April, 2016
and
1. General
1.1 Outline of the Project -----------------------------------------------------------------------
-------------------------------- 1
1.2 Introduction of Handpump --------------------------------------------------------- --- --- 1
1.3 Reference Documents ---------------------------------------------------------
------------------------------------------------------ ---------- --- 2
1.4 Introduction of Well Construction --------------------------------------------------- --- 3
2. Handpump Assembly
2.1 Structure ----------------------------------------------------------------------------------------
-------------------------------- 4
2.2 Assembly of Above Ground Components ----------------------------------------- --- 6
2.3 Assembly of Below Ground Components ----------------------------------------- --- 7
(1) Cylinder Parts (Stainless Type) ---------------------------------------- -------------- --- 7
(2) Cylinder Parts (Cast Iron Type) ---------------------------------------- ------------- --- 8
(3) Riser Pipe and Pump Rod ---------------------------------------- --------------------- --- 9
2.4 Maintenance Tools and Materials----------------------------------------------------
Materials --- 10
(1) Pipe Handling Instrument ---------------------------------------- -------------------- --- 10
(2) Special Maintenance Tools ---------------------------------------- -------------------- --- 11
(3) Standard Maintenance Tools ---------------------------------------- ----------------- --- 12
(4) Other Materials ----------------------------------------
------------------------------------- ----------------------------------- --- 13
3. Installation of Handpump
3.1 Preparation before Installation --------------------------------------- -------------- --- 14
(1) Preparation of Riser Pipe and Pump Rod ---------------------------------------- --- 14
(2) Checking of Pump Cylinder ---------------------------------------- ------------------- --- 16
(3) Leakage Test of Pump Cylinder ---------------------------------------- ------------- --- 16
(4) How to Assemble Plunger in CylinderC ---------------------------------------- ----- --- 17
(5) How to Assemble Other Parts of Cylinder (Stainless type) --- ------------- --- 18
(6) How to Assemble Other Parts of Cylinder (Cast Iron type) --- ------------- --- 19
(7) Preparation of Pump Head and Handle -------------------------------------- ---- --- 20
3.2 Installation of Below Ground Components ------------------ ------------------- --- 22
(1) Installation of Cylinder and 1st Riser Pipe---------------------------------------- --- 22
(2) Installation of Riser Pipe by Lifting Spanner---------------------------------------- 23
(3) Installation of Riser Pipe by Chain Block ---------------------------------------- --- 24
(4) Installation of Water Tank ------------------------------------------------------------- --- 27
3.2 Installation of Above Ground Components --------------------------------------- --- 28
(1) Adjustment of Pump Rod Length ---------------------------------------- ----------- --- 28
(2) Installation of Chain Assembly ---------------------------------------- -------------- --- 29
(3) Final Works -------------------------------------
-------------------------------------------------------------------------- --- 31
(4) Fixing T-Handle
Handle and Counter Weight ------------------------------------------- -- --- 32
Table 1-1
1 Project Name and Organization
Project Name : The Project of Rural Water Supply in Tabora Region
Client : Ministry of Water, the United Republic of Tanzania
Partner of the Client : Regional Administrative
Administ Secretary Tabora Office
Consultant : Earth System Science Co., Ltd, Japan
Contactor : KONOIKE Construction Co., Ltd, Japan
Community : Community Owned Water Supply Organization (COWSO)
Community-Owned
Maintenance Company : CBRC Community Based Resource Centre Shinyanga
Stainless steel 3m length pipe 42mm O.D., 36mm I.D. with welded threaded
Riser pipe
female socket
Inner rod Stainless steel 3m length connecting rod with threaded connector
Plunger Stainless plunger in Cylinder
Check Valve Stainless check valve in Cylinder
Table 1-3
3 Information of Manufacture of Hamdpump
Name : AJAY Industrial Corporation Ltd.
Address : 20/11, Site IV, Sahibabad Industrial Area Ghaziabad, Uttar Pradesh 201010,
India
Tel : +91-(120)-277-0679,
0679, 277-4747
277
E-mail : info@ajayindustrial.com ajaypump@ajaycorp.com
info@ajayindustrial.com,
Website : www.ajayindcorp.com www.ajayind.in
www.ajayindcorp.com,
1
The Project of Rural Water Supply in Tabora Region
1) Installation & Maintenance Manual for the India Mark II Handpump, 2008 8, SKAT -
RWSN
* Reference Website: http://rural-water-supply.net/en/resources/details/328
http://rural
3) Indian Mark 2 Major Maintenance Guideline, Inter Aide Sierra Leone, European Union
*Reference Website: http://rural
ttp://rural-water-supply.net/en/resources/details/630
2
The Project of Rural Water Supply in Tabora Region
Fig. 1-1
1 Working Flows for Well Construction
Table 1-1
1 Introduction of Contractor in this Project
Works Description
KONOIKE Construction Co., Ltd
2-7-5,
5, Minamisuna, Koto-ku,
Koto Tokyo 136-8880, Japan
Tel: +81-3-5617-7862,
7862, Fax: +81-3-5617-7864,
+81 Web: http://www.konoike.co.jp
General
TONE Engineering Corporation (on behalf of KONOIKE)
Yotuya Aneex, 4 Samoncho, Shinjuku-ku,
Shinjuku Tokyo 160-0017, Japan
Tel: +81-3-5312-5214,
5214, Fax: +81-5312-5214,
+81 Web: http://www.tone-eng.co.jp
eng.co.jp
SIAM TONE Co., Ltd
Geological
5/15 Moo 6 Bangna-Trad
Bangna Road, Bangcha-Long
Long Bangplee Samutprakarn 10540,
Survey
Thailand, Tel: +66-2-312-5281
+66
VICTORIA Boreholes Co., LTD
P.O.Box 1352 Dar es Salaam
Drilling Works/ Tel/Fax: +255-732
732-999713, web: http://www.victoriaboreholes.com
Pumping test DDCA (Drilling and Dam Construction Agency)
University of Dar es Salaam Rd, Ubungo, P.O. Box 55658 Dar es Salaam
Tel/Fax: +255-22
22-2410430, Web: http://www.ddca.go.tz
SGS/ African Assay Laboratory Tanzania Ltd
Water Quality
Balewa road, P.O. Box 1826 Mwanza, Tanzania
Analysis
Tel: +255-28-2501091,
2501091, Fax: +255-28-2501093,
+255 Web: http://sgs.com
MAC Contractors Ltd
Concrete Works
P.O.Box 31895 Dar es Salaam, Tel: +255-2202700720
Pump CBRC (Community Based Resource Centre) Shinyanga
Installation Ushirika Area P.O.Box 1200 Shinyanga, Tel/Fax: +250-28-2763279
+250 2763279
TONE Engineering Corporation:
Corp ration: Mr. Katsuhiko ADACHI, Mr. Selestine Shironga
Manual
CBRC: Mr. Ramadhani Chambulilo, Mr. Rajabu Amri Ally
3
The Project of Rural Water Supply in Tabora Region
4
The Project of Rural Water Supply in Tabora Region
5
The Project of Rural Water Supply in Tabora Region
6
The Project of Rural Water Supply in Tabora Region
7
The Project of Rural Water Supply in Tabora Region
8
The Project of Rural Water Supply in Tabora Region
9
The Project of Rural Water Supply in Tabora Region
10
The Project of Rural Water Supply in Tabora Region
Special Tools Kit Heavy Duty Clamp for Pipe Lifter Pipe for Water Tank
11
The Project of Rural Water Supply in Tabora Region
12
The Project of Rural Water Supply in Tabora Region
13
The Project of Rural Water Supply in Tabora Region
2) Check all pump rod thread with couplers for good engagement.
*It is used pump rod welded coupler at rod end, in this project.
3) Place all prepared pipes on the logs, pipe stand (Fig.3-2), or Blue Sheet (Fig.3-3)
(Fig.3 so that all
threads keep clean. Do not put materials on ground directly.
4) Clean up thread part of pipe and socket by brush. Toothbrush is useful to clean up female
thread of socket. And then, roll seal tap on threaded end.
14
The Project of Rural Water Supply in Tabora Region
7) Insert one pump rod into each of the riser pipes in advance or one by one at installation of
pipe into borehole. Make sure that the long hexagonal couplers are on the same side as the
riser pipe socket. *It is used welded connector at rod end, in this project.
p
8) Apply a little lubricant or grease to thread of rod end in advance or one by one at
installation of rods into borehole together of riser pipe (Fig.3-12).
12). However, do not apply
too much. If it is apply much lubricant or grease, rods will be disconnected
disconnected during
operation later.
15
The Project of Rural Water Supply in Tabora Region
*It is introduced the particulars how to assemble pump cylinder on chapter chapt of
maintenance.
*In case of stainless cylinder, thread of check valve might be rocked due to prevent that
thread of check valve will be loose during handpump operation. If it will be not found any
problem on check valve visually, it is not necessary to dismantle check valve.
10)) After check inside parts of pump cylinder,, tighten both reducer caps with pipe wrenches.
16
The Project of Rural Water Supply in Tabora Region
Fig.3
Fig.3-14 Assembly of the Plunger (1)
Fig.3
Fig.3-15 Assembly of the Plunger (2)
Fig.3
Fig.3-16 Assembly of the Plunger (3)
17
The Project of Rural Water Supply in Tabora Region
16-1) Assemble the pump cylinder. Prior to assembling, check cleanliness of cylinder liner
and all threads. And clean it and apply sealing fluid or grease on all of threads.
threads
d. Put O-ring
ring into check valve plug.
e.. Attach the cylinder with liner to the bottom plug (Check valve assembly).
assembly)
f. Insert plunger assembly into the cylinder pipe.
d) e) f)
18
The Project of Rural Water Supply in Tabora Region
19
The Project of Rural Water Supply in Tabora Region
Fig. 3-23
23 Assembly of Bearing Housing (1)
Fig. 3-24
24 Assembly of Bearing Housing (2)
20
The Project of Rural Water Supply in Tabora Region
a) b) c)
d.. If the pump handle is moving smoothly (up & down), secure the correct position by
second nut as a check nut.
d)
21
The Project of Rural Water Supply in Tabora Region
3)) Connect the riser pipe to the cylinder, and tighten riser pipe with reducer cap of the
cylinder with two pipe wrenches.
2-1) 2-2)
3-1) 3-2)
4) Lower the first riser pipe with cylinder into the pump stand (by hand) until the riser pipe
protrudes the top face of the pump stand by approx. 50cm.
5) Put the pipe vice on the stand, and fasten the riser pipe in this position.
4) 5)
22
The Project of Rural Water Supply in Tabora Region
7) Next, connect
onnect the riser pipes after it is applied sealing compound on thread at pipe end and
socket, tighten it with two pipe wrenches
8)) Hold riser pipe by two lifting spanner and then open and remove pipe vice.
6) 7
7) 8)
Fig.3-30
0 Installation of Riser Pipe using with Pipe Wrenches
9) Lower riser pipe into borehole using by two lifting spanner, until the riser pipe protrudes
the top face of the pump stand by approx. 30 to 50cm.
*Be careful to slip out riser pipe from lifting spanner and it will be fall down to borehole.
Lowering using by lifting spanner continue until the riser pipe will be too heavy
for handling by the lifting spanner. It could be 5 to 10 pipes.
However, if you afraid slipping out lowering riser pipe from lifting spanner, it is
recommend to lower it using chain block or pulley from beginning.
23
The Project of Rural Water Supply in Tabora Region
24
The Project of Rural Water Supply in Tabora Region
Fig.3-33
33 Tripod Head (TACOMAN company)
a) Arrange 3 steel pipes at an angle of 120 degrees each on ground (concrete platform).
b) Joint pipes to tripod head one by one,
one and tighten bolts and nuts.
a) b-1) b-2)
c) Hold up tripod to personss standing height, and hang chain block on tripod head.
d) Stand tripod pipe up one by one, and arrange position of tripod center on handpump.
c) d--1) d-2)
25
The Project of Rural Water Supply in Tabora Region
12)) Lower riser pipe into borehole using with chain block or pulley until the riser pipe
protrudes the top face of the pump stand by approx. 30 to 50cm,, and fasten the riser pipe
in this position by pipe vice.
* Pipe vice always stay on pump stand, and it is fasten with stand by bolt and nut.
13) When it is tighten riser pipes using with two pipe wrenches, pipe wrench shall be hold at
part of pipe, not at socket.
14) When it is tighten pump rod by spanner, lower rod shall be hold by spanner or fasten rod
clamp.
12) 14)
15) Proceed in the same manner until the last pump rod and riser
er pipe is connected.
26
The Project of Rural Water Supply in Tabora Region
17)) Screw the water tank onto the last pipe end
and tighten by hand. And hold
old water tank in
position by rope attached to hook of the chain
Fig.3-39 Installation off Water Tank (1)
block, and remove pipe vice from the pump
stand. And then, lower the water
water tank with riser pipe to the pump stand flange slowly.
18)) Turn the water tank so that the spout is positioning to the required direction
19)) Or, it is attached water tank onto the last pipe end in advance before installation of last
pipe, and connect hoisting plug onto water tank.
tank. And then pull up water tank with last
riser pipe, and install it into borehole.
Fig.3
Fig.3-40 Installation of Water Tank (2)
20)) Tighten it to the pump stand with bolts and nuts, and remove out hoisting plug.
Fig.3-41
41 Tightening water tank and stand
27
The Project of Rural Water Supply in Tabora Region
2) Mark the last pump rod by hacksaw at the top face of the water tank flange,
flange or measure
length of extra pump rod.. This position is exact length of pump rod.
1) 2-1) 2-2)
3) Lift pump rod up at easy cutting position, and fasten with connecting rod vice on the top
flange of the water tank.
4)) Wrap around the marked rod by a clean piece of cloth, in order to prevent meta-shavings
meta or
oil from falling into the well (contamination). And then cut last of pump rod at the mark
position.
3) 4) 5)
28
The Project of Rural Water Supply in Tabora Region
8) Allow a middle flange to rest on top of connecting rod vice, and fix the nut on the newly
threaded top rod.
6) 7) 8)
10)) Tighten check nut of connecting rod with the chain coupler.
11) Insert the chain coupler supporting tool below the chain coupler. Hold the middle flange
and remove connecting rod vice.
9) 10) 11)
29
The Project of Rural Water Supply in Tabora Region
13) Hold the head assembly in position, and insert the chain through the hole in bottom
flange. Lower head on top of middle flange ensuring all four holes to coincide.
14)) Tighten head, middle flange and water tank with bolts and nuts.
Fig.3-4
46 Installation of the Handle Assembly
15)) Lift handle up, and attach free end of the chain with high tensile bolt, washer and Nyloc
nut.
17)) Lower the handle, and remove chain coupler supporting tool.
30
The Project of Rural Water Supply in Tabora Region
Fig.3-49 Completion
31
The Project of Rural Water Supply in Tabora Region
M2Manpower
+ Tee-handle
Tee +
Counterweight
M1 x a = M2 x b M1: Input force (Resistance, Load) a : Distance between input force and the
t fulcrum
M1/M2 =b/a M2: Output force (Effort) b : Distance between output force and the fulcrum
Fig. 3-51 The Law of the Lever
32
The Project of Rural Water Supply in Tabora Region
c.. Check that fastener or parts of handpump are not missing. If it is missing, replace the
parts.
d. Check whether any unusual noise during operation. If any unusual noise is noticed,
check reason and take action.
If more than 5 full handle strokes are required to make the water flow again, it is
indication of leakage in the riser pipe or cylinder. And if more than 10 full handle strokes
stroke are
required, leakage is beyond an acceptable limit, it may be necessary to check riser pipe and
cylinder and to replace a rubber consumable.
33
The Project of Rural Water Supply in Tabora Region
Iff it is difficult to measure water volume in 20 liter bucket, followingng way is easy.
c. Count strokes at filling up 20 0 liter bucket.
d.. Calculate water yield at 40 strokes,
strokes as follows.
(40) strokes for filling up 20 liter: 20L x 40 / (40) = 20L x 1.00 = 20.0 L per 40 strokes
(60) strokes for filling up 20
0 liter:
liter 20L x 40 / (60) = 20L x 0.67 = 13.3 L per 40 strokes
Table 4-1
1 Calculation of Discharge yield at 40 strokes with 20L Bucket
Strokes at 20 L Yield at 40 stroke Strokes at 20 L Yield at 40 stroke
40 20.0 L 72 11.1 L
45 17.8 L 74 10.8 L
50 16.0 L 76 10.5 L
55 14.5 L 78 10.3 L
60 13.3 L 80 10.0 L
62 12.9 L 82 9.8 L
64 12.5 L 84 9.5 L
66 12.1 L 86 9.3 L
68 11.8 L 88 9.1 L
70 11.4 L 90 8.9 L
Remarks: 20L x 40 / ( ) strokes at 20L = ( ) L at 40 strokes
Discharge of India Mark-II II Extra Deepwell Handpump is 12 litters for 40 full strokes. And
in case of less than 10 litters for 40 full strokes, there might be a problem with pump cylinder.
Discharge rate to time is not concerned with pump capacity, but 40 strokes are estimated
as average stroke per 1 minute by human power, although it is depending on operator and
depth of cylinder, dynamic water level. And this is one of record checking well conditions.
Therefore, measure time at filling
ing up 20 liter bucket additionally.
(60) seconds at filling up 20 liter: 20L x 60 / (60) = 20L x 1.00 = 20.0 L/min
(100) seconds at filling up 20 liter: 20L x 60 / (100) = 20L x 0.60 = 12.0 L/min
34
The Project of Rural Water Supply in Tabora Region
The fast moving spare parts for India Mark II Handpump are bellows.
35
The Project of Rural Water Supply in Tabora Region
36
The Project of Rural Water Supply in Tabora Region
1-1) 1
1-2) 2)
Fig. 5-1
1 Open Head Cover and Supply Grease to the Chain
4) Lift
ft up the pump handle to top position, and then loosen Nyloc nut by two open-ended
open
spanners.
5) Remove the Nyloc nut anchor bolt and pull out chain from the handle.
3) 4) 5)
Fig. 5-2
2 Remove out Chain Assembly from Handle Assembly
37
The Project of Rural Water Supply in Tabora Region
7)) Lift and remove head assembly. The chain will go through hole in the bottom flange.
6) 7)
Fig. 5-3
5 Remove out Pump Head
8) Turn flange to 90, and lift connecting rod by holding middle flange and insert connecting
rod vice. Place rod vice on top flange of water tank, tighten it.
9) Remove out the chain support tool at first, and then loosen and remove the chain assembly
from top rod.
8) 9)
Fig. 5-4 Remove out the Chain Assembly from Pump rod
10) Leave
eave the middle flange for resting on the rod vice.
vice
11) In case of problem by chain, attach new the chain assembly as spare parts.
38
The Project of Rural Water Supply in Tabora Region
12) Remove out two nuts and washer from handle axle.
13)) Protect thread of handle axle by handle axle punch, and knock the handle axle punch by
hammer for removing handle axle out. It shall be lubricate little oil on handle axle for
smooth removing out.
Fig. 5-5
5 Remove out Handle Assembly
16) In case of supply grease in ball bearing, add grease into space between two bearings from
hole of bearing by finger.
15) 16)
Fig. 5-6
6 Maintenance of Ball Bearing without Removal
39
The Project of Rural Water Supply in Tabora Region
Spacer
Fig. 5-7
7 Remove out a Ball Bearing and Spacer
20)) Push out other ball bearing by tapping with minus drive and hammer.
21)) Before return back used bearing or replace new bearing, apply grease on bearing.
20) 21)
Fig. 5-8
8 Remove out another Bearing and Maintenance
40
The Project of Rural Water Supply in Tabora Region
2) Attach the rod lifter (in clockwise direction), and hold the rod lifter firmly. And
A then open
rod vice and remove it.
3)) Gently, lower the pump rod assembly until it sits on top of check valve, and unscrew the
rod lifter.
1) 2) 3)
Fig.
Fig.5-9 Lowering Pipe rod Assembly
4) Remove all bolts and nuts between water tank and pump stand.
5)) Lift the water tank upwards (about 50 cm) by chain block or pulley with tripod,
tripod and insert
and fasten pipe vice.
6)) Unscrew water tank by turning the spout by hand. If riser pipe is hard fixation, it will be
use pipe wrench.
4) 6)
41
The Project of Rural Water Supply in Tabora Region
8) Operate
perate chain block until the chain is tight,
tight and
nd open the pipe vice slowly and remove it.
And lift the riser pipes with pump rod and cylinder upward until the next pipe socket is
about 30 to 50cm above the top flange of pump stand.
7) 8)
Fig. 5-11 Remove out Riser Pipe Assembly with Cylinder (1)
9)) Hold riser pipe by pipe vice on the pipe stand, and open the protruding riser pipe by two
wrenches.
9) 10) 11)
Fig. 5-12
12 Remove out Riser Pipe Assembly with Cylinder (2)
42
The Project of Rural Water Supply in Tabora Region
13)) In case riser pipe is no so heavy, it is possible lift it up by the lifting spanner easily.
14)) Remove last riser pipe from the cylinder, and disconnect last pumprod from plunger rod.
Fig. 5-13
13 Remove out Riser Pipe Assembly with Cylinder (3)
Fig. 5-14
5 Open Cylinder Assembly
43
The Project of Rural Water Supply in Tabora Region
17)
7) Replace each rubber consumable (Cup seals and rubber seatings).
17-1)
Fig. 5-15
15 Cylinder Assembly (Stainless Steel, Extra Deepwell Type)
17-2)
Fig. 5-16
16 Cylinder Assembly (Cast Iron, Extra Deepwell Type)
18) After check / replace rubber consumable, install cylinder and riser pipe following
Installation process mentioned above.
44
The Project of Rural Water Supply in Tabora Region
The check valve is moving up and down in bottom plug during pumping up u water, and if
thread of check valve is loose tighten, check valve of stainless cylinder will be fall down into
borehole, because check valve is supported only upper part on bottom plug and lower part is
hang down from upper part. In case of Cast Iron cylinder, check valve assembly is support on
reducer cup, therefore check valve is not fall down, even if thread will be loose.
45
The Project of Rural Water Supply in Tabora Region
Fig. 5-21
21 Holding lower part of check valve
It is introduced stopper for lower part of check valve as additional tools which hold lower
part of check valve by four fingers from bottom plug.
Fig. 5-22
5 Check Valve Stopper
46
The Project of Rural Water Supply in Tabora Region
Table -1
1 Check Sheet of Handpump Maintenance (1)
(1) General
District : Village :
Borehole No. : Sub-village
Type of handpump : Num. of inner rod : Pcs
Confirmation of Caretaker
No Name Signature Date
A-1
The Project of Rural Water Supply in Tabora Region
District : Village :
Borehole No. : Type :
Name /
No. Date Item Description
Signature
1 Discharge test 20 L / ( ) strokes /40 = ( ) L per 40 strokes
Leakage test ( ) stroke after ( ) minutes stopping
Water condition Clean Slightly color Turbidity with sand
Handle operation Smooth Not smooth
Noise Nothing Noisy
Shaking Nothing Shaking
Other
observation
A-2
The Project of Rural Water Supply in Tabora Region
Table -3
3 Contact Information of Maintenance Service
3) Parts Shop
Name : Davis & Shirtliff
Address : P.O.Box 2877 Mwanza, Tanzania
Tel : 028-2541971/2
E-mail : www.davisandshirtliff.com
Contact : Mr. Ellison Malyi (Branch Manger)
: 0754-318827
318827 (Mob), Ellison.Malyi@dayliff.com
A-3
The Project of Rural Water Supply in Tabora Region
A-4
The Project of Rural Water Supply in Tabora Region
A-5
The Project of Rural Water Supply in Tabora Region
A-6
The Project of Rural Water Supply in Tabora Region
Table-7
7 Price of Miner Maintenance in the Village other than villages near Nzega Town
Unit
Amount
No. Description Detail price Qty Unit Remarks
(Tshs)
(Tshs)
person/
Supervisor
Supervisor-I 100,000 1 100,000 Working day
Staff Wage, day
1
allowance person/ No work day
Supervisor
Supervisor-II 80,000 1 80,000
day (only transport)
2 Consumable 10,000 1 unit 10,000
On above Price
O
3 Spare Parts - - - -
list
Transport of
4 - - - - Actual expense
Material
person/
5 Accommodation 20,000 1 20,000
day
6 Overhead 40 % 84,000
Moto
2,000 2 way 4,000
(in SHY)
Bus
8,000 16,000
(SHY~NZG
(SHY~NZG, 2 way
Transport of ~10,000 ~20,000
7 TBR) Actual Expense
person
Bus (NZG,, 8,000 16,000
2 way
TBR~village)
~village) ~10,000 ~20,000
Moto-Taxi
Taxi (in 10,000 person/ 10,000
1
village) ~30,000 day ~30,000
Total 340,000
~368,000
*1 In case of miner works which it is possible 1 supervisor from maintenance service for few
hours.
*2 In case of whole day transport from Shinyanga and return back with accommodation,
accommodation such like
villages other than villages near ar Nzega town. Price of transport will be changed depending
actual expense.
*3 Caretaker shall always work for maintenance and repair and assist supervisor from
maintenance service.
*4 Tools and spare parts, materials shall be provided by COWSO or order to maintenance service
following price list. In case big material is necessary,, it will be charged transport of materials.
Consumable on above list is included miner rubber consumable or lubricant oil or so on.
*5 Overhead is charged to price except transport of person.
*6 Transport fee is actual expense depending on traffic.
*7 Price
rice shall be confirmed maintenance service finally, it will be changed.
*8 It is recommended that Caretaker of COWSO will follow miner maintenance by themselves,
without maintenance service.
A-7
The Project of Rural Water Supply in Tabora Region
A-8
The Project of Rural Water Supply in Tabora Region
Table-9
9 Price of Repairing for India Mark-II
Mark in the Village
Unit
Amount
No. Description Detail price Qty Unit Remarks
(Tshs)
(Tshs)
person/
Supervisor
Supervisor-I 100,000 1 100,000 Working day
day
person/ No work day
Supervisor
Supervisor-II 80,000 2 160,000
Staff Wage, day (only transport)
1
allowance person/
Facilitator
Facilitator-I 80,000 2 160,000 Working day
day
person/ No work day
Facilitator
Facilitator-II 60,000 4 240,000
day (only transport)
2 Consumable 20,000 1 unit 20,000
On above Price
O
3 Spare Parts - - - -
list
Transport of
4 - - - - Actual expense
Material
person/
5 Accommodation 20,000 6 120,000
day
6 Overhead 40 % 320,000
Moto
2,000 6 way 12,000
(in SHY)
Bus
8,000 48,000
(SHY~NZG, 6 way
Transport of ~16,000 ~96,000
7 TBR) Actual Expense
person
Bus (NZG, 8,000 48,000
6 way
TBR~village) ~16,000 ~96,000
Moto-Taxi
Taxi (in 10,000 person/ 60,000
6
village) ~30,000 day ~180,000
Total 1,288,000
~1,504,000
*1 In case of repairing works which it is possible 1 supervisor and 1 facilitator from maintenance
service for 1 day.
*2 In case of whole day transport from Shinyanga and return back with accommodation,
accommodation such like
villages other than villages near Nzega town. Price of transport will be changed dependingdep
actual expense.
*3 Caretaker shall always work for maintenance and repair and assist supervisor from
maintenance service.
*4 Tools and spare parts, materials shall be provided by COWSO or order to maintenance service
following price list. In case big material is necessary,, it will be charged transport of materials.
Consumable on above list is included miner rubber consumable or lubricant oil or so on.
*5 Overhead is charged to price except transport of person.
*6 Transport fee is actual expense depending on traffic. In case many staff from maintenance
service, hiring car might be cheaper than public transport and it might be reduce educe staff wage
for transport day, and it is easy transport of tools and materials.
*7 Price shall be confirmed maintenance service finally, it will be changed.
*8 It is required that Caretaker of COWSO will work well so that it is possible to reduce 1
facilitator and his cost.
A-9
The Project of Rural Water Supply in Tabora Region
Tabora region
Water Engineer
Tabora
Technician
municipal
Water Engineer
Uyui district
Technician
(Tabora Rural)
Water Engineer
Urambo district Technician
Water Engineer
Kaliua district
Technician
(Urambo)
Water Engineer
Sikonge district Technician
Water Engineer
Igunga district Technician
Water Engineer
Nzega district Technician
A-10
The Project of Rural Water Supply in Tabora Region
2) Tabora Municipal
Municipal office
Kalumwa village
Misha village
3) Uyui District
District office
Mpumbuli village
Mabama village
Ufuluma village
Lutende village
4) Urambo District
District office
Imalamakoye village
5) Kaliua District
District office
Nsungwa village
Usonga village
6) Sikonge District
District office
Mpombwe village
Kasandalala village
Usunga village
A-11
The Project of Rural Water Supply in Tabora Region
8) Igunga District
District Office
Busomeke village
Kalemela village
Chapela village
Tambelale village
A-12