Вы находитесь на странице: 1из 11

FLYOVER BRIDGE (Structure 7) AT CHAINAGE 12+812 Km-DETAIL 'G'

BILL OF QUANTITIES FOR SHIMLA BYPASS CABLE STAYED BRIDGE AT


CHAINAGE Ch. 146+891 To 147+491KM

Office of Origin : Gurgaon


Item
Description Unit Total Qty
No.
Excavation for structures shall consist of the removal
of material for the construction of foundation of
1
bridges, retaining walls and other similar structures as
mentioned in clause no 304 of MoRTH 5th Revision.

Ordinary and soft Soils (material to disposal) Cum XXXX


Providing Plain Cement Concret e for levelling course
etc. including cantering all complete as per drawing
2
and Technical Specificat ions Sect ion Sect ion 1500 &
1700
PCC M 15 grade concrete Cum 150

Providing and laying of Reinforced cement concrete


3 for Raft complete as per drawing and Technical
Specificat ions Sect ion 1500,1700,1100,1200 & 2100

RCC M 35 grade Concrete Cum 8190

Measurement of Reinforcement for Raft includes


4 supplying, fabricating and fixing as per clause no 1608 M T 1350
& Sect ion 2100,1100 & 1200 of MoRTH 5th Revision.

Construction of all types of Piles with M 35 grade


concrete for structures in accordance with the
5
specifications shown in section 1100 and clause no
1118 of MoRTH 5th Revision.
1500mm Dia Pile in Soil Rm
2200mm Dia Pile in Soil Rm

Providing of Permanent Steel liner plates of 6mm thick


6 MT
for Piles as per clause 1118 of MoRTH 5th Revision.

supplying, fabricating and fixing Pile Reinforcem ent


7 including binding as per clause no 1608 & 1118 of MT
MoRTH 5th Revision.

Furnishing and Providing of Reinforced Concrete Sub


8 Structure (Pier, Pier Cap, Pedestal ) as per Sections
1500 & 2200 of MoRTH 5th Revision.

RCC M 50 grade Concrete Cum 1831

file:///conversion/tmp/scratch/367009960.xlsx 1 of 11
FLYOVER BRIDGE (Structure 7) AT CHAINAGE 12+812 Km-DETAIL 'G'

Supplying, fabricating and fixing Reinforcement of Sub


Structure (Pier, Pier Cap, Pedestal ) as per clause no
9 MT 314
1608
& 2209 of MoRTH 5th Revision.

Providing of RCC/ PSC/Structural Steel Super


structure in accordance with the drawing and as per
10
Sections 2300,1500,1600,1700 & 1800 of MoRTH 5th
Revision.
RCC M45 Deck Slab Cum 3600
RCC M50 Solid Slab Cum
RCC M60 Pylon Cum 8687
PSC M50 RIB/WINGS Cum
PSC M50 Precast girder Cum
PSC M50 Precast Segment Cum

S350 Grade Steel Plate Girders for Cable stayed deck


including welds, bearing plates, stiffeners and shear MT 3023
stud connectors

Providing of HT Steel for PSC concrete and Stay


Cables as per Sect ions 2300,1800 & 1009 of MoRTH
11 MT 505
5th
Revision.
Stay Cable Anchorages Nos 208

Supplying, fabricating and fixing Reinforcement of


12 Super Structure as per clause no 1608 & 2308 of MT 2028
MoRTH 5th Revision.

Providing Weep Holes in abutments, wing walls and


13 return walls complete as per drawing and clause no Nos
2706 of MoRTH 5th Revision.

Providing and laying Wearing Coat on top of deck slab


14
as per clause no 2702 & 2708 of MoRTH 5th Revision.

Asphaltic Concrete Wearing Coat. (80mm Thick) Sqm 10500

Furnishing and fixing in position of Drainage Spouts as


15 per drawing & Clause no 2705 & 2708 of MoRTH 5th Nos 200
Revision. (65 mm thick)

Providing and fixing Bearings in position as per


16 drawing and Section 2000,2200 and 2300 of MoRTH
4th Revision..
a)Elastomeric bearings CC 490000
b)Pot bearings (Refer additional items) nos
Fabrication and Placing expansion joints as per
17 drawing and as per Sect ion 2600 of MoRTH 4th
Revision.
a)Strip seal type of expansion joint +/ - 40mm Rm 48

file:///conversion/tmp/scratch/367009960.xlsx 2 of 11
FLYOVER BRIDGE (Structure 7) AT CHAINAGE 12+812 Km-DETAIL 'G'
Plain Cement Concrete (Grade M 15) for Levelling
18 Course below Approach Slabs as per drawings and Cum
2704 & 2708 of MoRTH 5th Revision.

Providing Reinforced Cement Concrete M 30 grade in


19 approach slabs as per drawings and clause no 2704 & Cum
2708 of MoRTH 5th Revision.

Providing and Constructing RCC Crash Barrier M 40


20 cum 420
grade as per Drawings and as per IRC:6 2010

Supplying, fabricating and fixing Reinforcement of


MT 50
crash barrier

Supplying, fixing and erecting Tubular Steel railings


21 over RCC Crash Barrier as per clause no 809 of Rm
MoRTH 5th Revision. (50 NB)

Constructing Hand Rail as per clause no 809,2703.3 &


22
2703.4 of MoRTH 5th Revision.

Tubular Steel Railing Rm 1200

Pre cast RCC Railing (M 30 Grade) Rm


Providing Utility Ducts in Footpath as per drawing & as
23 Rm
directed by Engineer.

Providing and painting with Synthetic enamel paint of


approved quality for bridge numbering, Type of culvert
24 Nos
and details of Span arrangement as per IRC:7-1971
and as directed by Engineer.

25 Bridge Lighting Nos 20


26 Road Marking Rm 600
27 Traffic signs
28 Information boards
29 Kerb painting Rm
30 Studs

31 Confirmatory bore holes for soil investigation report Rm

file:///conversion/tmp/scratch/367009960.xlsx 3 of 11
FLYOVER BRIDGE (Structure 7) AT CHAINAGE 12+812 Km-DETAIL 'G'

FOR BOTH CARRIAGEWAYS COMBINED FOR CABLE STAYED PORTION


A Chainage 146+891 To 147+491

Deck Width = 24 m As per Dwg. No. AECOM-CS-GAD-101


Total Span = 600 m
No of Span = 3 (120+ 360 + 120)
No of Pylon = 2 Nos
No. of Pier = 2 Nos

Summary of Chainage (146+891 To 147+491) for only 1 Carriageway

Concrete QTY. Rebar QTY Structural Prestressing Area Length


S. No. Items Nos
(cu.m) (MT) Steel (MT) QTY (MT) (Sqm.) (RM)

1 Main Longitudinal Plate Girder 1243


2 Main Steel Cross Girder 1108
3 Intermediate Steel Cross Girder 671
Stiffeners, Welds, Bearing Plates, Shear
4 151
Studs, (5% of Steel Weight)
5 Stay Cables 505 104
6 Stay Cable Anchorages 208
7 Deck Slab 3600 432
8 Crash Barriers 420 50
9 Pedestal 2 1
10 Bearing (Elastometric ) (CC) 490000
11 Wearing Course 10500
12 Pylon Towers 7626 1373
13 Pylon Upper Cross Beam 612 92
14 Pylon Lower Cross Beam 449 81
15 Pier Cap 195 44

file:///conversion/tmp/scratch/367009960.xlsx 4 of 11
FLYOVER BRIDGE (Structure 7) AT CHAINAGE 12+812 Km-DETAIL 'G'

16 Pier 1634 270


17 Open Foundation of End Piers 990 124
18 PCC of Raf 150
19 Excavation 1031
20 Filling 11
22 Open Foundation of Pylons 7200 900
25 Drainage Spouts / Drainage Pipe (100mm) 36 200
26 Expansion Joints 48
27 Flyover Lighting 20

file:///conversion/tmp/scratch/367009960.xlsx 5 of 11
FLYOVER BRIDGE (Structure 7) AT CHAINAGE 12+812 Km-DETAIL 'G'
FOR ONE CARRIAGEWAY ONLY
A Chainage 146+891 To 147+491

Deck Width = 24 m As per Dwg. No. AECOM-CS-GAD-101


Total Span = 600 m
No of Span = 3 (120+ 360 + 120)
No of Pylon = 2 Nos
No. of Pier = 2 Nos

Chainage 146+891 To 147+491

SUPERSTRUCTURE
1.0 Main Longitudinal Plate- Girder

Area of the Plate Girder = 0.132 sqm.

No. of Plate Girders = 2

Total length of the plate girder = 600 m

Structural Steel Qty. = 0.132 x 600 x 2 x 7.85

= 1243 MT

2.0 Main Cross Girder

Area of the Main cross Girder = 0.103 sqm.

No. of Main Cross Girders = 51

Total length of the plate girder = 27 m

Structural Steel Qty. = 0.1025 x 27 x 51 x 7.85

= 1108 MT

3.0 Intermediate Cross Girder

Area of the Inter cross Girder = 0.044 sqm.

No. of Main Cross Girders = 108

Total length of the plate girder = 18 m

Structural Steel Qty. = 0.044 x 18 x 108 x 7.85

= 671 MT

Total Structural Steel Qty. = 1243 + 1108 + 671

= 3023 MT

4.0 Stiffeners, welds, bearing plates = 5% x 3023


and shear studs
= 151 MT

file:///conversion/tmp/scratch/367009960.xlsx 6 of 11
FLYOVER BRIDGE (Structure 7) AT CHAINAGE 12+812 Km-DETAIL 'G'

5.0 Stay Cables

Total Number of Planes of Cables = 2

Total Number of Pylons = 2

END SPAN MID SPAN

Area of 1 Cable Area Length of Cable Area of 1 Cable Length of Cable


No of No of
Cable strand stay cable Weight Cable strand Area stay cable Weight
strands (mm2) strands
(mm2) (m) (MT) (mm2) (mm2) (m) (MT)

ES-1 10 150 1548.4 58.4 0.71 MS-1 10 150 1533.7 59.1 0.71
ES-2 17 150 2551.3 62.5 1.25 MS-2 17 150 2515.4 65.1 1.29
ES-3 20 150 3027.2 67.6 1.61 MS-3 23 150 3411.0 73.0 1.96
ES-4 20 150 3073.1 73.6 1.78 MS-4 26 150 3959.9 82.3 2.56
ES-5 26 150 3859.6 80.3 2.43 MS-5 28 150 4273.4 92.5 3.10
ES-6 30 150 4438.2 87.5 3.05 MS-6 30 150 4517.9 103.4 3.67
ES-7 32 150 4738.9 95.0 3.54 MS-7 32 150 4746.7 114.7 4.28
ES-8 27 150 4093.5 102.9 3.31 MS-8 33 150 5018.9 126.4 4.98
ES-9 22 150 3374.0 111.0 2.94 MS-9 36 150 5443.4 138.4 5.91
ES-10 28 150 4125.3 119.3 3.86 MS-10 41 150 6080.2 150.6 7.19
ES-11 46 150 6973.8 127.8 6.99 MS-11 46 150 6879.6 162.9 8.80
ES-12 82 150 12262.6 136.4 13.13 MS-12 50 150 7566.0 175.3 10.41
ES-13 91 150 13671.0 145.0 15.57 MS-13 51 150 7676.2 187.9 11.32
SUM 60.16 SUM 66.17

Cable Wt per plane per pylon = 60.16


in End Span

Cable Wt per plane per pylon = 66.17


in Main Span

Cable Qty. per plane per pylon = 60.16 + 66.17

= 126.33

Total Stay Cable Quantity = 126.33 x 2 x 2

= 505 MT

Total Number of Stay Cables = 104

6.0 Total Cable Anchorages = 208

7.0 Deck Slab

Area of the Deck Slab = 24 x 0.25 sqm (Thickness of slab=250mm)


= 6 sqm.
Total Span = 600 m

Concrete QTY. = 6 x 600

= 3600 cum.

Rebar Qty. = 120 x 3600

file:///conversion/tmp/scratch/367009960.xlsx 7 of 11
FLYOVER BRIDGE (Structure 7) AT CHAINAGE 12+812 Km-DETAIL 'G'
= 432 MT

8.0 Crash Barrier

No. of C.B. = 2 Nos


Area of the C.B. = 0.35 sqm.
Total Span = 600 M

Concrete QTY = 2 x 0.35 x 600

= 420 cum.

Rebar QTY = 120 x 420

= 50 MT

9.0 Pedestal

Nos = 8 Nos
Height = 0.3 m
Size = 1 x 1 m

area = 1 sq. m

Concrete Qty = 1 x 0.3 x 8

= 2.4 cu.m

Rebar QTY = 300 x 2.4

= 1 MT

10.0 Bearing (Elastometric Bearing)

No of Bearing = 8 Nos.
Size of Bearing = 70 x 70 x 12.5 in centimeter

Qty of Bearing = 70 x 70 x 12.5 x 8

= 490000 cubic centimeter

11.0 Wearing Course

Carriageway Width = 1 x 17.5


= 17.5 m
Total Span = 600 m

Area of the Wearing Course = 17.5 x 600


= 10500 sqm.

12.0 Pylon (including pier)

Area of 1 Leg of Pylon = 12.3 sqm

No. of Legs = 2

No. of Pylons = 2

file:///conversion/tmp/scratch/367009960.xlsx 8 of 11
FLYOVER BRIDGE (Structure 7) AT CHAINAGE 12+812 Km-DETAIL 'G'
Height of Pylon = 155 m

Concrete QTY = 12.3 x 2 x 2 x 155

= 7626 cum.

Rebar QTY = 180 x 7626

= 1373 MT

13.0 Pylon Upper Cross Beam

Area of Upper Cross Beam = 10.2 sqm

Length of Upper Cross Beam = 30 m

No. of Cross Beams/ pylon = 1

No. of H-Pylons = 2

Concrete QTY = 10.2 x 30 x 1 x 2

= 612 cum.

Rebar QTY = 150 x 612

= 92 MT

14.0 Pylon Lower Cross Beam

Area of Lower Cross Beam = 10.2 sqm

Length of Lower Cross Beam = 22 m

No. of Cross Beams/ pylon = 1

No. of H-Pylons = 2

Concrete QTY = 10.2 x 22 x 1 x 2

= 449 cum.

Rebar QTY = 180 x 448.8

= 81 MT

SUBSTRUCTURE
15.0 Pier Cap

No of Pier Cap = 2 Nos

Vertical C.S. Area of Pier Cap = 32.53 sqm.

Length of the Pier Cap = 3 m

Concrete QTY = 2 x 32.53 x 3

= 195 Cum.

Rebar QTY. = 225 x 195

file:///conversion/tmp/scratch/367009960.xlsx 9 of 11
FLYOVER BRIDGE (Structure 7) AT CHAINAGE 12+812 Km-DETAIL 'G'

= 44 MT

16.0 Pier

No of Pier = 2 Nos
Avg. Ht of the pier = 65 m
Size of the pier = 4 m Circular
Area of the pier = 12.57 sqm.

Concrete QTY. = 2 x 65 x 12.57

= 1634 cum.

Rebar QTY. = 165 x 1634

= 270 MT

17.0 Open foundation of End Piers

No of Rafs = 2 Nos
Depth Of the Raf = 2.5 m
Size Of Raf = 16.5 x 12 m

Concrete QTY. = 2 x 2.5 x 16.5 x 12

= 990 cum.

Rebar QTY. = 125 x 990

= 124 MT

18.0 PCC of Raf

No of Rafs\ = 2 Nos
Depth Of the PCC = 0.075 m
Size Of Raf = 16.575 x 12.075 m

PCC QTY. = 2 x 0.075 x 16.575 x 12.075

= 30 cum.

19.0 Excavation of Pile Cap

No of Pile Cap = 2 Nos


Depth Of the Excavation = 2.575 m
Size Of Pile Cap = 16.575 x 12.075 m

Excavation QTY. = 2 x 2.575 x 16.575 x 12.075

= 1031 cum.

20.0 Filling of Pile Cap

QTY. of Filling = 1031 - 990 - 30

= 11 cum

22.0 Open Foundation of Pylons

file:///conversion/tmp/scratch/367009960.xlsx 10 of 11
FLYOVER BRIDGE (Structure 7) AT CHAINAGE 12+812 Km-DETAIL 'G'
No of Rafs = 2 Nos
Depth Of the Raf = 4 m
Size Of Raf = 30 x 30 m

Concrete QTY. = 2 x 4 x 30 x 30

= 7200 cum.

Rebar QTY. = 125 x 7200

= 900 MT

25.0 Drainage Spouts / Drainage Pipe

Spacing of Drainage Spouts = 3 m c/c


Total Span = 600 m

No. of Drainage Spouts = 600 / 3

= 200 Nos

OR

No of Piers/Pylons = 4 Nos
Avg. Ht of the Pier + Pier Cap = 9 m
Dia of the Drainage Pipe = 100 mm
Total Length of drainage pipe = 4 x 9
= 36 RM

26.0 Expansion Joints

No. of Expansion Joints = 2 Nos

Width of the Road = 24 m

Expansion Joint = 2 x 24

= 48 RM

27.0 Flyover Lighting

Spacing of electric Pole to pole = 30 m

Total Span = 600 m

No. of Lighting = 600 / 30

= 20 Nos

file:///conversion/tmp/scratch/367009960.xlsx 11 of 11

Вам также может понравиться