SYSTEM: HAIL

Category Sub-System No.


1 Civil H-CI-001
2 Civil H-CI-002
3 Civil H-CI-003
4 Civil H-CI-004
5 Civil H-CI-005
6 Civil H-CI-006
7 Civil H-CI-007
8 Electrical H-EL-001
9 Electrical H-EL-002
10 Electrical H-EL-003
11 Electrical H-EL-004
12 Electrical H-EL-005
13 Electrical H-EL-006
14 Electrical H-EL-007
15 Electrical H-EL-008
16 Electrical H-EL-009
17 Electrical H-EL-010
18 Electrical H-EL-011
19 Electrical H-EL-012
20 Electrical H-EL-013
21 Electrical H-EL-016
22 Electrical H-EL-017
23 Instrumentation H-IN-001
24 Instrumentation H-IN-002
25 Instrumentation H-IN-003
26 Instrumentation H-IN-004
27 Instrumentation H-IN-005
28 Instrumentation H-IN-006
29 Instrumentation H-IN-013
30 Mechanical H-ME-001
31 Mechanical H-ME-002
32 Mechanical H-ME-003
33 Process H-PR-001
34 Process H-PR-002
35 Process H-PR-003
36 Process H-PR-004
37 Safety H-SA-001
38 Safety H-SA-002
39 Safety H-SA-003
40 Telecommunication H-TE-001
41 Telecommunication H-TE-002
42 Telecommunication H-TE-003
43 Telecommunication H-TE-004
44 Telecommunication H-TE-005
45 Telecommunication H-TE-006
46 Utility H-UT-001
47 Utility H-UT-002
48 Utility H-UT-003
49 Utility H-UT-004
50 Utility H-UT-005
51 Utility H-UT-007
52 Utility H-UT-008
53 Utility H-UT-009
54 Utility H-UT-010
55 Utility H-UT-011
56 Utility H-UT-012

SYSTEM: MUBARRAZ
Category Sub-System No.
1 Civil M-CI-001
2 Civil M-CI-002
3 Civil M-CI-003
4 Civil M-CI-004
5 Electrical M-EL-001
6 Electrical M-EL-002
7 Electrical M-EL-003
8 Electrical M-EL-005
9 Electrical M-EL-006
10 Electrical M-EL-007
11 Electrical M-EL-008
12 Electrical M-EL-009
13 Electrical M-EL-010
14 Electrical M-EL-011
15 Instrumentation M-IN-001
16 Instrumentation M-IN-002
17 Instrumentation M-IN-003
18 Instrumentation M-IN-009
19 Instrumentation M-IN-010
20 Process M-PR-001
21 Process M-PR-002
22 Process M-PR-003
23 Process M-PR-004
24 Process M-PR-005
25 Process M-PR-006
26 Process M-PR-007
27 Process M-PR-008
28 Process M-PR-009
29 Process M-PR-010
30 Process M-PR-011
31 Process M-PR-012
32 Safety M-SA-001
33 Telecommunication M-TE-001
34 Telecommunication M-TE-002
35 Telecommunication M-TE-003
36 Telecommunication M-TE-004
37 Telecommunication M-TE-005
38 Utility M-UT-001
39 Utility M-UT-002.1
40 Utility M-UT-002.2
41 Utility M-UT-003
42 Utility M-UT-004
43 Utility M-UT-005
44 Utility M-UT-006
45 Utility M-UT-007
46 Utility M-UT-008
47 Utility M-UT-010
48 Utility M-UT-011
49 Utility M-UT-012
50 Utility M-UT-013
51 Utility M-UT-014
52 Utility M-UT-015
53 Utility M-UT-016
54 Utility M-UT-017
55 Utility M-UT-018
56 Utility M-UT-019

SYSTEM: SUBSEA
Category Sub-System No.
1 Electrical S-EL-001
2 Process S-PR-001
3 Process S-PR-002
4 Process S-PR-003
SYSTEM: HAIL
Sub-System Name
ETR Building Sub-system
ICR Building Sub-system
FW Pump House Sub-system
Structures Sub-system
Roads Sub-system
Fencing Sub-system
Foundations Sub-system
33/6.9kV Transformer Sub-system
6.9kV Switchgear Sub-system
6.9/0.460kV Transformer Sub-system
460V LV Switchgear Sub-system
Main Lighting Sub-system
Small Power Sub-system
105V AC UPS Sub-system
110V DC UPS Sub-system
Navigational Aids Sub-system
Emergency Lighting Sub-system
Hail Earthing Sub-system
MOV Power Distribution Sub-system
Space Heater Power Distribution Sub-system
Socket Outlets and Welding Receptacles Sub-system
IRP Sub-system
PCS Sub-system
ESD Sub-system
F&G Sub-system
Wellhead Control Panel Wellpad-A Sub-system
Wellhead Control Panel Wellpad-B Sub-system
Hydraulic Power Unit Sub-system
Multicable and Junction Boxes Sub-system
ICR HVAC Sub-system
ETR HVAC Sub-system
Material Handling Sub-system
Flowlines / MPFS - Wellpad-A Sub-system
Flowlines / MPFS - Wellpad-B Sub-system
Production Multiphase Flow Metering Sub-system
Multiphase Flow / Wet Gas Testing Sub-system
Safety Equipment Sub-system
ICR NOVEC Clean Agent Sub-system
ETR NOVEC Clean Agent Sub-system
Telephone / LAN Sub-system
Emergency Telephone Sub-system
CCTV Sub-system
PAGA Sub-system
Access Control Sub-system
Radio Sub-system
Methanol Injection Sub-system
Corrosion Inhibitor Injection Sub-system
Demulsifier Injection Sub-system
Xylene Injection Sub-system
Closed Drain Sub-system
Non-hazardous Drain Sub-system
FW Storage Tank Sub-system
FW Main Pump P-5850A-HF Sub-system
FW Jockey Pumps Sub-system
FW Main Pump P-5850B-HF Sub-system
FW Distribution Network Sub-system

SYSTEM: MUBARRAZ
Sub-System Name
MCR Modifications Sub-system
Structures Sub-system
Road Sub-system
Foundations Sub-system
6.9kV Switchgear Modification Sub-system
460V LV Switchgear Modification Sub-system
MOV Power Distribution Sub-system
Main Lighting Sub-system
Small Power Distribution Sub-system
Earthing Sub-system
Socket Outlets and Welding Receptacles Sub-system
UPS Power Distribution Sub-system
No-UPS Power Distribution Sub-system
IRP Sub-system
PCS and Integration Sub-system
ESD and Integration Sub-system
F&G and Integration Sub-system
System Modication MCR Sub-system
Multicable and Junction Boxes Sub-system
Oil Slug Catcher Sub-system
Production Oil Separation Sub-system
Production Oil Transfer Pump A Sub-system
Production Oil Transfer Pump B Sub-system
Sour Gas Inlet and Transfer Sub-system
Crude Oil Transfer Sub-system
Sweet Gas From AR Sub-system
Tie-in TP-01&02 Sub-system
Tie-in TP-04A&B Sub-system
Tie-in TP-12A,B,C&D Sub-system
Tie-in TP-06A&B Sub-system
Tie-in TP-26A&B Sub-system
Safety Equipment Sub-system
Telephone / LAN and Integration Sub-system
Emergency Telephone Sub-system
CCTV Sub-system
PAGA Sub-system
Access Control Sub-system
Closed Drain Sub-system
Flare Package Sub-system
Flare Distribution Sub-system
Fuel Gas Sub-system
Instrument Air Sub-system
Plant Air Sub-system
Utility Water Sub-system
FW Distribution Network Sub-system
Deluge Sub-system
Non-hazardous Drain Sub-system
Tie-in TP-09A&B Sub-system
Tie-in TP-05A&B Sub-system
Tie-in TP-10A&B Sub-system
Tie-in TP-11A&B Sub-system
Tie-in TP-17 Sub-system
Tie-in TP-18 Sub-system
Tie-in TP-19A,B,C,D&E Sub-system
Tie-in TP-20A,B&C Sub-system
Tie-in TP-21 Sub-system

SYSTEM: SUBSEA
Sub-System Name
Composite Cable Sub-system
18" Multiphase Pipeline Sub-system
8" Gas Lift Pipeline Sub-system
6" Gas Injection Pipeline Sub-system
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
COMMISSIONING DOCUMENTS

LIST AND DESCRIPTION OF OPERATIONAL TESTS


OVERALL MECHANICAL COMPLETION AND PRE-COMMISSIONING EXECUTION AND MANAGEMENT PLAN
AS PRE-COMMISSIONED DOCUMENTATION PROCEDURE
HANDOVER PROCEDURE
SOFTWARE MODIFICATIONS MANAGEMENT PROCEDURE
PUNCH LIST PROCEDURE
OPERATIONAL TEST PROCEDURE - CLOSED DRAIN SYSTEM
OPERATIONAL TEST PROCEDURE - PRODUCTION SEPARATOR AND OIL TRANSFER PUMPS
FIRST FILL & LUBRICANTS SCHEDULE
OPERATIONAL TEST PROCEDURE - HAIL XILENE INJECTION PACKAGE
PERFORMANCE TEST PROCEDURES
OPERATIONAL TEST PROCEDURE - METHANOL INJECTION PACKAGE
MC AND PRE-COMMISSIONING COMPLETION MANAGEMENT TECHNICAL DATA BASE
PRE-COMMISSIONING PLANNING (MANPOWER / ACTIVITY / DURATIONS) BY SYSTEM / SUB-SYSTEMS & DISCIPLINE
OPERATIONAL TEST PROCEDURE - MUBARRAZ CLOSED DRAIN SYSTEM
START-UP SEQUENCES (INCLUDING EQUIPMENT / PACKAGES START-UP)
COMMISSIONING & START-UP PLANNING (MANPOWER / ACTIVITY / DURATIONS)
OPERATIONAL TEST PROCEDURE - MUBARRAZ OIL SLUG CATCHER
OPERATIONAL TEST PROCEDURE - MUBARRAZ DELUGE SYSTEM
VENDOR'S SITE ASSISTANCE AND MOBILIZATION SCHEDULE
OPERATIONAL TEST PROCEDURE - MUBARRAZ FLARE KO DRUM AND PUMPS
OPERATIONAL TEST PROCEDURES - OIL PIG LAUNCHER & RECEIVER
OPERATIONAL TEST PROCEDURE - FIRE WATER STORAGE TANK, DIESEL PUMPS AND JOCKEY PUMPS
PIPELINES PRE-COMMISSIONING PROCEDURES (CLEANING, GAUGING, FLOODING,HYDROTEST, DEWATERING, DRYING, INERTING)
A 0 1
IFR IFC IFC
10-May-16 17-Aug-16 29-Jul-17 HD-EC-CM-BPGL-0001
11-Jul-16 13-Sep-16 HD-EC-CM-BPMF-0003
11-Jul-16 29-Aug-16 27-Apr-17 HD-EC-CM-BPMF-0006
26-Jul-16 27-Apr-17 HD-EC-CM-BPGF-0002
26-Jul-16 20-Apr-17 HD-EC-CM-BPMF-0008 B
19-Oct-16 27-Apr-17 HD-EC-CM-ZQGI-0002 A
18-Nov-16 24-Jan-17 23-May-17 HD-EC-CM-BPGF-0014 B
15-Nov-16 24-Jan-17 HD-EC-CM-BPGF-0018 B
29-Nov-16 9-Feb-17 HD-EC-CM-BPMW-0001