.02 5.80 100.00 0.00 0.00
06 PILETAS FAMILIARES (36 UND)
06.01 TRABAJOS PRELIMINARES
06.01.01 LIMPIEZA DE TERRENO MANUAL M2 62.00 1.32 81.84 62.00 81.84 0.00 0.00 0.00 62.00 81.84 100.00 0.00 0.00
06.01.02 TRAZO Y REPLANTEO M2 27.90 0.99 27.62 27.90 27.62 0.00 0.00 0.00 27.90 27.62 100.00 0.00 0.00
06.02 MOVIMIENTO DE TIERRAS
06.02.01 EXCAVACION MASIVA MANUAL - POZO PERCOLADOR M3 0.84 33.36 27.86 0.84 27.86 0.00 0.00 0.00 0.84 27.86 100.00 0.00 0.00
06.02.02 ACARREO DE MATERIAL EXCEDENTE (D=30 M) M3 1.05 23.35 24.55 1.05 24.55 0.00 0.00 0.00 1.05 24.55 100.00 0.00 0.00
06.03 OBRAS DE CONCRETO SIMPLE
06.03.01 CONCRETO f'c = 140 kg/cm2 M3 4.80 221.03 1,060.06 4.80 1,060.06 0.00 0.00 0.00 4.80 1,060.06 100.00 0.00 0.00
06.04 OBRAS DE CONCRETO ARMADO
06.04.01 CONCRETO f'c=175 kg/cm2, losa, muros y soporte pileta M3 5.06 288.56 1,458.67 5.06 1,458.67 0.00 0.00 0.00 5.06 1,458.67 100.00 0.00 0.00
06.04.02 ENCOFRADO Y DESENCOFRADO M2 119.88 50.66 6,072.87 119.88 6,072.87 0.00 0.00 0.00 119.88 6,072.87 100.00 0.00 0.00
06.04.03 ACERO ESTRUCTURAL TRABAJDO fy=4200 kg/cm2 GRADO 60 KG 296.44 6.11 1,811.27 296.44 1,811.27 0.00 0.00 0.00 296.44 1,811.27 100.00 0.00 0.00
Pgina 42 de 81

VALORIZACION DE DEDUCTIVOS DE OBRA N 01


FRMULA 02
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
: SISTEMA ALCCAMARINE - INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE
FORMULA 02
AYAVIRI, PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR REFERENCIAL : S/. 7,529,454.25 (INCLUYE IGV)
MONTO DEL CONTRATO : S/. 7,529,454.25 (INCLUYE IGV)
ADELANTO DIRECTO : S/. 752,945.43 (INCLUYE IGV) 10.00%
ADELANTO PARA MATERIALES : S/. 1,505,890.85 (INCLUYE IGV) 20.00%
FECHA VALOR REFERENCIAL May-16

DEDUCTIVO ACUMULADO DEDUCTIVO ACUMULADO


PRESUPUESTO DEDUCTIVO DE OBRA DEDUCTIVO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N ANTERIOR ACTUAL
UND CANT. P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADOVALORIZADO % METRADO VALORIZADO
06.05 TARRAJEOS
06.05.01 TARRAJEO EN INTERIORES Y EXTERIORES MORTERO 1:5, e=1.5cm M2 168.14 38.55 6,481.80 168.14 6,481.80 0.00 0.00 0.00 168.14 6,481.80 100.00 0.00 0.00
06.06 SUMINISTRO E INSTALACION DE TUB.
06.06.01 SUMINISTRO Y COLOCACION DE ACCESORIO DE PILETAS DOMICILIARIAS UND 31.00 70.30 2,179.30 31.00 2,179.30 0.00 0.00 0.00 31.00 2,179.30 100.00 0.00 0.00
06.07 ACCESORIOS
06.07.01 VALVULA Y ACCESORIOS GLB 31.00 35.65 1,105.15 31.00 1,105.15 0.00 0.00 0.00 31.00 1,105.15 100.00 0.00 0.00
06.08 PINTURA
06.08.01 PINTURA EN EXTERIOR M2 168.14 12.63 2,123.61 168.14 2,123.61 0.00 0.00 0.00 168.14 2,123.61 100.00 0.00 0.00
COSTO DIRECTO 23,981.94 23,981.94 0.00 23,981.94 0.00
GASTOS GENERALES 6.60% 1,582.81 1,582.81 0.00 1,582.81 0.00
UTILIDAD 8.00% 1,918.56 1,918.56 0.00 1,918.56 0.00
TOTAL 27,483.31 27,483.31 0.00 0.00% 27,483.31 100.00% 0.00
IGV 18% 4,947.00 4,947.00 - 4,947.00 -
TOTAL VALORIZADO 32,430.31 32,430.31 - 32,430.31 -
% VALORIZADO 100.00% 0.00% 100.00% 0.00%
VALORIZACION DE DEDUCTIVOS DE OBRA N 01
FRMULA 03
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
: SISTEMA CALUYO - INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE
FORMULA 03
AYAVIRI, PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR REFERENCIAL : S/. 7,529,454.25 (INCLUYE IGV)
MONTO DEL CONTRATO : S/. 7,529,454.25 (INCLUYE IGV)
ADELANTO DIRECTO : S/. 752,945.43 (INCLUYE IGV) 10.00%
ADELANTO PARA MATERIALES : S/. 1,505,890.85 (INCLUYE IGV) 20.00%
FECHA VALOR REFERENCIAL May-16

DEDUCTIVO ACUMULADO DEDUCTIVO ACUMULADO


PRESUPUESTO DEDUCTIVO CONTRACTUAL DEDUCTIVO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N ANTERIOR ACTUAL
UND CANT. P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADOVALORIZADO % METRADO VALORIZADO
02 LINEA DE CONDUCCION ( 21,931.23 ML)
02.02 MOVIMIENTO DE TIERRAS 0.00
02.02.01 EXCAVACION MANUAL EN TERRENO NORMAL M3 5.18 33.36 172.80 5.18 172.80 0.00 0.00 0.00 5.18 172.80 100.00 0.00 0.00
04 RED DE ADUCCION Y DISTRIBUCION (L=5,810.68 ML)
04.01 TRABAJOS PRELIMINARES
04.01.01 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS ML 224.96 0.45 101.23 224.96 101.23 0.00 0.00 0.00 224.96 101.23 100.00 0.00 0.00
04.02 MOVIMIENTO DE TIERRAS
04.02.03 EXCAVACION MANUAL EN MATERIAL SUELTO Y REFINE M3 213.01 29.19 6,217.76 213.01 6,217.76 0.00 0.00 0.00 213.01 6,217.76 100.00 0.00 0.00
04.02.04 CAMA DE APOYO PARA TUBERIA C/MAT. PROP. e=0.10m ML 224.96 2.34 526.41 224.96 526.41 0.00 0.00 0.00 224.96 526.41 100.00 0.00 0.00
04.02.05 RELLENO C/ MAT. PROP. b =0.40m, H=0.60m SOBRE LA CLAVE DE TUB. ML 224.96 5.08 1,142.80 224.96 1,142.80 0.00 0.00 0.00 224.96 1,142.80 100.00 0.00 0.00
04.03 SUMINISTRO E INSTALACION DE TUB.
04.03.04 TUBERIA PVC SAP CLASE-10 D= 3/4", NTP 399.002 ML 241.47 3.30 796.85 241.47 796.85 0.00 0.00 0.00 241.47 796.85 100.00 0.00 0.00
04.03.05 TUBERIA PVC SAP CLASE-10 D= 1/2", NTP 399.002 ML 66.68 2.46 164.03 66.68 164.03 0.00 0.00 0.00 66.68 164.03 100.00 0.00 0.00
04.03.06 PRUEBA HIDRAULICA EN TUBERIAS ML 149.61 0.78 116.70 149.61 116.70 0.00 0.00 0.00 149.61 116.70 100.00 0.00 0.00
05 INSTALACION DE LETRINAS Y TRATAMIENTO DE AGUAS SERVIDAS
05.01 MODULO DE LETRINAS (36 und)
05.01.04 OBRAS DE CONCRETO ARMADO
05.01.04.02 CONCRETO f'c=175 kg/cm2 P/VIGUETAS M3 0.32 342.40 109.57 0.32 109.57 0.00 0.00 0.00 0.32 109.57 100.00 0.00 0.00
05.01.08 CARPINTERIA DE MADERA
05.01.08.02 CORREAS DE MADERA 2"x2"x10' ML 7.56 8.63 65.24 7.56 65.24 0.00 0.00 0.00 7.56 65.24 100.00 0.00 0.00
05.01.09 CUBERTURA
05.01.09.01 COBERTURA IMPERMEABILIZANTE ONDULINE 2.00 X 0.95 X 0.26 MM M2 40.73 48.60 1,979.57 40.73 1,979.57 0.00 0.00 0.00 40.73 1,979.57 100.00 0.00 0.00
05.01.10 PINTURA
05.01.10.02 PINTURA ESMALTE EN ZOCALOS EXTERIOR LETRINAS M2 56.70 13.10 742.77 56.70 742.77 0.00 0.00 0.00 56.70 742.77 100.00 0.00 0.00
06 TRATAMIENTO AGUAS RESIDUALES DOMESTICAS (36 UND)
06.06 CONCRETO ARMADO (TAPAS DE CAJAS)
06.06.01 CONCRETO f'c = 175 kg/cm2 - (TAPAS DE CAJAS) M3 0.08 289.99 23.20 0.08 23.20 0.00 0.00 0.00 0.08 23.20 100.00 0.00 0.00
06.06.02 ENCOFRADO Y DESENCOFRADO M2 1,242.43 31.21 38,776.24 1,242.43 38,776.24 0.00 0.00 0.00 1,242.43 38,776.24 100.00 0.00 0.00

COSTO DIRECTO 50,935.19 50,935.19 0.00 50,935.19 0.00


VALORIZACION DE DEDUCTIVOS DE OBRA N 01
FRMULA 03
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
: SISTEMA CALUYO - INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE
FORMULA 03
AYAVIRI, PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR REFERENCIAL : S/. 7,529,454.25 (INCLUYE IGV)
MONTO DEL CONTRATO : S/. 7,529,454.25 (INCLUYE IGV)
ADELANTO DIRECTO : S/. 752,945.43 (INCLUYE IGV) 10.00%
ADELANTO PARA MATERIALES : S/. 1,505,890.85 (INCLUYE IGV) 20.00%
FECHA VALOR REFERENCIAL May-16

DEDUCTIVO ACUMULADO DEDUCTIVO ACUMULADO


PRESUPUESTO DEDUCTIVO CONTRACTUAL DEDUCTIVO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N ANTERIOR ACTUAL
UND CANT. P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADOVALORIZADO % METRADO VALORIZADO
GASTOS GENERALES 6.60% 3,361.72 3,361.72 0.00 3,361.72 0.00
UTILIDAD 8.00% 4,074.82 4,074.82 0.00 4,074.82 0.00
TOTAL 58,371.73 58,371.73 0.00 0.00% 58,371.73 100.00% 0.00
IGV 18% 10,506.91 10,506.91 - 10,506.91 -
TOTAL VALORIZADO 68,878.64 68,878.64 - 68,878.64 -
% VALORIZADO 100.00% 0.00% 100.00% 0.00%
VALORIZACION DE DEDUCTIVOS DE OBRA N 01
FRMULA 04
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
: SISTEMA KALLACALLANI - INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE
FORMULA 04
AYAVIRI, PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR REFERENCIAL : S/. 7,529,454.25 (INCLUYE IGV)
MONTO DEL CONTRATO : S/. 7,529,454.25 (INCLUYE IGV)
ADELANTO DIRECTO : S/. 752,945.43 (INCLUYE IGV) 0.10
ADELANTO PARA MATERIALES : S/. 1,505,890.85 (INCLUYE IGV) 0.20
FECHA VALOR REFERENCIAL ###

PRESUPUESTO DEDUCTIVO CONTRACTUAL DEDUCTIVO ACTUAL DEDUCTIVO ACUMULADO ANTERIOR DEDUCTIVO ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N
UND CANT. P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADO VALORIZADO % METRADO VALORIZADO
02 PLANTA DE TRATAMIENTO PRIMARIO DE AGUA (01 UND)
02.01 SEDIMENTADOR (01 UND)
02.01.04 OBRAS DE CONCRETO ARMADO
02.01.04.03 ACERO ESTRUCTURAL TRABAJADO fy=4200 kg/cm2 GRADO 60 (MURO) KG 267.84 6.11 1,636.53 267.84 1,636.53 0.00 0.00 0.00 267.84 1,636.53 100.00 0.00 0.00
03 LINEA DE CONDUCCION ( 21726.98 ML) 0.00 0.00 0.00
03.01 TRABAJOS PRELIMINARES 0.00 0.00 0.00
03.01.01 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS ML 8.85 0.45 3.98 8.85 3.98 0.00 0.00 0.00 8.85 3.98 100.00 0.00 0.00
03.02 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00
03.02.01 EXCAVACION EN TERRENO NORMAL CON EQUIPO RETROEXCAVADOR M3 11,298.19 6.95 78,522.42 11,298.19 78,522.42 0.00 0.00 0.00 11,298.19 78,522.42 100.00 0.00 0.00
VALORIZACION DE DEDUCTIVOS DE OBRA N 01
FRMULA 04
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
: SISTEMA KALLACALLANI - INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE
FORMULA 04
AYAVIRI, PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR REFERENCIAL : S/. 7,529,454.25 (INCLUYE IGV)
MONTO DEL CONTRATO : S/. 7,529,454.25 (INCLUYE IGV)
ADELANTO DIRECTO : S/. 752,945.43 (INCLUYE IGV) 0.10
ADELANTO PARA MATERIALES : S/. 1,505,890.85 (INCLUYE IGV) 0.20
FECHA VALOR REFERENCIAL ###

PRESUPUESTO DEDUCTIVO CONTRACTUAL DEDUCTIVO ACTUAL DEDUCTIVO ACUMULADO ANTERIOR DEDUCTIVO ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N
UND CANT. P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADO VALORIZADO % METRADO VALORIZADO
03.02.02 EXCAVACION MANUAL DE ZANJA, MATERIAL ROCA SUELTA M3 4,478.88 38.92 174,318.01 4,478.88 174,318.01 0.00 0.00 0.00 4,478.88 174,318.01 100.00 0.00 0.00
03.02.03 EXCAVACION MANUAL EN MATERIAL SUELTO Y REFINE M3 775.91 29.19 22,648.81 775.91 22,648.81 0.00 0.00 0.00 775.91 22,648.81 100.00 0.00 0.00
03.02.04 CAMA DE APOYO PARA TUBERIA C/MAT. PROP. e=0.10m y b = 0.50m ML 8.85 3.35 29.65 8.85 29.65 0.00 0.00 0.00 8.85 29.65 100.00 0.00 0.00
03.02.05 RELLENO C/ MAT. PROP. b =0.40m, H=0.60m SOBRE LA CLAVE DE TUB. ML 8.85 5.08 44.96 8.85 44.96 0.00 0.00 0.00 8.85 44.96 100.00 0.00 0.00
03.04 CRUCE DE AEREO L=10M, TUB.DE 2 1/2" (02 UND) 0.00 0.00 0.00
03.04.01 TRABAJOS PRELIMINARES 0.00 0.00 0.00
03.04.01.01 LIMPIEZA DE TERRENO MANUAL M2 16.80 1.32 22.18 16.80 22.18 0.00 0.00 0.00 16.80 22.18 100.00 0.00 0.00
03.04.01.02 TRAZO Y REPLANTEO M2 16.80 0.99 16.63 16.80 16.63 0.00 0.00 0.00 16.80 16.63 100.00 0.00 0.00
03.04.02 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00
03.04.02.01 EXCAVACION MANUAL DE ZANJA, MATERIAL COMPACTADO M3 7.60 58.38 443.69 7.60 443.69 0.00 0.00 0.00 7.60 443.69 100.00 0.00 0.00
03.04.02.02 REFINE Y NIVELACION DE FONDOS ML 4.00 1.98 7.92 4.00 7.92 0.00 0.00 0.00 4.00 7.92 100.00 0.00 0.00
03.04.02.03 ACARREO DE MATERIAL EXCEDENTE (D=30 M) M3 9.12 23.35 212.95 9.12 212.95 0.00 0.00 0.00 9.12 212.95 100.00 0.00 0.00
03.04.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00 0.00
03.04.03.01 SOLADO CONCRETO f'c=100kg/cm2, E=10CM M2 8.00 51.42 411.36 8.00 411.36 0.00 0.00 0.00 8.00 411.36 100.00 0.00 0.00
03.04.04 OBRAS DE CONCRETO ARMADO 0.00 0.00 0.00
03.04.04.01 CONCRETO f'c=175 kg/cm2 P/ZAPATAS M3 7.60 377.87 2,871.81 7.60 2,871.81 0.00 0.00 0.00 7.60 2,871.81 100.00 0.00 0.00
03.04.04.02 CONCRETO f'c=210 kg/cm2 M3 0.84 403.95 339.32 0.84 339.32 0.00 0.00 0.00 0.84 339.32 100.00 0.00 0.00
03.04.04.03 ENCOFRADO Y DESENCOFRADO M2 25.60 36.12 924.67 25.60 924.67 0.00 0.00 0.00 25.60 924.67 100.00 0.00 0.00
03.04.04.04 ACERO ESTRUCTURAL TRABAJADO fy=4200 kg/cm2 GRADO 60 KG 176.24 5.81 1,023.95 176.24 1,023.95 0.00 0.00 0.00 176.24 1,023.95 100.00 0.00 0.00
03.04.05 TARRAJEOS 0.00 0.00 0.00
03.04.05.01 TARRAJEO FROTACHADO MURO EXTERIOR 1:5, e=1.5cm M2 19.20 17.96 344.83 19.20 344.83 0.00 0.00 0.00 19.20 344.83 100.00 0.00 0.00
03.04.06 ACCESORIOS 0.00 0.00 0.00
03.04.06.01 COLOCADO -CRUCE AEREO D=2" X L=10M GLB 2.00 1,006.89 2,013.78 2.00 2,013.78 0.00 0.00 0.00 2.00 2,013.78 100.00 0.00 0.00
03.04.06.02 COLOCADO DE ACCESORIOS-CRUCE AEREO GLB 2.00 783.95 1,567.90 2.00 1,567.90 0.00 0.00 0.00 2.00 1,567.90 100.00 0.00 0.00
03.04.07 PINTURA 0.00 0.00 0.00
03.04.07.01 PINTADO DE MURO EXTERIOR C/LATEX LAVABLE M2 19.20 6.74 129.41 19.20 129.41 0.00 0.00 0.00 19.20 129.41 100.00 0.00 0.00
03.04.08 ANCLAJE PARA TUBERIAS Y ACCESORIOS 0.00 0.00 0.00
03.04.08.01 CONCRETO f'c = 100 kg/cm2 PARA ANCLAJES M3 1.00 255.96 255.96 1.00 255.96 0.00 0.00 0.00 1.00 255.96 100.00 0.00 0.00
03.05 CRUCE POR PUENTE TUB. HDPE 75MM 12M (3 UND) 0.00 0.00 0.00
03.05.01 SUMINISTRO Y COLOCACION DE ACCESORIOS 0.00 0.00 0.00
03.05.01.01 SUMINISTRO DE ACCESORIOS PARA CRUCE DE PUENTE UND 3.00 114.00 342.00 3.00 342.00 0.00 0.00 0.00 3.00 342.00 100.00 0.00 0.00
03.05.01.02 COLOCADO DE ACCESORIOS EN CRUCE DE RIO POR PUENTE UND 3.00 550.43 1,651.29 3.00 1,651.29 0.00 0.00 0.00 3.00 1,651.29 100.00 0.00 0.00
04 RESERVORIOS 0.00 0.00 0.00
04.01 RESERVORIO CAP. (20 M3 = 02 und) 0.00 0.00 0.00
04.01.10 CERCO PERIMETRICO 0.00 0.00 0.00
04.01.10.01 COLOCADO DEL CERCO DE PROTECCION ML 4.80 26.35 126.48 4.80 126.48 0.00 0.00 0.00 4.80 126.48 100.00 0.00 0.00
04.02 RESERVORIO CAP. (15 M3 = 01 und) 0.00 0.00 0.00
04.02.10 CERCO PERIMETRICO 0.00 0.00 0.00
04.02.10.01 COLOCADO DEL CERCO DE PROTECCION ML 12.30 26.35 324.11 12.30 324.11 0.00 0.00 0.00 12.30 324.11 100.00 0.00 0.00
05 RED DE ADUCCION Y DISTRIBUCION (L=68,077.43 ML) 0.00 0.00 0.00
05.02 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00
05.02.03 EXCAVACION MANUAL EN MATERIAL SUELTO Y REFINE M3 1,436.03 29.19 41,917.72 1,436.03 41,917.72 0.00 0.00 0.00 1,436.03 41,917.72 100.00 0.00 0.00
05.03 SUMINISTRO E INSTALACION DE TUB. 0.00 0.00 0.00
05.03.01 TUBERIA PVC SAP CLASE-10 D= 2 1/2"", NTP 399.002 ML 13.77 6.84 94.19 13.77 94.19 0.00 0.00 0.00 13.77 94.19 100.00 0.00 0.00
05.03.05 TUBERIA PVC SAP CLASE-10 D= 3/4", NTP 399.002 ML 1,063.34 3.30 3,509.02 1,063.34 3,509.02 0.00 0.00 0.00 1,063.34 3,509.02 100.00 0.00 0.00
05.06 CAJA VALV. DE PURGA (12 UND), D= 3/4" 0.00 0.00 0.00
05.06.03 OBRAS DE CONCRETO ARMADO 0.00 0.00 0.00
05.06.03.01 CONCRETO f'c = 140 kg/cm2 M3 0.00 221.03 0.00 - 0.00 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00
05.06.03.02 ENCOFRADO Y DESENCOFRADO M2 19.60 50.66 992.94 19.60 992.94 0.00 0.00 0.00 19.60 992.94 100.00 0.00 0.00
05.08 VALVULA REGULADORA DE PRESIONES (11 UND) 0.00 0.00 0.00
05.08.01 TRABAJOS PRELIMINARES 0.00 0.00 0.00
05.08.01.01 LIMPIEZA DE TERRENO MANUAL M2 1.98 1.32 2.61 1.98 2.61 0.00 0.00 0.00 1.98 2.61 100.00 0.00 0.00
05.08.01.02 TRAZO Y REPLANTEO M2 1.98 0.99 1.96 1.98 1.96 0.00 0.00 0.00 1.98 1.96 100.00 0.00 0.00
05.08.02 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00
05.08.02.01 EXCAVACION MANUAL EN MATERIAL SUELTO M3 1.31 29.19 38.17 1.31 38.17 0.00 0.00 0.00 1.31 38.17 100.00 0.00 0.00
05.08.02.02 REFINE Y NIVELACION - COMPACTADO M2 2.00 3.94 7.88 2.00 7.88 0.00 0.00 0.00 2.00 7.88 100.00 0.00 0.00
05.08.02.03 ACARREO DE MATERIAL EXCEDENTE (D=30 M) M3 1.56 23.35 36.43 1.56 36.43 0.00 0.00 0.00 1.56 36.43 100.00 0.00 0.00
05.08.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00 0.00
VALORIZACION DE DEDUCTIVOS DE OBRA N 01
FRMULA 04
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
: SISTEMA KALLACALLANI - INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE
FORMULA 04
AYAVIRI, PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR REFERENCIAL : S/. 7,529,454.25 (INCLUYE IGV)
MONTO DEL CONTRATO : S/. 7,529,454.25 (INCLUYE IGV)
ADELANTO DIRECTO : S/. 752,945.43 (INCLUYE IGV) 0.10
ADELANTO PARA MATERIALES : S/. 1,505,890.85 (INCLUYE IGV) 0.20
FECHA VALOR REFERENCIAL ###

PRESUPUESTO DEDUCTIVO CONTRACTUAL DEDUCTIVO ACTUAL DEDUCTIVO ACUMULADO ANTERIOR DEDUCTIVO ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N
UND CANT. P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADO VALORIZADO % METRADO VALORIZADO
05.08.03.01 CONCRETO f 'c=175 kg/cm2, P/LOSA DE FONDO, TAPA Y MUROS M3 0.56 279.23 157.49 0.56 157.49 0.00 0.00 0.00 0.56 157.49 100.00 0.00 0.00
05.08.03.02 ENCOFRADO Y DESENCOFRADO M2 7.94 50.66 402.44 7.94 402.44 0.00 0.00 0.00 7.94 402.44 100.00 0.00 0.00
05.08.04 TARRAJEOS 0.00 0.00 0.00
05.08.04.01 TARRAJEO EN EXTERIORES MORTERO 1:5, e=1.5cm M2 5.06 37.29 188.69 5.06 188.69 0.00 0.00 0.00 5.06 188.69 100.00 0.00 0.00
05.08.05 ACCESORIOS Y ACCESORIOS 0.00 0.00 0.00
05.08.05.03 VALVULA Y ACCESORIOS EN CAJA VALV. REGULADORA DE PRESION 1 1/2" GLB 1.00 3,067.83 3,067.83 1.00 3,067.83 0.00 0.00 0.00 1.00 3,067.83 100.00 0.00 0.00
05.08.05.05 COLOCADO DE ACCESORIOS EN CAJA VALV . REDUCTORA DE PRESION UND 1.00 72.28 72.28 1.00 72.28 0.00 0.00 0.00 1.00 72.28 100.00 0.00 0.00
05.08.06 PINTURA 0.00 0.00 0.00
05.08.06.01 PINTURA EN EXTERIOR M2 5.06 10.64 53.84 5.06 53.84 0.00 0.00 0.00 5.06 53.84 100.00 0.00 0.00
05.09 CRUCE DE AEREO L=10M, TUB.DE 1 1/2" Y 1" (02 UND) 0.00 0.00 0.00
05.09.01 TRABAJOS PRELIMINARES 0.00 0.00 0.00
05.09.01.01 LIMPIEZA DE TERRENO MANUAL M2 16.80 1.32 22.18 16.80 22.18 0.00 0.00 0.00 16.80 22.18 100.00 0.00 0.00
05.09.01.02 TRAZO Y REPLANTEO M2 16.80 0.99 16.63 16.80 16.63 0.00 0.00 0.00 16.80 16.63 100.00 0.00 0.00
05.09.02 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00
05.09.02.01 EXCAVACION MANUAL DE ZANJA, MATERIAL COMPACTADO M3 7.41 58.38 432.60 7.41 432.60 0.00 0.00 0.00 7.41 432.60 100.00 0.00 0.00
05.09.02.02 REFINE Y NIVELACION DE FONDOS ML 9.76 1.98 19.32 9.76 19.32 0.00 0.00 0.00 9.76 19.32 100.00 0.00 0.00
05.09.02.03 ACARREO DE MATERIAL EXCEDENTE (D=30 M) M3 17.78 23.35 415.16 17.78 415.16 0.00 0.00 0.00 17.78 415.16 100.00 0.00 0.00
05.09.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00 0.00
05.09.03.01 SOLADO CONCRETO f'c=100kg/cm2, E=10CM M2 9.76 51.42 501.86 9.76 501.86 0.00 0.00 0.00 9.76 501.86 100.00 0.00 0.00
VALORIZACION DE DEDUCTIVOS DE OBRA N 01
FRMULA 04
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
: SISTEMA KALLACALLANI - INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE
FORMULA 04
AYAVIRI, PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR REFERENCIAL : S/. 7,529,454.25 (INCLUYE IGV)
MONTO DEL CONTRATO : S/. 7,529,454.25 (INCLUYE IGV)
ADELANTO DIRECTO : S/. 752,945.43 (INCLUYE IGV) 0.10
ADELANTO PARA MATERIALES : S/. 1,505,890.85 (INCLUYE IGV) 0.20
FECHA VALOR REFERENCIAL ###

PRESUPUESTO DEDUCTIVO CONTRACTUAL DEDUCTIVO ACTUAL DEDUCTIVO ACUMULADO ANTERIOR DEDUCTIVO ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N
UND CANT. P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADO VALORIZADO % METRADO VALORIZADO
05.09.04 OBRAS DE CONCRETO ARMADO 0.00 0.00 0.00
05.09.04.01 CONCRETO f'c=175 kg/cm2 P/ZAPATAS M3 7.41 377.87 2,800.02 7.41 2,800.02 0.00 0.00 0.00 7.41 2,800.02 100.00 0.00 0.00
05.09.04.02 CONCRETO f'c=210 kg/cm2 M3 0.50 403.95 201.98 0.50 201.98 0.00 0.00 0.00 0.50 201.98 100.00 0.00 0.00
05.09.04.03 ENCOFRADO Y DESENCOFRADO M2 20.80 36.12 751.30 20.80 751.30 0.00 0.00 0.00 20.80 751.30 100.00 0.00 0.00
05.09.04.04 ACERO ESTRUCTURAL TRABAJADO fy=4200 kg/cm2 GRADO 60 KG 341.70 5.81 1,985.28 341.70 1,985.28 0.00 0.00 0.00 341.70 1,985.28 100.00 0.00 0.00
05.09.05 TARRAJEOS 0.00 0.00 0.00
05.09.05.01 TARRAJEO FROTACHADO MURO EXTERIOR 1:5, e=1.5cm M2 19.20 17.96 344.83 19.20 344.83 0.00 0.00 0.00 19.20 344.83 100.00 0.00 0.00
05.09.06 ACCESORIOS 0.00 0.00 0.00
05.09.06.01 COLOCADO -CRUCE AEREO D=1" X L=10M GLB 1.00 825.81 825.81 1.00 825.81 0.00 0.00 0.00 1.00 825.81 100.00 0.00 0.00
05.09.06.02 COLOCADO -CRUCE AEREO D=1 1/2" X L=10M GLB 1.00 890.21 890.21 1.00 890.21 0.00 0.00 0.00 1.00 890.21 100.00 0.00 0.00
05.09.06.03 COLOCADO DE ACCESORIOS-CRUCE AEREO GLB 2.00 783.95 1,567.90 2.00 1,567.90 0.00 0.00 0.00 2.00 1,567.90 100.00 0.00 0.00
05.09.07 PINTURA 0.00 0.00 0.00
05.09.07.01 PINTADO DE MURO EXTERIOR C/LATEX LAVABLE M2 19.20 6.74 129.41 19.20 129.41 0.00 0.00 0.00 19.20 129.41 100.00 0.00 0.00
06 INSTALACION DE LETRINAS Y TRATAMIENTO DE AGUAS SERVIDAS 0.00 0.00 0.00
06.01 MODULO DE LETRINAS (365 und) 0.00 0.00 0.00
06.01.01 TRABAJOS PRELIMINARES 0.00 0.00 0.00
06.01.01.01 LIMPIEZA DE TERRENO MANUAL M2 9.80 1.32 12.94 9.80 12.94 0.00 0.00 0.00 9.80 12.94 100.00 0.00 0.00
06.01.01.02 TRAZO Y REPLANTEO M2 9.80 0.99 9.70 9.80 9.70 0.00 0.00 0.00 9.80 9.70 100.00 0.00 0.00
06.01.02 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00
06.01.02.01 EXCAVACION EN TERRENO NORMAL P/ CIMIENTOS M3 3.00 29.19 87.57 3.00 87.57 0.00 0.00 0.00 3.00 87.57 100.00 0.00 0.00
06.01.02.02 RELLENO CON MATERIAL PROPIO M3 0.18 16.68 3.06 0.18 3.06 0.00 0.00 0.00 0.18 3.06 100.00 0.00 0.00
06.01.02.03 REFINE Y NIVELACION - COMPACTADO M2 24.00 3.94 94.56 24.00 94.56 0.00 0.00 0.00 24.00 94.56 100.00 0.00 0.00
06.01.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00 0.00 0.00
06.01.03.01 CIMIENTO CORRIDO MEZCLA 1:10+30 % PM) M3 2.40 166.39 399.34 2.40 399.34 0.00 0.00 0.00 2.40 399.34 100.00 0.00 0.00
VALORIZACION DE DEDUCTIVOS DE OBRA N 01
FRMULA 04
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
: SISTEMA KALLACALLANI - INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE
FORMULA 04
AYAVIRI, PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR REFERENCIAL : S/. 7,529,454.25 (INCLUYE IGV)
MONTO DEL CONTRATO : S/. 7,529,454.25 (INCLUYE IGV)
ADELANTO DIRECTO : S/. 752,945.43 (INCLUYE IGV) 0.10
ADELANTO PARA MATERIALES : S/. 1,505,890.85 (INCLUYE IGV) 0.20
FECHA VALOR REFERENCIAL ###

PRESUPUESTO DEDUCTIVO CONTRACTUAL DEDUCTIVO ACTUAL DEDUCTIVO ACUMULADO ANTERIOR DEDUCTIVO ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N
UND CANT. P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADO VALORIZADO % METRADO VALORIZADO
06.01.03.02 SOBRECIMIENTO CONCRETO MEZCLA 1:8+25% PM M3 0.61 247.18 150.47 0.61 150.47 0.00 0.00 0.00 0.61 150.47 100.00 0.00 0.00
06.01.03.03 ENCOFRADO Y DESENCOFRADO P/SOBRECIMIENTOS M2 8.10 43.87 355.35 8.10 355.35 0.00 0.00 0.00 8.10 355.35 100.00 0.00 0.00
06.01.04 OBRAS DE CONCRETO ARMADO 0.00 0.00 0.00 0.00
06.01.04.02 CONCRETO f'c=175 kg/cm2 P/VIGUETAS M3 3.42 342.40 1,170.15 3.42 1,170.15 0.00 0.00 0.00 3.42 1,170.15 100.00 0.00 0.00
06.01.04.03 ACERO ESTRUCTURAL TRABAJADO fy=4200 kg/cm2 GRADO 60 P/VIGUETA KG 14.03 6.03 84.60 14.03 84.60 0.00 0.00 0.00 14.03 84.60 100.00 0.00 0.00
06.01.05 MUROS Y TABIQUES DE ALBAILERIA 0.00 0.00 0.00 0.00
06.01.05.01 MURO DE LADRILLO K.K. DE SOGA CARAVISTA MEZC. C:A 1:4, E=1.5 CM M2 27.84 77.44 2,156.12 27.84 2,156.12 0.00 0.00 0.00 27.84 2,156.12 100.00 0.00 0.00
06.01.06 REVOQUES Y PISO 0.00 0.00 0.00 0.00
06.01.06.01 TARRAJEO INTERIORES C/MORTERO 1:5 E=1.5CM M2 24.62 17.35 427.20 24.62 427.20 0.00 0.00 0.00 24.62 427.20 100.00 0.00 0.00
06.01.07 CONTRAZOCALOS 0.00 0.00 0.00 0.00
06.01.07.01 CONTRAZOCALO DE CEMENTO H=0.40 m., 1:5 ML 13.60 15.88 215.97 13.60 215.97 0.00 0.00 0.00 13.60 215.97 100.00 0.00 0.00
06.01.08 CARPINTERIA DE MADERA 0.00 0.00 0.00 0.00
06.01.08.01 VIGA DE MADERA 2"x3"x2.05 M. UND 8.00 14.28 114.24 8.00 114.24 0.00 0.00 0.00 8.00 114.24 100.00 0.00 0.00
06.01.08.02 CORREAS DE MADERA 2"x2"x10' ML 94.23 8.63 813.20 94.23 813.20 0.00 0.00 0.00 94.23 813.20 100.00 0.00 0.00
06.01.08.03 SUMINISTRO Y COLOCADO DE VENTANA METALICA INC/VIDRIOS UND 2.00 76.14 152.28 2.00 152.28 0.00 0.00 0.00 2.00 152.28 100.00 0.00 0.00
06.01.08.04 SUMINISTRO Y COLOCADO DE PUERTA METALICA INC/VIDRIOS UND 2.00 224.21 448.42 2.00 448.42 0.00 0.00 0.00 2.00 448.42 100.00 0.00 0.00
06.01.09 CUBERTURA 0.00 0.00 0.00 0.00
06.01.09.01 COBERTURA IMPERMEABILIZANTE ONDULINE 2.00 X 0.95 X 0.26 MM M2 424.72 48.60 20,641.54 424.72 20,641.54 0.00 0.00 0.00 424.72 20,641.54 100.00 0.00 0.00
06.01.10 PINTURA 0.00 0.00 0.00 0.00
06.01.10.02 PINTURA ESMALTE EN ZOCALOS EXTERIOR LETRINAS M2 579.08 13.10 7,585.95 579.08 7,585.95 0.00 0.00 0.00 579.08 7,585.95 100.00 0.00 0.00
06.01.11 INSTALACIONES SANITARIAS 0.00 0.00 0.00 0.00
06.01.11.01 SUMINISTRO Y COLOCADO DE LAVATORIO DE LOSA VITRIFICADA (INC ACCESORIOS) UND 2.00 268.64 537.28 2.00 537.28 0.00 0.00 0.00 2.00 537.28 100.00 0.00 0.00
06.01.11.02 SUMINISTRO Y COLOCADO DE INODORO UND 2.00 259.90 519.80 2.00 519.80 0.00 0.00 0.00 2.00 519.80 100.00 0.00 0.00
06.01.11.03 SUMINISTRO Y COLOCADO DE DUCHA UND 2.00 53.22 106.44 2.00 106.44 0.00 0.00 0.00 2.00 106.44 100.00 0.00 0.00
06.01.11.04 SUMIDERO DE 2", PARA DUCHA UND 2.00 51.50 103.00 2.00 103.00 0.00 0.00 0.00 2.00 103.00 100.00 0.00 0.00
06.01.12 INSTALACIONES SANITARIAS 0.00 0.00 0.00 0.00
06.01.12.01 TENDIDO DE TUBERIA PVC SAL DE 4" ML 8.00 6.57 52.56 8.00 52.56 0.00 0.00 0.00 8.00 52.56 100.00 0.00 0.00
06.01.12.02 TENDIDO DE TUBERIA PVC SAL DE 2" ML 8.00 3.82 30.56 8.00 30.56 0.00 0.00 0.00 8.00 30.56 100.00 0.00 0.00
06.01.13 INSTALACIONES ELECTRICAS 0.00 0.00 0.00 0.00
06.01.13.01 SALIDA DE TECHO C/CABLE AWG TW 2.5MM(14)+D PVC SEL 16MM(5/8) pto 2.00 57.52 115.04 2.00 115.04 0.00 0.00 0.00 2.00 115.04 100.00 0.00 0.00
06.02 TRATAMIENTO AGUAS RESIDUALES DOMESTICAS (365 UND) 0.00 0.00 0.00 0.00
06.02.01 TRABAJOS PRELIMINARES 0.00 0.00 0.00 0.00
06.02.01.01 LIMPIEZA DE TERRENO MANUAL M2 20.00 1.32 26.40 20.00 26.40 0.00 0.00 0.00 20.00 26.40 100.00 0.00 0.00
06.02.01.02 TRAZO Y REPLANTEO M2 20.00 0.99 19.80 20.00 19.80 0.00 0.00 0.00 20.00 19.80 100.00 0.00 0.00
VALORIZACION DE DEDUCTIVOS DE OBRA N 01
FRMULA 04
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
: SISTEMA KALLACALLANI - INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE
FORMULA 04
AYAVIRI, PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR REFERENCIAL : S/. 7,529,454.25 (INCLUYE IGV)
MONTO DEL CONTRATO : S/. 7,529,454.25 (INCLUYE IGV)
ADELANTO DIRECTO : S/. 752,945.43 (INCLUYE IGV) 0.10
ADELANTO PARA MATERIALES : S/. 1,505,890.85 (INCLUYE IGV) 0.20
FECHA VALOR REFERENCIAL ###

PRESUPUESTO DEDUCTIVO CONTRACTUAL DEDUCTIVO ACTUAL DEDUCTIVO ACUMULADO ANTERIOR DEDUCTIVO ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N
UND CANT. P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADO VALORIZADO % METRADO VALORIZADO
06.02.02 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00 0.00
06.02.02.01 EXCAVACION MANUAL EN TERRENO NORMAL P/CAJA DE REGISTRO M3 1.14 29.19 33.25 1.14 33.25 0.00 0.00 0.00 1.14 33.25 100.00 0.00 0.00
06.02.02.02 EXCAVACION MANUAL EN TERRENO NORMAL P/COLECTOR M3 7.26 29.19 211.92 7.26 211.92 0.00 0.00 0.00 7.26 211.92 100.00 0.00 0.00
06.02.02.03 EXCAVACION MANUAL EN TERRENO NORMAL P/BIODIGESTOR M3 1.99 29.19 58.06 1.99 58.06 0.00 0.00 0.00 1.99 58.06 100.00 0.00 0.00
06.02.02.04 EXCAVACION MANUAL EN TERRENO NORMAL P/CAJA DE LODOS M3 1.22 29.19 35.54 1.22 35.54 0.00 0.00 0.00 1.22 35.54 100.00 0.00 0.00
06.02.02.05 EXCAVACION MANUAL EN TERRENO NORMAL P/ZANJA DE INFILTACION M3 2.80 29.19 81.73 2.80 81.73 0.00 0.00 0.00 2.80 81.73 100.00 0.00 0.00
06.02.02.06 REFINE Y NIVELACION DE FONDOS ML 36.00 1.98 71.28 36.00 71.28 0.00 0.00 0.00 36.00 71.28 100.00 0.00 0.00
06.02.02.07 REFINE Y NIVELACION P/BIODIGESTOR M2 3.40 4.76 16.18 3.40 16.18 0.00 0.00 0.00 3.40 16.18 100.00 0.00 0.00
06.02.02.08 ACARREO DE MATERIAL EXCEDENTE (D=30 M) M3 1.97 23.35 45.95 1.97 45.95 0.00 0.00 0.00 1.97 45.95 100.00 0.00 0.00
06.02.03 CAMA DE APOYO (TUBERIA Y BIODIGESTOR) 0.00 0.00 0.00 0.00
06.02.03.01 CAMA DE APOYO C/MAT. PROP. ML 36.00 2.91 104.76 36.00 104.76 0.00 0.00 0.00 36.00 104.76 100.00 0.00 0.00
06.02.03.02 CAMA DE APOYO C/MAT. PROP. (BIODIGESTOR) M2 8.99 3.90 35.07 8.99 35.07 0.00 0.00 0.00 8.99 35.07 100.00 0.00 0.00
06.02.04 RELLENO 0.00 0.00 0.00 0.00
06.02.04.01 PRIMER RELLENO C/ MATERIAL PROP. A=0.50, H=0.15CM ML 36.00 2.63 94.68 36.00 94.68 0.00 0.00 0.00 36.00 94.68 100.00 0.00 0.00
06.02.04.02 RELLENO COMPACATDO C/MATERIAL PROPIO - BIODIGESTOR M3 36.00 19.46 700.56 36.00 700.56 0.00 0.00 0.00 36.00 700.56 100.00 0.00 0.00
06.02.05 CONCRETO SIMPLE (CAJAS DE REGISTRO, LODOS Y DIST.) 0.00 0.00 0.00 0.00
06.02.05.01 SOLADO DE CONCRETO f'c=100kg/cm2 (CAJAS Y BIODIGESTOR) M2 2.84 42.90 121.84 2.84 121.84 0.00 0.00 0.00 2.84 121.84 100.00 0.00 0.00
06.02.05.02 CONCRETO f'c = 140 kg/cm2 P/CAJA DE LODOS M3 0.16 256.31 39.73 0.16 39.73 0.00 0.00 0.00 0.16 39.73 100.00 0.00 0.00
06.02.05.03 ENCOFRADO Y DESENCOFRADO M2 6.00 31.21 187.26 6.00 187.26 0.00 0.00 0.00 6.00 187.26 100.00 0.00 0.00
06.02.05.04 CONCRETO f'c = 175 kg/cm2 P/CAJAS DE DIST. Y REGISTRO M3 0.61 289.99 175.59 0.61 175.59 0.00 0.00 0.00 0.61 175.59 100.00 0.00 0.00
06.02.05.05 ENCOFRADO Y DESENCOFRADO M2 5.22 31.21 162.92 5.22 162.92 0.00 0.00 0.00 5.22 162.92 100.00 0.00 0.00
06.02.06 CONCRETO ARMADO (TAPAS DE CAJAS) 0.00 0.00 0.00 0.00
06.02.06.01 CONCRETO f'c = 175 kg/cm2 - (TAPAS DE CAJAS) M3 0.97 289.99 281.29 0.97 281.29 0.00 0.00 0.00 0.97 281.29 100.00 0.00 0.00
06.02.06.02 ENCOFRADO Y DESENCOFRADO M2 0.00 31.21 0.00 - 0.00 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00
06.02.06.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 KG 0.00 6.23 0.00 - 0.00 0.00 0.00 #DIV/0! 0.00 0.00 #DIV/0! 0.00 0.00
06.02.07 BIODIGESTOR AUTOLIMPIABLE 0.00 0.00 0.00 0.00
06.02.07.01 SUMINISTRO E INST. DE BIODIGESTOR CLARIFICADOR DE 600LTS UND 2.00 1,034.07 2,068.14 2.00 2,068.14 0.00 0.00 0.00 2.00 2,068.14 100.00 0.00 0.00
06.02.08 TUBERIA DE RED COLECTOR 0.00 0.00 0.00 0.00
06.02.08.01 SUMINISTRO E INSTALACION DE TUBERIAS NTP 399.003 ML 10.00 9.98 99.80 10.00 99.80 0.00 0.00 0.00 10.00 99.80 100.00 0.00 0.00
06.02.08.02 SUMINISTRO E INSTALACION DE TUB. NTP 4435 DN 110MM ML 12.00 16.32 195.84 12.00 195.84 0.00 0.00 0.00 12.00 195.84 100.00 0.00 0.00
06.02.09 ZANJAS DE INFILTRACION 0.00 0.00 0.00 0.00
06.02.09.01 CRIBADO DE TUB. ML 10.00 3.29 32.90 10.00 32.90 0.00 0.00 0.00 10.00 32.90 100.00 0.00 0.00
06.02.09.02 SUMINISTRO E INSTALACION DE TUBERIAS NTP 399.003 ML 14.00 7.04 98.56 14.00 98.56 0.00 0.00 0.00 14.00 98.56 100.00 0.00 0.00
06.02.09.03 SUMINISTRO E INSTALACION DE ACCESORIOS GLB 2.00 49.02 98.04 2.00 98.04 0.00 0.00 0.00 2.00 98.04 100.00 0.00 0.00
06.02.09.04 COLOCADO DE GRAVA S M3 0.80 75.21 60.17 0.80 60.17 0.00 0.00 0.00 0.80 60.17 100.00 0.00 0.00
07 PILETAS FAMILIARES (365 UND) 0.00 0.00 0.00 0.00
07.01 TRABAJOS PRELIMINARES 0.00 0.00 0.00 0.00
07.01.01 LIMPIEZA DE TERRENO MANUAL M2 4.00 1.32 5.28 4.00 5.28 0.00 0.00 0.00 4.00 5.28 100.00 0.00 0.00
VALORIZACION DE DEDUCTIVOS DE OBRA N 01
FRMULA 04
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
: SISTEMA KALLACALLANI - INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE
FORMULA 04
AYAVIRI, PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR REFERENCIAL : S/. 7,529,454.25 (INCLUYE IGV)
MONTO DEL CONTRATO : S/. 7,529,454.25 (INCLUYE IGV)
ADELANTO DIRECTO : S/. 752,945.43 (INCLUYE IGV) 0.10
ADELANTO PARA MATERIALES : S/. 1,505,890.85 (INCLUYE IGV) 0.20
FECHA VALOR REFERENCIAL ###

PRESUPUESTO DEDUCTIVO CONTRACTUAL DEDUCTIVO ACTUAL DEDUCTIVO ACUMULADO ANTERIOR DEDUCTIVO ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N
UND CANT. P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADO VALORIZADO % METRADO VALORIZADO
07.01.02 TRAZO Y REPLANTEO M2 1.80 0.99 1.78 1.80 1.78 0.00 0.00 0.00 1.80 1.78 100.00 0.00 0.00
07.02 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00 0.00
07.02.01 EXCAVACION MASIVA MANUAL - POZO PERCOLADOR M3 0.06 33.36 1.97 0.06 1.97 0.00 0.00 0.00 0.06 1.97 100.00 0.00 0.00
07.02.02 ACARREO DE MATERIAL EXCEDENTE (D=30 M) M3 0.07 23.35 1.61 0.07 1.61 0.00 0.00 0.00 0.07 1.61 100.00 0.00 0.00
07.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00 0.00 0.00
07.03.01 CONCRETO f'c = 140 kg/cm2 M3 0.31 221.03 68.00 0.31 68.00 0.00 0.00 0.00 0.31 68.00 100.00 0.00 0.00
07.04 OBRAS DE CONCRETO ARMADO 0.00 0.00 0.00 0.00
07.04.01 CONCRETO f'c=175 kg/cm2, losa, muros y soporte pileta M3 0.33 288.56 95.52 0.33 95.52 0.00 0.00 0.00 0.33 95.52 100.00 0.00 0.00
07.04.02 ENCOFRADO Y DESENCOFRADO M2 7.74 50.66 392.06 7.74 392.06 0.00 0.00 0.00 7.74 392.06 100.00 0.00 0.00
07.04.03 ACERO ESTRUCTURAL TRABAJDO fy=4200 kg/cm2 GRADO 60 KG 19.31 6.11 117.95 19.31 117.95 0.00 0.00 0.00 19.31 117.95 100.00 0.00 0.00
07.05 TARRAJEOS 0.00 0.00 0.00 0.00
07.05.01 TARRAJEO EN INTERIORES Y EXTERIORES MORTERO 1:5, e=1.5cm M2 10.85 38.55 418.19 10.85 418.19 0.00 0.00 0.00 10.85 418.19 100.00 0.00 0.00
07.06 SUMINISTRO E INSTALACION DE TUB.
07.06.01 SUMINISTRO Y COLOCACION DE ACCESORIO DE PILETAS DOMICILIARIAS UND 2.00 70.30 140.60 2.00 140.60 0.00 0.00 0.00 2.00 140.60 100.00 0.00 0.00
07.07 ACCESORIOS
07.07.01 VALVULA Y ACCESORIOS GLB 2.00 35.65 71.30 2.00 71.30 0.00 0.00 0.00 2.00 71.30 100.00 0.00 0.00
07.08 PINTURA
07.08.01 PINTURA EN EXTERIOR M2 10.85 12.63 137.01 10.85 137.01 0.00 0.00 0.00 10.85 137.01 100.00 0.00 0.00

COSTO DIRECTO 394,678.55 394,678.55 0.00 394,678.55 0.00


GASTOS GENERALES 6.60% 26,048.78 26,048.78 0.00 26,048.78 0.00
UTILIDAD 8.00% 31,574.28 31,574.28 0.00 31,574.28 0.00
TOTAL 452,301.61 452,301.61 0.00 0.00% 452,301.61 100.00% 0.00
IGV 18% 81,414.29 81,414.29 - 81,414.29 -
TOTAL VALORIZADO 533,715.90 533,715.90 - 533,715.90 -
% VALORIZADO 100.00% 0.00% 100.00% 0.00%
VALORIZACION DE OBRA DE PARTIDAS CORREGIDAS
Formula 05
JUNIO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE MELGAR -
PUNO.
: SISTEMA KALLACALLANI - INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI,
FORMULA 04
PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR REFERENCIAL : S/. 7,529,454.25 (INCLUYE IGV)
MONTO DEL CONTRATO : S/. 7,529,454.25 (INCLUYE IGV)
ADELANTO DIRECTO : S/. 752,945.43 (INCLUYE IGV) 0.10
ADELANTO PARA MATERIALES : S/. 1,505,890.85 (INCLUYE IGV) 0.20
FECHA VALOR REFERENCIAL May-16

VALORIZACION QUE NO
PRESUPUESTO VALORIZADO POR EL VALORIZACION
AVANCE ACUMULADO ANTERIOR AVANCE ACUMULADO ACTUAL CORRESPONDE AL
PARTIDA D E S C R I P C I O N CONTRATISTA REALMENTE EJECUTADO
CONTRATISTA
UND METRADO P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADOVALORIZADO % METRADO VALORIZADO
03 LINEA DE CONDUCCION ( 21726.98 ML)
03.02 MOVIMIENTO DE TIERRAS
03.02.01 EXCAVACION EN TERRENO NORMAL CON EQUIPO RETROEXCAVADOR M3 15,112.36 6.95 105,030.90 4,231.46 29,408.65 0.00 0.00 0.00 4,231.46 29,408.65 28.00 10,880.90 75,622.25
03.02.02 EXCAVACION MANUAL DE ZANJA, MATERIAL ROCA SUELTA M3 4,603.62 38.92 179,172.89 1,289.01 50,168.41 0.00 0.00 0.00 1,289.01 50,168.41 28.00 3,314.61 129,004.48
03.02.03 EXCAVACION MANUAL EN MATERIAL SUELTO Y REFINE M3 2,000.00 29.19 58,380.00 320.00 9,340.80 0.00 0.00 0.00 320.00 9,340.80 16.00 1,680.00 49,039.20
COSTO DIRECTO 342,583.79 88,917.86 0.00 88,917.86 253,665.93
GASTOS GENERALES 6.60% 22,610.53 5,868.58 0.00 5,868.58 16,741.95
UTILIDAD 8.00% 27,406.70 7,113.43 0.00 7,113.43 20,293.27
TOTAL 392,601.02 101,899.87 0.00 0.00% 101,899.87 25.96% 290,701.15
IGV 18% 70,668.18 18,341.98 - 18,341.98 52,326.21
TOTAL VALORIZADO 463,269.20 120,241.85 - 120,241.85 343,027.36
% VALORIZADO 25.96% 0.00% 25.96% 74.04%
RESUMEN DE VALORIZACION DE DEDUCTIVOS DE OBRA N 01
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR REFERENCIAL : S/. 7,529,454.25 (INCLUYE IGV)
MONTO DEL CONTRATO : S/. 7,529,454.25 (INCLUYE IGV)
ADELANTO DIRECTO : S/. 752,945.43 (INCLUYE IGV) 10.00%
ADELANTO PARA MATERIALES : S/. 1,505,890.85 (INCLUYE IGV) 20.00%
FECHA VALOR REFERENCIAL : MAYO DEL 2016

SALDO POR
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANTERIOR AVANCE ACUMULADO ACTUAL
FRMULA D E S C R I P C I O N VALORIZAR
UND CANT. P.U. PARCIAL VALORIZADO VALORIZADO % VALORIZADO % VALORIZADO
01 OBRAS PROVISIONALES Y CAPACITACION GLB 1.00 328.77 328.77 328.77 0.00 0.00 328.77 100.00 0.00
02 SISTEMA ALCCAMARINE GLB 1.00 23,981.94 23,981.94 23,981.94 0.00 0.00 23,981.94 100.00 0.00
03 SISTEMA CALUYO GLB 1.00 50,935.19 50,935.19 50,935.19 0.00 0.00 50,935.19 100.00 0.00
04 SISTEMA KALLACALLANI GLB 1.00 394,678.55 394,678.55 394,678.55 0.00 0.00 394,678.55 100.00 0.00
COSTO DIRECTO 469,924.45 469,924.45 0.00 469,924.45 0.00
GASTOS GENERALES 6.60% 31,015.01 31,015.01 0.00 31,015.01 0.00
UTILIDAD 8.00% 37,593.96 37,593.96 0.00 37,593.96 0.00
TOTAL 538,533.42 538,533.42 0.00 0.00% 538,533.42 100.00% 0.00
IGV 18% 96,936.02 96,936.02 - 96,936.02 0.00
TOTAL VALORIZADO 635,469.44 635,469.44 - 635,469.43 0.00
% VALORIZADO 100.00% 0.00% 100.00% 0.00%
VALORIZACION DE OBRA N 01 MAYOR METRADO
FRMULA 04
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
: SISTEMA ALCAMARINE - INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI,
FORMULA 04
PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR REFERENCIAL : S/. 7,529,454.25 (INCLUYE IGV)
MONTO DEL CONTRATO : S/. 7,529,454.25 (INCLUYE IGV)
ADELANTO DIRECTO : S/. 752,945.43 (INCLUYE IGV) 0.10
ADELANTO PARA MATERIALES : S/. 1,505,890.85 (INCLUYE IGV) 0.20
FECHA VALOR REFERENCIAL May-16

PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANTERIOR AVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N
UND CANT. P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADO VALORIZADO % METRADO VALORIZADO
2 LINEA DE CONDUCCION ( 10.44 ML)
2.01 TRABAJOS PRELIMINARES
02.01.01 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS ML 3.56 0.45 1.60 3.56 1.60 0.00 0.00 0.00 3.56 1.60 100.00 0.00 0.00
2.02 MOVIMIENTO DE TIERRAS
02.02.01 EXCAVACION MANUAL EN MATERIAL SUELTO Y REFINE M3 2.25 29.19 65.68 2.25 65.68 0.00 0.00 0.00 2.25 65.68 100.00 0.00 0.00
02.02.02 CAMA DE APOYO PARA TUBERIA C/MAT. PROP. e=0.10m y b = 0.50m ML 3.56 3.35 11.93 3.56 11.93 0.00 0.00 3.56 11.93 100.00 0.00 0.00
02.02.03 RELLENO C/ MAT. PROP. b =0.40m, H=0.60m SOBRE LA CLAVE DE TUB. ML 3.56 5.08 18.08 3.56 18.08 0.00 0.00 0.00 3.56 18.08 100.00 0.00 0.00
2.03 SUMINISTRO E INSTALACION DE TUB.
02.03.01 TUBERIA PVC SAP CLASE-10 D= 2", NTP 399.002 ML 3.56 6.41 22.82 3.56 22.82 0.00 0.00 0.00 3.56 22.82 100.00 0.00 0.00
02.03.02 PRUEBA HIDRAULICA EN TUBERIAS ML 3.56 0.78 2.78 3.56 2.78 0.00 0.00 0.00 3.56 2.78 100.00 0.00 0.00
4 RED DE ADUCCION Y DISTRIBUCION (L=644.44 ML)
4.01 TRABAJOS PRELIMINARES
04.01.01 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS ML 18.24 0.45 8.21 18.24 8.21 0.00 0.00 0.00 18.24 8.21 100.00 0.00 0.00
4.02 MOVIMIENTO DE TIERRAS
04.02.01 EXCAVACION MANUAL EN TERRENO NORMAL M3 37.46 33.36 1,249.71 37.46 1,249.71 0.00 0.00 0.00 37.46 1,249.71 100.00 0.00 0.00
04.02.04 CAMA DE APOYO PARA TUBERIA C/MAT. PROP. e=0.10m ML 18.24 2.34 42.68 18.24 42.68 0.00 0.00 0.00 18.24 42.68 100.00 0.00 0.00
04.02.05 RELLENO C/ MAT. PROP. b =0.40m, H=0.60m SOBRE LA CLAVE DE TUB. ML 18.24 5.08 92.66 18.24 92.66 0.00 0.00 0.00 18.24 92.66 100.00 0.00 0.00
4.03 SUMINISTRO E INSTALACION DE TUB.
04.03.01 TUBERIA PVC SAP CLASE-10 D= 1", NTP 399.002 ML 4.46 3.80 16.95 4.46 16.95 0.00 0.00 0.00 4.46 16.95 100.00 0.00 0.00
04.03.03 TUBERIA PVC SAP CLASE-10 D= 1/2", NTP 399.002 ML 13.78 2.46 33.90 13.78 33.90 0.00 0.00 0.00 13.78 33.90 100.00 0.00 0.00
04.03.04 PRUEBA HIDRAULICA EN TUBERIAS ML 18.24 0.78 14.23 18.24 14.23 0.00 0.00 0.00 18.24 14.23 100.00 0.00 0.00
5 INSTALACION DE LETRINAS Y TRATAMIENTO DE AGUAS SERVIDAS
5.01 MODULO DE LETRINAS (05 und)
05.01.04 OBRAS DE CONCRETO ARMADO
05.01.04.01 CONCRETO f'c=175 kg/cm2 P/Losa Sanitaria M3 0.12 342.40 39.80 0.12 39.80 0.00 0.00 0.00 0.12 39.80 100.00 0.00 0.00
05.01.04.04 ENCOFRADO Y DESENCOFRADO P/VIGUETA M2 0.38 54.21 20.46 0.38 20.46 0.00 0.00 0.00 0.38 20.46 100.00 0.00 0.00
05.01.06 REVOQUES Y PISO
05.01.06.02 PISO DE CONCRETO COLOREADO FROTACHADO E=2.5CM M2 2.36 25.27 59.70 2.36 59.70 0.00 0.00 0.00 2.36 59.70 100.00 0.00 0.00
05.01.10 PINTURA
05.01.10.01 PINTURA LATEX 2 MANOS EN LETRINAS M2 15.06 8.30 124.98 15.06 124.98 0.00 0.00 0.00 15.06 124.98 100.00 0.00 0.00
COSTO DIRECTO 1,826.17 1,826.17 0.00 1,826.17 0.00
GASTOS GENERALES 6.60% 120.53 120.53 0.00 120.53 0.00
UTILIDAD 8.00% 146.09 146.09 0.00 146.09 0.00
TOTAL 2,092.79 2,092.79 0.00 0.00% 2,092.79 100.00% 0.00
IGV 18% 376.70 376.70 - 376.70 -
TOTAL VALORIZADO 2,469.49 2,469.49 - 2,469.49 -
% VALORIZADO 100.00% 0.00% 100.00% 0.00%
VALORIZACION DE OBRA N 01 MAYOR METRADO
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
: SISTEMA CALUYO - INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI,
FORMULA 04
PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR REFERENCIAL : S/. 7,529,454.25 (INCLUYE IGV)
MONTO DEL CONTRATO : S/. 7,529,454.25 (INCLUYE IGV)
ADELANTO DIRECTO : S/. 752,945.43 (INCLUYE IGV) 0.10
ADELANTO PARA MATERIALES : S/. 1,505,890.85 (INCLUYE IGV) 0.20
FECHA VALOR REFERENCIAL May-16

PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANTERIOR AVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N
UND CANT. P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADO VALORIZADO % METRADO VALORIZADO
4 RED DE ADUCCION Y DISTRIBUCION (L=5,810.68 ML)
4.02 MOVIMIENTO DE TIERRAS
04.02.01 EXCAVACION MANUAL EN TERRENO NORMAL M3 52.32 33.36 1,745.40 52.32 1,745.40 0.00 0.00 0.00 52.32 1,745.40 100.00 0.00 0.00
04.02.02 EXCAVACION MANUAL DE ZANJA, MATERIAL ROCA SUELTA M3 257.45 46.70 12,023.12 257.45 12,023.12 0.00 0.00 0.00 257.45 12,023.12 100.00 0.00 0.00
4.03 SUMINISTRO E INSTALACION DE TUB.
04.03.01 TUBERIA PVC SAP CLASE-10 D= 2", NTP 399.002 ML 27.70 6.41 177.56 27.70 177.56 0.00 0.00 0.00 27.70 177.56 100.00 0.00 0.00
04.03.02 TUBERIA PVC SAP CLASE-10 D= 1 1/2", NTP 399.002 ML 25.08 4.64 116.37 25.08 116.37 0.00 0.00 0.00 25.08 116.37 100.00 0.00 0.00
04.03.03 TUBERIA PVC SAP CLASE-10 D= 1", NTP 399.002 ML 105.33 3.80 400.25 105.33 400.25 0.00 0.00 0.00 105.33 400.25 100.00 0.00 0.00
5 INSTALACION DE LETRINAS Y TRATAMIENTO DE AGUAS SERVIDAS
5.01 MODULO DE LETRINAS (05 und)
05.01.04 OBRAS DE CONCRETO ARMADO
05.01.04.01 CONCRETO f'c=175 kg/cm2 P/Losa Sanitaria M3 0.84 342.40 286.59 0.84 286.59 0.00 0.00 0.00 0.84 286.59 100.00 0.00 0.00
05.01.04.04 ENCOFRADO Y DESENCOFRADO P/VIGUETA M2 2.70 54.21 146.37 2.70 146.37 0.00 0.00 0.00 2.70 146.37 100.00 0.00 0.00
05.01.06 REVOQUES Y PISO
05.01.06.02 PISO DE CONCRETO COLOREADO FROTACHADO E=2.5CM M2 17.01 25.27 429.84 17.01 429.84 0.00 0.00 0.00 17.01 429.84 100.00 0.00 0.00
05.01.10 PINTURA
05.01.10.01 PINTURA LATEX 2 MANOS EN LETRINAS M2 108.41 8.30 899.80 108.41 899.80 0.00 0.00 0.00 108.41 899.80 100.00 0.00 0.00
COSTO DIRECTO 16,225.30 16,225.30 0.00 16,225.30 0.00
GASTOS GENERALES 6.60% 1,070.87 1,070.87 0.00 1,070.87 0.00
UTILIDAD 8.00% 1,298.02 1,298.02 0.00 1,298.02 0.00
TOTAL 18,594.19 18,594.19 0.00 0.00% 18,594.19 100.00% 0.00
IGV 18% 3,346.95 3,346.95 - 3,346.95 -
TOTAL VALORIZADO 21,941.14 21,941.14 - 21,941.14 -
% VALORIZADO 100.00% 0.00% 100.00% 0.00%
VALORIZACION DE OBRA N 01 MAYOR METRADO
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
: SISTEMA KALLACALLANI - INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE
FORMULA 04
AYAVIRI, PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR REFERENCIAL : S/. 7,529,454.25 (INCLUYE IGV)
MONTO DEL CONTRATO : S/. 7,529,454.25 (INCLUYE IGV)
ADELANTO DIRECTO : S/. 752,945.43 (INCLUYE IGV) 0.10
ADELANTO PARA MATERIALES : S/. 1,505,890.85 (INCLUYE IGV) 0.20
FECHA VALOR REFERENCIAL May-16

PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANTERIOR AVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N
UND CANT. P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADO VALORIZADO % METRADO VALORIZADO
2 PLANTA DE TRATAMIENTO PRIMARIO DE AGUA (01 UND)
2.01 SEDIMENTADOR (01 UND)
02.01.03 OBRAS DE CONCRETO SIMPLE
02.01.03.01 SOLADO DE 4" CONCRETO 1:10 C:H M2 1.84 26.11 48.04 1.84 48.04 0.00 0.00 1.84 48.04 100.00 0.00 0.00
02.01.04 OBRAS DE CONCRETO ARMADO
02.01.04.01 CONCRETO f'c=210 kg/cm2 M3 2.12 403.95 856.37 2.12 856.37 0.00 0.00 2.12 856.37 100.00 0.00 0.00
02.01.04.02 ENCOFRADO Y DESENCOFRADO -(MURO) M2 12.35 50.66 625.65 12.35 625.65 0.00 0.00 12.35 625.65 100.00 0.00 0.00
02.01.05 REVOQUES ENLUCIDOS Y MOLDURAS
02.01.05.01 TARRAJEO EN LOSAS DE SUPERFICIE/PISO M2 1.43 35.90 51.34 1.43 51.34 0.00 0.00 1.43 51.34 100.00 0.00 0.00
02.01.05.02 TARRAJEO EN INTERIORES Y EXTERIORES M2 2.18 39.32 85.72 2.18 85.72 0.00 0.00 2.18 85.72 100.00 0.00 0.00
3 LINEA DE CONDUCCION ( 21726.98 ML)
3.01 TRABAJOS PRELIMINARES
03.01.01 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS ML 123.93 0.45 55.77 123.93 55.77 0.00 0.00 123.93 55.77 100.00 0.00 0.00
3.02 MOVIMIENTO DE TIERRAS
03.02.04 CAMA DE APOYO PARA TUBERIA C/MAT. PROP. e=0.10m y b = 0.50m ML 123.93 3.35 415.17 123.93 415.17 0.00 0.00 123.93 415.17 100.00 0.00 0.00
03.02.05 RELLENO C/ MAT. PROP. b =0.40m, H=0.60m SOBRE LA CLAVE DE TUB. ML 123.93 5.08 629.56 123.93 629.56 0.00 0.00 123.93 629.56 100.00 0.00 0.00
3.03 SUMINISTRO E INSTALACION DE TUB.
03.03.01 SUMINISTRO E INSTALACION DE TUBERIAS HDPE D= 90 MM PN 10 0E 80 ML 9.42 11.60 109.27 9.42 109.27 0.00 0.00 9.42 109.27 100.00 0.00 0.00
03.03.02 SUMINISTRO E INSTALACION DE TUBERIAS HDPE D= 75 MM PN 10 0E 80 ML 210.25 9.20 1,934.30 210.25 1,934.30 0.00 0.00 210.25 1,934.30 100.00 0.00 0.00
03.03.03 SUMINISTRO E INSTALACION DE TUBERIAS HDPE D= 63 MM PN 10 0E 80 ML 112.84 8.98 1,013.30 112.84 1,013.30 0.00 0.00 112.84 1,013.30 100.00 0.00 0.00
03.03.04 PRUEBA HIDRAULICA EN TUBERIAS ML 332.51 0.78 259.36 332.51 259.36 0.00 0.00 332.51 259.36 100.00 0.00 0.00
4 RESERVORIOS
4.01 RESERVORIO CAP. (20 M3 = 02 und)
04.01.04 OBRAS DE CONCRETO ARMADO
04.01.04.04 CONCRETO f'c=210 kg/cm2 M3 6.19 403.95 2,500.45 6.19 2,500.45 0.00 0.00 6.19 2,500.45 100.00 0.00 0.00
04.01.04.05 ENCOFRADO Y DESENCOFRADO P/MURO M2 61.92 61.39 3,801.27 61.92 3,801.27 0.00 0.00 61.92 3,801.27 100.00 0.00 0.00
04.01.04.06 ACERO ESTRUCTURAL TRABAJADO fy=4200 kg/cm2 GRADO 60 P/MURO KG 348.51 5.81 2,024.84 348.51 2,024.84 0.00 0.00 348.51 2,024.84 100.00 0.00 0.00
04.01.04.07 CONCRETO f'c=210 kg/cm2 M3 2.34 403.95 945.24 2.34 945.24 0.00 0.00 2.34 945.24 100.00 0.00 0.00
04.01.04.08 ENCOFRADO Y DESENCOFRADO P/LOSA DE TECHO M2 13.96 54.34 758.59 13.96 758.59 0.00 0.00 13.96 758.59 100.00 0.00 0.00
04.01.04.09 ACERO ESTRUCTURAL TRABAJADO fy=4200 kg/cm2 GRADO 60 P/LOSA DE TECHO KG 103.49 6.28 649.92 103.49 649.92 0.00 0.00 103.49 649.92 100.00 0.00 0.00
04.01.05 TARRAJEOS
04.01.05.02 TARRAJEO FROTACHADO EXT. 1:5, e=1.5cm M2 60.80 42.03 2,555.42 60.80 2,555.42 0.00 0.00 60.80 2,555.42 100.00 0.00 0.00
04.01.05.03 MORTERO PARA DAR PENDIENTE DE FONDO M2 11.56 17.96 207.62 11.56 207.62 0.00 0.00 11.56 207.62 100.00 0.00 0.00
04.01.08 PINTURA
04.01.08.01 PINTADO DE MURO EXTERIOR C/LATEX LAVABLE M2 57.76 6.74 389.30 57.76 389.30 0.00 0.00 57.76 389.30 100.00 0.00 0.00
VALORIZACION DE OBRA N 01 MAYOR METRADO
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
: SISTEMA KALLACALLANI - INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE
FORMULA 04
AYAVIRI, PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR REFERENCIAL : S/. 7,529,454.25 (INCLUYE IGV)
MONTO DEL CONTRATO : S/. 7,529,454.25 (INCLUYE IGV)
ADELANTO DIRECTO : S/. 752,945.43 (INCLUYE IGV) 0.10
ADELANTO PARA MATERIALES : S/. 1,505,890.85 (INCLUYE IGV) 0.20
FECHA VALOR REFERENCIAL May-16

PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANTERIOR AVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N
UND CANT. P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADO VALORIZADO % METRADO VALORIZADO
5 RED DE ADUCCION Y DISTRIBUCION (L=68,077.43 ML)
05.01. TRABAJOS PRELIMINARES
05.01.01 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS ML 17,637.71 0.45 7,936.97 17,637.71 7,936.97 0.00 0.00 17,637.71 7,936.97 100.00 0.00 0.00
05.02. MOVIMIENTO DE TIERRAS
05.02.01 EXCAVACION EN TERRENO NORMAL CON EQUIPO RETROEXCAVADOR M3 5,860.22 6.95 40,728.53 5,860.22 40,728.53 0.00 0.00 5,860.22 40,728.53 100.00 0.00 0.00
05.02.02 EXCAVACION MANUAL DE ZANJA, MATERIAL ROCA SUELTA M3 1,721.04 38.92 66,982.88 1,721.04 66,982.88 0.00 0.00 1,721.04 66,982.88 100.00 0.00 0.00
05.02.04 CAMA DE APOYO PARA TUBERIA C/MAT. PROP. e=0.10m ML 17,637.71 2.34 41,272.24 17,637.71 41,272.24 0.00 0.00 17,637.71 41,272.24 100.00 0.00 0.00
05.02.05 RELLENO C/ MAT. PROP. b =0.40m, H=0.60m SOBRE LA CLAVE DE TUB. ML 17,637.71 5.08 89,599.57 17,637.71 89,599.57 0.00 0.00 17,637.71 89,599.57 100.00 0.00 0.00
5.03 SUMINISTRO E INSTALACION DE TUB.
05.03.02 TUBERIA PVC SAP CLASE-10 D= 2", NTP 399.002 ML 234.82 6.41 1,505.20 234.82 1,505.20 0.00 0.00 234.82 1,505.20 100.00 0.00 0.00
05.03.03 TUBERIA PVC SAP CLASE-10 D= 1 1/2", NTP 399.002 ML 595.16 4.64 2,761.54 595.16 2,761.54 0.00 0.00 595.16 2,761.54 100.00 0.00 0.00
05.03.04 TUBERIA PVC SAP CLASE-10 D= 1", NTP 399.002 ML 345.88 3.80 1,314.34 345.88 1,314.34 0.00 0.00 345.88 1,314.34 100.00 0.00 0.00
05.03.06 TUBERIA PVC SAP CLASE-10 D= 1/2", NTP 399.002 ML 20,418.76 2.46 50,230.15 20,418.76 50,230.15 0.00 0.00 20,418.76 50,230.15 100.00 0.00 0.00
05.03.07 PRUEBA HIDRAULICA EN TUBERIAS ML 20,640.17 0.78 16,099.33 20,640.17 16,099.33 0.00 0.00 20,640.17 16,099.33 100.00 0.00 0.00
6 INSTALACION DE LETRINAS Y TRATAMIENTO DE AGUAS SERVIDAS
6.01 MODULO DE LETRINAS (361 und)
06.01.02 MOVIMIENTO DE TIERRAS
06.01.02.04 ACARREO DE MATERIAL EXCEDENTE (D=30 M) M3 42.63 23.35 995.41 42.63 995.41 0.00 0.00 42.63 995.41 100.00 0.00 0.00
06.01.04 OBRAS DE CONCRETO ARMADO
06.01.04.01 CONCRETO f'c=175 kg/cm2 P/Losa Sanitaria M3 7.90 342.40 2,704.96 7.90 2,704.96 0.00 0.00 7.90 2,704.96 100.00 0.00 0.00
06.01.04.04 ENCOFRADO Y DESENCOFRADO P/VIGUETA M2 25.20 54.21 1,366.09 25.20 1,366.09 0.00 0.00 25.20 1,366.09 100.00 0.00 0.00
06.01.06 REVOQUES Y PISO
06.01.06.02 PISO DE CONCRETO COLOREADO FROTACHADO E=2.5CM M2 166.12 25.27 4,197.85 166.12 4,197.85 0.00 0.00 166.12 4,197.85 100.00 0.00 0.00
06.01.10 PINTURA
06.01.10.01 PINTURA LATEX 2 MANOS EN LETRINAS m2 1,069.95 8.30 8,880.59 1,069.95 8,880.59 0.00 0.00 1,069.95 8,880.59 100.00 0.00 0.00
COSTO DIRECTO 356,492.15 356,492.15 0.00 356,492.15 0.00
GASTOS GENERALES 6.60% 23,528.48 23,528.48 0.00 23,528.48 0.00
UTILIDAD 8.00% 28,519.37 28,519.37 0.00 28,519.37 0.00
TOTAL 408,540.00 408,540.00 0.00 0.00% 408,540.00 100.00% 0.00
IGV 18% 73,537.20 73,537.20 - 73,537.20 -
TOTAL VALORIZADO 482,077.20 482,077.20 - 482,077.20 -
% VALORIZADO 100.00% 0.00% 100.00% 0.00%
RESUMEN DE VALORIZACIONES N 01 MAYOR METRADO
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR REFERENCIAL : S/. 7,529,454.25 (INCLUYE IGV)
MONTO DEL CONTRATO : S/. 7,529,454.25 (INCLUYE IGV)
ADELANTO DIRECTO : S/. 752,945.43 (INCLUYE IGV) 10.00%
ADELANTO PARA MATERIALES : S/. 1,505,890.85 (INCLUYE IGV) 20.00%
FECHA VALOR REFERENCIAL : MAYO DEL 2016

SALDO POR
PRESUPUESTO MAYOR METRADO AVANCE ACTUAL AVANCE ACUMULADO ANTERIOR AVANCE ACUMULADO ACTUAL
FRMULA D E S C R I P C I O N VALORIZAR
UND CANT. P.U. PARCIAL VALORIZADO VALORIZADO % VALORIZADO % VALORIZADO
01 OBRAS PROVISIONALES Y CAPACITACION GLB 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02 SISTEMA ALCCAMARINE GLB 1.00 1,826.17 1,826.17 1,826.17 0.00 0.00 1,826.17 100.00 0.00
03 SISTEMA CALUYO GLB 1.00 16,225.30 16,225.30 16,225.30 0.00 0.00 16,225.30 100.00 0.00
04 SISTEMA KALLACALLANI GLB 1.00 356,492.15 356,492.15 356,492.15 0.00 0.00 356,492.15 100.00 0.00
COSTO DIRECTO 374,543.62 374,543.62 0.00 374,543.62 0.00
GASTOS GENERALES 6.60% 24,719.88 24,719.88 0.00 24,719.88 0.00
UTILIDAD 8.00% 29,963.49 29,963.49 0.00 29,963.49 0.00
TOTAL 429,226.99 429,226.99 0.00 0.00% 429,226.99 100.00% 0.00
IGV 18% 77,260.86 77,260.86 - 77,260.86 -
TOTAL VALORIZADO 506,487.85 506,487.85 - 506,487.85 -
% VALORIZADO 100.00% 0.00% 100.00% 0.00%
Pgina 59 de 81

VALORIZACION DE OBRA N 01 PARTIDAS NUEVAS


DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
: SISTEMA ALCCAMARINE - INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE
FORMULA 02
AYAVIRI, PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR ADICIONAL N01 : S/. 48,806.97 (INCLUYE IGV)
FECHA VALOR REFERENCIAL Aug-17

PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANTERIOR AVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N
UND CANT. P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADOVALORIZADO % METRADO VALORIZADO
SISTEMA ALCCAMARINE
01 CAPTACION DE LADERA
01.01 CAJA MEDIDOR DE CAUDALES (1 UND)
01.01.01 TRABAJOS PRELIMINARES
01.01.01.01 LIMPIEZA DE TERRENO MANUAL M2 0.39 1.32 0.51 0.39 0.51 0.00 0.00 0.39 0.51 100.00 0.00 0.00
01.01.01.02 TRAZO Y REPLANTEO M2 0.39 0.99 0.39 0.39 0.39 0.00 0.00 0.39 0.39 100.00 0.00 0.00
01.01.02 MOVIMIENTO DE TIERRAS
01.01.02.01 EXCAVACION MANUAL EN TERRENO NORMAL M3 0.12 33.36 4.00 0.12 4.00 0.00 0.00 0.12 4.00 100.00 0.00 0.00
01.01.02.02 REFINE Y NIVELACION - COMPACTADO M2 0.39 1.95 0.76 0.39 0.76 0.00 0.00 0.39 0.76 100.00 0.00 0.00
01.01.02.03 ACARREO DE MATERIAL EXCEDENTE (D=30 M) M3 0.12 23.35 2.80 0.12 2.80 0.00 0.00 0.12 2.80 100.00 0.00 0.00
01.01.03 OBRAS DE CONCRETO ARMADO
01.01.03.01 CONCRETO f 'c=175 kg/cm2, P/LOSA DE FONDO, TAPA Y MUROS M3 0.25 262.90 65.73 0.25 65.73 0.00 0.00 0.25 65.73 100.00 0.00 0.00
01.01.03.02 ENCOFRADO Y DESENCOFRADO MUROS M2 1.04 36.12 37.56 1.04 37.56 0.00 0.00 1.04 37.56 100.00 0.00 0.00
01.01.04 TARRAJEOS
01.01.04.01 TARRAJEO EN EXTERIORES MORTERO 1:5, e=1.5cm M2 1.11 37.29 41.39 1.11 41.39 0.00 0.00 1.11 41.39 100.00 0.00 0.00
01.01.05 VALVULAS Y ACCESORIOS
01.01.05.01 VALVULAS Y ACCESORIOS MEDIDOR DE CAUDAL UND 1.00 789.18 789.18 1.00 789.18 0.00 0.00 1.00 789.18 100.00 0.00 0.00
01.01.05.02 COLOCACION DE ACCESORIOS CAPTACIN Und 1.00 43.37 43.37 1.00 43.37 0.00 0.00 1.00 43.37 100.00 0.00 0.00
01.01.06 PINTURA
01.01.06.01 PINTURA EN EXTERIORES EN CAJA DE MEDIDOR DE CAUDAL M2 1.11 9.10 10.10 1.11 10.10 0.00 0.00 1.11 10.10 100.00 0.00 0.00
02 CAJA REGISTRO CONTROL (PILETAS Y LETRINAS 05 UND)
02.01 TRABAJOS PRELIMINARES
02.01.01 LIMPIEZA DE TERRENO MANUAL M2 0.45 1.32 0.59 0.45 0.59 0.00 0.00 0.45 0.59 100.00 0.00 0.00
02.01.02 TRAZO Y REPLANTEO M2 0.45 0.99 0.45 0.45 0.45 0.00 0.00 0.45 0.45 100.00 0.00 0.00
02.02 MOVIMIENTO DE TIERRAS
02.02.01 EXCAVACION MANUAL EN TERRENO NORMAL M3 0.10 33.36 3.34 0.10 3.34 0.00 0.00 0.10 3.34 100.00 0.00 0.00
02.02.02 REFINE Y NIVELACION - COMPACTADO M2 0.45 1.95 0.88 0.45 0.88 0.00 0.00 0.45 0.88 100.00 0.00 0.00
02.02.03 ACARREO DE MATERIAL EXCEDENTE (D=30 M) M3 0.10 23.35 2.34 0.10 2.34 0.00 0.00 0.10 2.34 100.00 0.00 0.00
02.03 OBRAS DE CONCRETO SIMPLE
02.03.01 SUMINISTRO CAJA CONCRETO SIMPLE + TAPA 0.30X0.30X0.22M S/FONDO UND 5.00 15.67 78.35 5.00 78.35 0.00 0.00 5.00 78.35 100.00 0.00 0.00
02.04 ACCESORIOS
02.04.01 SUMINISTRO DE ACCESORIOS Y COLOCACION UND 5.00 20.82 104.10 5.00 104.10 0.00 0.00 5.00 104.10 100.00 0.00 0.00
COSTO DIRECTO 1,185.84 1,185.84 0.00 1,185.84 0.00
GASTOS GENERALES 6.60% 78.27 78.27 0.00 78.27 0.00
UTILIDAD 8.00% 94.87 94.87 0.00 94.87 0.00
TOTAL 1,358.98 1,358.98 0.00 0.00% 1,358.98 100.00% 0.00
IGV 18% 244.62 244.62 - 244.62 -
TOTAL VALORIZADO 1,603.60 1,603.60 - 1,603.60 -
% VALORIZADO 100.00% 0.00% 100.00% 0.00%
VALORIZACION DE OBRA N 01 PARTIDAS NUEVAS
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
: SISTEMA CALUYO - INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE
FORMULA 02
AYAVIRI, PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR ADICIONAL N01 : S/. 48,806.97 (INCLUYE IGV)
FECHA VALOR REFERENCIAL Aug-17

PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANTERIOR AVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N
UND CANT. P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADOVALORIZADO % METRADO VALORIZADO
SISTEMA CALUYO
01 CAPTACION DE LADERA
01.01 CAJA MEDIDOR DE CAUDALES (1 UND)
01.01.01 TRABAJOS PRELIMINARES
01.01.01.01 LIMPIEZA DE TERRENO MANUAL M2 0.39 1.32 0.51 0.39 0.51 0.00 0.00 0.39 0.51 100.00 0.00 0.00
01.01.01.02 TRAZO Y REPLANTEO M2 0.39 0.99 0.39 0.39 0.39 0.00 0.00 0.39 0.39 100.00 0.00 0.00
01.01.02 MOVIMIENTO DE TIERRAS
01.01.02.01 EXCAVACION MANUAL EN TERRENO NORMAL M3 0.12 33.36 4.00 0.12 4.00 0.00 0.00 0.12 4.00 100.00 0.00 0.00
01.01.02.02 REFINE Y NIVELACION - COMPACTADO M2 0.39 1.95 0.76 0.39 0.76 0.00 0.00 0.39 0.76 100.00 0.00 0.00
01.01.02.03 ACARREO DE MATERIAL EXCEDENTE (D=30 M) M3 0.12 23.35 2.80 0.12 2.80 0.00 0.00 0.12 2.80 100.00 0.00 0.00
01.01.03 OBRAS DE CONCRETO ARMADO
01.01.03.01 CONCRETO f 'c=175 kg/cm2, P/LOSA DE FONDO, TAPA Y MUROS M3 0.25 252.90 63.23 0.25 63.23 0.00 0.00 0.25 63.23 100.00 0.00 0.00
01.01.03.02 ENCOFRADO Y DESENCOFRADO MUROS M2 1.04 36.40 37.86 1.04 37.86 0.00 0.00 1.04 37.86 100.00 0.00 0.00
01.01.04 TARRAJEOS
01.01.04.01 TARRAJEO EN EXTERIORES MORTERO 1:5, e=1.5cm M2 1.11 37.29 41.39 1.11 41.39 0.00 0.00 1.11 41.39 100.00 0.00 0.00
01.01.05 VALVULAS Y ACCESORIOS
01.01.05.01 VALVULAS Y ACCESORIOS MEDIDOR DE CAUDAL UND 1.00 789.18 789.18 1.00 789.18 0.00 0.00 1.00 789.18 100.00 0.00 0.00
01.01.05.02 COLOCACION DE ACCESORIOS CAPTACIN Und 1.00 43.37 43.37 1.00 43.37 0.00 0.00 1.00 43.37 100.00 0.00 0.00
01.01.06 PINTURA
01.01.06.01 PINTURA EN EXTERIORES EN CAJA DE MEDIDOR DE CAUDAL M2 1.11 9.10 10.10 1.11 10.10 0.00 0.00 1.11 10.10 100.00 0.00 0.00
02 CAJA REGISTRO CONTROL (PILETAS Y LETRINAS 36 UND)
02.01 TRABAJOS PRELIMINARES
02.01.01 LIMPIEZA DE TERRENO MANUAL M2 3.24 1.32 4.28 3.24 4.28 0.00 0.00 3.24 4.28 100.00 0.00 0.00
02.01.02 TRAZO Y REPLANTEO M2 3.24 0.99 3.21 3.24 3.21 0.00 0.00 3.24 3.21 100.00 0.00 0.00
02.02 MOVIMIENTO DE TIERRAS
02.02.01 EXCAVACION MANUAL EN TERRENO NORMAL M3 0.71 33.36 23.69 0.71 23.69 0.00 0.00 0.71 23.69 100.00 0.00 0.00
02.02.02 REFINE Y NIVELACION - COMPACTADO M2 3.24 1.95 6.32 3.24 6.32 0.00 0.00 3.24 6.32 100.00 0.00 0.00
02.02.03 ACARREO DE MATERIAL EXCEDENTE (D=30 M) M3 0.71 23.35 16.58 0.71 16.58 0.00 0.00 0.71 16.58 100.00 0.00 0.00
02.03 OBRAS DE CONCRETO SIMPLE
02.03.01 SUMINISTRO CAJA CONCRETO SIMPLE + TAPA 0.30X0.30X0.22M S/FONDO UND 36.00 15.67 564.12 36.00 564.12 0.00 0.00 36.00 564.12 100.00 0.00 0.00
02.04 ACCESORIOS
02.04.01 SUMINISTRO DE ACCESORIOS Y COLOCACION UND 36.00 20.82 749.52 36.00 749.52 0.00 0.00 36.00 749.52 100.00 0.00 0.00
COSTO DIRECTO 2,361.31 2,361.31 0.00 2,361.31 0.00
GASTOS GENERALES 6.60% 155.85 155.85 0.00 155.85 0.00
UTILIDAD 8.00% 188.90 188.90 0.00 188.90 0.00
TOTAL 2,706.06 2,706.06 0.00 0.00% 2,706.06 100.00% 0.00
IGV 18% 487.09 487.09 - 487.09 -
TOTAL VALORIZADO 3,193.15 3,193.15 - 3,193.15 -
% VALORIZADO 100.00% 0.00% 100.00% 0.00%
VALORIZACION DE OBRA N 01 PARTIDAS NUEVAS
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
: SISTEMA KALLAKALLANI- INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE
FORMULA 02
AYAVIRI, PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR ADICIONAL N01 : S/. 48,806.97 (INCLUYE IGV)
FECHA VALOR REFERENCIAL Aug-17

PRESUPUESTO DEDUCTIVO CONTRACTUAL DEDUCTIVO ACTUAL DEDUCTIVO ACUMULADO ANTERIOR DEDUCTIVO ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N
UND CANT. P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADO VALORIZADO % METRADO VALORIZADO
SISTEMA KALLACALLANI
01 CAPTACION DE LADERA
01.01 CAJA MEDIDOR DE CAUDALES (2 UND)
01.01.01 TRABAJOS PRELIMINARES
01.01.01.01 LIMPIEZA DE TERRENO MANUAL M2 0.77 1.32 1.02 0.77 1.02 0.00 0.00 0.77 1.02 100.00 0.00 0.00
01.01.01.02 TRAZO Y REPLANTEO M2 0.77 0.99 0.76 0.77 0.76 0.00 0.00 0.77 0.76 100.00 0.00 0.00
01.01.02 MOVIMIENTO DE TIERRAS
01.01.02.01 EXCAVACION MANUAL EN TERRENO NORMAL M3 0.23 33.36 7.67 0.23 7.67 0.00 0.00 0.23 7.67 100.00 0.00 0.00
01.01.02.02 REFINE Y NIVELACION - COMPACTADO M2 0.77 1.95 1.50 0.77 1.50 0.00 0.00 0.77 1.50 100.00 0.00 0.00
01.01.02.03 ACARREO DE MATERIAL EXCEDENTE (D=30 M) M3 0.23 23.35 5.37 0.23 5.37 0.00 0.00 0.23 5.37 100.00 0.00 0.00
01.01.03 OBRAS DE CONCRETO ARMADO
01.01.03.01 CONCRETO f 'c=175 kg/cm2, P/LOSA DE FONDO, TAPA Y MUROS M3 0.51 252.90 128.98 0.51 128.98 0.00 0.00 0.51 128.98 100.00 0.00 0.00
01.01.03.02 ENCOFRADO Y DESENCOFRADO MUROS M2 2.08 36.40 75.71 2.08 75.71 0.00 0.00 2.08 75.71 100.00 0.00 0.00
01.01.04 TARRAJEOS
01.01.04.01 TARRAJEO EN EXTERIORES MORTERO 1:5, e=1.5cm M2 2.23 37.29 83.16 2.23 83.16 0.00 0.00 2.23 83.16 100.00 0.00 0.00
01.01.05 VALVULAS Y ACCESORIOS
01.01.05.01 VALVULAS Y ACCESORIOS MEDIDOR DE CAUDAL UND 2.00 789.18 1,578.36 2.00 1,578.36 0.00 0.00 2.00 1,578.36 100.00 0.00 0.00
01.01.05.02 COLOCACION DE ACCESORIOS CAPTACIN Und 2.00 54.21 108.42 2.00 108.42 0.00 0.00 2.00 108.42 100.00 0.00 0.00
01.01.06 PINTURA
01.01.06.01 PINTURA EN EXTERIORES EN CAJA DE MEDIDOR DE CAUDAL M2 2.23 9.10 20.29 2.23 20.29 0.00 0.00 2.23 20.29 100.00 0.00 0.00
02 PLANTA DE TRATAMIENTO PRIMARIO DE AGUA (01 UND)
02.01 SEDIMENTADOR (01 UND)
02.01.01 CARPINTERIA METALICA
02.01.01.01 TAPA METALICA INSPECCION DE 60X60M UND 2.00 190.53 381.06 2.00 381.06 0.00 0.00 2.00 381.06 100.00 0.00 0.00
03 LINEA DE CONDUCCION (206.30 ML)
03.01 TRABAJOS PRELIMINARES
03.01.01 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS ML 206.30 0.45 92.84 206.30 92.84 0.00 0.00 206.30 92.84 100.00 0.00 0.00
03.02 MOVIMIENTO DE TIERRAS
03.02.01 EXCAVACION DE JANZAS EN TERRENO NORMAL M3 57.76 29.19 1,686.01 57.76 1,686.01 0.00 0.00 57.76 1,686.01 100.00 0.00 0.00
03.02.02 CAMA DE APOYO PARA TUBERIA C/MAT. PROP. e=0.10m y b = 0.50m ML 206.30 3.35 691.11 206.30 691.11 0.00 0.00 206.30 691.11 100.00 0.00 0.00
03.02.03 RELLENO C/ MAT. PROP. b =0.40m, H=0.60m SOBRE LA CLAVE DE TUB. ML 206.30 5.08 1,048.00 206.30 1,048.00 0.00 0.00 206.30 1,048.00 100.00 0.00 0.00
03.03 SUMINISTRO E INSTALACION DE TUB.
03.03.01 TUBERIA PVC SAP CLASE-05, D= 4", NTP 399.002 ML 55.00 16.85 926.75 55.00 926.75 0.00 0.00 55.00 926.75 100.00 0.00 0.00
03.03.02 TUBERIA PVC SAP CLASE-10 D= 3", NTP 399.002 ML 151.30 15.17 2,295.22 151.30 2,295.22 0.00 0.00 151.30 2,295.22 100.00 0.00 0.00
03.03.03 PRUEBA HIDRAULICA EN TUBERIAS ML 206.30 0.78 160.91 206.30 160.91 0.00 0.00 206.30 160.91 100.00 0.00 0.00
04 UNION EMPALME, TUBERIA HDPE CON PVC SAP
VALORIZACION DE OBRA N 01 PARTIDAS NUEVAS
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
: SISTEMA KALLAKALLANI- INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE
FORMULA 02
AYAVIRI, PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR ADICIONAL N01 : S/. 48,806.97 (INCLUYE IGV)
FECHA VALOR REFERENCIAL Aug-17

PRESUPUESTO DEDUCTIVO CONTRACTUAL DEDUCTIVO ACTUAL DEDUCTIVO ACUMULADO ANTERIOR DEDUCTIVO ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N
UND CANT. P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADO VALORIZADO % METRADO VALORIZADO
04.01 ACCESORIOS
04.01.01 SUMINISTRO DE ACCESORIOS UNION HDPE CON PVC SAP GLB 1.00 1,114.00 1,114.00 1.00 1,114.00 0.00 0.00 1.00 1,114.00 100.00 0.00 0.00
04.01.02 COLOCADO DE ACCESORIOS UNION EMPALME Und 1.00 45.87 45.87 1.00 45.87 0.00 0.00 1.00 45.87 100.00 0.00 0.00
05 CAMARA DE REUNION (01 UND)
05.01 TRABAJOS PRELIMINARES
05.01.01 LIMPIEZA DE TERRENO MANUAL M2 1.96 1.32 2.59 1.96 2.59 0.00 0.00 1.96 2.59 100.00 0.00 0.00
05.01.02 TRAZO Y REPLANTEO M2 1.96 0.99 1.94 1.96 1.94 0.00 0.00 1.96 1.94 100.00 0.00 0.00
05.02 MOVIMIENTO DE TIERRAS
05.02.01 EXCAVACION MANUAL EN TERRENO NORMAL M3 1.17 36.49 42.69 1.17 42.69 0.00 0.00 1.17 42.69 100.00 0.00 0.00
05.02.02 REFINE Y NIVELACION EN TERRENO NORMAL M2 1.96 1.95 3.82 1.96 3.82 0.00 0.00 1.96 3.82 100.00 0.00 0.00
05.02.03 ACARREO DE MATERIAL EXCEDENTE (D=30 M) M3 1.17 23.35 27.32 1.17 27.32 0.00 0.00 1.17 27.32 100.00 0.00 0.00
05.03 OBRAS DE CONCRETO SIMPLE
05.03.01 SOLADO DE 4" CONCRETO 1:10 C:H M2 1.96 26.11 51.18 1.96 51.18 0.00 0.00 1.96 51.18 100.00 0.00 0.00
05.04 OBRAS DE CONCRETO ARMADO
05.04.01 CONCRETO f 'c=175 kg/cm2, P/LOSA DE FONDO, TAPA Y MUROS M3 0.82 252.90 207.38 0.82 207.38 0.00 0.00 0.82 207.38 100.00 0.00 0.00
05.04.02 ENCOFRADO Y DESENCOFRADO M2 6.30 36.12 227.56 6.30 227.56 0.00 0.00 6.30 227.56 100.00 0.00 0.00
05.04.03 ACERO ESTRUCTURAL TRABAJDO fy=4200 kg/cm2 GRADO 60 KG 33.70 5.81 195.80 33.70 195.80 0.00 0.00 33.70 195.80 100.00 0.00 0.00
05.05 TARRAJEOS
05.05.01 TARRAJEO C/IMPER. INT. 1:5, e=1.5cm M2 3.59 40.27 144.57 3.59 144.57 0.00 0.00 3.59 144.57 100.00 0.00 0.00
05.05.02 TARRAJEO EN EXTERIORES MORTERO 1:5, e=1.5cm M2 5.03 37.29 187.57 5.03 187.57 0.00 0.00 5.03 187.57 100.00 0.00 0.00
05.06 SUMINISTRO E COLOCACION DE ACCESORIOS
05.06.01 ACCESORIOS PVC PARA CAMARA REUNION UND 1.00 218.80 218.80 1.00 218.80 0.00 0.00 1.00 218.80 100.00 0.00 0.00
05.06.02 COLOCACION DE ACCESORIOS Und 1.00 72.28 72.28 1.00 72.28 0.00 0.00 1.00 72.28 100.00 0.00 0.00
05.07 CARPINTERIA METALICA
05.07.01 TAPA METALICA INSPECCION DE 60X60M UND 1.00 190.53 190.53 1.00 190.53 0.00 0.00 1.00 190.53 100.00 0.00 0.00
06 CRUCE DE AEREO L=14.70 ML, TUB.DE FG 3" (01 UND)
06.01 TRABAJOS PRELIMINARES
06.01.01 LIMPIEZA DE TERRENO MANUAL M2 8.40 1.32 11.09 8.40 11.09 0.00 0.00 8.40 11.09 100.00 0.00 0.00
06.01.02 TRAZO Y REPLANTEO M2 8.40 0.99 8.32 8.40 8.32 0.00 0.00 8.40 8.32 100.00 0.00 0.00
06.02 MOVIMIENTO DE TIERRAS
06.02.01 EXCAVACION MANUAL DE ZANJA, MATERIAL COMPACTADO M3 6.92 58.38 403.99 6.92 403.99 0.00 0.00 6.92 403.99 100.00 0.00 0.00
06.02.02 REFINE Y NIVELACION DE FONDOS ML 4.88 1.98 9.66 4.88 9.66 0.00 0.00 4.88 9.66 100.00 0.00 0.00
06.02.03 ACARREO DE MATERIAL EXCEDENTE (D=30 M) M3 8.30 23.35 193.81 8.30 193.81 0.00 0.00 8.30 193.81 100.00 0.00 0.00
06.03 OBRAS DE CONCRETO SIMPLE
06.03.01 CONCRETO CICLOPEO f'c=140 kg/cm2 + 30 % PM. M3 0.86 51.42 44.22 0.86 44.22 0.00 0.00 0.86 44.22 100.00 0.00 0.00
06.04 OBRAS DE CONCRETO ARMADO
VALORIZACION DE OBRA N 01 PARTIDAS NUEVAS
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
: SISTEMA KALLAKALLANI- INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE
FORMULA 02
AYAVIRI, PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR ADICIONAL N01 : S/. 48,806.97 (INCLUYE IGV)
FECHA VALOR REFERENCIAL Aug-17

PRESUPUESTO DEDUCTIVO CONTRACTUAL DEDUCTIVO ACTUAL DEDUCTIVO ACUMULADO ANTERIOR DEDUCTIVO ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N
UND CANT. P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADO VALORIZADO % METRADO VALORIZADO
06.04.01 CONCRETO f'c=175 kg/cm2 P/ZAPATAS M3 2.74 377.87 1,035.36 2.74 1,035.36 0.00 0.00 2.74 1,035.36 100.00 0.00 0.00
06.04.02 CONCRETO f'c=210 kg/cm2 M3 0.41 403.95 165.62 0.41 165.62 0.00 0.00 0.41 165.62 100.00 0.00 0.00
06.04.03 ENCOFRADO Y DESENCOFRADO M2 19.88 36.12 718.07 19.88 718.07 0.00 0.00 19.88 718.07 100.00 0.00 0.00
06.04.04 ACERO ESTRUCTURAL TRABAJADO fy=4200 kg/cm2 GRADO 60 KG 70.52 5.81 409.72 70.52 409.72 0.00 0.00 70.52 409.72 100.00 0.00 0.00
06.05 TARRAJEOS
06.05.01 TARRAJEO FROTACHADO MURO EXTERIOR 1:5, e=1.5cm M2 8.60 17.96 154.46 8.60 154.46 0.00 0.00 8.60 154.46 100.00 0.00 0.00
06.06 ACCESORIOS
06.06.01 ACCESORIO-CRUCE AEREO L=14.70 M GLB 1.00 1,527.88 1,527.88 1.00 1,527.88 0.00 0.00 1.00 1,527.88 100.00 0.00 0.00
06.06.02 COLOCADO DE ACCESORIOS-CRUCE AEREO UND 1.00 130.66 130.66 1.00 130.66 0.00 0.00 1.00 130.66 100.00 0.00 0.00
06.07 PINTURA
06.07.01 PINTADO DE MURO EXTERIOR C/LATEX LAVABLE M2 8.60 6.74 57.96 8.60 57.96 0.00 0.00 8.60 57.96 100.00 0.00 0.00
07 CRUCE POR PUENTE TUB. HDPE 90MM (3 UND)
07.01 SUMINISTRO DE ACCESORIOS PARA CRUCE DE PUENTE UND 3.00 185.00 555.00 3.00 555.00 0.00 0.00 3.00 555.00 100.00 0.00 0.00
07.02 COLOCADO DE ACCESORIOS EN CRUCE DE RIO POR PUENTE UND 3.00 137.61 412.83 3.00 412.83 0.00 0.00 3.00 412.83 100.00 0.00 0.00
08 CRUCE DE ALCANTARRILLA L= 24.0 (TUB. FG 2") 01 UND
08.01 SUMINISTRO DE ACCESORIOS PARA CRUCE DE ALCANTARRILLA GLB 1.00 647.30 647.30 1.00 647.30 0.00 0.00 1.00 647.30 100.00 0.00 0.00
08.02 COLOCADO DE ACCESORIOS EN ALCANTARRILLA UND 1.00 130.66 130.66 1.00 130.66 0.00 0.00 1.00 130.66 100.00 0.00 0.00
09 CAJA REGISTRO CONTROL (PILETAS Y LETRINAS 365 UND)
09.01 TRABAJOS PRELIMINARES
09.01.01 LIMPIEZA DE TERRENO MANUAL M2 32.67 1.32 43.12 32.67 43.12 0.00 0.00 32.67 43.12 100.00 0.00 0.00
09.01.02 TRAZO Y REPLANTEO M2 32.67 0.99 32.34 32.67 32.34 0.00 0.00 32.67 32.34 100.00 0.00 0.00
09.02 MOVIMIENTO DE TIERRAS
09.02.01 EXCAVACION MANUAL EN TERRENO NORMAL M3 7.19 37.89 272.33 7.19 272.33 0.00 0.00 7.19 272.33 100.00 0.00 0.00
09.02.02 REFINE Y NIVELACION - COMPACTADO M2 32.67 1.95 63.71 32.67 63.71 0.00 0.00 32.67 63.71 100.00 0.00 0.00
09.02.03 ACARREO DE MATERIAL EXCEDENTE (D=30 M) M3 7.19 23.35 167.83 7.19 167.83 0.00 0.00 7.19 167.83 100.00 0.00 0.00
09.03 OBRAS DE CONCRETO SIMPLE
09.03.01 SUMINISTRO CAJA CONCRETO SIMPLE + TAPA 0.30X0.30X0.22M S/FONDO UND 363.00 15.67 5,688.21 363.00 5,688.21 0.00 0.00 363.00 5,688.21 100.00 0.00 0.00
09.04 ACCESORIOS
09.04.01 SUMINISTRO DE ACCESORIOS Y COLOCACION UND 363.00 20.82 7,557.66 363.00 7,557.66 0.00 0.00 363.00 7,557.66 100.00 0.00 0.00
COSTO DIRECTO 32,468.85 32,468.85 0.00 32,468.85 0.00
GASTOS GENERALES 6.60% 2,142.94 2,142.94 0.00 2,142.94 0.00
UTILIDAD 8.00% 2,597.51 2,597.51 0.00 2,597.51 0.00
TOTAL 37,209.30 37,209.30 0.00 0.00% 37,209.30 100.00% 0.00
IGV 18% 6,697.67 6,697.67 - 6,697.67 -
TOTAL VALORIZADO 43,906.97 43,906.97 - 43,906.97 -
% VALORIZADO 100.00% 0.00% 100.00% 0.00%
HOJA DE RESUMEN DE PRESUPUESTO

Instalacion del Sistema de Agua Potable y Samenamiento Basico en la Parcialidad de Pacobamba Bajo del
Distrito de Ayaviri, Provincia de Melgar - Puno

PRESUPUESTO BASE POR SISTEMAS

OBRAS PROVISIONALES Y CAPACITACION 270,783.91 270,455.14


SISTEMA ALCCAMARINE 80,749.92 56,660.68
SISTEMA CALUYO 452,989.76 402,054.57
SISTEMA KALLACALLANI 4,763,446.24 #REF!

COSTO DIRECTO 5,567,969.83 #REF!

GASTOS GENERALES 367,486.01 6.60%

UTILIDAD 445,437.59 8.00%

COSTO PARCIAL 6,380,893.43

IGV (18%) 1,148,560.83 18.00%

COSTO EJECUCION DE OBRA 7,529,454.25


COSTO SUPERVISION 272,830.52 4.90%

COSTO TOTAL 7,802,284.77

EXPEDIENTE TECNICO 108,575.41 1.95%


TOTAL PROYECTO 7,910,860.18
RESUMEN DE VALORIZACIONES N 01 PARTIDAS NUEVAS
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA

SALDO POR
PRESUPUESTO MAYOR METRADO AVANCE ACTUAL AVANCE ACUMULADO ANTERIOR AVANCE ACUMULADO ACTUAL
FRMULA D E S C R I P C I O N VALORIZAR
UND CANT. P.U. PARCIAL VALORIZADO VALORIZADO % VALORIZADO % VALORIZADO
01 OBRAS PROVISIONALES Y CAPACITACION GLB 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02 SISTEMA ALCCAMARINE GLB 1.00 1,185.84 1,185.84 1,185.84 0.00 0.00 1,185.84 100.00 0.00
03 SISTEMA CALUYO GLB 1.00 2,361.31 2,361.31 2,361.31 0.00 0.00 2,361.31 100.00 0.00
04 SISTEMA KALLACALLANI GLB 1.00 32,468.85 32,468.85 32,468.85 0.00 0.00 32,468.85 100.00 0.00
COSTO DIRECTO 36,016.00 36,016.00 0.00 36,016.00 0.00
GASTOS GENERALES 6.60% 2,377.06 2,377.06 0.00 2,377.06 0.00
UTILIDAD 8.00% 2,881.28 2,881.28 0.00 2,881.28 0.00
TOTAL 41,274.34 41,274.34 0.00 0.00% 41,274.34 100.00% 0.00
IGV 18% 7,429.38 7,429.38 - 7,429.38 -
TOTAL VALORIZADO 48,703.72 48,703.72 - 48,703.72 -
% VALORIZADO 100.00% 0.00% 100.00% 0.00%
VALORIZACION DE DEDUCTIVOS DE OBRA N 01 PARTIDAS NUEVAS
FRMULA 04
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
: SISTEMA KALLACALLANI - INSTALACION DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BASICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE
FORMULA 04
AYAVIRI, PROVINCIA DE MELGAR - PUNO
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA

PRESUPUESTO DEDUCTIVO CONTRACTUAL DEDUCTIVO ACTUAL DEDUCTIVO ACUMULADO ANTERIOR DEDUCTIVO ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA D E S C R I P C I O N
UND CANT. P.U. PARCIAL METRADO VALORIZADO METRADO VALORIZADO % METRADO VALORIZADO % METRADO VALORIZADO
09 CAJA REGISTRO CONTROL (PILETAS Y LETRINAS 365 UND) PARTIDA NUEVA
09.01 TRABAJOS PRELIMINARES
09.01.01 LIMPIEZA DE TERRENO MANUAL M2 0.18 1.32 0.24 0.18 0.24 0.00 0.00 0.18 0.24 100.00 0.00 0.00
09.01.02 TRAZO Y REPLANTEO M2 0.18 0.99 0.18 0.18 0.18 0.00 0.00 0.18 0.18 100.00 0.00 0.00
09.02 MOVIMIENTO DE TIERRAS
09.02.01 EXCAVACION MANUAL EN TERRENO NORMAL M3 0.04 37.89 1.52 0.04 1.52 0.00 0.00 0.04 1.52 100.00 0.00 0.00
09.02.02 REFINE Y NIVELACION - COMPACTADO M2 0.18 1.95 0.35 0.18 0.35 0.00 0.00 0.18 0.35 100.00 0.00 0.00
09.02.03 ACARREO DE MATERIAL EXCEDENTE (D=30 M) M3 0.04 23.35 0.93 0.04 0.93 0.00 0.00 0.04 0.93 100.00 0.00 0.00
09.03 OBRAS DE CONCRETO SIMPLE
09.03.01 SUMINISTRO CAJA CONCRETO SIMPLE + TAPA 0.30X0.30X0.22M S/FONDO UND 2.00 15.67 31.40 2.00 31.40 0.00 0.00 2.00 31.40 100.00 0.00 0.00
09.04 ACCESORIOS
09.04.01 SUMINISTRO DE ACCESORIOS Y COLOCACION UND 2.00 20.82 41.73 2.00 41.73 0.00 0.00 2.00 41.73 100.00 0.00 0.00

COSTO DIRECTO 76.35 76.35 0.00 76.35 0.00


GASTOS GENERALES 6.60% 5.04 5.04 0.00 5.04 0.00
UTILIDAD 8.00% 6.11 6.11 0.00 6.11 0.00
TOTAL 87.50 87.50 0.00 0.00% 87.50 100.00% 0.00
IGV 18% 15.75 15.75 - 15.75 -
TOTAL VALORIZADO 103.25 103.25 - 103.25 -
% VALORIZADO 100.00% 0.00% 100.00% 0.00%
RESUMEN DE VALORIZACION DE DEDUCTIVOS ADICIONAL DE OBRA N 01 PARTIDAS NUEVAS
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA

SALDO POR
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANTERIOR AVANCE ACUMULADO ACTUAL
FRMULA D E S C R I P C I O N VALORIZAR
UND CANT. P.U. PARCIAL VALORIZADO VALORIZADO % VALORIZADO % VALORIZADO
01 OBRAS PROVISIONALES Y CAPACITACION GLB 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02 SISTEMA ALCCAMARINE GLB 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03 SISTEMA CALUYO GLB 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04 SISTEMA KALLACALLANI GLB 1.00 76.35 76.35 76.35 0.00 0.00 76.35 100.00 0.00
COSTO DIRECTO 76.35 76.35 0.00 76.35 0.00
GASTOS GENERALES 6.60% 5.04 5.04 0.00 5.04 0.00
UTILIDAD 8.00% 6.11 6.11 0.00 6.11 0.00
TOTAL 87.50 87.50 0.00 0.00% 87.50 100.00% 0.00
IGV 18% 15.75 15.75 - 15.75 -
TOTAL VALORIZADO 103.25 103.25 - 103.25 -
% VALORIZADO 100.00% 0.00% 100.00% 0.00%
AMORTIZACION DEL ADELANTO DIRECTO
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017

OBRA : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE


PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE MELGAR - PUNO.

CONTRATO : CONTRATO N 019-MPM-A


CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL CONTRATO 7,529,454.25 6,380,893.43 (SIN IGV)
ADELANTO DIRECTO 752,945.43 10.00% 638,089.35 (SIN IGV)
FECHA PAGO ADELANTO DIRECTO 11/21/2016
ADELANTO PARA MATERIALES 1,505,890.85 20.00% 1,276,178.69 (SIN IGV)
FECHA PAGO ADELANTO MATERIALES 11/23/2016
FECHA VALOR REFERENCIAL : MAYO DEL 2016

VALORIZACION MONTO DEL AMORTIZACION SALDO POR


MONTO ADELANTO (SIN IGV) DEL ADELANTO AMORTIZAR
No. MES V (SIN IGV) A AM=V*A/C S=A-AM
1.00 Nov-16 174,863.23 638,089.35 17,486.32 620,603.02
2.00 Dec-16 728,882.51 72,888.25 547,714.77
3.00 Jan-17 1,163,795.05 116,379.51 431,335.27
4.00 Feb-17 1,047,200.59 104,720.06 326,615.21
5.00 Mar-17 826,665.15 82,666.52 243,948.69
6.00 Apr-17 816,673.85 81,667.39 162,281.31
7.00 May-17 707,116.80 70,711.68 91,569.63
8.00 Jun-17 290,277.91 29,027.79 62,541.83
9.00 Jul-17 - 38,102.27 62,541.83 0.00
10.00 Aug-17 - -
TOTAL 5,717,372.82 638,089.35 -

SALDO POR AMORTIZAR S/. -

AVANCE DE OBRA ACUMULADO 100.00%

AMORTIZACION ACUMULADA 638,089.35


AMORTIZACION ACUMULADA ANTERIOR 638,089.35
AMORTIZACION PRESENTE VALORIZACION 0.00
AMORTIZACION DEL ADELANTO DE MATERIALES
DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017

OBRA : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA


PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE MELGAR -
PUNO.

CONTRATO : CONTRATO N 019-MPM-A


CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL CONTRATO 7,529,454.25 6,380,893.43 (SIN IGV)
ADELANTO DIRECTO 20% 752,945.43 10.00%
FECHA PAGO ADELANTO DIRECTO
ADELANTO PARA MATERIALES 1,505,890.85 20.00% 1,276,178.69 (SIN IGV)
FECHA PAGO ADELANTO MATERIALES
FECHA VALOR REFERENCIAL : MAYO DEL 2016

MONTO AMORTIZACION MONTO DEL SALDO POR


VALORIZACION
VALORIZADO DEL MES ADELANTO (S/IGV) AMORTIZAR
VAL. N 01 (NOVIEMBRE-2016) 174,863.23 18,656.36 1,276,178.69 1,257,522.33
VAL. N 02 (DICIEMBRE-2016) 728,882.51 173,257.28 1,084,265.05
VAL. N 03 (ENERO-2017) 1,163,795.05 357,959.42 726,305.63
VAL. N 04 (FEBRERO-2017) 1,047,200.59 314,575.15 411,730.48
VAL. N 05 (MARZO-2017) 826,665.15 239,347.25 172,383.23
VAL. N 06 (ABRIL-2017) 816,673.85 172,383.23 -
VAL. N 07 (MAYO-2017) 707,116.80 - -
TOTAL AMORTIZACION A ABRIL - 2017 1,276,178.69 -
FICHA DE PAGO AL CONTRATISTA
DEL 14 DE JULIO AL AL 11 DE AGOSTO DEL 2017
OBRA : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA
BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE MELGAR - PUNO.
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR REFERENCIAL : S/. 7,529,454.25 (INCLUYE IGV)
MONTO DEL CONTRATO : S/. 7,529,454.25 (INCLUYE IGV)
ADELANTO DIRECTO : S/. 752,945.43
ADELANTO PARA MATERIALES : S/. 1,505,890.85

MONTO VALORIZACION % SALDO


DESCRIPCION CONTRATO AVANCE POR
(s/IGV) ANTERIOR ACTUAL ACUMULADO ACUMULADO VALORIZAR

A: VALORIZACION CONTRACTUAL
VALORIZACION PRINCIPAL ACTUALIZADO INC. DEDUCTIVO 5,842,237.04 5,880,339.32 -38,102.27 5,842,237.05 100.00% -0.01

TOTAL (A) 5,842,237.04 5,880,339.32 -38,102.27 5,842,237.05 -0.01

AVANCE FISICO DE OBRA 100.65% -0.65% 100.00% 0.00%

B: REAJUSTES
CONTRATO PRINCIPAL 0.00 0.00 0.00
TOTAL (B) 0.00 0.00 0.00

VALORIZACION BRUTA (VB=A+B) 5,880,339.32 -38,102.27 5,842,237.05

C: AMORTIZACIONES
AMORTIZACION DEL ADELANTO DIRECTO 638,089.35 638,089.35 0.00 638,089.35 0.00
AMORTIZACION DEL ADELANTO DE MATERIALES 1,276,178.69 1,276,178.69 0.00 1,276,178.69 0.00
TOTAL (C) 1,914,268.03 1,914,268.04 0.00 1,914,268.04 0.00

VALORIZACION NETA (VN=VB-C) 3,966,071.28 -38,102.27 3,927,969.01

D: RETENCIONES
FONDO DE GARANTIA (10%*VB) 0.00 0.00 0.00
GASTOS DE RESIDENTE 0.00 0.00 0.00
MULTA POR ATRASO DE OBRA 0.00 0.00 0.00
TOTAL (D) 0.00 0.00 0.00

E: MONTO A PAGAR AL CONTRATISTA


EN EFECTIVO (VN-D) 3,966,071.28 -38,102.27 3,927,969.01
EN I.G.V. (18%*VN) 713,892.83 -6,858.41 707,034.42
TOTAL (E) 4,679,964.11 -44,960.68 4,635,003.43
TOTAL 4,679,964.11 -44,960.68 4,635,003.43
TOTAL COMPROMISO A PAGAR -44,960.68
FICHA DE PAGO AL CONTRATISTA
DEL 14 DE JULIO AL AL 11 DE AGOSTO DEL 2017
OBRA : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA
BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE MELGAR - PUNO.
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL VALOR DE ADICIONAL DE O: S/. 48,806.97 (INCLUYE IGV)

MONTO VALORIZACION % SALDO


DESCRIPCION CONTRATO AVANCE POR
(s/IGV) ANTERIOR ACTUAL ACUMULADO ACUMULADO VALORIZAR

A: VALORIZACION CONTRACTUAL
VALORIZACION DE ADICIONAL DE OBRA N01. PARTIDAS 41,274.34 0.00 41,274.34 41,274.34 100.00% 0.00
NUEVASACTUALIZADO INC. DEDUCTIVO
TOTAL (A) 41,274.34 0.00 41,274.34 41,274.34 0.00

AVANCE FISICO DE OBRA 0.00% 100.00% 100.00% 0.00%

B: REAJUSTES
CONTRATO PRINCIPAL 0.00 0.00 0.00
TOTAL (B) 0.00 0.00 0.00

VALORIZACION BRUTA (VB=A+B) 0.00 41,274.34 41,274.34

C: AMORTIZACIONES
AMORTIZACION DEL ADELANTO DIRECTO 0.00 0.00 0.00 0.00 0.00
AMORTIZACION DEL ADELANTO DE MATERIALES 0.00 0.00 0.00 0.00 0.00
TOTAL (C) 0.00 0.00 0.00 0.00 0.00

VALORIZACION NETA (VN=VB-C) 0.00 41,274.34 41,274.34

D: RETENCIONES
FONDO DE GARANTIA (10%*VB) 0.00 0.00 0.00
GASTOS DE RESIDENTE 0.00 0.00 0.00
MULTA POR ATRASO DE OBRA 0.00 0.00 0.00
TOTAL (D) 0.00 0.00 0.00

E: MONTO A PAGAR AL CONTRATISTA


EN EFECTIVO (VN-D) 0.00 41,274.34 41,274.34
EN I.G.V. (18%*VN) 0.00 7,429.38 7,429.38
TOTAL (E) 0.00 48,703.72 48,703.72
TOTAL 0.00 48,703.72 48,703.72
TOTAL COMPROMISO A PAGAR 48,703.72
RESUMEN DE VALORIZACIONES DE SUPERVISIN N 10
AGOSTO DEL 2017 (DEL 14 DE JULIO AL 11 DE AGOSTO DEL 2017)
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE
AYAVIRI, PROVINCIA DE MELGAR - PUNO.
CONTRATO DE SUPERVISIN: CONTRATO N 020-MPM-A FECHA DE INICIO 11/16/2016
SUPERVISIN : CONSORCIO PACOBAMBA BAJO FECHA DE TRMINO PROGRAMADO 7/13/2017
JEFE DE SUPERVISIN : ING WILLAMS MAURO VILLACREZ ENRIQUEZ PLAZO DE EJECUCIN 240.00 Dias Calendarios
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA 8.00 Meses
MONTO DE SUPERVISIN : S/. 272,830.52 (CON IGV) 231,212.31 (SIN IGV)

VALORIZACIONES AVANCE FSICO


MONTO A RETENCIN
MONTO DE REAJUSTE FACTURADAS VALORIZACIN
SUB TOTAL FACTURAR FIEL VALORIZACIN
VALORIZACIN VALORIZACIN CANCELADAS IGV NETA A
VALORIZACIN VAL. 03 CUMPLIMIEN A PAGAR
BRUTO S/. FACTURAR ACTUAL ACUMULADO
Ir Io Reajuste FACTURA N MONTO S/. ENERO 2017 TO (10% MC)

01 (NOV-16) 6,335.22 001-000128 5,606.67 6,335.22 1,140.34 7,475.56 2.74% 2.74%


02 (DIC-16) 26,404.45 001-000130 31,157.25 26,404.45 4,752.80 31,157.25 13,641.53 11.42% 14.16%
001-000136 11,000.00
03 (ENE-17) 42,173.12 42,173.12 7,591.16 49,764.29 51,633.18 6,820.76 44,812.42 18.24% 32.40%
001-000137 40,633.18
04 (FEB-17) 37,941.94 001-000138 44,771.49 37,941.94 6,829.55 44,771.49 6,820.76 37,950.73 16.41% 48.81%
05 (MAR.17) 29,965.11 001-000140 35,358.83 29,965.11 5,393.72 35,358.83 35,358.83 12.96% 61.77%
06 (ABRIL 17) 29,595.18 29,595.18 5,327.13 34,922.31 34,922.31 12.80% 74.57%
07 (MAYO 17) 25,618.32 25,618.32 4,611.30 30,229.62 30,229.62 11.08% 85.65%
08 (JUNIO 17) 10,520.16 10,520.16 1,893.63 12,413.79 12,413.79 4.55% 90.20%
09 (JULIO 17) 4,531.76 4,531.76 815.72 5,347.48 5,347.48 1.96% 92.16%
10 (AGOSTO 17) 18,127.04 18,127.04 3,262.87 21,389.91 21,389.91 7.84% 100.00%
TOTAL 231,212.31 0.00 168,527.42 231,212.31 38,355.35 272,830.53 27,283.05 222,425.09
RESUMEN DE VALORIZACIONES DE SUPERVISIN N 09
JULIO DEL 2017
PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO
DE AYAVIRI, PROVINCIA DE MELGAR - PUNO.
CONTRATO DE SUPERVISIN: CONTRATO N 020-MPM-A FECHA DE INICIO 11/16/2016
SUPERVISIN : CONSORCIO PACOBAMBA BAJO FECHA DE TRMINO PROGRAMADO 7/13/2017
JEFE DE SUPERVISIN : ING WILLAMS MAURO VILLACREZ ENRIQUEZ PLAZO DE EJECUCIN 240.00 Dias Calendarios
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA 8.00 Meses
MONTO DE SUPERVISIN : S/. 272,830.52 (CON IGV) 231,212.31 (SIN IGV)

VALORIZACIONES AVANCE FSICO


MONTO A RETENCIN
MONTO DE REAJUSTE FACTURADAS VALORIZACIN
SUB TOTAL FACTURAR FIEL VALORIZACIN
VALORIZACIN VALORIZACIN CANCELADAS IGV NETA A
VALORIZACIN VAL. 03 CUMPLIMIEN A PAGAR
BRUTO S/. FACTURAR ACTUAL ACUMULADO
Ir Io Reajuste FACTURA N MONTO S/. ENERO 2017 TO (10% MC)

01 (NOV-16) 6,335.22 001-000128 5,606.67 6,335.22 1,140.34 7,475.56 2.74% 2.74%


02 (DIC-16) 26,404.45 001-000130 31,157.25 26,404.45 4,752.80 31,157.25 13,641.53 11.42% 14.16%
001-000136 11,000.00
03 (ENE-17) 42,173.12 42,173.12 7,591.16 49,764.29 51,633.18 6,820.76 44,812.42 18.24% 32.40%
001-000137 40,633.18
04 (FEB-17) 37,941.94 001-000138 44,771.49 37,941.94 6,829.55 44,771.49 6,820.76 37,950.73 16.41% 48.81%
05 (MAR.17) 29,965.11 001-000140 35,358.83 29,965.11 5,393.72 35,358.83 35,358.83 12.96% 61.77%
06 (ABRIL 17) 29,595.18 29,595.18 5,327.13 34,922.31 34,922.31 12.80% 74.57%
07 (MAYO 17) 25,618.32 25,618.32 4,611.30 30,229.62 30,229.62 11.08% 85.65%
08 (JUNIO 17) 10,520.16 10,520.16 1,893.63 12,413.79 12,413.79 4.55% 90.20%
09 (JULIO 17) 18,127.04 18,127.04 ### 21,389.91 21,389.91 7.84% 98.04%
TOTAL 226,680.54 0.00 168,527.42 226,680.54 40,802.50 267,483.04 27,283.05 217,077.61 90.20%
VALORIZACIN N 01 DE LA SUPERVISIN
NOVIEMBRE DEL 2016
: INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA
PROYECTO PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE
MELGAR - PUNO.
CONTRATO : CONTRATO N 020-MPM-A
CONSULTOR SUPERVISOR CONSORCIO PACOBAMBA BAJO
MONTO DEL CONTRATO S/. 272,830.52

MONTO TOTAL POR SERVICIOS DE SUPERVISIN 272,830.52 (CON IGV)


MONTO TOTAL POR SERVICIOS DE SUPERVISIN 231,212.31 (SIN IGV)

COSTO DE SERVICIOS DE SUPERVISIN 272,830.52 (CON IGV)


COSTO DE SERVICIOS DE SUPERVISIN 231,212.31 (SIN IGV)

VALORIZACIN SUPERVISIN N 01

AVANCE FISICO DE OBRA AL 30 DE NOVIEMBRE DEL 2016 2.74%


MONTO DE LA VALORIZACIN N 01 DE LA SUPERVISIN 2.74% X 231,212.31 6,335.22

REAJUSTES
CONTRATO PRINCIPAL 0.00

RESUMEN
VALORIZACION MONTO SIN IGV REAJUSTE TOTAL BRUTO IGV (18%) MONTO A PAGAR
N 01 / AL 30 DE NOVIEMBRE DEL 2016 S/. 6,335.22 S/. - S/. 6,335.22 S/. 1,140.34 S/. 7,475.56

TOTAL S/. 6,335.22 S/. - S/. 6,335.22 S/. 1,140.34 S/. 7,475.56
MUNICIPALIDAD PROVINCIAL DE MELGAR - AYAVIRI

GRAFICO DE CONTROL DE VALORIZACIONES


AVANCE PROGRAMADO vs. EJECUTADO JULIO 2017
OBRA: INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE MELGAR - PUNO.

CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.


SUPERVISOR : CONSORCIO PACOBAMBA BAJO
CONTRATO DE OBRA : CONTRATO N 019-MPM-A PLAZO EJECUCION : 240 DIAS CALENDARIOS
VALOR REFERENCIAL : S/. 7529,454.25 (INCLUYE IGV) FECHA DE INICIO 11/16/2016
MONTO DEL CONTRATO : S/. 7529,454.25 (INCLUYE IGV) FECHA DE TERMINO 11/15/2016

TIEMPO PROGRAMADO EJECUTADO


100.00 99.61 100.00
%
90.87 92.16 16-Nov-16 - -
90.00 Column J Column K 90.20
85.65 30-Nov-16 1.50 2.74
80.00 80.13 31-Dec-16 10.99 14.16
$100.00
74.57 31-Jan-17 31.79 32.40
$90.00
70.00
28-Feb-17 50.01 48.81
64.78
$80.00 61.77 31-Mar-17 64.78 61.77
60.00
$70.00 30-Apr-17 80.13 74.57
50.00 50.01
48.81 31-May-17 90.87 85.65
$60.00
30-Jun-17 99.61 90.20
40.00
$50.00 13-Jul-17 100.00 92.16
32.40
31.79
$40.00
30.00 AVANCE PROGRAMADO
AVANCE EJECUTADO

$30.00
20.00
$20.00 14.16
10.00 10.99
$10.00
2.74
1.50
-$0.00-
16-Nov-16 30-Nov-16 31-Dec-16 31-Jan-17 28-Feb-17 31-Mar-17 30-Apr-17 31-May-17 30-Jun-17 13-Jul-17

+
COEFICIENTE DE REAJUSTE
#REF!

PROYECTO #REF!
#REF!
CONTRATO #REF!
CONTRATISTA #REF!
SUPERVISOR #REF!
RESIDENTE DE OBRA #REF!
MONTO DEL CONTRATO #REF! AREA GEOGRAFICA: 3 Huancavelica
ADELANTO DIRECTO #REF!
ADELANTO PARA MATERIALES #REF!
FECHA VALOR REFERENCIAL #REF!

SIM- COEF. % Io
BO ELEMENTO REPRESENTATIVO CODIGO I. BASE ABRIL'08 MAYO'08 JUNIO'08 JULIO'08
LO INCID. INCID. SET.'07 Ir K Ir K Ir K Ir K

J MANO DE OBRA INC. LEYES SOCIALES 47 0.123 100.000% 374.22 374.78 374.78
374.22 374.78 0.123 374.78 0.123

H HERRAMIENTA MANUAL 37 0.016 26.817% 259.98 277.05 281.04


ACERO DE CONSTRUCCION LISO 02 17.293% 459.14 571.98 659.49
INDICE GENERAL DE PRECIOS AL CONSUMIDOR 39 55.890% 322.15 332.60 333.83
329.17 359.10 0.017 375.99 0.018

M MAQUINARIA Y EQUIPO NACIONAL 48 0.341 100.000% 331.54 313.53 318.76


331.54 313.53 0.322 318.76 0.328

E MAQUINARIA Y EQUIPO IMPORTADO 49 0.520 100.000% 261.18 232.00 236.91


261.18 232.00 0.462 236.91 0.472

COEFICIENTE DE REAJUSTE: K= 1.000 0.924 0.941 0.000 0.000


DEDUCCION POR ADELANTO DIRECTO
(REINTEGRO QUE NO CORRESPONDE)
#REF!

PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE
AYAVIRI, PROVINCIA DE MELGAR - PUNO.

CONTRATO : CONTRATO N 019-MPM-A


CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL CONTRATO 8E+06 6,380,893.43 (SIN IGV)
ADELANTO DIRECTO 8E+05
FECHA PAGO ADELANTO DIRECTO
ADELANTO PARA MATERIALES 2E+06 EN TRMITE
FECHA PAGO ADELANTO MATERIALES
FECHA VALOR REFERENCIAL : MAYO DEL 2016
D = V * A/C * (K / Ka-1)

VALORIZACION ADELANTO CONTRATO DEDUCCION


No. MES MONTO A C K Ka D

1.00 Nov-16 #REF! 638,089.35 6,380,893.43 0.924 0.924 #REF!


2.00 Dec-16
3.00 Jan-17

SUB-TOTAL #REF! #REF!

(*) No corresponde realizar la deduccin, ya que el Adelanto Directo no fue SOLICITADO


DEDUCCION POR ADELANTO DE MATERIALES
(REINTEGRO QUE NO CORRESPONDE)
#REF!

PROYECTO : INSTALACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO BSICO EN LA PARCIALIDAD DE PACOBAMBA BAJO DEL DISTRITO DE AYAVIRI, PROVINCIA DE MELGAR - PUNO.
0
CONTRATO : CONTRATO N 019-MPM-A
CONTRATISTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
SUPERVISOR : ING WILLAMS MAURO VILLACREZ ENRIQUEZ
RESIDENTE DE OBRA : ING MOISES BENAVENTE PARICAHUA
MONTO DEL CONTRATO 7529454.25 6,380,893.43
ADELANTO DIRECTO 752945.43
FECHA PAGO ADELANTO DIRECTO
ADELANTO PARA MATERIALES 1505890.85
FECHA PAGO ADELANTO MATERIALES
FECHA VALOR REFERENCIAL : MAYO DEL 2016
D = Coef.*V*(Ir-Ia)/Io
VALORIZACION ADELANTO PAGADO COEFICIENTE INDICES ADELANTO ADELANTO DEDUCCION
MONTO MONTO COEF.INCID. INCID. DEFLAC. UTILIZADO
No. MES V FECHA A C % Io Ia Ir AD=A*Io/Ia AU=C*%*V D
ACERO DE CONSTRUCCIN LISO (02)
1.00 Nov-16 #REF! 1,276,178.69 0.000 417.92 439.52 439.52 1,213,461.50 #REF! #REF!
2.00 Dec-16 #REF! 0.00
3.00 Jan-17

#REF!
ACERO DE CONSTRUCCIN CORRUGADO (03)
1.00 Nov-16 #REF! 1,276,178.69 0.000 415.38 436.74 436.74 1,213,763.57 #REF! #REF!
2.00 Dec-16 #REF! 0.00
3.00 Jan-17

#REF!
AGREGADO GRUESO (05)
1.00 Nov-16 #REF! 1,276,178.69 0.000 306.34 318.48 318.48 1,227,532.59 #REF! #REF!
2.00 Dec-16 #REF! 0.00
3.00 Jan-17

#REF!
CEMENTO PORTLAND TIPO I (21)
1.00 Nov-16 #REF! 1,276,178.69 0.000 350.43 350.43 350.43 1,276,178.69 #REF! #REF!
2.00 Dec-16 #REF! 0.00
3.00 Jan-17

#REF!
DETONANTE (28)
1.00 Nov-16 #REF! 1,276,178.69 0.000 300.73 327.79 327.79 1,170,826.49 #REF! #REF!
2.00 Dec-16 #REF! 0.00
3.00 Jan-17

#REF!
MADERA NACIONAL PARA ENCOFRADO (43)
1.00 Nov-16 #REF! 1,276,178.69 0.000 581.52 647.60 647.60 1,145,959.59 #REF! #REF!
2.00 Dec-16 #REF! 0.00
3.00 Jan-17

#REF! #REF!
SUB TOTAL 1,276,178.69 #REF!
MESES ANTERIORES 0.00
TOTAL #REF!
REINTEGRO POR REAJUSTE
(CONTROL DE VALORIZACIONES Y REAJUSTES)
CONTRATO PRINCIPAL

PROYECTO #REF!
#REF!
CONTRATO #REF!
CONTRATISTA #REF!
SUPERVISOR #REF!
RESIDENTE DE OBRA #REF!
MONTO DEL CONTRATO #REF!
ADELANTO DIRECTO #REF!
ADELANTO PARA MATERIALES #REF!
FECHA VALOR REFERENCIAL #REF!

VALORIZACION REINTEGRO REINTEGRO DEDUCCION REINTEGRO


No. MES K-1 BRUTO NETO
PROGRAM. EJECUTADO PROGRAM. EJECUTADO AUTORIZADO EFECTIVO MATER. AUTORIZADO

1.00 Nov-16 21,350.79 #REF! -0.076 -1,622.66 #REF! #REF! #REF! #REF! #REF!
2.00 Dec-16 173,509.31 0.00 -0.059 -10,237.05 0.00 0.00 0.00 0.00 0.00
3.00 Jan-17 184,335.49

SUBTOTAL 379,195.59 #REF! -11,859.71 #REF! #REF! #REF! #REF! #REF!


EN VALORIZ. ANTERIOR #REF!
REINTEGRO ACTUAL #REF!
AMORTIZACION Y DEDUCCION DE MATERIALES
#REF!

PROYECTO #REF!
#REF!
CONTRATO #REF!
CONTRATISTA #REF!
SUPERVISOR #REF!
RESIDENTE DE OBRA #REF!
MONTO DEL CONTRATO #REF!
ADELANTO DIRECTO #REF!
ADELANTO PARA MATERIALES #REF!
FECHA VALOR REFERENCIAL #REF!

Valorizacion de Materiales
IU Descripcion Und P. Unitario Anterior Actual Acumluado
Cant. P.Parcial Cant. P.Parcial Cant. P.Parcial
02 ACERO DE CONSTRUCCIN LISO 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00

03 ACERO DE CONSTRUCCIN CORRUGADO 0.00


0.00 0.00 0.00 0.00

05 AGREGADO GRUESO 0.00


0.00 0.00 0.00 0.00

21 CEMENTO PORTLAND TIPO I 0.00


0.00 0.00 0.00 0.00

28 DETONANTE 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00

43 MADERA NACIONAL PARA ENCOFRADO 0.00


0.00 0.00 0.00 0.00

MONTOS ACUMULADOS 0.00 0.00 0.00


CONTROL DE VALORIZACIONES
PROYECTO #REF!
#REF!
CONTRATO #REF!
CONTRATISTA #REF!
SUPERVISOR #REF!
RESIDENTE DE OBRA #REF!
MONTO DEL CONTRATO #REF!
ADELANTO DIRECTO 20% #REF!
ADELANTO PARA MATERIALES 29.31% #REF!

VALORIZACION CONTRACTUAL VALORIZ. AMORTIZACIONES VALORIZ. RETENCIONES MONTO NETO PAGADO COMPROBANTES DE PAGO
MONTO REINTEGRO DEDUCCION REAJUSTE BRUTA EFECTIVO MATERIALES NETA FONDO GARAN. RESIDENTE MULTA EFECTIVO I.G.V. TOTAL FECHA DE
No. V AUTORIZ. ADEL. EFECT. R VB=V+R E M VN=VB-(E+M) FG RES MU VN-(FG+GL+MU) 19%VN PAGADO No. COBRANZA
1.00 #REF! #REF! 620,603.02 #REF! #REF! 17,486.32 18,656.36 #REF! 0.00 0.00 0.00 #REF! #REF! #REF!
2.00 #REF! 0.00 547,714.77 547,714.77 #REF! 72,888.25 173,257.28 #REF! 0.00 0.00 0.00 #REF! #REF! #REF!
3.00
4.00

TOTAL #REF! #REF! #REF! 90,374.57 191,913.64 #REF! 0.00 0.00 0.00 #REF! #REF! #REF!

ADELANTOS (s/IGV) MONTO NETO PAGADO COMPROBANTES DE PAGO


No. DIRECTO MATERIALES EFECTIVO I.G.V. TOTAL No. FECHA DE COB.
1 638,089.35 1,276,178.69 1,914,268.03 363,710.93 ###
2 0.00 0.00 0.00 0.00 0.00
3
4

TOTAL 0.00 0.00 0.00 0.00 0.00

TOTAL NETO PAGADO AL CONTRATISTA #REF! #REF! #REF!

Nota: La retencin es de acuerdo a la Ley de Promocin de la Micro y Pequea empresa y el Artculo 40 del Reglamento de la Ley de Contrataciones y Adquisiciones del Estado, que acumulado con IGV es S/. 50,315.66