Seasonal Conversion Factor (SCF) Estimate

ERA Cycle Raw data (GEDO - FINCHA)

Yerar Cycle/Season Car L/Rover S/Bus L/Bus S/Truck M/Truck H/Truck Truck & Trailer Total
1 0 11 12 12 12 47 72 50 216
2 0 15 27 9 27 64 66 20 228
3 2 44 52 31 54 150 140 91 564
2007 2007 (AADT) 1 23 30 17 31 87 93 54 336
1 0 18 30 2 25 30 22 32 159
2 0 7 35 5 16 47 37 29 176
3 0 14 12 19 19 37 29 21 151
2008 2008 (AADT) 0 13 26 9 20 38 29 27 162
1 0 18 55 8 44 88 81 73 367
2 0 14 14 25 31 54 39 38 215
3 0 15 41 2 41 82 45 34 260
2009 2009 (AADT) 0 16 37 12 39 75 55 48 281
1 1 24 6 35 25 56 35 51 233
2 1 24 44 6 54 84 49 58 320
3 1 27 5 17 39 49 29 59 226
2010 2010 (AADT) 1 25 18 19 39 63 38 56 260
Period Traffic growth estimates by Vehicle Group
Cars & Utilities Buses Trucks
Low
2013-2022 7.0% 7.0% 7.8%
2023-2035 6.4% 6.4% 6.5%
Medium
2013-2022 9.2% 9.2% 10.8%
2023-2035 8.8% 8.8% 9.8%
High
2013-2022 11.2% 11.2% 14.3%
2023-2035 10.0% 10.0% 13.0%

1. Project the traffic by considering Medium traffic growth senario)


2. Generted traffic is considered as 40 % of the normal traffic since 2018 assuming three years construction period starting
3. The first two years period (2013 and 2014) is considered as a period of design and other preconstruction activities.
4. Analysis period is 25 years considering 3 years construction period (2015 -2017) & 20 years project life after the opening
onstruction period starting from 2015
nstruction activities.
oject life after the opening of the road in 2018.