This Gantt chart outlines the tasks and timeline for the Go Kart Design Challenge 2017 project by Team Wreckers from Panimalar Engineering College. The project involves designing and building a go kart and will run from August 15, 2017 to January 14, 2018, consisting of 40 tasks over that period including fabricating transmission and steering systems, installing engines and brakes, testing, and preparing final reports.
This Gantt chart outlines the tasks and timeline for the Go Kart Design Challenge 2017 project by Team Wreckers from Panimalar Engineering College. The project involves designing and building a go kart and will run from August 15, 2017 to January 14, 2018, consisting of 40 tasks over that period including fabricating transmission and steering systems, installing engines and brakes, testing, and preparing final reports.
This Gantt chart outlines the tasks and timeline for the Go Kart Design Challenge 2017 project by Team Wreckers from Panimalar Engineering College. The project involves designing and building a go kart and will run from August 15, 2017 to January 14, 2018, consisting of 40 tasks over that period including fabricating transmission and steering systems, installing engines and brakes, testing, and preparing final reports.
TEAM WRECKERS (GKDC) (20170355) PANIMALAR ENGINEERING COLLEGE
Task Name Start Date Duration End Date GANTT CHART
Tentetive results of Round 1 8/15/2017 1 8/15/2017 Purchase of tools 28/8/2016 3 30/8/2017 Fabricatoin of transmission system 8/12/2017 4 12/12/2017 Purchase of wheels and rim 12/12/2017 1 12/12/2017 Team meet and review of work 13/12/2017 1 14/12/2017 Selection of chain drive 14/12/2017 2 15/12/2017 Fabrication of steering system 15/12/2017 2 17/12/2017 Mounting of seat 17/12/2017 1 18/12/2017 Fixing of engine and transmission 18/12/2017 2 20/12/2017 Colum Fixing of battery and fuel tank 20/12/2017 2 22/12/2017 nD Installation of braking system 22/12/2017 2 24/12/2016 Colum Body work and electricals 24/12/2017 2 26/12/2016 nC Innovation implementation 26/12/2017 1 27/12/2017 Colum Acceleration and brake pedal 27/12/2017 2 29/12/2017 nB Testing 29/12/2017 3 31/12/2017 Aesthetics 1/1/2018 2 2/1/2018 Team meet and validation 3/1/2018 1 4/1/2018 Check for acceleration and braking 4/1/2018 2 6/1/2018 Preparation of cost report and final design report 8/1/2018 6 14/1/2018 Total duration 40days