SITE CLEARANCE
10hrs of unskilled labour
Add 25% p&oh
TRENCH EXCAVATION
Excvt trnch. For ground beam
(2.2hrs/m cube of unskilled labour)
Add 25% p&oh
10
0.25
125
0.45
0.25
125
2.2
0.25
125
2.2
0.25
125
EARTHWORK SUPPORT
Cost of 3.6m x 0.3m plank (1.08m sq)
no. Of plank in 1m sq
cost of 1m sq of plank
cost of transportation
Add 7.5% waste
Labour for fixing and striking
(1.5hrs of unskilled labour)
(2hrs of skilled labour)
Add 25% P&oh
BACKFILLING
Backfilling of excavated material
spread and level exc. Mat.
2.25 man hour@ 125/h
Add 25% profit and O/h
1562.5
56.25
14.0625
70.3125
70.3125
275
68.75
343.75
343.75
275
68.75
343.75
343.75
800
1.85
740
50
790
59.25
849.25
0.075
1.5
2
125
250
0.25
PROTECTION
Allow for keeping the site free from water
1250
312.5
1562.5
187.5
500
1536.75
384.1875
1920.938 1920.938
20000
125
125
1.5
125
187.5
312.5
78.125
390.625
390.625
187.5
46.875
234.375
234.375
0.25
1.5
0.25
125
125
281.25
70.3125
351.5625 351.5625
K
0.3
0.2
0.45
0.25
0.75
0.25
15000
3000
125
375
0.2
1.25
250
28
1600
10
11
5249
0.4
0.75
0.25
375
44800
3000
52490
100290
3646.909
375
28
1600
10
11
5249
250
50
300
375
9117.273
281.25
70.3125
351.5625 351.5625
2000
281.25
13045.43
3261.358
16306.79 16306.79
44800
3000
52490
100290
9117.273
0.4
0.75
0.25
3646.909
375
281.25
13045.43
3261.358
16306.79
GROUND BEAM
IN-SITU REINF
REINFORCED
CONC.
ED CONCRETE
1:2:4 -19mm
1:2:4
agg.
- 19mm agg.
1Cubic meter of cementMETER
@N1600
OF CEMENT @ N1600
TRANSPORT/CARRIAGE
1 CUBIC METER OF CEMENT
fine agg.
5 cubic meter of sand
2 cubic meter of sharp sand
Coarse agg.
28
28
1600
100
44800
2800
47600
15000
6000
1 cubic meter of granite
4cubic meter of granite
7853
31414
0.4
5.42
0.25
85014
12144.86
375
4857.943
2032.5
19035.3
4758.825
23794.13 23794.13
RAFT SLAB
DITTO AS DESCRIBED ABOVE
1 cubic meter
UBE
of OF
cement
METER
@ N1600
@N1600
TRANSPORT/CARRIAGE
FINE AGG.
5 CUBIC METER
2CUBIC METER OF SHARP SAND
28
28
15000
COARSE AGG.
1 CUBIC METER OF GRANITE
4CUBIC METER OF GRANITE
44800
2800
6000
7853
31414
1600
100
0.4
5.42
85014
12144.86
375
0.25
4857.94
2032.5
19035.3
4758.825
23794.13 23794.13
ENTRANCE SLAB
Ditto for entrance step
23794.13
0.05
1 kg of reinforcement
Add 25% profit/Oh
250
1000
0.25
185000
1000
186000
9300
195300
2500
1500
199300
199.3
49.825
249.125
185000
1000
0.25
250
9300
2500
1500
199300
199.3
249.125
FORMWORK
800
1.5
2
0.25
800
3.6
0.1
0.25
PROTECTION
125
250
250
0.2
0.25
250
740
50
59.25
300
187.5
500
200
2036.75
509.1875
2545.938 2545.938
222.2222
25
247.2222
61.80556
309.0278 309.0278
600
50
650
162.5
812.5
812.5
100
100