Академический Документы
Профессиональный Документы
Культура Документы
0 HOSPITAL
2.1 AIR-CONDITIONING SYSTEM
The air-conditioning system shall be designed in accordance to the following specifications
listed below:-
No. Heat Load Area Parameter
1. Population Anchor Tenant / Mini Anchor 0.3 person / m2
Retail / General Tenant 0.3 person / m2
F&B / Restaurant 0.6 person / m2
Common Area 0.3 person / m2
Backyard 0.2 person / m2
2. Lighting and Small Power Anchor Tenant / Mini Anchor 50 W / m2
Load Retail / General Tenant 100 W / m2
F&B / Restaurant 80W / m2
Common Area 50 W / m2
Backyard 20 W / m2