5.Calculate the expected time (Te) from the following table of 3time estimate. Find the
probability of project completion in 40 days.
Job 1-2 1-6 2-3 2-4 3-5 4-5 6-7 5-8 7-8
To 1 2 2 2 7 5 5 3 8
Tm 7 5 14 5 10 5 8 3 17
Tp 13 14 26 8 19 17 29 9 32
9.Calculate the total Project duration, Critical path & Total Float
Jobs 1-2 1-3 2-4 3-4 3-5 4-5 4-6 5-6
Time 6 5 10 3 4 6 2 9
13. A company has 3 plants A,B,C ,3 warehouse X,Y,Z. The number of units
available at the plants is 60,70,80 & the demand at X,Y,Z is 50,80,80 . The unit
cost of transportation is given below by Matrix minima and VAM .
A 1 2 3
B 4 3 2
C 0 2 2
14. Calculate the expected time (Te) from the following table of 3time estimate. Find
the probability of project completion in 25 days.
Job 1-2 1-3 1-4 2-5 3-5 4-6 5-6
To 5 1 2 3 1 2 1
Tm 6 1 4 6 1 2 4
Tp 7 7 12 15 1 8 7
15. What are the advantages & limitation of CPM & PERT