TANKER TEST AND INSPECTION REPORT

TANK IDENTIFICATION NO. INSPECTION TEST DATE REPORT NUMBER


For compliance with 49 CFR 180.407(h)(4), 180.417(b) & (c), and 40 CFR 60.505(b)

OWNER CARRIER (if other than owner)

PRINCIPAL PLACE OF BUSINESS ADDRESS PRINCIPAL PLACE OF BUSINESS ADDRESS

CITY, STATE, ZIP CODE TELEPHONE CITY, STATE, ZIP CODE TELEPHONE

OWNERS TANK SERIAL NO. MFG. DATE CARRIERS EQUIPMENT NO. VESSEL MATERIAL SPEC. NO.

CARGO TANK MOTOR VEHICLE MFG. CARGO TANK MOTOR VEHICLE CERT. DATE TANK MANUFACTURER MANUFACTURERS TANK SERIAL NO.

MAX. WEIGHT OF LADING LINING MATERIALS DOT SPECIFICATION NO. FLUID CAPACITY (GALS.) ASME CODE SYMBOL

LBS.
HEATING DESIGN PRESSURE DESIGN TEMPERATURE ORIGINAL TEST DATE MAXIMUM ALLOWABLE WORKING PRESSURE
SYSTEM
(PSIG) F PSIG
MATERIAL DESIGN TEMPERATURE WATER CAPACITY IN LBS.

SHELL HEAD F TO F
EXPOSED SURFACE AREA IN SQ. FT. MAX. DESIGN DENSITY OF LADING TANK
(LBS. PER GAL.)
LINED INSULATED
TYPE OF TEST(S) SPECIAL SERVICE
EXTERNAL VISUAL (V) LEAKAGE TEST (K) PRESSURE RETEST (P) MATERIAL CORROSIVE TO TANK
INTERNAL VISUAL (I)  HYDROSTATIC PNEUMATIC HYDROSTATIC
DEDICATED SERVICE
LINING INSPECTION (L) DELIVERY HOSE/PIPING PNEUMATIC
THICKNESS TEST (T) K-EPA27 OTHER

ITEMS INSPECTED OR TESTED


YES NO ITEM YES NO ITEM TYPE K-EPA27
Gasoline Delivery Tank Pressure Test
Tank Shell Frangible (Rupture) Disk
PRESSURE EPA Reference Method 27

E
TIME MEASURE AVERAGE
Tank Heads Major Appurtenances TEST
RELIEF START END START END RESULTS
Head-to-Shell Seam - upper coupler assembly PRES.
DEVICES 1
Valves - suspension system

L
attachments
PRES.
Gaskets Device Number 1 2 3 4 5
- connecting structures 2
Manhole Covers Tested
Lining Material VAC.
Manhole Gaskets Removed 1

P

Devices for Tightening Pressure Bearing Portions
Inspected VAC.
Manhole of Heating System
Gaskets on Full Opening
Replaced 2
Rear Head
Flues for Heating System VR
Self-closing Stop-valves Reinstalled VENT
Corroded or Abraded Areas 1

M
Excess Flow Valves Repaired
VR
Distortions VENT
Remote Closure Devices Pressure - set to discharge
2
Reclosing Pressure Dents Pressure - when open
Relief Valves UPPER COUPLER ASSEMBLY

A
Nuts and Bolts Welds Pressure - when reseated EXAMINED IN PLACE
THICKNESS (INCHES) MFG. MIN. TESTED REMOVED FOR EXAMINATION
DELIVERY HOSE/PIPING
HEAD LEAKAGE TEST PRESSURE TEST
HOSE DATE OF ORIG. HOSE
I.D. NO. ASSEMBLY TEST SHELL TOP FLUID USED

S
SHELL SIDE PRESSURE
CONDITION OF HOSE ASSEMBLY
& PIPING SYSTEM SHELL BOTTOM HOLDING TIME

(CHECK ONE) NO DEFECT OR DAMAGE DISCOVERED DEFECTS OR DAMAGE DISCOVERED


LOCATION OF DEFECTS OR DAMAGE: weld heat-affected zone liquid phase vapor phase head-to-shell seam delivery hose/piping appurtenances
Explain:

NATURE AND SEVERITY:

METHOD OF REPAIRS: IS REPAIR CERTIFICATION REQUIRED? YES NO DESIGN CERTIFYING ENGINEER REGISTRATION NO.

ANHYDROUS AMMONIA ANY OTHER MATERIAL THAT MAY STRESS RELIEVED AFTER FABRICATION REPAIR DATE
THIS UNIT
( CERTIFIED AS 0.2% WATER BY WEIGHT) CAUSE STRESS CORROSION CRACKING
HAS
HAULED LIQUEFIED PETROLEUM GAS YES NO
DOT REGISTRATION NUMBER OF THE TESTING FACILITY/PERSON TEST DATE STRESS RELIEVED AFTER REPAIR ASME OR NATIONAL BOARD NO. OF REPAIR FACILITY

YES ( Full Local) NO

TESTED BY (Persons Name) REPAIRED BY

ADDRESS ADDRESS

CITY, STATE, ZIP CITY, STATE, ZIP

CARGO TANK: MEETS FAILS TO MEET THE REQUIREMENTS OF THE DOT SPECIFICATIONS IDENTIFIED ON THIS REPORT
DISPOSITION OF CARGO TANK: WITHDRAWN FROM SERVICE RETURNED TO SERVICE MARKINGS APPLIED: YES NO
SIGNATURE OF INSPECTOR / TESTER DOT REGISTRATION NUMBER DATE SIGNATURE OF OWNER DATE

Copyright 2013 J. J. Keller & Associates, Inc. All rights reserved. 8898 (Rev. 9/13)
Neenah, WI USA 800-327-6868 jjkeller.com Printed in the United States
ORIGINAL
COMPLIANCE DATES INSPECTIONS AND discharge opening for leakage through the valve at
TEST UNDER 180.407(c) least once each calendar month the cargo tank is
in service. On cargo tanks equipped with a meter,
Test or Inspection (cargo Date by which first test
Interval period the meter creep test as outlined in Appendix B to
tank specification, must be completed
after first test this part or a test providing equivalent accuracy is
configuration, and service) (see note 1)
acceptable. For cargo tanks that are not equipped
External Visual Inspection: with a meter, Appendix B to this part outlines one
All cargo tanks designed to be loaded acceptable method that may be used to check
by vacuum with full opening rear
internal self-closing stop valves for closure.
heads. . . . . . . . . . . . . . . . . . . . . . . September 1, 1991. . . . . . . . . . . . . . 6 months.
(5) The operator must note each inspection in
All other cargo tanks. . . . . . . . . . . . . September 1, 1991. . . . . . . . . . . . . . 1 year.
a record. That record must include the inspection
Internal Visual Inspection:
date, the name of the person performing the
All insulated cargo tanks, except
MC 330, MC 331, MC 338 (See inspection, the hose assembly identification
Note 4). . . . . . . . . . . . . . . . . . . . . . September 1, 1991. . . . . . . . . . . . . . 1 year. number, the manufacturer of the hose assembly,
All cargo tanks transporting lading the date the hose was assembled and tested,
corrosive to the tank . . . . . . . . . . . September 1, 1991. . . . . . . . . . . . . . 1 year. and an indication that the delivery hose assembly
All other cargo tanks except MC 338. September 1, 1995. . . . . . . . . . . . . . 5 years. and piping system passed or failed the tests and
Lining Inspection: inspections. The operator must retain a copy of
All lined cargo tanks transporting each test and inspection record at its principal
lading corrosive to the tank. . . . . . . . September 1, 1991. . . . . . . . . . . . . . 1 year. place of business or where the vehicle is housed
Leakage Test: or maintained until the next test of the same type is
MC 330 and MC 331 cargo tanks in successfully completed.
chlorine service. . . . . . . . . . . . . . . September 1, 1991. . . . . . . . . . . . . . 2 years. (e) Annual hose leakage test. The owner of a
All other cargo tanks except MC 338. September 1, 1991. . . . . . . . . . . . . . 1 year. delivery hose assembly that is not permanently
Pressure Test: attached to a cargo tank motor vehicle must
(Hydrostatic or pneumatic) (See ensure that the hose assembly is annually tested in
Notes 2 and 3). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . accordance with 180.407(h)(4).
All cargo tanks which are insulated (f) New or repaired delivery hose assemblies.
with no manhole or insulated and Each operator of a cargo tank must ensure each
lined, except MC 338. . . . . . . . . . . September 1, 1991. . . . . . . . . . . . . . 1 year. new and repaired delivery hose assembly is tested
All cargo tanks designed to be loaded at a minimum of 120 percent of the hose maximum
by vacuum with full opening rear working pressure.
heads. . . . . . . . . . . . . . . . . . . . . . . September 1, 1992. . . . . . . . . . . . . . 2 years. (1) The operator must visually examine the
MC 330 and MC 331 cargo tanks in delivery hose assembly while it is under pressure.
chlorine service. . . . . . . . . . . . . . . September 1, 1992. . . . . . . . . . . . . . 2 years. (2) Upon successful completion of the pressure
All other cargo tanks. . . . . . . . . . . . . September 1, 1995. . . . . . . . . . . . . . 5 years. test and inspection, the operator must assure that
Thickness Test: the delivery hose assembly is permanently marked

E
All unlined cargo tanks transporting with the month and year of the test.
material corrosive to the tank, except (3) After July 1, 2000, the operator must
MC 338. . . . . . . . . . . . . . . . . . . . . . . September 1, 1992. . . . . . . . . . . . . . 2 years. complete a record documenting the test and
Note 1: If a cargo tank is subject to an applicable inspection or test requirement under the regulations in inspection, including the date, the signature of the

L
effect on December 30, 1990, and the due date (as specified by a requirement in effect on December 30, inspector, the hose owner, the hose identification
1990) for completing the required inspection or test occurs before the compliance date listed in Table I, the number, the date of original delivery hose assembly
earlier date applies. and test, notes of any defects observed and
Note 2: Pressure testing is not required for MC 330 and MC 331 cargo tanks in dedicated sodium metal repairs made, and an indication that the delivery

P
service. hose assembly passed or failed the tests and
Note 3: Pressure testing is not required for uninsulated lined cargo tanks with a design pressure or MAWP inspections. A copy of each test and inspection
15 psig or less, which receive an external visual inspection and lining inspection at least once each year. record must be retained by the operator at its
Note 4: Insulated cargo tanks equipped with manholes or inspection openings may perform either an principal place of business or where the vehicle
internal visual inspection in conjunction with the external visual inspection or a hydrostatic or pneumatic is housed or maintained until the next test of the
pressure-test of the cargo tank. same type is successfully completed.

M
(g) Rejection criteria. (1) No operator may use
180.407(h)(4) a delivery hose assembly determined to have any
(4) After July 1, 2000, Registered Inspectors (c) For a cargo tank motor vehicle composed of condition identified below for unloading liquefied
of specification MC 330 and MC 331 cargo tanks, multiple cargo tanks constructed to the same compressed gases. An operator may remove

A
and nonspecification cargo tanks authorized under specification, which are tested and inspected at the and replace damaged sections or correct defects
173.315(k) of this subchapter must visually same time, one set of test and inspection markings discovered. Repaired hose assemblies may be
inspect the delivery hose assembly and piping may be used to satisfy the requirements of this placed back in service if retested successfully in
system while the assembly is under leakage section. For a cargo tank motor vehicle composed accordance with paragraph (f) of this section.
of multiple cargo tanks constructed to different (i) Damage to the hose cover that exposes the

S
test pressure utilizing the rejection criteria listed
in 180.416(g). Delivery hose assemblies not specifications, which are tested and inspected at reinforcement.
permanently attached to the cargo tank motor different intervals, the test and inspection markings (ii) Wire braid reinforcement that has been
vehicle may be inspected separately from the cargo must appear in the order of the cargo tanks kinked or flattened so as to permanently deform the
tank motor vehicle. In addition to a written record corresponding location, from front to rear. wire braid.
of the inspection prepared in accordance with (iii) Soft spots when not under pressure, bulging
180.416 Discharge system inspection and
180.417(b), the Registered Inspector conducting under pressure, or loose outer covering.
maintenance program for cargo tanks
the test must note the hose identification number, (iv) Damaged, slipping, or excessively worn
transporting liquefied compressed gases.
the date of the test, and the condition of the hose hose couplings.
(a) Applicability. This section is applicable to
assembly and piping system tested. (v) Loose or missing bolts or fastenings on
an operator using specification MC 330, MC 331,
bolted hose coupling assemblies.
180.415 Test and inspection markings. and nonspecification cargo tanks authorized under
(2) No operator may use a cargo tank with a
(a) Each cargo tank successfully completing 173.315(k) of this subchapter for transportation
piping system found to have any condition identified
the test and inspection requirements contained of liquefied compressed gases other than carbon
in this paragraph (g)(2) for unloading liquefied
in 180.407 must be marked as specified in this dioxide. Paragraphs (b), (c), (d)(1), (d)(5), (e), (f),
compressed gases.
section. and (g)(1) of this section, applicable to delivery
(i) Any external leak identifiable without the use
(b) Each cargo tank must be durably and legibly hose assemblies, apply only to hose assemblies
of instruments.
marked, in English, with the date (month and installed or carried on the cargo tank.
(ii) Bolts that are loose, missing, or severely
year) and the type of test or inspection performed, (b) Hose identification. By July 1, 2000, the
corroded.
subject to the following provisions: operator must assure that each delivery hose
(iii) Manual stop valves that will not actuate.
(1) The date must be readily identifiable with the assembly is permanently marked with a unique
(iv) Rubber hose flexible connectors with
applicable test or inspection. identification number and maximum working
any condition outlined in paragraph (g)(1) of this
(2) The markings must be in letters and pressure.
section.
numbers at least 32 mm (1.25 inches) high, near (c) Post-delivery hose check. After each
(v) Stainless steel flexible connectors with
the specification plate or anywhere on the front unloading, the operator must visually check that
damaged reinforcement braid.
head. portion of the delivery hose assembly deployed
(vi) Internal self-closing stop valves that fail
(3) The type of test or inspection may be during the unloading.
to close or that permit leakage through the valve
abbreviated as follows: (d) Monthly inspections and tests. (1) The
detectable without the use of instruments.
(i) V for external visual inspection and test; operator must visually inspect each delivery hose
(vii) Pipes or joints that are severely corroded.
(ii) I for internal visual inspection; assembly at least once each calendar month the
(iii) P for pressure test; delivery hose assembly is in service.
(iv) L for lining inspection; (2) The operator must visually inspect the
(v) T for thickness test; and piping system at least once each calendar month
(vi) K for leakage test for a cargo tank tested the cargo tank is in service. The inspection must
under 180.407, except 180.407(h)(2); and include fusible elements and all components of the
(vii) K-EPA27 for a cargo tank tested under piping system, including bolts, connections, and
180.407(h)(2) after October 1, 2004. seals.
(3) At least once each calendar month a cargo
Examples to paragraph (b). The markings 10-99 P, V,
tank is in service, the operator must actuate all
L represent that in October 1999, a cargo tank passed
the prescribed pressure test, external visual inspection emergency discharge control devices designed to
and test, and the lining inspection. The markings 2-00 close the internal self-closing stop valve to assure
K-EPA27 represent that in February 2000, a cargo that all linkages operate as designed. Appendix A
tank passed the leakage test under 180.407(h)(2). The to this part outlines acceptable procedures that may
markings 2-00 K, K-EPA27 represent that in February be used for this test.
2000, a cargo tank passed the leakage test under (4) The operator of a cargo tank must check
both 180.407(h)(1) and under EPA Method 27 under the internal self-closing stop valve in the liquid
180.407(h)(2).