Вы находитесь на странице: 1из 1

EDX FSE100x gnatt chart https://goo.

gl/PXLbMe

DATE 09/21/17

WBS START DUE PCT OF TASK


NUMBER TASK TITLE DATE DATE DURATION COMPLETE M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F
1 WEEK 7: Designing for a Purpose 9/25/17 9/29/17
1.1 aircraft purpose 9/25/17 9/29/17 4 0%
1.2 Interior design 9/25/17 9/29/17 4 0%
2 WEEK 8: Modeling 10/2/17 10/6/17 4 0%
2.1 wing shape 10/2/17 10/6/17 4 0%
3 WEEK 9: The Design of Wings 10/9/2017 10/13/17 4 0%
3.1 Wing structure 10/9/2017 10/13/17 4 0%
4 WEEK 10: UML Descriptive Modeling 10/16/17 10/20/17 4 0%
4.1 UML Automation Models 10/16/17 10/20/17 4 0%
4.2 Eportfolio skills reflection for UM Models 10/16/17 10/20/17 4 0%
5 WEEK 11: Arduino Programming 10/23/17 10/27/17 4 0%
5.1 Automation code 10/23/17 10/27/17 4 0%
Eportfolio skills reflection for Automation
5.2 code 10/23/17 10/27/17 4 0%
6 WEEK 12: Finalizing Your Design 10/30/17 11/3/17 4 0%
6.1 Final design description and drawing 10/30/17 11/3/17 3 0%
7 WEEK 13: Acceptance testing 11/6/17 11/13/17 7 0%
Eportfolio skills reflection for FAT
7.1 procedures 11/6/17 11/13/17 7 0%
8 WEEK 14: Financial analysis 11/13/17 11/20/17 7 0%
8.1 Financial analysis 11/13/17 11/20/17 7 0%
WEEK 15: Wrap-up: The Future Of
9 Enginnering 11/20/17 11/27/17 7 0%
9.1 FInal report for Disaster Relief Project 11/20/17 11/27/17 7 0%
Eportfolio project reflection for Disaster
9.2 Relief 11/20/17 11/27/17 7 0%
9.3 Eportfolio Final Reflection for class 11/20/17 11/27/17 7 0%
10 FINALE EXAM 11/27/17 12/1/17 4 0%

Вам также может понравиться