SWITCHGEAR DOCUMENT CHECK LIST

Project Description
Client / End User Manufacture
Item Tag No.

External Document Identification Document Status


No. Result Remark
Description Document Number Rev. Comp Date Ncom Date N/A
1 Design Specification
2 Data Sheet
3 Drawings
4 Bill of Material
5 Certificate of Auxilliary Equipment
6 Test Procedure
7 Factory Acceptance Test Report
8 Factory Acceptance Certificate
9 Operating & Maintenance Manual
10 Name Plate Rubbing
11 Field / Site Test Report

No Transmittal No. Receiving Date Recorded by Reviewed by Overall Complete Date :

Surveyor :
Glossary : Note : Receiving Date by Client :
Comp : Complete
NCom : Not Complete
N/A : Not Applicable
Client :