PROBLEM 15: A sludge pump operates 30 mins/hour. It delivers 19 gal/min of sludge. Laboratory tests
shows that the sludge is 3% of solids and 60% of volatile matter. How many pounds of volatile matter are
transferred from the settling tank to the digester in lb/day?
Pump time : 30 min/hour
Pump Rate : 19 gal/min
% Solids : 3%
% Volatile Matter : 60%
Volume of Solids = Pump Rate x Pump Time x % Solids x % Volatile Matter
= (19 gal/min) x (30 min/hour) x 0.03 x 0.60
= 19 x 30 x 24 x 8.34 x 0.03 x 0.60
0.6
= 100
51.03
= 1.1758%
BOD AND SUSPENDED SOLIDS REMOVAL
PROBLEM 17: If 115 mg/L suspended solids are removed by a primary clarifier, how many pounds per day
of suspended solids are removed when the flow is 5.17 MGD?
SS Removed = Suspended solids x Flow rate
= 115 x 5.17 x 8.34
= 4,958.547 lb/day
DETERMINING THE POND AREA IN ACRES
PROBLEM 18: A stabilization pond has a volume of 47.35 ac-ft. What is the detention time in days when
the flow is 0.21 MGD?
Influent flow = 0.21 x 3.069
= 0.64449 ac-ft/day
()
Detention time =
( )
47.35
= 0.64449 /
= 73.4689 days
TOTAL FLOW IN TRICKLING FILTERS
PROBLEM 19: The trickling filter is currently operating with a recirculation rate of 2.2. What is the total flow
applied to the filter when the influent flow rate is 4.82 MGD?
Total Flow in MGD = Influent flow x (Recirculation Rate + 1.0)
= 4.82 MGD x (2.2 + 1.0)
= 15.424 MGD
HYDRAULIC LOADING RATE
PROBLEM 20: A trickling filter 75 ft. in diameter is operated with a primary effluent of 0.561 MGD and a
recirculated effluent flow rate of 0.648 MGD. Calculate the hydraulic loading rate on the filter in gpd/sq. ft.
Q with Recirculation = Primary Effluent + Recirculated Effluent Flow Rate
= 0.561 MGD + 0.648 MGD
= 1.209 MGD
= 1,209,000 gpd
2
Media Top Surface = ( 4 )
752
= ( )
4
= 4,417.864669 ft2
Hydraulic Loading Rate =
1,209,000
Hydraulic Loading Rate = 4,417.864669 2
752
= ( )
4
= 4,417.864669 ft2
Media Volume = Surface Area x Depth
= 4,417.864669 ft2 x 10 ft.
= 44,178.64669 ft3
Organic Loading Rate =
327.5118 lb x 1000 lb BOD/day
= x
44,178.64669 ft3 1000 ft3