Вы находитесь на странице: 1из 4

H

DE
OS
METRADO No.
BR 0001
M
E
Sunday, August 13, 2017
MI
DE
O
D
RA ESTRIBOS
ITEM DESCRIPCION # LONG. BASE ALTURA VOL. 1/2" 1/2"
ET
# Long Cuanta Sep. Cant. Long. Cuanta
M
01.1 Viga de amare "V-1"
01.1.1 4 ", est. " @ 0.20 m 1.0 Und 5.16 m 0.20 m 0.20 m 0.21 m 4.0 Und 5.56 m 2.54 qq/m
0.20 m 27 Und 0.70 m 2.16 qq/M
01.1 Columna de amare
01.1.1 4 ", est. " @ 0.20 m 1.0 Und 0.60 m 0.20 m 0.20 m 0.02 m 4.0 Und 1.00 m 3.92 qq/m
0.20 m 4 Und 0.70 m 2.75 qq/M
01.2 Zapata de muros de hormign armado 0
01.2.1 " @ 0.15 m ( En ambas direccin) 1.0 Und 109.18 m 1.00 m 0.25 m 27.30 m 0.00 qq/M
01.2.1.1 Direccio n X-X 8.0 Und 109.58 m 0.76 qq/m 0.00 qq/M
01.2.1.2 Direccio n Y-Y 729.0 Und 1.40 m 0.88 qq/m 0.00 qq/M
01.3 Muros laterales 0
01.3.1 Muros laterales rampa entrada a continuar " @ 0.15 m 1.0 Und 96.10 m 0.20 m 0.75 m 14.42 m 0.00 qq/M
01.3.1.1 Direccio n X-X 642.0 Und 1.15 m 1.21 qq/m 0.00 qq/M
01.3.1.2 Direccio n Y-Y 6.0 Und 96.50 m 0.95 qq/m 0.00 qq/M
01.3.2 Muros laterales rampa salida a continuar " @ 0.15 m 1.0 Und 130.73 m 0.20 m 0.75 m 19.61 m 0.00 qq/M
01.3.2.1 Direccio n X-X 873.0 Und 1.15 m 1.21 qq/m 0.00 qq/M
01.3.2.2 Direccio n Y-Y 6.0 Und 131.13 m 0.94 qq/m 0.00 qq/M
01.3.1 Muros laterales nuevos rampa entrada " @ 0.15 m 1.0 Und 57.02 m 0.20 m 0.46 m 5.25 m 0.00 qq/M
01.3.2.1 Direccio n X-X 382.0 Und 0.86 m 1.47 qq/m 0.00 qq/M
01.3.2.2 Direccio n Y-Y 5.0 Und 57.42 m 1.29 qq/m 0.00 qq/M
01.3.1 Muros laterales nuevos rampa salida " @ 0.15 m 1.0 Und 52.16 m 0.20 m 0.46 m 4.80 m 0.00 qq/M
01.3.2.1 Direccio n X-X 349.0 Und 0.86 m 1.47 qq/m 0.00 qq/M
01.3.2.2 Direccio n Y-Y 5.0 Und 52.56 m 1.29 qq/m 0.00 qq/M
01.3.2 Losa de rampa " @ 0.30 m 1.0 Und 162.85 m 5.16 m 0.20 m 168.06 m 0.00 qq/M
01.3.2.1 Direccio n X-X 544.0 Und 5.56 m 0.42 qq/m 0.00 qq/M
01.3.2.2 Direccio n Y-Y 19.0 Und 163.25 m 0.43 qq/m 0.00 qq/M
01.4 Hormign de limpieza 1.0 Und 109.32 m 1.00 m 0.05 m 5.47 m 0.00 qq/M
01.5 Demolicin muros de hormign armado 1.0 Und 237.16 m 0.20 m 0.20 m 9.49 m 0.00 qq/M
01.3.1 Zapatas de columnas " @ 0.15 m 1.0 Und 1.00 m 1.00 m 0.25 m 0.25 m 0.00 qq/M
01.3.2.1 Direccio n X-X 8.0 Und 1.40 m 1.05 qq/m 0.00 qq/M
01.3.2.2 Direccio n Y-Y 8.0 Und 1.40 m 1.05 qq/m 0.00 qq/M
0.00 qq/M

ING. LUIS B. LEDESMA C.


Pgina 1 de 4
CODIA No.10184
TR
Y
O
N
TA
SO
Monday, August 21, 2017 DE METRADO No. 0001
SA
LO
O
Acero malla Bovedillas en
ITEM DESCRIPCION 1/2" 3/8" 1/4" Alambre galv. Volumen Cantidad Precio Unitario Mano de Obra
D
Calibre 18 (D2.5 x D2.5, Foam 0.40 x 0.40 Hormigon
RA 150 x 150) x 0.11m

01.00 MATERIALES LOSA DE SOTANO 24.00 qq 11.00 qq 11.00 qq


ET 115.0 Lbs 2.0 Rollos 350.0 Unds 15.00 m
MANO DE OBRA MADERA EN: M
Losa 113.62 m 175.00 /m RD$ 19,883.50
Vigas 47.98 m 175.00 /m RD$ 8,396.50
Rampa 2.0 Und 2,000.00 /Und RD$ 4,000.00
RD$ 32,280.00
MANO DE OBRA VARILLA EN:
Losa 30.98 qq 240.00 /qq RD$ 7,435.20
Acerro malla 113.62 m 34.00 /m RD$ 3,863.08
Vigas 67.42 m 90.00 /m RD$ 6,067.80
Rampa 2.0 Und 2,000.00 /Und RD$ 4,000.00
RD$ 21,366.08
HORMIGON
Hormigon industrial 210 Kg/cms 15.00 m 6,000.00 /m RD$ 90,000.00
RD$ 90,000.00

TOTAL MANO DE OBRA RD$ 143,646.08

ING. LUIS B. LEDESMA C.


Pgina 2 de 4
CODIA No.10184
O
NT
IE
IM
OV
Saturday, August 05, 2017 M METRADO No. 0001

O
D
RA
ET Suministro
VOL. VOL. RELLENO VOL. BOTE DE
ITEM DESCRIPCION # LONG. BASE ALTURA material de
EXCAVACION COMPACTADO MATERIAL
M
mina

01.00 Area existente


01.01 Relleno 1.0 Und 162.85 m 4.76 m 0.48 m 372.08 m
01.02 Area nueva
01.03 Excavacio n para muros y zapatas de muros 1.0 Und 109.18 m 1.00 m 0.50 m 54.59 m
01.05 Excavacio n material inservible 1.0 Und 49.43 m 4.16 m 0.30 m 61.69 m
01.01 Relleno base zapata 1.0 Und 109.18 m 1.00 m 0.15 m 18.01 m

ING. LUIS B. LEDESMA C.


Pgina 3 de 4
CODIA No.10184
H
DE
OS
METRADO No.
BR 0001
M
E
Sunday, August 13, 2017
MI
DE
O
D
RA ESTRIBOS
ITEM DESCRIPCION # LONG. BASE ALTURA VOL. 1/2" 1/2"
ET
# Long Cuanta Sep. Cant. Long. Cuanta
M
01.1 Viga de amare "V-1"
01.1.1 4 ", est. " @ 0.20 m 1.0 Und 5.16 m 0.20 m 0.20 m 0.21 m 4.0 Und 5.56 m 2.54 qq/m
0.20 m 27 Und 0.70 m 2.16 qq/M
01.2 Zapata de muros de hormign armado 0
01.2.1 " @ 0.15 m ( En ambas direccin) 1.0 Und 109.32 m 1.00 m 0.25 m 27.33 m 0.00 qq/M
01.2.1.1 Direccio n X-X 8.0 Und 109.72 m 0.76 qq/m 0.00 qq/M
01.2.1.2 Direccio n Y-Y 730.0 Und 1.40 m 0.88 qq/m 0.00 qq/M
01.3 Muros laterales 0
01.3.1 Muros laterales rampa entrada a continuar " @ 0.15 m 1.0 Und 82.40 m 0.20 m 0.78 m 12.77 m 0.00 qq/M
01.3.1.1 Direccio n X-X 551.0 Und 1.18 m 1.19 qq/m 0.00 qq/M
01.3.1.2 Direccio n Y-Y 7.0 Und 82.80 m 1.07 qq/m 0.00 qq/M
01.3.2 Muros laterales rampa salida a continuar " @ 0.15 m 1.0 Und 144.44 m 0.20 m 0.65 m 18.78 m 0.00 qq/M
01.3.2.1 Direccio n X-X 964.0 Und 1.05 m 1.27 qq/m 0.00 qq/M
01.3.2.2 Direccio n Y-Y 6.0 Und 144.84 m 1.09 qq/m 0.00 qq/M
01.3.1 Muros laterales nuevos rampa entrada " @ 0.15 m 1.0 Und 56.96 m 0.20 m 1.40 m 15.95 m 0.00 qq/M
01.3.2.1 Direccio n X-X 381.0 Und 1.80 m 1.01 qq/m 0.00 qq/M
01.3.2.2 Direccio n Y-Y 11.0 Und 57.36 m 0.93 qq/m 0.00 qq/M
01.3.1 Muros laterales nuevos rampa salida " @ 0.15 m 1.0 Und 52.16 m 0.20 m 1.40 m 14.60 m 0.00 qq/M
01.3.2.1 Direccio n X-X 349.0 Und 1.80 m 1.01 qq/m 0.00 qq/M
01.3.2.2 Direccio n Y-Y 11.0 Und 52.56 m 0.93 qq/m 0.00 qq/M
01.3.2 Losa de rampa " @ 0.30 m 1.0 Und 162.82 m 5.16 m 0.20 m 168.03 m 0.00 qq/M
01.3.2.1 Direccio n X-X 544.0 Und 5.56 m 0.42 qq/m 0.00 qq/M
01.3.2.2 Direccio n Y-Y 19.0 Und 163.22 m 0.43 qq/m 0.00 qq/M
01.4 Hormign de limpieza 1.0 Und 109.32 m 1.00 m 0.05 m 5.47 m 0.00 qq/M
01.5 Demolicin muros de hormign armado 1.0 Und 237.16 m 0.20 m 0.20 m 9.49 m 0.00 qq/M

0.00 qq/M
0.00 qq/M

ING. LUIS B. LEDESMA C.


Pgina 4 de 4
CODIA No.10184

Вам также может понравиться