DATE : 23/09/2005
PROJECT : THE REGATTA PLUIT - PHASE 1
LOCATION : CH-01/VA-3 (TOWER VA-3)
A B C D E F G H I J K
No. Pipes and Flow Diameter Velocity Pipe length Number of Fittings EQ. Length Total Length Friction Friction loss
Section
Accessories (Gpm) (mm) (fps) (feet) fittings (feet) (feet) per 100 ft (feet)
I DISCHARGE PIPE
3 A5 - B -Chiller 15.00
-Butterfly Valve 120 80 2 32 64.0 3.5 3.47
-Flex. Joint 80 2 10 20.0
-Mot. Stop valve 80 1 15 15.0
-Balancing valve 80 1 5.00
II SUCTION PIPE
1 (G - A)
G-H -Pipe 120 80 4.7 4.9 4.9 3.5 0.52
-Elbow 80 1 10 10.0