Вы находитесь на странице: 1из 40

PT.

INDOPORA RAJAWALI PLAC


No Form : IPR/DW/03

CAPPING BEAM STEEL C


Capping Beam No : 1 Length : 19m

Type : 1

SECTION REBAR CAGE

REBAR CAGE DEPT

A1 = 0.8

BAND BEAM START

B1 = 0

REBAR CAGE DEPT

C1 = 0.6
T.O.C.B

WATERSTOP MEAS

D = 0.08
C.O.L D-WALL
B.O.C.B
OTHER CHECKLIST

MAIN BAR 12D22

EXTRA BAR 2D13

HORIZONTAL BAR D

Inspected by, Noted by, TIES BAR D10-100

STARTER BAR 2xD

RETAINING WALL D

MUD / DIRT STICK O

PT. Indonesia Pondasi Raya PT. PKN TIEROD REBAR FO

file:///conversion/tmp/scratch/366974912.xlsxP.1 09/26/2017
Notes :

file:///conversion/tmp/scratch/366974912.xlsxP.1 09/26/2017
LACE PT. PKN

SLAB START
CHECK T
TEEL CAGE REBAR [TYPE 1] Date :

Thick : 0.8 m T.O.C.B. : -8.500 SLAB START


CHECK T
Height : 0.9 m B.O.C.B. : - 9.400 D3

INSPECTION

GE DEPTH & LENGTH CAPPING BEAM in m

A2 = 0.7

M STARTER BAR MEASUREMENT & VOID in m (0 IF NO BEAM / VOID)


D4
B2 = 19 NO GA

GE DEPTH & LENGTH RETAINING WALL in m


NO GA
C2 = 0.6 C3 = 1.66

OP MEASUREMENT FROM THE EDGE in m

ECKLIST

NO YES

R 2D13 NO YES
FOR L CORNER - REBA
AL BAR D10-100 NO YES

D10-100 NO YES

BAR 2xD13-200 NO YES

G WALL D13-200+D29-200 & D13-200 NO YES

T STICK ON REBAR ? NO YES

EBAR FOR STRENGHTEN ? NO YES

file:///conversion/tmp/scratch/366974912.xlsxP.1 09/26/2017
file:///conversion/tmp/scratch/366974912.xlsxP.1 09/26/2017
PT. INDOPORA RAJAWALI PLAC
No Form : IPR/DW/03

CAPPING BEAM STEEL C


Capping Beam No : 2 Length : 20m

Type : 1

SECTION REBAR CAGE

REBAR CAGE DEPT

A1 = 0.8

BAND BEAM START

B1 = 0

REBAR CAGE DEPT

C1 = 0.6
T.O.C.B

WATERSTOP MEAS

D = 0.08
C.O.L D-WALL
B.O.C.B
OTHER CHECKLIST

MAIN BAR 12D22

EXTRA BAR 2D13

HORIZONTAL BAR D

Inspected by, Noted by, TIES BAR D10-100

STARTER BAR 2xD

RETAINING WALL D

MUD / DIRT STICK O

PT. Indonesia Pondasi Raya PT. PKN TIEROD REBAR FO

file:///conversion/tmp/scratch/366974912.xlsxP.2 09/26/2017
Notes :

file:///conversion/tmp/scratch/366974912.xlsxP.2 09/26/2017
WALI PLACE PT. PKN

BEAM STEEL CAGE REBAR [TYPE 1] Date :

Thick : 0.8 m T.O.C.B. : -8.500

Height : 0.9 m B.O.C.B. : - 9.400

INSPECTION

REBAR CAGE DEPTH & LENGTH CAPPING BEAM in m

A2 = 0.7

BAND BEAM STARTER BAR MEASUREMENT & VOID in m (0 IF NO BEAM / VOID)

B2 = 20

REBAR CAGE DEPTH & LENGTH RETAINING WALL in m

C2 = 0.6 C3 = 1.66

WATERSTOP MEASUREMENT FROM THE EDGE in m

OTHER CHECKLIST

NO YES

EXTRA BAR 2D13 NO YES

HORIZONTAL BAR D10-100 NO YES

TIES BAR D10-100 NO YES

STARTER BAR 2xD13-200 NO YES

RETAINING WALL D13-200+D29-200 & D13-200 NO YES

MUD / DIRT STICK ON REBAR ? NO YES

TIEROD REBAR FOR STRENGHTEN ? NO YES

file:///conversion/tmp/scratch/366974912.xlsxP.2 09/26/2017
file:///conversion/tmp/scratch/366974912.xlsxP.2 09/26/2017
PT. INDOPORA RAJAWALI PLAC
No Form : IPR/DW/03

CAPPING BEAM STEEL C


Capping Beam No : 3 Length : 4m

Type : 1

SECTION REBAR CAGE

REBAR CAGE DEPT

A1 = 0.8

BAND BEAM START

B1 = 0

REBAR CAGE DEPT

C1 = 0.6
T.O.C.B

WATERSTOP MEAS

D = 0.08
C.O.L D-WALL
B.O.C.B
OTHER CHECKLIST

MAIN BAR 12D22

EXTRA BAR 2D13

HORIZONTAL BAR D

Inspected by, Noted by, TIES BAR D10-100

STARTER BAR 2xD

RETAINING WALL D

MUD / DIRT STICK O

PT. Indonesia Pondasi Raya PT. PKN TIEROD REBAR FO

file:///conversion/tmp/scratch/366974912.xlsxP.3 09/26/2017
Notes :

file:///conversion/tmp/scratch/366974912.xlsxP.3 09/26/2017
WALI PLACE PT. PKN

BEAM STEEL CAGE REBAR [TYPE 1] Date :

Thick : 0.8 m T.O.C.B. : -8.500

Height : 0.9 m B.O.C.B. : - 9.400

INSPECTION

REBAR CAGE DEPTH & LENGTH CAPPING BEAM in m

A2 = 0.7

BAND BEAM STARTER BAR MEASUREMENT & VOID in m (0 IF NO BEAM / VOID)

B2 =4

REBAR CAGE DEPTH & LENGTH RETAINING WALL in m

C2 = 0.6 C3 = 1.66

WATERSTOP MEASUREMENT FROM THE EDGE in m

OTHER CHECKLIST

NO YES

EXTRA BAR 2D13 NO YES

HORIZONTAL BAR D10-100 NO YES

TIES BAR D10-100 NO YES

STARTER BAR 2xD13-200 NO YES

RETAINING WALL D13-200+D29-200 & D13-200 NO YES

MUD / DIRT STICK ON REBAR ? NO YES

TIEROD REBAR FOR STRENGHTEN ? NO YES

file:///conversion/tmp/scratch/366974912.xlsxP.3 09/26/2017
file:///conversion/tmp/scratch/366974912.xlsxP.3 09/26/2017
PT. INDOPORA RAJAWALI PLAC
No Form : IPR/DW/03

CAPPING BEAM STEEL C


Capping Beam No : 5 Length : 4m

Type : 1

SECTION REBAR CAGE

REBAR CAGE DEPT

A1 = 0.8

BAND BEAM START

B1 = 0

REBAR CAGE DEPT

C1 = 0.6
T.O.C.B

WATERSTOP MEAS

D = 0.08
C.O.L D-WALL
B.O.C.B
OTHER CHECKLIST

MAIN BAR 12D22

EXTRA BAR 2D13

HORIZONTAL BAR D

Inspected by, Noted by, TIES BAR D10-100

STARTER BAR 2xD

RETAINING WALL D

MUD / DIRT STICK O

PT. Indonesia Pondasi Raya PT. PKN TIEROD REBAR FO

file:///conversion/tmp/scratch/366974912.xlsxP.5 09/26/2017
Notes :

file:///conversion/tmp/scratch/366974912.xlsxP.5 09/26/2017
WALI PLACE PT. PKN

BEAM STEEL CAGE REBAR [TYPE 1] Date :

Thick : 0.8 m T.O.C.B. : -8.500

Height : 0.9 m B.O.C.B. : - 9.400

INSPECTION

REBAR CAGE DEPTH & LENGTH CAPPING BEAM in m

A2 = 0.7

BAND BEAM STARTER BAR MEASUREMENT & VOID in m (0 IF NO BEAM / VOID)

B2 =4

REBAR CAGE DEPTH & LENGTH RETAINING WALL in m

C2 = 0.6 C3 = 1.66

WATERSTOP MEASUREMENT FROM THE EDGE in m

OTHER CHECKLIST

NO YES

EXTRA BAR 2D13 NO YES

HORIZONTAL BAR D10-100 NO YES

TIES BAR D10-100 NO YES

STARTER BAR 2xD13-200 NO YES

RETAINING WALL D13-200+D29-200 & D13-200 NO YES

MUD / DIRT STICK ON REBAR ? NO YES

TIEROD REBAR FOR STRENGHTEN ? NO YES

file:///conversion/tmp/scratch/366974912.xlsxP.5 09/26/2017
file:///conversion/tmp/scratch/366974912.xlsxP.5 09/26/2017
PT. INDOPORA RAJAWALI PLAC
No Form : IPR/DW/03

CAPPING BEAM STEEL C


Capping Beam No : 6 Length : 10m

Type : 1

SECTION REBAR CAGE

REBAR CAGE DEPT

A1 = 0.8

BAND BEAM START

B1 = 0

REBAR CAGE DEPT

C1 = 0.6
T.O.C.B

WATERSTOP MEAS

D = 0.08
C.O.L D-WALL
B.O.C.B
OTHER CHECKLIST

MAIN BAR 12D22

EXTRA BAR 2D13

HORIZONTAL BAR D

Inspected by, Noted by, TIES BAR D10-100

STARTER BAR 2xD

RETAINING WALL D

MUD / DIRT STICK O

PT. Indonesia Pondasi Raya PT. PKN TIEROD REBAR FO

file:///conversion/tmp/scratch/366974912.xlsxP.6 09/26/2017
Notes :

file:///conversion/tmp/scratch/366974912.xlsxP.6 09/26/2017
WALI PLACE PT. PKN

BEAM STEEL CAGE REBAR [TYPE 1] Date :

Thick : 0.8 m T.O.C.B. : -8.500

Height : 0.9 m B.O.C.B. : - 9.400

INSPECTION

REBAR CAGE DEPTH & LENGTH CAPPING BEAM in m

A2 = 0.7

BAND BEAM STARTER BAR MEASUREMENT & VOID in m (0 IF NO BEAM / VOID)

B2 =10

REBAR CAGE DEPTH & LENGTH RETAINING WALL in m

C2 = 0.6 C3 = 1.66

WATERSTOP MEASUREMENT FROM THE EDGE in m

OTHER CHECKLIST

NO YES

EXTRA BAR 2D13 NO YES

HORIZONTAL BAR D10-100 NO YES

TIES BAR D10-100 NO YES

STARTER BAR 2xD13-200 NO YES

RETAINING WALL D13-200+D29-200 & D13-200 NO YES

MUD / DIRT STICK ON REBAR ? NO YES

TIEROD REBAR FOR STRENGHTEN ? NO YES

file:///conversion/tmp/scratch/366974912.xlsxP.6 09/26/2017
file:///conversion/tmp/scratch/366974912.xlsxP.6 09/26/2017
PT. INDOPORA RAJAWALI PLA
No Form : IPR/DW/03

CAPPING BEAM ST
Capping Beam No : 7 Length : 22m

Type : 1

SECTION REBAR CAGE

REBAR CAG

BAND BEAM

REBAR CAG

T.O.C.B

WATERSTO

C.O.L D-WALL
B.O.C.B
OTHER CHE

MAIN BAR 1

EXTRA BAR

HORIZONTA

Inspected by, Noted by, TIES BAR D

STARTER B

RETAINING

MUD / DIRT

PT. Indonesia Pondasi Raya PT. PKN TIEROD RE

file:///conversion/tmp/scratch/366974912.xlsxP.7 09/26/2017
Notes :

file:///conversion/tmp/scratch/366974912.xlsxP.7 09/26/2017
WALI PLACE PT. PKN

G BEAM STEEL CAGE REBAR [TYPE 1] Date :

Thick : 0.8 m T.O.C.B. : -8.500

Height : 0.9 m B.O.C.B. : - 9.400

INSPECTION

REBAR CAGE DEPTH & LENGTH CAPPING BEAM in m

A1 = 0.8 A2 = 0.7

BAND BEAM STARTER BAR MEASUREMENT & VOID in m (0 IF NO BEAM / VOID)

B1 = 16.2 B2 =5.8

REBAR CAGE DEPTH & LENGTH RETAINING WALL in m

C1 = 0.6 C2 = 0.6 C3 = 1.66

WATERSTOP MEASUREMENT FROM THE EDGE in m

D = 0.08

OTHER CHECKLIST

MAIN BAR 12D22 NO YES

EXTRA BAR 2D13 NO YES

HORIZONTAL BAR D10-100 NO YES

TIES BAR D10-100 NO YES

STARTER BAR 2xD13-200 NO YES

RETAINING WALL D13-200+D29-200 & D13-200 NO YES

MUD / DIRT STICK ON REBAR ? NO YES

TIEROD REBAR FOR STRENGHTEN ? NO YES

file:///conversion/tmp/scratch/366974912.xlsxP.7 09/26/2017
file:///conversion/tmp/scratch/366974912.xlsxP.7 09/26/2017
PT. INDOPORA RAJAWALI PLA
No Form : IPR/DW/03

CAPPING BEAM ST
Capping Beam No : 8 Length : 6m

Type : 1

SECTION REBAR CAGE

REBAR CAG

BAND BEAM

REBAR CAG

T.O.C.B

WATERSTO

C.O.L D-WALL
B.O.C.B
OTHER CHE

MAIN BAR 1

EXTRA BAR

HORIZONTA

Inspected by, Noted by, TIES BAR D

STARTER B

RETAINING

MUD / DIRT

PT. Indonesia Pondasi Raya PT. PKN TIEROD RE

file:///conversion/tmp/scratch/366974912.xlsxP.8 09/26/2017
Notes :

file:///conversion/tmp/scratch/366974912.xlsxP.8 09/26/2017
WALI PLACE PT. PKN

G BEAM STEEL CAGE REBAR [TYPE 1] Date :

Thick : 0.8 m T.O.C.B. : -8.500

Height : 0.9 m B.O.C.B. : - 9.400

INSPECTION

REBAR CAGE DEPTH & LENGTH CAPPING BEAM in m

A1 = 0.8 A2 = 0.7

BAND BEAM STARTER BAR MEASUREMENT & VOID in m (0 IF NO BEAM / VOID)

B1 = 4.85 B2 =1.15

REBAR CAGE DEPTH & LENGTH RETAINING WALL in m

C1 = 0.6 C2 = 0.6 C3 = 1.66

WATERSTOP MEASUREMENT FROM THE EDGE in m

D = 0.08

OTHER CHECKLIST

MAIN BAR 12D22 NO YES

EXTRA BAR 2D13 NO YES

HORIZONTAL BAR D10-100 NO YES

TIES BAR D10-100 NO YES

STARTER BAR 2xD13-200 NO YES

RETAINING WALL D13-200+D29-200 & D13-200 NO YES

MUD / DIRT STICK ON REBAR ? NO YES

TIEROD REBAR FOR STRENGHTEN ? NO YES

file:///conversion/tmp/scratch/366974912.xlsxP.8 09/26/2017
file:///conversion/tmp/scratch/366974912.xlsxP.8 09/26/2017
PT. INDOPORA RAJAWALI PLA
No Form : IPR/DW/03

CAPPING BEAM ST
Capping Beam No : 9 Length : 10m

Type : 1

SECTION REBAR CAGE

REBAR CAG

BAND BEAM

REBAR CAG

T.O.C.B

WATERSTO

C.O.L D-WALL
B.O.C.B
OTHER CHE

MAIN BAR 1

EXTRA BAR

HORIZONTA

Inspected by, Noted by, TIES BAR D

STARTER B

RETAINING

MUD / DIRT

PT. Indonesia Pondasi Raya PT. PKN TIEROD RE

file:///conversion/tmp/scratch/366974912.xlsxP.9 09/26/2017
Notes :

file:///conversion/tmp/scratch/366974912.xlsxP.9 09/26/2017
WALI PLACE PT. PKN

G BEAM STEEL CAGE REBAR [TYPE 1] Date :

Thick : 0.8 m T.O.C.B. : -8.500

Height : 0.9 m B.O.C.B. : - 9.400

INSPECTION

REBAR CAGE DEPTH & LENGTH CAPPING BEAM in m

A1 = 0.8 A2 = 0.7

BAND BEAM STARTER BAR MEASUREMENT & VOID in m (0 IF NO BEAM / VOID)

B1 = 2.13 B2 =7.87

REBAR CAGE DEPTH & LENGTH RETAINING WALL in m

C1 = 0.6 C2 = 0.6 C3 = 1.66

WATERSTOP MEASUREMENT FROM THE EDGE in m

D = 0.08

OTHER CHECKLIST

MAIN BAR 12D22 NO YES

EXTRA BAR 2D13 NO YES

HORIZONTAL BAR D10-100 NO YES

TIES BAR D10-100 NO YES

STARTER BAR 2xD13-200 NO YES

RETAINING WALL D13-200+D29-200 & D13-200 NO YES

MUD / DIRT STICK ON REBAR ? NO YES

TIEROD REBAR FOR STRENGHTEN ? NO YES

file:///conversion/tmp/scratch/366974912.xlsxP.9 09/26/2017
file:///conversion/tmp/scratch/366974912.xlsxP.9 09/26/2017
PT. INDOPORA RAJAWALI PLA
No Form : IPR/DW/03

CAPPING BEAM ST
Capping Beam No : 10 Length : 20m

Type : 2

SECTION REBAR CAGE

REBAR CAG

BAND BEAM

REBAR CAG

T.O.C.B

WATERSTO

C.O.L D-WALL
B.O.C.B
OTHER CHE

MAIN BAR 4

HORIZONTA

Inspected by, Noted by, TIES BAR D

STARTER B

MUD / DIRT

TIEROD RE

PT. Indonesia Pondasi Raya PT. PKN CAPPING B

NOTES FO

file:///conversion/tmp/scratch/366974912.xlsxP.10 09/26/2017
Notes :

file:///conversion/tmp/scratch/366974912.xlsxP.10 09/26/2017
WALI PLACE PT. PKN

G BEAM STEEL CAGE REBAR [TYPE 1] Date :

Thick : 1m T.O.C.B. : -8.500

Height : 1m B.O.C.B. : - 9.500

INSPECTION

REBAR CAGE DEPTH & LENGTH CAPPING BEAM in m

A1 = 0.9 A2 = 0.9

BAND BEAM STARTER BAR MEASUREMENT & VOID in m (0 IF NO BEAM / VOID)

B1 = 17.852 B2 =2.148

REBAR CAGE DEPTH & LENGTH RETAINING WALL in m

C1 = 0 C2 = 0

WATERSTOP MEASUREMENT FROM THE EDGE in m

D = 0.08

OTHER CHECKLIST

MAIN BAR 42D32 NO YES

HORIZONTAL BAR D16-150 NO YES

TIES BAR D16-150 NO YES

STARTER BAR D13-200 NO YES

MUD / DIRT STICK ON REBAR ? NO YES

TIEROD REBAR FOR STRENGHTEN ? NO YES

CAPPING BEAM INTERFACE WITH COLUMN ? NO YES

NOTES FOR COLUMN : -TOTAL COLUMN:

file:///conversion/tmp/scratch/366974912.xlsxP.10 09/26/2017
-NUMBER & TYPE OF COLUMN:

-DIMENSIONS OF EACH COLUMN:

-COLUMNS REBAR :

file:///conversion/tmp/scratch/366974912.xlsxP.10 09/26/2017
PT. INDOPORA RAJAWALI PLA
No Form : IPR/DW/03

CAPPING BEAM ST
Capping Beam No : 11 Length : 12m

Type : 2

SECTION REBAR CAGE

REBAR CAG

BAND BEAM

REBAR CAG

T.O.C.B

WATERSTO

C.O.L D-WALL
B.O.C.B
OTHER CHE

MAIN BAR 4

HORIZONTA

Inspected by, Noted by, TIES BAR D

STARTER B

MUD / DIRT

TIEROD RE

PT. Indonesia Pondasi Raya PT. PKN CAPPING B

NOTES FO

file:///conversion/tmp/scratch/366974912.xlsxP.11 09/26/2017
Notes :

file:///conversion/tmp/scratch/366974912.xlsxP.11 09/26/2017
WALI PLACE PT. PKN

G BEAM STEEL CAGE REBAR [TYPE 1] Date :

Thick : 1m T.O.C.B. : -8.500

Height : 1m B.O.C.B. : - 9.500

INSPECTION

REBAR CAGE DEPTH & LENGTH CAPPING BEAM in m

A1 = 0.9 A2 = 0.9

BAND BEAM STARTER BAR MEASUREMENT & VOID in m (0 IF NO BEAM / VOID)

B1 = 12 B2 =0

REBAR CAGE DEPTH & LENGTH RETAINING WALL in m

C1 = 0 C2 = 0

WATERSTOP MEASUREMENT FROM THE EDGE in m

D = 0.08

OTHER CHECKLIST

MAIN BAR 42D32 NO YES

HORIZONTAL BAR D16-150 NO YES

TIES BAR D16-150 NO YES

STARTER BAR D13-200 NO YES

MUD / DIRT STICK ON REBAR ? NO YES

TIEROD REBAR FOR STRENGHTEN ? NO YES

CAPPING BEAM INTERFACE WITH COLUMN ? NO YES

NOTES FOR COLUMN : -TOTAL COLUMN:

file:///conversion/tmp/scratch/366974912.xlsxP.11 09/26/2017
-NUMBER & TYPE OF COLUMN:

-DIMENSIONS OF EACH COLUMN:

-COLUMNS REBAR :

file:///conversion/tmp/scratch/366974912.xlsxP.11 09/26/2017