A

SITE CLEARANCE
10hrs of unskilled labour
Add 25% p&oh

EXCAVATION OF VEGETABLE TOPSOIL


Excvtn of veg. Topsoil 150mm deep
(0.45hrs/m sq)
Add 25% p&oh

TRENCH EXCAVATION
Excvt trnch. For ground beam
(2.2hrs/m cube of unskilled labour)
Add 25% p&oh

excvtn of wk. Space


Add 25% p&oh

10
0.25

125

0.45
0.25

125

2.2
0.25

125

2.2
0.25

125

EARTHWORK SUPPORT
Cost of 3.6m x 0.3m plank (1.08m sq)
no. Of plank in 1m sq
cost of 1m sq of plank
cost of transportation
Add 7.5% waste
Labour for fixing and striking
(1.5hrs of unskilled labour)
(2hrs of skilled labour)
Add 25% P&oh

Add 25% profit & O/h

REMOVAL OF SURPLUS SOIL


Remove surplus soil
1.5hrs of unsilled labour
Add 25% profit & O/h
J

BACKFILLING
Backfilling of excavated material
spread and level exc. Mat.
2.25 man hour@ 125/h
Add 25% profit and O/h

1562.5

56.25
14.0625
70.3125

70.3125

275
68.75
343.75

343.75

275
68.75
343.75

343.75

800
1.85
740
50
790
59.25
849.25

0.075

1.5
2

125
250

0.25

PROTECTION
Allow for keeping the site free from water

WHEEL AND SPREAD


Wheel and spread top soil 150mm deep
(1hr of unskilled labour)
Spread and level
(1.5hrs of unskilled)

1250
312.5
1562.5

187.5
500
1536.75
384.1875
1920.938 1920.938

20000

125

125

1.5

125

187.5
312.5
78.125
390.625

390.625

187.5
46.875
234.375

234.375

0.25

1.5
0.25

125

1.50 man hour


0.75 man hour
2.25
0.25

125

281.25
70.3125
351.5625 351.5625
K

FILLING TO MAKE UP LEVEL


5 Cubic meter of sharp sand
1cubic meter
o of sharp sand
T/4 300mm of sharp sand
20% Consolidation
0.45 man hour labour

0.3
0.2
0.45

Add 25% profit and O/h

0.25

LEVEL AND COMPACT


LEVEL AND COMPACT FDN. TRENCH 0.75 man hour
( for skilled & unskilled)
Add 25% profit and O/h

0.75
0.25

ANTI TERMITE SOLUTION


4 litres of anti-termite soln.
0.5 litres needed/m sq
0.2 hrs of skilled labour
Add 25% profit & O/h
CONCRETE BLINDING
I CUBIC METER OF CEMENT= 28 BAGS @1600
LOADING AND OFF-LOADING
10 CUBIC METER OF AGG. @ N5,249
11 CUBIC METER OF CONCRETE

15000
3000

125

375

0.2
1.25

250

28
1600

10
11

5249

0.4
0.75

Add 25% profit and O/h

0.25

375

44800
3000
52490
100290

3646.909
375

28

1600

10
11

5249

1 CUBIC METER OF CONRETE =


Add 40% void

250
50
300
375

9117.273

Add 0.75 man-hour labour rate

DITTO CONCRETE OVER DAMP PROOF


I CUBIC METER OF CEMENT= 28 BAGS @1600
LOADING AND OFF-LOADING
10 CUBIC METER OF AGG. @ N5,249
11 CUBIC METER OF CONCRETE

281.25
70.3125
351.5625 351.5625

2000

1 CUBIC METER OF CONRETE =


Add 40% void
900
180
56.25
1136.25
284.0625
1420.313 1420.313

281.25
13045.43
3261.358
16306.79 16306.79

44800
3000
52490
100290
9117.273

0.4

Add 0.75 man-hour labour rate

0.75

Add 25% profit and O/h

0.25

3646.909
375

281.25
13045.43
3261.358
16306.79

GROUND BEAM
IN-SITU REINF
REINFORCED
CONC.
ED CONCRETE
1:2:4 -19mm
1:2:4
agg.
- 19mm agg.
1Cubic meter of cementMETER
@N1600
OF CEMENT @ N1600
TRANSPORT/CARRIAGE
1 CUBIC METER OF CEMENT

fine agg.
5 cubic meter of sand
2 cubic meter of sharp sand

Coarse agg.

28
28

1600
100

44800
2800
47600

15000
6000
1 cubic meter of granite
4cubic meter of granite

7853
31414

7 cubic meter of concrete


1 cubic meter of concrete

Add 40% for waste/compaction


5.42 man hour labour@N375

0.4
5.42

Add 25% profit and O/h

0.25

85014
12144.86

375

4857.943
2032.5
19035.3
4758.825
23794.13 23794.13

RAFT SLAB
DITTO AS DESCRIBED ABOVE
1 cubic meter
UBE
of OF
cement
METER
@ N1600
@N1600
TRANSPORT/CARRIAGE
FINE AGG.
5 CUBIC METER
2CUBIC METER OF SHARP SAND

28
28
15000

COARSE AGG.
1 CUBIC METER OF GRANITE
4CUBIC METER OF GRANITE

44800
2800
6000

7853
31414

7 CUBIC METER OF CONCRETE


1 CUBIC METER OF CONCRETE
Add 40% for waste/compaction
5.42 man hour labours@N 375
(For skilled and unskilled)
Add 25% profit and O/h

1600
100

0.4
5.42

85014
12144.86

375

0.25

4857.94
2032.5
19035.3
4758.825
23794.13 23794.13

ENTRANCE SLAB
Ditto for entrance step

23794.13

10- 20mm reinforcement


1 ton of Y10mm reinforcement
Carriage/loading/off-loading
Off- cut (5% waste)

0.05

5Kg of binding wire


6hrs of labour

1 kg of reinforcement
Add 25% profit/Oh

250

1000
0.25

12-16mm reinforcemnt for raft slab


1 ton of Y10mm reinf.
Carriage/loading/off-loading
Off-cut (5% waste)
5kg of binding wire
6hrs of labour
1 kg of reinforcement
Add 25% O/H and profit

185000
1000
186000
9300
195300
2500
1500
199300
199.3
49.825
249.125

185000
1000

0.25

250

9300
2500
1500
199300
199.3

249.125
FORMWORK

cost of 3.6x0.3m plank (1.08m2)

800

No. Of planks in 1m2 of formwork 0.93 plank


cost of 1m2 of plank
cost of transportation
Add 7.5% for waste
cost of vertical supports 50x75mm plank
1.5hrs of unskilled labour for fixing/striking
2.0hrs of skilled labour
Allow for 1 pound of nail

1.5
2

Allow for 25% O/h and profit

0.25

EDGES OF RAFT FLOOR SLAB


3.6m length of 300x25mm plank
1m length of plank
cost of 0.1hr of skilled labour

800
3.6
0.1

Add 25% profit and O/h

0.25

DAMP PROOF MEMBRANE


COST OF 1000mm guage polythene material/sq m
(2 layers)
0.2hrs of skilled labour
Add profit & O/h 25%

PROTECTION

125
250

250

0.2
0.25

250

740
50
59.25
300
187.5
500
200
2036.75
509.1875
2545.938 2545.938

222.2222
25
247.2222
61.80556
309.0278 309.0278

600
50
650
162.5
812.5

812.5

100