PLANILLA DE HIERROS

PLINTOS - COLUMNAS
DIMENSIONES (m)
LONG. LONG. OBSERVACIONES
Mc TIPO (mm) NUM
a b c d DES. TOTAL
(m) (m)
PLINTOS
100 C 16 80 1.75 0.15 0.15 2.05 164.00
101 C 16 52 2.25 0.15 0.15 2.55 132.60
COLUMNAS
200 L 16 64 6.65 0.50 7.15 457.60
201 O 10 532 0.30 0.30 0.60 319.20
202 C 10 1064 0.30 0.10 0.10 0.50 532.00
RESUMEN
PESO
LONG PESO TOTAL
mm m kg/ml m
10 851.20 0.616 524.68
16 621.60 1.578 980.88
20 0.00 2.466 0.00
1505.56

TOTAL DE HIERRO EN PLINTOS (KG) 980.88


TOTAL DE HIERRO EN COLUMNAS (KG) 524.68

RESUMEN DE HORMIGONES f'c=140kg/cm2


PLINTOS
DIMENSIONES (m) VOLUMEN
DESCRIPCIN NUM OBSERVACIONES
a b h (m3)
Plinto Tipo 1 4 2.10 2.10 0.10 1.76
Plinto Tipo 2 2 2.60 2.60 0.10 1.35
Losa de Fondo 1 9.15 4.30 0.10 3.93
Viga 0,35x0,350 2 5.10 0.55 0.10 0.56
Caja de Cables 1 1.40 4.60 0.10 0.64
TOTAL DE HORMIGN EN REPLANTILLOS 8.26

RESUMEN DE HORMIGONES f'c=240kg/cm2


PLINTOS - COLUMNAS
DIMENSIONES (m) VOLUMEN
DESCRIPCIN NUM OBSERVACIONES
a b h (m3)
Plinto Tipo 1 4 1.90 1.90 0.40 5.78
Plinto Tipo 2 2 2.40 2.40 0.40 4.61
Losa de Fondo 1 8.39 4.10 0.20 6.88
TOTAL DE HORMIGON 17.26

PLANILLA DE HIERROS
VIGAS DE CIMENTACIN
LONG. LONG.
DIMENSIONES (m) DES. TOTAL OBSERVACIONES
Mc TIPO (mm) NUM
a b c gancho (m) (m)
PLINTOS
15 300 C 18 12 9.20 0.30 0.30 9.80 117.60
16 301 C 12 4 9.20 0.30 0.30 9.80 39.20
17 302 C 18 20 1.70 0.20 0.20 2.10 42.00
18 303 C 18 4 3.00 0.20 0.20 3.40 13.60
19 304 O 10 205 2x ,70 2X ,25 2X,05 2.00 410.00
20 305 C 10 287 0.25 0.10 0.10 0.45 129.15
21 306 C 18 24 4.70 0.30 0.30 5.30 127.20
22 307 C 12 8 4.70 0.30 0.30 5.30 42.40
24 308 O 10 82 2x ,40 2X ,25 2X,05 1.40 114.80
25 309 O 10 41 2x ,70 2x ,20 2X,05 1.90 77.90
26 310 C 10 41 0.20 0.10 0.10 0.40 16.40
RESUMEN
PESO
LONG PESO TOTAL
mm m kg/ml m
10 748.25 0.616 461.22
12 81.60 0.888 72.46
18 300.40 1.98 594.79
1128.47

TOTAL DE HIERRO EN PLINTOS (KG) 72.46


TOTAL DE HIERRO EN COLUMNAS (KG) 1056.01

RESUMEN DE HORMIGONES f'c=140kg/cm2


VIGAS DE CIMENTACIN
DIMENSIONES (m) VOLUMEN
DESCRIPCIN NUM OBSERVACIONES
a b h (m3)
Viga 0,35x0,80m 4 4.10 0.35 0.10 0.57
Viga 0,30x0,80m 2 4.10 0.30 0.10 0.25
Viga 0,35x0,50m 1 4.10 0.35 0.10 0.14
TOTAL DE HORMIGN EN REPLANTILLOS 0.96

RESUMEN DE HORMIGONES f'c=240kg/cm2


VIGAS DE CIMENTACIN
DIMENSIONES (m) VOLUMEN
DESCRIPCIN NUM OBSERVACIONES
a b h (m3)
Viga 0,35x0,80m 4 4.10 0.35 0.80 4.59
Viga 0,30x0,80m 2 4.10 0.30 0.80 1.97
Viga 0,35x0,50m 1 4.10 0.35 0.50 0.72
Muro Entrada de Cables 1 4.10 0.20 0.70 0.57
TOTAL DE HORMIGON 7.85

PLANILLA DE HIERROS
VIGAS DE LOSA
LONG. LONG.
DIMENSIONES (m) DES. TOTAL OBSERVACIONES
Mc TIPO (mm) NUM
a b c gancho (m) (m)
PLINTOS
27 400 C 18 12 9.20 0.30 0.30 9.80 117.60
28 401 C 12 4 9.20 0.30 0.30 9.80 39.20
29 402 C 18 20 1.70 0.20 0.20 2.10 42.00
30 403 C 18 4 3.00 0.20 0.20 3.40 13.60
31 404 O 10 205 2x ,70 2X ,25 2X,05 2.00 410.00
32 405 C 10 287 0.25 0.10 0.10 0.45 129.15
33 406 C 18 24 4.70 0.30 0.30 5.30 127.20
34 407 C 12 8 4.70 0.30 0.30 5.30 42.40
35 408 O 10 82 2x ,40 2X ,25 2X,05 1.40 114.80
36 409 O 10 41 2x ,70 2x ,20 2X,05 1.90 77.90
37 410
38 411
39 412
40 413
41 414
42 415
43 416
44 417
45 418
46 419
47 420
48 421
49 422
50 423
51 424
52 425
53 426
54 427
55 428 C 10 41 0.20 0.10 0.10 0.40 16.40
RESUMEN
PESO
LONG PESO TOTAL
mm m kg/ml m
10 748.25 0.616 461.22
12 81.60 0.888 72.46
18 300.40 1.98 594.79
1128.47

TOTAL DE HIERRO EN PLINTOS (KG) 72.46


TOTAL DE HIERRO EN COLUMNAS (KG) 1056.01

RESUMEN DE HORMIGONES f'c=140kg/cm2


VIGAS DE CIMENTACIN
DIMENSIONES (m) VOLUMEN
DESCRIPCIN NUM OBSERVACIONES
a b h (m3)
Viga 0,35x0,80m 4 4.10 0.35 0.10 0.57
Viga 0,30x0,80m 2 4.10 0.30 0.10 0.25
Viga 0,35x0,50m 1 4.10 0.35 0.10 0.14
TOTAL DE HORMIGN EN REPLANTILLOS 0.96

RESUMEN DE HORMIGONES f'c=240kg/cm2


VIGAS DE CIMENTACIN
DIMENSIONES (m) VOLUMEN
DESCRIPCIN NUM OBSERVACIONES
a b h (m3)
Viga 0,35x0,80m 4 4.10 0.35 0.80 4.59
Viga 0,30x0,80m 2 4.10 0.30 0.80 1.97
Viga 0,35x0,50m 1 4.10 0.35 0.50 0.72
Muro Entrada de Cables 1 4.10 0.20 0.70 0.57
TOTAL DE HORMIGON 7.85
RESMEN DE HORMIGN f'c= 140kg/cm2, EN REPLANTILLOS DE MURO DE SECCIN "H"
ESQUEMA LONGITUD CANTIDAD DIMENSIONES (m) HORMIGON
DE MURO DE MUROS a1 b h1 (m3)
6.89 1.00 1.50 6.89 0.10 1.03
11.90 1.00 1.50 11.90 0.10 1.79
6.41 1.00 1.50 6.41 0.10 0.96
1.50 1.00 1.50 1.50 0.10 0.23
8.05 1.00 1.50 8.05 0.10 1.21
HORMIGN TOTAL EN REPLANTILLOS 5.21

RESMEN DE HORMIGN ESTRUCTURAL f'c= 240kg/cm2, EN ZAPATAS DE MURO DE SECCIN


"H"
ESQUEMA LONGITUD CANTIDAD DIMENSIONES (m) HORMIGON
DE MURO DE MUROS a2 b h2 (m3)
6.89 1.00 1.40 6.89 0.30 2.89
11.90 1.00 1.40 11.90 0.30 5.00
6.41 1.00 1.40 6.41 0.30 2.69
1.50 1.00 1.40 1.50 0.30 0.63
8.05 1.00 1.40 8.05 0.30 3.38
HORMIGN TOTAL EN ZAPATAS 14.60

RESMEN DE HORMIGN ESTRUCTURAL f'c= 240kg/cm2, EN MURO DE SECCIN "H"


ESQUEMA LONGITUD CANTIDAD DIMENSIONES (m) HORMIGON
DE MURO DE MUROS a3 b h3 (m3)
6.89 1.00 0.25 6.89 2.06 3.55
11.90 1.00 0.25 11.90 2.06 6.13
6.41 1.00 0.25 6.41 2.06 3.30
1.50 1.00 0.25 1.50 2.06 0.77
8.05 1.00 0.25 8.05 2.06 4.15
HORMIGN TOTAL EN MUROS 17.90

RESMEN DE HORMIGN f'c= 140kg/cm2, EN REPLANTILLOS DE MURO DE SECCIN "J"


ESQUEMA LONGITUD CANTIDAD DIMENSIONES (m) HORMIGON
DE MURO DE MUROS a1 b h1 (m3)
4.94 1.00 1.50 4.94 0.10 0.74
9.22 1.00 1.50 9.22 0.10 1.38
2.20 1.00 1.50 2.20 0.10 0.33
1.00 1.00 1.50 1.00 0.10 0.15
10.00 1.00 1.50 10.00 0.10 1.50
HORMIGN TOTAL EN REPLANTILLOS 4.10
RESMEN DE HORMIGN ESTRUCTURAL f'c= 240kg/cm2, EN ZAPATAS DE MURO DE SECCIN
"J"
ESQUEMA LONGITUD CANTIDAD DIMENSIONES (m) HORMIGON
DE MURO DE MUROS a2 b h2 (m3)
4.94 1.00 1.40 4.94 0.30 2.07
9.22 1.00 1.40 9.22 0.30 3.87
2.20 1.00 1.40 2.20 0.30 0.92
1.00 1.00 1.40 1.00 0.30 0.42
10.00 1.00 1.40 10.00 0.30 4.20
HORMIGN TOTAL EN ZAPATAS 11.49

RESMEN DE HORMIGN ESTRUCTURAL f'c= 240kg/cm2, EN MURO DE SECCIN "J"


ESQUEMA LONGITUD CANTIDAD DIMENSIONES (m) HORMIGON
DE MURO DE MUROS a3 b h3 (m3)
4.94 1.00 0.25 4.94 1.03 1.27
9.22 1.00 0.25 9.22 1.03 2.37
2.20 1.00 0.25 2.20 1.03 0.57
1.00 1.00 0.25 1.00 1.03 0.26
10.00 1.00 0.25 10.00 1.03 2.58
HORMIGN TOTAL EN MUROS 7.05