If X delays the procurement of material by 2 days and company take 10 days to obtain the
material, what shall be the delay(days) for product completion
a. 0
b. 1
c. 2
d. 3
8) In a construction firm the project manager has conducted the analysis for soil and has
designed the frame and structural which has the budget of $25000. However he was told to
bring down the budget to $20000. How can he manage it?
a. He will change the soil analysis report and framing to bring down the budget with
some effect on Specification
b. He will carry out the soil analysis again to bring some better figures
c. He will bring down the framing to an acceptable and within specification
d. He will do (b) & (c) both
10) The system is maintained at 24V output voltage. The input source varies from 120V to
126V. while the output current varies from 0A to 5 A. What is the min power rating required
for the diode.
Rs Is
a. 80W
b. 150W
c. 300W
d. 600W
13) The undergroung cable is laid in a marine environment at system voltage,A. what shall be
the design of the cable insulation
a. (1/3) *A
b. 3 * A
c. 2 * A
d. 2 A
14) The series of cell combine to give output of 230V at no load. The rated output od 300V to
provide the power of 2 MW. If the cell are used in standard battery, what is the internal
resistenace of each battery.
a. 0.003
b. 0.05
c.
17) What is the top cable used for on the transmission lines
a. Ground
b. Phase
c. Neutral