KERALA STATE ELECTRICITY BOARD LIMITED

220kV SUB STATION SUB-DIVISION, POOVANTHURUTHU


Abstract
Name of work: Repairing,Replacing and painting of Cable Trench ,Covering Slabs , foundation ,Structu
Yard fencing at 220kV Sub Station Poovanthuruthu
Sl.
Quantity Unit Particulars Unit Rate
No.
Err:509

1 Err:509 m3 m3 Err:509

Err:509

2 Err:509 m3 m3 Err:509

Err:509

3 Err:509 m3 m3 Err:509

Err:509

4 Err:509 m3 m3 Err:509

Reinforced cement concrete work for the repairing of


trench and covering slab excluding the cost of
centering, shuttering, finishing and reinforcement,
with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone
5 26.000 m3 m3 8393.01
aggregate 20 mm nominal size).
Centering and shuttering for for the repairing of
trench and covering slab as per the given
measurement including strutting, propping in
6 200.000 m2 finished condition etc. and removal of form for m2 288.16
Foundations, footings, bases of columns, etc. as per
the direction of dprt officers at site
Steel reinforcement for R.C.C. work including
straightening, cutting, bending,placing in position
7 1300.000 kg and binding all complete kg 99.92

Plastering with CM 1:4 12 mm thick one coat floated


hard and trovelled smooth, charges includes the
tools,lifting etc as per the direction of dept officers at
8 45.000 m2 m2 254.31
site

Demolishing RCC work manually/by mechanical


means including stacking of steel bars and disposal
of unserviceable material within 50 m lead as per
9 4.000 m3 direction of Engineer in charge m3 1910.10

Erection of yard structures and assembling of


columns and beams using bolt and nut including
10 160.000 kg MT 5030.19
punching of holes.

Fabrication of structures for erecting equipments. The


GI & MS angles will be supplied departmentally,
charges includes the drilling
11 190.000 kg holes,cutting,leveling,grinding,tools etc complete Qtl 2562.19

Err:509

12 Err:509 set set Err:509

Err:509

13 Err:509 m3 m3 Err:509
Err:509

14 Err:509 No No Err:509
Err:509

15 1.000 No No Err:509

Err:509

16 Err:509 kg kg 3.17

Err:509

17 1.000 set set Err:509

Err:509

18 1.000 set set Err:509

Total
Service Tax-15%(40% of the Total Amount)
Sub total
Unforseen
Grand total
Rs. TWO LAKH FIFTY THOUSAND ONLY
E ELECTRICITY BOARD LIMITED
N SUB-DIVISION, POOVANTHURUTHU
Abstract
ting of Cable Trench ,Covering Slabs , foundation ,Structure and
uruthu

Amount

Err:509

Err:509

Err:509

Err:509

218218.26
57632.00
129896.00

11443.95

7640.40

804.83

4868.16

Err:509

Err:509
Err:509
Err:509

Err:509

Err:509

Err:509

Err:509
Err:509
Err:509
Err:509
250,000.00
KERALA STATE ELECTRICITY BOARD LIMITED
220kV SUB STATION SUB-DIVISION, POOVANTHURUTHU
Name of work: Repairing,Replacing and painting of Cable Trench ,Covering Slabs ,
foundation ,Structure and Yard fencing at 220kV Sub Station Poovanthuruthu
CONVEYANCE STATEMENT
Item No Description Place Road distance
1 Cement Kottayam 5km
2 Coarse sand/M Sand Kottayam 5km

3 Broken stone 40mm, 20mm and 10mm Kottayam 5km

4 Tor steel Kottayam 5km


5 Wire cut bricks Kattachira 25km
Certificate
The distance noted in the data for the conveyance from quarry or source have been personally verified and
found correct.These are the minimum leads required.

Assistant Executive Engineer.


KERALA STATE ELECTRICITY BOARD LIMITED
220kV SUB STATION SUB-DIVISION, POOVANTHURUTHU
DATA

Name of work: Repairing,Replacing and painting of Cable Trench ,Covering Slabs , founda
Yard fencing at 220kV Sub Station Poovanthuruthu

ItemCost Index of Kottayam (154-105)/105 0.4667


Sl. No. No. IN
DATA Particulars Unit
BOOK /
CODE
Item
Sl. No. No. IN
DATA Particulars Unit
BOOK /
1 CODE
5.1.3 of
CPWD
Reinforced cement concrete work for the repairing
2014
of trench and covering slab excluding the cost of
centering, shuttering, finishing and reinforcement, m3
with 1:2:4 (1 cement : 2 coarse sand : 4 graded
stone aggregate 20 mm nominal size).

Details of cost for 1 cum.


MATERIAL:
0295 Stone Aggregate (Single size) : 20 mm nominal
cum
size
0297 Stone Aggregate (Single size) : 10 mm nominal
cum
size
2202 Carriage of stone aggregate below 40 mm
cum
nominal size
0982 M coarse sand (MR) cum
2203 Carriage of coarse M sand cum
0367 Portland Cement (0.2225 cum) tonne
2209 Carriage of cement tonne
LABOUR:
0155 Mason (average) day
0114 Beldar day
0101 Bhisti day
0002 Hire charges of Concrete Mixer 0.25 to 0.40 cum
day
with Hopper
0012 Vibrator (Needle type 40 mm) day
9999 Sundries L.S.

Add Water Charges @ 1% 5174.50

Add CPOH @ 15% 5226.25

Cost of, market rate and their CPOH


Add Price Index 154 For Kottayam 5105.67
Cost of 1 m3
Say Rs. 8393.01
2 5.9.1 of Centering and shuttering for for the repairing of
CPWD trench and covering slab as per the given
2014 measurement including strutting, propping in
finished condition etc. and removal of form for
Foundations, footings, bases of columns, etc. as
per the direction of dprt officers at site

Cost of 1 sqm
Item
Sl. No. No. IN
DATA Particulars Unit
BOOK /
CODE Details of cost for footing size 2.7mx2.7mx 1.00m
Contact area = 10.8 sqm.
MATERIAL:
Assuming shuttering material will become
unserviceable after use of 40 times, Adding for
maintenance @ 10% of cost, Taking salvage value
after full use of material @ 25% of cost Wall form
panel 1250x500 mm
Wall from panel 1250x500mm Qty taken for cost
7319 each
of using once = 16x0.85/40 =0.34
Corner angle 45x45x5mm, 1.50m long Qty taken
7326 for cost of using once = 4x0.85/40 = 0.085 each

100 mm channel shoulder 2.5 m long Qty taken


7327 for cost of using once = 8x0.85/40 = 0.17 each

Double clip ( bridge clip) Qty taken for cost of


7328 each
using once =16x0.85/40 = 0.34
Single clip Qty taken for cost of using once
7329 each
=8x0.85/40 = 0.17
M.S. tube 40 mm dia Qty taken for cost of using
7330 metre
once = 10.8x0.85/40 = 0.2295
Item
Sl. No. No. IN
DATA Particulars Unit
BOOK /
CODE Assembly nuts & bolts Qty taken for cost of
9999 L.S.
using once = 1040x0.85/40 = 22.10
9999 Carriage L.S.
LABOUR:
116 Fitter (grade 1) day
0114 Beldar day
9999 Shuttering oil L.S.
9999 Sundries L.S.

Add Water Charges @ 1% 1826.80

Add CPOH @ 15% 1845.07

Add Price Index 154 For Kottayam 2121.83


Cost of 10.8 sqm
Cost of 1sqm
Say Rs. 288.16
3 5.22.6 of
CPWD Steel reinforcement for R.C.C. work including
2014 straightening, cutting, bending,placing in
position and binding all complete

Details of cost for 1 quintal


MATERIAL:
Deformed twisted steel bars = 1.00 q
Add 5% wastage =0.05
Total =1.05q
1005 Twisted steel/ deformed bars quintal
2205 Carriage of steel tonne
1.05/10 = 0.105t
9999 Cover block L.S.
LABOUR:
For straightening, cutting, bending,binding and
placing in position
0102 Blacksmith 1 st class day
0114 Beldar day
9999 Sundries L.S.

Add Water Charges @ 1% 5865.07

Add CPOH @ 15% 5923.72

Add Price Index 154 For Kottayam 6812.28


Cost of 100 kilogram
Cost of 1 kilogram
Item
Sl. No. No. IN
DATA Particulars Unit
BOOK /
CODE Say Rs. 99.92
4 13.1.1 of Plastering with CM 1:4 12 mm thick one coat
CPWD floated hard and trovelled smooth, charges
2014 includes the tools,lifting etc as per the direction of
dept officers at site

Details of cost for 10 sqm.


MATERIAL:
Cement mortar 1 : 4 (1 cement: 4 fine sand)
Rate as per Item Number 3.4 of SH: Mortars ( Sub
0.144
data no.1)
Mason (average) 0.67
Item
Sl. No. No. IN
DATA Particulars Unit
BOOK /
CODE Coolie 0.75
Bhisti 0.92
Scaffolding and sundries. 12.61

Add Water Charges @ 1% 882.55

Add CPOH @ 15% 891.38

Cost of subdata item


Add Price Index 154 For Kottayam 1025.09
Cost of 10sqm
Cost of 1sqm
Say Rs. 254.31
5 15.3 of
CPWD
Demolishing RCC work manually/by
2014
mechanical means including stacking of steel bars
m3
and disposal of unserviceable material within 50
m lead as per direction of Engineer in charge

Details of cost for 1 cum


LABOUR:
0114 Beldar day
0115 Coolie day
9999 Sundries L.S.

Add Water Charges @ 1% 1121.23

Add CPOH @ 15% 1132.44

Add Price Index 154 For Kottayam 1302.31


Cost of 1 cum
Say Rs. 1910.10
6 ssion
Data for
Erection of yard structures and assembling of
substati
columns and beams using bolt and nut including 1MT
on
punching of holes.
works
-ITEM -
0116 Fitter day
0100 Bandhani day
Mechanic Gr - I/pwd rate(excluded from cost
day
index)
T & P Sundries including scaffolding etc
Item
Sl. No. No. IN
DATA Particulars Unit
BOOK /
CODE Add CPOH @ 15% 3256.80

Cost of market rate and their CPOH


Add Price Index 154 For Kottayam 2753.10
Cost of 1 MT
Transmi Say Rs. 5030.19
7 ssion
Data for Fabrication of structures for erecting equipments.
substati The GI & MS angles will be supplied
1 Qtl
on departmentally, charges includes the drilling
works holes,cutting,leveling,grinding,tools etc complete
-ITEM -
70 GI/MS angle(department supply) Qtl
(a) levelling
0102 Black smith day
0100 Bandhani day
(b) Marking
0116 Fitter day
0100 Bandhani day
(c) Cutting angle
0102 Black smith day
0100 Bandhani day
(d) Drilling Holes
0102 Black smith day
0100 Bandhani day

Add CPOH @ 15% 1519.05

Add Price Index 154 For Kottayam 1746.91


Cost of 1Qtl
Say Rs. 2562.19
8 Dismantling steel work in built up sections in
CPW- angles, tees, flats and channels including all
DAR- gusset plates, bolts, nuts, cutting rivets, welding
2014 etc. including dismembering and stacking within
-15.18 50 metres lead.

0103 Blacksmith 2nd class day


0100 Bandhani day
0114 Beldar day
9999 Sundries LS

Add Water Charges @ 1% 185.80

Add CPOH @ 15% 187.66


Item
Sl. No. No. IN
DATA Particulars Unit
BOOK /
CODE
Add Price Index 154 For Kottayam 215.81
Cost of 100 kilogram
Cost of 1kg
Say Rs. 3.17
9 5.1.2 of
CPWD Reinforced cement concrete work for the repairing
2014 of trench and covering slab excluding the cost of
centering, shuttering, finishing and reinforcement, m3
with 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded
stone aggregate 20 mm nominal size).

Details of cost for 1 cum.


MATERIAL:
295 Stone Aggregate (Single size) : 20 mm nominal
cum
size
297 Stone Aggregate (Single size) : 10 mm nominal
cum
size
2202 Carriage of stone aggregate below 40 mm
cum
nominal size
982 M coarse sand (MR) cum
2203 Carriage of coarse M sand cum
367 Portland Cement (0.2225 cum) tonne
2209 Carriage of cement tonne
LABOUR:
155 Mason (average) day
114 Beldar day
101 Bhisti day
2 Hire charges of Concrete Mixer 0.25 to 0.40 cum
day
with Hopper
12 Vibrator (Needle type 40 mm) day
9999 Sundries L.S.

Add Water Charges @ 1% 5597.68

Add CPOH @ 15% 5653.66

Cost of, market rate and their CPOH


Add Price Index 154 For Kottayam 5637.84
Cost of 1 m3
Say Rs. 9132.89
Item
Sl. No. No. IN
DATA Particulars Unit
BOOK /
10 CODE Transporting R.C.C Cover Slab of Different Sizes
from stocked locations to the required locations as
speciified and placing over the power/control
trenches safely and carefully and leveling after
Arrived cleaning the sides of slabs and cable trenches
Data including removing and lifting to stockyard of
already covered slabs for the purpose of cable
laying if necessary etc as per the direction of
departmental officers

0100 Bandhani day


0114 Beldar day

Add Water Charges @ 1% 278.50

Add CPOH @ 15% 281.29

Add Price Index 154 For Kottayam 323.48


Cost of 10 No
Cost of 1No
Say Rs. 47.45
A STATE ELECTRICITY BOARD LIMITED
TATION SUB-DIVISION, POOVANTHURUTHU
DATA

nd painting of Cable Trench ,Covering Slabs , foundation ,Structure and


oovanthuruthu

Quantity Rate Amount


Quantity Rate Amount

0.670 1175.00 787.25

0.220 1175.00 258.50

0.890 106.49 94.78


0.445 1750.00 778.75
0.445 106.49 47.39
0.32 6300.00 2016.00
0.32 94.65 30.29

0.17 417.00 70.89


2.00 329.00 658.00
0.9 363.00 326.70
0.07 800.00 56.00
0.07 350.00 24.50
14.3 1.78 25.45
5174.50
51.75
5226.25
783.94
6010.19
904.52
2382.82
8393.01
/1m3

Data for 1
sqm
Quantity Rate Amount

0.34 1050.00 357.00

0.085 300.00 25.50

0.17 1160.00 197.20

0.34 97.00 32.98

0.17 77.00 13.09

0.2295 280.00 64.26


Quantity Rate Amount

22.1 1.78 39.34


78 1.78 138.84

0.75 435.00 326.25


1.5 329.00 493.50
52 1.78 92.56
26 1.78 46.28
1826.80
18.27
1845.07
276.76
2121.83
990.26
3112.09
288.16
/1m2

1.050 4759.00 4996.95


0.105 94.65 9.94

26.000 1.78 46.28

1.000 435.00 435.00


1.000 329.00 329.00
26.910 1.78 47.90
5865.07
58.65
5923.72
888.56
6812.28
3179.29
9991.57
99.92
Quantity Rate Amount

/1kg

Data for
1m2

cum 7219.18 1039.56


day 417.00 279.39
Quantity Rate Amount

day 329.00 246.75


day 363.00 333.96
L.S. 1.78 22.45
1922.11
8.83
1930.94
133.71
2064.65
1039.56
478.41
2543.06
254.31
/1m2

2.650 329.00 871.85


0.720 329.00 236.88
7.020 1.78 12.50
1121.23
11.21
1132.44
169.87
1302.31
607.79
1910.10
/1m3

3.00 435.00 1305.00


3.00 363.00 1089.00
1.56 505.00 787.80
75.00
3256.80
Quantity Rate Amount

488.52
3745.32
992.22
1284.87
5030.19
/1MT

1.05

0.40 435.00 174.00


0.15 363.00 54.45

0.20 435.00 87.00


0.10 363.00 36.30

1.10 435.00 478.50


1.20 363.00 435.60

0.29 435.00 126.15


0.35 363.00 127.05
1519.05
227.86
1746.91
815.28
2562.19
/1Qtl

1 kg

0.15 399.00 59.85


0.1 363.00 36.30
0.25 329.00 82.25
4.16 1.78 7.40
185.80
1.86
187.66
28.15
Quantity Rate Amount

215.81
100.72
316.53
3.17
/1kg

0.570 1175.00 669.75

0.280 1175.00 329.00

0.850 106.49 90.52


0.425 1750.00 743.75
0.425 106.49 45.26
0.400 6300.00 2520.00
0.400 94.65 37.86
0.00
0.170 417.00 70.89
2.000 329.00 658.00
0.900 363.00 326.70
0.070 800.00 56.00
0.070 350.00 24.50
14.300 1.78 25.45
5597.68
55.98
5653.66
848.05
6501.71
863.87
2631.18
9132.89
/1m3
Quantity Rate Amount

1No

0.45 363.00 163.35


0.35 329.00 115.15
278.50
2.79
281.29
42.19
323.48
150.97
474.45
47.45
/1No
KERALA STATE ELECTRICITY BOARD LIMITED
220kV SUB STATION SUB-DIVISION, POOVANTHURUTHU
Abstract
Name of work: Repairing,Replacing and painting of Cable Trench ,Covering Slabs , foundation ,Structu
Yard fencing at 220kV Sub Station Poovanthuruthu
Sl.
Quantity Unit Particulars Unit Rate
No.
Reinforced cement concrete work for the repairing of
trench and covering slab excluding the cost of
centering, shuttering, finishing and reinforcement,
1 26.000 m3 m3 8393.01
with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone
aggregate 20 mm nominal size).

Centering and shuttering for for the repairing of


trench and covering slab as per the given
measurement including strutting, propping in
2 200.000 m2 finished condition etc. and removal of form for m2 288.16
Foundations, footings, bases of columns, etc. as per
the direction of dprt officers at site
Steel reinforcement for R.C.C. work including
straightening, cutting, bending,placing in position
3 1300.000 kg and binding all complete kg 99.92

Plastering with CM 1:4 12 mm thick one coat floated


hard and trovelled smooth, charges includes the
tools,lifting etc as per the direction of dept officers at
4 45.000 m2 m2 254.31
site

Demolishing RCC work manually/by mechanical


means including stacking of steel bars and disposal
of unserviceable material within 50 m lead as per
5 4.000 m3 direction of Engineer in charge m3 1910.10

Erection of yard structures and assembling of


columns and beams using bolt and nut including
6 160.000 kg MT 5030.19
punching of holes.

Fabrication of structures for erecting equipments. The


GI & MS angles will be supplied departmentally,
7 190.000 kg charges includes the drilling Qtl 2562.19
holes,cutting,leveling,grinding,tools etc complete

Dismantling steel work in built up sections in angles,


tees, flats and channels including all gusset plates,
bolts, nuts, cutting rivets, welding etc. including
8 260.000 kg dismembering and stacking within 50 metres lead. kg 3.17

Reinforced cement concrete work for the repairing of


trench and covering slab excluding the cost of
centering, shuttering, finishing and reinforcement,
9 1.800 m3 with 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded m3 9132.89
stone aggregate 20 mm nominal size).

Transporting R.C.C Cover Slab of Different Sizes


from stocked locations to the required locations as
speciified and placing over the power/control
trenches safely and carefully and leveling after
10 778.000 no cleaning the sides of slabs and cable trenches no 47.45
including removing and lifting to stockyard of
already covered slabs for the purpose of cable laying
if necessary etc as per the direction of departmental
officers
Removing dry or oil bound distemper, water
proofing cement paint and the like by scrapping,
11 1900.000 m2 sand papering and preparing the surface smooth m2 14.50
including necessary repairs to scratches etc complete.

Applying one coat of water thinnable cement primer


12 1150.000 m2 of approved brand and manufacture on wall m2 52.55
surface:Water thinnable cement primer
Wall painting with plastic emulsion paint of
approved brand and manufacture to give an even
13 0.000 m2 m2 77.05
shade two coats on old work

Painting with aluminum paint 2 coat using approved


quality paint as specified to old iron work after
14 110.000 m2 m2 62.23
rubbing with sand paper and cleaning.

Painting with synthetic enamel paint two coat for old


surfaces of 63mva transformer or steel work after
15 700.000 m2 rubbing with and paper and cleaning the surfaces m2 71.16

Finishing walls with water proofing cement paint of


required shade for Old work (one or more coats @
16 1900.000 m2 2.20 kg/ 10 sqm) complete m2 54.20

Finishing exterior walls with Acrylic Smooth exterior


paint two coats of required shade after scraping and
17 1350.000 m2 cleaning the surface. m2 98.70

Dismantling old plaster or skirting raking out joints


and cleaning the surface for plaster including
18 160.000 m2 disposal of rubbish to the dumping ground within 50 m2 29.45
metres lead.
Repairs to plaster of thickness 12 mm to 20 mm in
patches of area 2.5 sq meters and under, including
19 160.000 m2 cutting the patch in proper shape, raking out joints m2 382.15
and preparing and plastering the surface of the walls
complete, including
Manufacturing, disposal
supplying of rubbish
and fixing to the
retro reflective
dumping
overhead ground
signagewithin
boards50made
metresup
lead:
of With
2 mmcement
thick
20 3.000 m2 mortar 1:4 (1 cement : 4 fine sand)
aluminium sheet, face to be fully covered with high m2 6930.70
intensity and encapsulated lens type heat activated
retro reflective sheeting
Manufacturing, supplying conforming
and fixing to typereflective
retro - III of
ASTM-D-4956-01
sign boards made up asof approved by Engineer-in-
2 mm thick aluminium sheet,
21 3.000 m2 Charge, letters, borders etc. as per
face to be fully covered with high intensity IRC: 67-2001 in m2 11017.00
silver white with
encapsulated typeblue colour
heat back ground
activated retro and with
reflective
high intensity
sheeting grade, pasted
conforming to type on- IV
substrate
of ASTM-Dby pressure
4956-
Manufacturing,
sensitive adhesive supplying
backing and
which fixing
shallretro
be reflective
activated
01in blue made
signapplying
boards and upsilver
of 2 mm whiteor
thick other colour
to aluminium sheet,
m2 by
combination pressure
including conforming
subject classmessage
matter, II of ASTM-(bi- m2
22 3.000 face to be fully covered withto high intensity 14482.50
D-4956-01and
lingual), symbols fixing
and the same
borders etc. as the plate
per reflective
IRC: 67- of
encapsulated
structural frame type heat
work by by activated
means retro
of suitable sized
2001,
sheetingpasted on substrate
conforming to type - an
IV adhesive
of ASTM-D backing
4956-
aluminium
which shallalloys, rivets or bolts
be activated & nuts @heat
by applying 300 mmand
01in
centre blue
to centreandall silver thewhiteor
along periphery other
as wellcolour
as in
pressure
combination conforming
including tosubject
class-2 matter,
of ASTM-D-4956-01
message (bi-
two vertical rows along with theft resistant measures,
Providing Retro-reflective regulatory sign board of
size 900 mm diameter made out of 2 mm thick
23 3.000 m2 aluminium sheet, face to be fully covered with high m2 12139.55
intensity encapsulated lens type retro-reflective
Total sheeting as approved by Engineer-in-Charge . Letter,
symbols, borders etc. will be as per IRC - 67 with
Service Tax-15%(40% of the Total Amount)
required colour scheme on the boards and with the
Sub total
high intensity grade A. The aluminium sheet to be
Unforseen riveted to M.S. frame of angle iron of size 40x40x4
Grand total mm. The boards will be fixed to 1 No. 50x50mm
Rs. TWO LAKH FIFTY THOUSAND ONLY
square post made of M.S. angle 50x50x 4mm, 4m long
welded to the frame with adequate anti-theft
arrangement. Sheet work to be painted with two or
more coats of synthetic enamel paint over an under
coat (primer) and back side of aluminium sheet to be
painted with two or more coats of epoxy paint
including appropriate priming coat complete in all
respects as per direction of Engineer-in-Charge
E ELECTRICITY BOARD LIMITED
N SUB-DIVISION, POOVANTHURUTHU
Abstract
ing of Cable Trench ,Covering Slabs , foundation ,Structure and
ruthu

Amount

218218.26

57632.00
129896.00

11443.95

7640.40

804.83

4868.16

824.20

16439.20

36916.10
27550.00

60432.50

0.00

6845.30

49812.00

102980.00

133245.00

4712.00

61144.00

20792.10

33051.00

43447.50
36418.65

1065113.15
63906.79
1129019.94
-479019.94
650,000.00
KERALA STATE ELECTRICITY BOARD LIMITED
220kV SUB STATION SUB-DIVISION, POOVANTHURUTHU
Quantity

Name of work: Repairing,Replacing and painting of Cable Trench ,Covering Slabs , foundation ,Struc
Yard fencing at 220kV Sub Station Poovanthuruthu

Sl.
No. Particulars No Length Breadth Hight

Reinforced cement concrete work for the repairing of trench


and covering slab excluding the cost of centering, shuttering,
finishing and reinforcement, with 1:2:4 (1 cement : 2 coarse
sand : 4 graded stone aggregate 20 mm nominal size).

1 Covering Slabs 200 0.70 1.00 0.10


50 0.45 0.45 0.10
50 0.75 0.45 0.10
50 1.00 1.00 0.10
Repairing trench 100 0.25 1.00 0.10

Add extra
Total
Centering and shuttering for for the repairing of trench and
covering slab as per the given measurement including
strutting, propping in finished condition etc. and removal of
form for Foundations, footings, bases of columns, etc. as per
the direction of dprt officers at site

Covering Slabs 200 2.00 0.70 0.10


2 50 2.00 1.00 0.10
50 4.00 0.45 0.10
50 2.00 0.45 0.10
100 2.00 0.75 0.10
50 4.00 1.00 0.10
50 4.00 0.25 1.00
Reparing Trech 15 2.00 2.00

Add extra
Total

Steel reinforcement for R.C.C. work including straightening,


cutting, bending,placing in position and binding all complete
3
Qty of reinforced cement concrete
26.000 m3 @ 50.00 kg/m3
Plastering with CM 1:4 12 mm thick one coat floated hard and
trovelled smooth, charges includes the tools,lifting etc as per
the direction of dept officers at site
4
Reparing Trench 10 2.00 2.00
Add extra
Total
Demolishing RCC work manually/by mechanical means
including stacking of steel bars and disposal of unserviceable
material within 50 m lead as per direction of Engineer in charge

Old Foundation in the Yard 2 1.00 0.85 2.00


Add extra
Total
Erection of yard structures and assembling of columns and
beams using bolt and nut including punching of holes.

6
Erection of GI Pipe for sign boards 2 75

Add extra
Total

Fabrication of structures for erecting equipments. The GI & MS


angles will be supplied departmentally, charges includes the
drilling holes,cutting,leveling,grinding,tools etc complete
7
Equipment Structure 3 60

Add extra
Total
tion ,Structure and

Total Unit

14.000 m3
1.013 m3
1.688 m3
5.000 m3
2.500 m3
24.201
1.799
26.000 m3

28.000
10.000
9.000
4.500
15.000
20.000
50.000
60.000
196.500
3.500
200.000 m2

1300.000
Kg
40.000
5.000
45.000 m2
3.400
0.600
4.000 m3

150.000
150.000
10.000
160.000 kg

180.000
180.000
10.000
190.000 Kg
sinle bay la ct cb pt iso total
110kv 2.2275 3.96 11.88 3.96 8.1 30.1275 482.04
66kv 2.2275 3.96 11.88 0 8.1 26.1675 261.675
220kv 2.2275 3.96 11.88 3.96 8.1 30.1275 180.765
916 column 2.85 293.55 293.55
fencing 450 585 585
964.9725 1803.03

103
KERALA STATE ELECTRICITY BOARD LIMITED
220kV SUB STATION SUB-DIVISION, POOVANTHURUTHU
Name of work: Repairing,Replacing and painting of Cable Trench ,Covering Slabs , foundation ,Structure
Yard fencing at 220kV Sub Station Poovanthuruthu
SUB DATA
Sl no. Code Description Unit Qty. Rate
3.4 of Cement mortar 1:4 (1 cement : 4 fine sand)
cpwd
2014

Details of cost for 1 cum.


MATERIAL:
(0.268 cum. of cement = 0.38 tonne) Cement required
for cement mortar is 26.80%
367 Portland Cement tonne 0.38 6300.00
2209 Carriage of cement tonne 0.38 94.65
Fine Msand (MR) m3 1.07 1850.00
2261 Carriage of fine sand m3 1.07 106.49
LABOUR:
For measuring, carrying, depositing and mixing-
1 114 Beldar day 0.75 329.00
101 Bhisti day 0.07 363.00
9999 Hire and running charges of mechanical mixer L.S. 26.91 1.78
9999 Sundries L.S. 13.52 1.78

Add Water Charges @ 1% 4867.54

Add CPOH @ 15% 4916.22

Cost of market rate and their CPOH


Add Price Index 154 For Kottayam 3354.46
Cost of 1 cum
Say Rs. 7219.18 /1m3
,Structure and

Amount

2394.00
35.97
1979.50
113.94

246.75
25.41
47.90
24.07
4867.54
48.68
4916.22
737.43
5653.65
2299.19
1565.53
7219.18
STRUCTURE

75X75X6
6.8 2.65 4 6 6.8
0.8 4 6 6.8
8.4 4 2 9

50X50X6
4.5 0.7 16 6 4.5
1.35 8 6 4.5
1.3 6 4.5
0.6 20 4.5
60X60X6

5.4 2.75 4 5.4


1.3 6

WEL 444/NO 30
LY 115/M 20
OV 199
432.48
130.56
604.8

302.4
291.6
35.1
54 1910.34 3.17 6055.778

59.4

4 6 0.8 19.2 6.8 130.56


4 6 2.65 0.65 6.8 106.08
6 2 0.6 7.2 6.8 48.96
6 6 0.7 4.5 113.4
399 2562.19 10223.14

15096
2300
2985
KERALA STATE ELECTRICITY BOARD LIMITED
220kV SUB STATION SUB-DIVISION, POOVANTHURUTH
DATA

Name of work: Replacing of damaged Covering Slabs and Repiring the Cable Trench at 2
Poovanthuruthu - Data approval reg.

Cost Index of Kottayam (154-105)/105


Sl. No.
Item No. IN DATA
Particulars
BOOK / CODE

Transporting R.C.C Cover Slab of Different Sizes


from stocked locations to the required locations as
Arrived Data( Reff: speciified and placing over the power/control
sanctioned trenches safely and carefully and leveling after
estimate- cleaning the sides of slabs and cable trenches
TDP/77/10-11/09- including removing and lifting to stockyard of
01-2011 OF already covered slabs for the purpose of cable
EE,Transmission laying if necessary etc as per the direction of
Division departmental officers
Poovanthuruthu)

10
0100 Bandhani
0114 Beldar

Add Water Charges @ 1%

Add CPOH @ 15%

Add Price Index 154 For Kottayam


Cost of 10 No
Cost of 1No
Say Rs.
LA STATE ELECTRICITY BOARD LIMITED
STATION SUB-DIVISION, POOVANTHURUTHU
DATA

overing Slabs and Repiring the Cable Trench at 220kV Sub Station

0.4667

Unit Quantity Rate Amount

1No

day 0.45 363.00 163.35


day 0.35 329.00 115.15
278.50
278.50 2.79
281.29
281.29 42.19
323.48
323.48 150.97
474.45
47.45
47.45 /1No
KERALA STATE ELECTRICITY BOARD LIMITED
220kV SUB STATION SUB-DIVISION, POOVANTHURUTHU
Quantity

Name of work: Repairing,Replacing and painting of Cable Trench ,Covering Slabs , foundation
,Structure and Yard fencing at 220kV Sub Station Poovanthuruthu

Sl.
No. Particulars No Length Breadth Hight

Reinforced cement concrete work for the repairing of


trench and covering slab excluding the cost of
centering, shuttering, finishing and reinforcement,
with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone
aggregate 20 mm nominal size).

1 Covering Slabs 200 0.70 1.00 0.10


50 0.45 0.45 0.10
50 0.75 0.45 0.10
50 1.00 1.00 0.10
Repairing trench 100 0.25 1.00 0.10

Add extra
Total
Centering and shuttering for for the repairing of
trench and covering slab as per the given
measurement including strutting, propping in
finished condition etc. and removal of form for
Foundations, footings, bases of columns, etc. as per
the direction of dprt officers at site

Covering Slabs 200 2.00 0.70 0.10


2 50 2.00 1.00 0.10
50 4.00 0.45 0.10
50 2.00 0.45 0.10
100 2.00 0.75 0.10
50 4.00 1.00 0.10
50 4.00 0.25 1.00
Reparing Trech 15 2.00 2.00

Add extra
Total

Steel reinforcement for R.C.C. work including


straightening, cutting, bending,placing in position
3 and binding all complete

Qty of reinforced cement concrete


25.000 m3 @ 50.00 kg/m3
Plastering with CM 1:4 12 mm thick one coat floated
hard and trovelled smooth, charges includes the
tools,lifting etc as per the direction of dept officers at
site
4
Reparing Trench 10 2.00 2.00
Add extra
Total
Demolishing RCC work manually/by mechanical
means including stacking of steel bars and disposal
of unserviceable material within 50 m lead as per
direction of Engineer in charge
5

Old Foundation in the Yard 1.5 1.00 0.85 2.00


Add extra
Total
Erection of yard structures and assembling of
columns and beams using bolt and nut including
punching of holes.
6
Structure for equipments 2 75

Add extra
Total

Fabrication of structures for erecting equipments.


The GI & MS angles will be supplied departmentally,
charges includes the drilling
holes,cutting,leveling,grinding,tools etc complete
7
Equipment Structure 3 60

Add extra
Total
Dismantling steel work in built up sections in angles,
tees, flats and channels including all gusset plates,
bolts, nuts, cutting rivets, welding etc. including 1 250
dismembering and stacking within 50 metres lead.
8

Unwanted structures in the yard


Add extra
Total
Reinforced cement concrete work for the repairing of
trench and covering slab excluding the cost of
centering, shuttering, finishing and reinforcement,
with 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded 25 0.25 0.25 1
9 stone aggregate 20 mm nominal size).

Road crossing trench


Add extra
Total
Transporting R.C.C Cover Slab of Different Sizes
from stocked locations to the required locations as
speciified and placing over the power/control
trenches safely and carefully and leveling after
cleaning the sides of slabs and cable trenches
including removing and lifting to stockyard of
10 already covered slabs for the purpose of cable laying
if necessary etc as per the direction of departmental
officers

Covering slabs
Add extra
Total
Removing dry or oil bound distemper, water
proofing cement paint and the like by scrapping,
sand papering and preparing the surface smooth 1 1800
including necessary repairs to scratches etc complete.
11

Equipment Foundation and Fencing Foundation


Add extra
Total
Applying one coat of water thinnable cement primer
of approved brand and manufacture on wall
surface:Water thinnable cement primer
12
Equipment Foundation and Fencing Foundation
Add extra
Total
Wall painting with plastic emulsion paint of
approved brand and manufacture to give an even
shade two coats on old work
13
Equipment Foundation and Fencing Foundation
Add extra
Total
Painting with aluminum paint 2 coat using approved
quality paint as specified to old iron work after
rubbing with sand paper and cleaning.
14
Equipment Structure
Add extra
Total
Painting with synthetic enamel paint two coat for old
surfaces of 63mva transformer or steel work after
rubbing with and paper and cleaning the surfaces
15
Equipment Structure and Fencing poles
Add extra
Total
Finishing walls with water proofing cement paint of
required shade for Old work (one or more coats @
2.20 kg/ 10 sqm) complete
16
16
Equipment Structure and Fencing poles
Add extra
Total
Finishing exterior walls with Acrylic Smooth
exterior paint two coats of required shade after
scraping and cleaning the surface.
17
Equipment Structure and Fencing poles
Add extra
Total
Dismantling old plaster or skirting raking out joints
and cleaning the surface for plaster including
disposal of rubbish to the dumping ground within 50
18 metres lead.
Equipment Structure and Fencing poles
Add extra
Total
Repairs to plaster of thickness 12 mm to 20 mm in
patches of area 2.5 sq meters and under, including
cutting the patch in proper shape, raking out joints
and preparing and plastering the surface of the walls
complete, including disposal of rubbish to the
19 dumping ground within 50 metres lead: With cement
mortar 1:4 (1 cement : 4 fine sand)
U

abs , foundation
u

Total Unit

14.000 m3
1.013 m3
1.688
5.000
2.500
24.201
0.799
25.000 m3

28.000
10.000
9.000
4.500
15.000
20.000
50.000
60.000
196.500
3.500
200.000 m2

1250.000
Kg
40.000
5.000
45.000 m2
2.550
0.200
2.750 m3

150.000
150.000
10.000
160.000 kg

180.000
180.000
10.000
190.000 Kg

250.000

250.000
10.000
260.000 Kg

1.563 m3

1.563
0.237
1.800 m3
700.000

700.000
78.000
778.000 Kg

1800.000

1800.000
100.000
1900.000 m2

m2

m2

m2

m2
m2

m2

m3

m4
118.22
5.3
626.566

Вам также может понравиться