SMC-Mine Surveying

Question Text:
Alidade is used in

Options:
(1) Tachoemetry
(2) Plane Tabling
(3) Chaining
(4) Compass Surveying
(5) All the Options

Correction Answer : Option No.(2)


Question Text:
The length of a link in a chain is

Options:
(1) 20 cm
(2) 30 cm
(3) 35 cm
(4) 40 cm
(5) None of the Options

Correction Answer : Option No.(1)


Question Text:
A level cannot be used for

Options:
(1) Profile levelling
(2) Reciprocal levelling
(3) Vertical Angles
(4) Contouring
(5) None of the Options

Correction Answer : Option No.(3)


Question Text:
A Theodolite measures

Options:
(1) Horizontal angle only
(2) Vertical angle only
(3) Horizontal and Vertical angles
(4) both angle and distance
(5) None of the Options

Correction Answer : Option No.(3)


Question Text:
Alidade is used for

Options:
(1) Sighting the object
(2) Centering
(3) Transferring of the ground point
SMC-Mine Surveying
(4) Making perpendicular offsets
(5) None of the Options

Correction Answer : Option No.(1)


Question Text:
An underground plan shall show spot level on

Options:
(1) Roof of working
(2) side of gallery
(3) floor of working
(4) roof and floor both
(5) None of the Options

Correction Answer : Option No.(3)


Question Text:
Contours of different elevations can cross each other

Options:
(1) Only at a vertical cliff
(2) Only at an overhanging cliff
(3) Only at a valley
(4) Only at a depression
(5) None of the Options

Correction Answer : Option No.(2)


Question Text:
For ranging a line, the number of ranging rods required is

Options:
(1) At least two
(2) At least three
(3) At least four
(4) At least five
(5) At least one

Correction Answer : Option No.(2)


Question Text:
In a tilting level the telescope

Options:
(1) is rigidly fixed with the level tube
(2) is capable of some movement with respect to the level tube in vertical plane
(3) can rotate upto 90 in vertical plane
(4) can rotate freely in vertical plane
(5) None of the Options

Correction Answer : Option No.(2)


Question Text:
In chain surveying, slope correction is
SMC-Mine Surveying
Options:
(1) Always positive
(2) Positive or negative
(3) Always negative
(4) Compensating type
(5) None of the Options

Correction Answer : Option No.(3)


Question Text:
In Surveying, contours are lines of equal

Options:
(1) length
(2) elevation
(3) bearing
(4) latitude
(5) None of the Options

Correction Answer : Option No.(2)


Question Text:
In the underground coal mine plans, the surface contours drawn at vertical intervals not exceeding

Options:
(1) 5 m
(2) 2 m
(3) 3 m
(4) 4 m
(5) None of the Options

Correction Answer : Option No.(1)


Question Text:
Most important factor in selecting survey stations is

Options:
(1) Distance between two stations
(2) intervisibility
(3) Intervisibility and well-conditioned triangle
(4) Accessibility and distance
(5) None of the Options

Correction Answer : Option No.(3)


Question Text:
On a change point

Options:
(1) Only a backsight is taken
(2) Only a foresight is taken
(3) Both foresight and backsight are taken
(4) An intersight is taken
(5) None of the Options
SMC-Mine Surveying
Correction Answer : Option No.(3)
Question Text:
Prismatic compass gives the

Options:
(1) Quadrantal Bearing
(2) Reduced Bearing
(3) Whole circle Bearing
(4) Quadrantal and Reduced Bearing
(5) None of the Options

Correction Answer : Option No.(3)


Question Text:
Surveys which are carried out to depict mountains, rivers, water bodies, wooded areas and other
cultural details, are known as

Options:
(1) city surveys
(2) guide map surveys
(3) topographical surveys
(4) cadastral surveys
(5) hydrographical survey

Correction Answer : Option No.(3)


Question Text:
The closing error in a closed traverse is adjusted by

Options:
(1) Lehmann's rule
(2) Slide rule
(3) Bowditch's rule
(4) Simpson's rule
(5) Trapezoidal rule

Correction Answer : Option No.(3)


Question Text:
The field observations and plotting of the plan proceed simultaneously in

Options:
(1) Chain surveying
(2) Traversing
(3) Contouring
(4) Plane table surveying
(5) None of the Options

Correction Answer : Option No.(4)


Question Text:
The latitude and longitude are the

Options:
(1) Linear coordinates
SMC-Mine Surveying
(2) Plane coordinates
(3) Spherical coordinates
(4) Angular coordinates
(5) None of the Options

Correction Answer : Option No.(3)


Question Text:
The line passes through zero declination is known as the

Options:
(1) isogonic line
(2) Agonic line
(3) Dip line
(4) Contour line
(5) None of the Options

Correction Answer : Option No.(2)


Question Text:
The main principle of surveying is to work from

Options:
(1) Higher level to lower level
(2) Lower level to higher level
(3) Part to whole
(4) Whole to part
(5) Part to whole and Whole to part

Correction Answer : Option No.(4)


Question Text:
The mean-sea-level surface is a,

Options:
(1) Horizontal Surface
(2) Inclined Surface
(3) Flat Surface
(4) Level Surface
(5) None of the Options

Correction Answer : Option No.(4)


Question Text:
The suspended compensation system is a component of

Options:
(1) Auto Level
(2) Tilting Level
(3) Dumpy Level
(4) Y- level
(5) None of the Options

Correction Answer : Option No.(1)


Question Text:
SMC-Mine Surveying
The vertical angle is,

Options:
(1) The angle between two lines measured on horizontal plane
(2) The angle between north direction and a line
(3) The angle between horizontal line and any other line measured along vertical plane
(4) The angle between any two lines measured along vertical plane
(5) None of the Options

Correction Answer : Option No.(3)


Question Text:
Which of the following is not a temporary adjustment of Theodolite?

Options:
(1) Elimination of Parallaxes
(2) Centering
(3) Levelling
(4) Adjustment of Plate Bubble
(5) None of the Options

Correction Answer : Option No.(4)


Question Text:
Contour line of different elevation can unite to form one line in case of

Options:
(1) valley
(2) ridge
(3) vertical cliff
(4) steep slope
(5) none

Correction Answer : Option No.(3)


Question Text:
During levelling, if the reading of the staff at backsight is more than the foresight,

Options:
(1) Forward staff point is lower than the back staff point
(2) Different in level cannot be ascertained
(3) Back staff point is lower than the forward staff point
(4) Back and forward staff points are at the same elevation
(5) None of the Options

Correction Answer : Option No.(3)


Question Text:
If the reading on a leveling staff held at bench mark is less than that on the staff held at forward
station, the forward station is at

Options:
(1) lower elevation that of bench mark
(2) higher elevation that of bench mark
(3) same elevation that of bench mark
SMC-Mine Surveying
(4) insufficient data to interpret the result
(5) None of the Options

Correction Answer : Option No.(1)


Question Text:
In height of collimation method of levelling, the arithmetic check performed is given by

Options:
(1) Sum of foresights - Sum of backsights = Last R. L. - First R. L
(2) Sum of backsights - Sum of foresights = Last R. L. - First R. L.
(3) Sum of backsights - Sum of foresights = First R. L. - Last R. L.
(4) Sum of backsights - Sum of foresights = Sum of rises - Sum of falls
(5) None of the Options

Correction Answer : Option No.(2)


Question Text:
In tacheometer, anallatic lens is used to make

Options:
(1) Distance between stadia wires equal to zero
(2) Multiplying constant equal to 100
(3) Additive constant equal to focal length
(4) Additive constant equal to zero
(5) Multiplying constant equal to 100 and Additive constant equal to zero

Correction Answer : Option No.(5)


Question Text:
Modern EDM instruments use

Options:
(1) amplitude modulation
(2) frequency modulation
(3) amplitude and frequency modulation
(4) All the Options
(5) None of the Options

Correction Answer : Option No.(1)


Question Text:
Pick up the correct statement from the following :

Options:
(1) Gradiometer is used for setting out any required gradient
(2) Cross staff is used for setting out right angles
(3) Box sextant is used for the measurement of horizontal angles
(4) Optical square is used for setting out right angles
(5) All the Options

Correction Answer : Option No.(5)


Question Text:
Tacheometry is used to determine
SMC-Mine Surveying
Options:
(1) Horizontal and vertical distances
(2) Horizontal distances
(3) Horizontal angles
(4) Vertical angles
(5) None of the Options

Correction Answer : Option No.(1)


Question Text:
The device used as a substitute for plumb bob for centering a theodolite over a ground station is

Options:
(1) U - fork
(2) Alidade
(3) Optical square
(4) Optical plummet
(5) All of the above

Correction Answer : Option No.(4)


Question Text:
The sum of the interior angles of a closed traverse of N sides is equal to

Options:
(1) (N - 1) x 90
(2) (N + 1) x 90
(3) (2N - 4) x 90
(4) (2N + 1) x 90
(5) None of the Options

Correction Answer : Option No.(3)


Question Text:
The Two-Peg Test is carried out to check

Options:
(1) Collimation error
(2) Plate level error
(3) Graduation error
(4) All the Options
(5) None of the Options

Correction Answer : Option No.(1)


Question Text:
The U-tube is a component of

Options:
(1) Auto Level
(2) Digital Level
(3) Tilting Level
(4) Dumpy Level
(5) None of the Options
SMC-Mine Surveying
Correction Answer : Option No.(3)
Question Text:
Two mirrors are used for offsetting in

Options:
(1) Cross-staff
(2) Optical square
(3) Miner's dial
(4) Prism compass
(5) Cross-staff and Optical square

Correction Answer : Option No.(2)


Question Text:
Which of the following helps to identify the objects on the earth surface?

Options:
(1) Atmospheric window
(2) Signature
(3) Radiometric error
(4) None of the Options
(5) All the Options

Correction Answer : Option No.(2)


Question Text:
Which of the following instruments can not be used for monitoring of subsidence in mines?

Options:
(1) Total Station
(2) DGPS
(3) Digital Level
(4) Laser scanners
(5) Gyro-theodolites

Correction Answer : Option No.(5)


Question Text:
A distance is measured along a rising ground of 50 cm at every 10 m and was found to be 235 m.
The horizontal distance is,

Options:
(1) 235 m
(2) 235.293 m
(3) 234.706 m
(4) 244 m
(5) None of the Options

Correction Answer : Option No.(3)


Question Text:
A mine boundary is plotted on a scale of 1:2000. If a Planimeter measures the plotted area as 87
cm2, the actual mine area in m2 is

Options:
SMC-Mine Surveying
(1) 8700
(2) 17400
(3) 34800
(4) 39000
(5) None of the Options

Correction Answer : Option No.(3)


Question Text:
A plan drawn to a scale of 1:4000 was measured by a scale of 1:5000. The % error in the area
measured would be

Options:
(1) 43.75
(2) 35.2
(3) 25.1
(4) 56.25
(5) None of the Options

Correction Answer : Option No.(4)


Question Text:
ABCD is a regular parallelogram plot of land whose angle BAD is 60. If the bearing of the line AB is
30, the bearing of CD, is

Options:
(1) 90
(2) 120
(3) 210
(4) 270
(5) 180

Correction Answer : Option No.(3)


Question Text:
An offset is laid out at 20 from its true direction in the field. The resultant displacement (parallel
to chain line) of the plotted point on the paper for a 30 m offset length and scale of 20 m to 1 cm
will be

Options:
(1) 0.88 cm
(2) 0.0904 cm
(3) 0.513 cm
(4) 3.96 cm
(5) None of the Options

Correction Answer : Option No.(3)


Question Text:
Consider the following statements about the characteristics of contours:
(i) Closed contour lines with higher values inside show a lake
(ii) Contour is an imaginary line joining points of equal elevations
(iii) Closed spaced contours indicate steep slope
(iv) Contour lines can cross each other in case of overhanging cliff
Which of the above statements are correct?
SMC-Mine Surveying

Options:
(1) (i), (ii) and (iii)
(2) (i) and (iv)
(3) (i) and (ii) only
(4) (ii), (iii), (iv)
(5) None of the Options

Correction Answer : Option No.(4)


Question Text:
If 2 cm on the topographical map represents 1 km on the ground, what would be the R.F?

Options:
(1) 1:5000
(2) 1: 100000
(3) 1: 50000
(4) 1:10000
(5) None of the Options

Correction Answer : Option No.(3)


Question Text:
If a level reads a staff kept over a point of 25 m RL as 3.39 m, the height of collimation of the level
is

Options:
(1) 3.39 m
(2) 21.61 m
(3) 25.0 m
(4) 28.39 m
(5) None of the Options

Correction Answer : Option No.(4)


Question Text:
If the declination of the needle is 10 W

Options:
(1) each of the whole circle reckoning has to be micros by 10
(2) in the Quadrantal method, the correction is positive in the 1st and 3rd quadrants
(3) in the Quadrantal method, the corrections is negative in 2nd and 4th quadrants
(4) All the Options
(5) None of the Options

Correction Answer : Option No.(4)


Question Text:
If the reduced bearing of a line AB is N 60 W and length is 100 m, then the latitude and departure
respectively of the line AB will be

Options:
(1) + 50 m, + 86.6 m
(2) + 86.6 m, - 50 m
(3) + 50 m, - 86.6 m
SMC-Mine Surveying
(4) + 70.7 m, - 50 m
(5) None of the Options

Correction Answer : Option No.(3)


Question Text:
In triangulation the two perpendicular sides of a triangle are measured to be 180 m and 200 m.
The area enclosed by the triangle will be

Options:
(1) 4.5 hectares
(2) 3.6 hectares
(3) 1.8 hectares
(4) 1.2 hectares
(5) None of the Options

Correction Answer : Option No.(3)


Question Text:
Keeping the instrument height as 1.5 m, length of staff 4 m, the slope of the ground as 1 in 10, the
sight on the down-slope, must be less than

Options:
(1) 30 m
(2) 25 m
(3) 20 m
(4) 15 m
(5) None of the Options

Correction Answer : Option No.(2)


Question Text:
The magnetic bearing of a line is S30 20'E. What will be the true bearing of the line if the
magnetic declination is 4 10' East?

Options:
(1) 145 30'
(2) 153 50'
(3) 63 50'
(4) 65 30'
(5) None of the Options

Correction Answer : Option No.(2)


Question Text:
The multiplicative constant in a tacheometer with focal length f and stadia wire interval i, is

Options:
(1) i f
(2) f i
(3) i+f
(4) ixf
(5) None of the Options

Correction Answer : Option No.(2)


SMC-Mine Surveying
Question Text:
The perpendicular offsets taken at 10 m intervals from one end of a chain line to an irregular
boundary are 3.06, 4.14, 5.6, 4.86, 6.0, 6.6, 7.8, 6.3 and 7.2 m. The area enclosed between the
chain line, the irregular boundary, and the first and last offsets using Simpson's rule is

Options:
(1) 455.53 sq. m
(2) 453.55 sq. m
(3) 456.55 sq. m
(4) 545.53 sq. m
(5) None of the Options

Correction Answer : Option No.(1)


Question Text:
The radius of curvature of the arc of the bubble tube is generally kept

Options:
(1) 50 m
(2) 25 m
(3) 10 m
(4) 100 m
(5) None of the Options

Correction Answer : Option No.(4)


Question Text:
The whole circle bearing of a line with Quadrantal bearing of S 19 30' E is

Options:
(1) 19 30'
(2) 109 30'
(3) 160 30'
(4) 199 30'
(5) None of the Options

Correction Answer : Option No.(3)


Question Text:
What will be R.F for a scale of 2.5 cm = 100 m?

Options:
(1) 1:5000
(2) 1:1000
(3) 1 :4000
(4) 1:3000
(5) 1:2000

Correction Answer : Option No.(3)


Question Text:
Which of the following are permanent adjustment of compass?
A) Adjustment of level
B) Centering
C) Levelling
SMC-Mine Surveying
D) Adjustment of needle
E) Adjustment of pivot point

Options:
(1) A, B, C
(2) A, C, D
(3) B, D, E
(4) A, D, E
(5) C, D, E

Correction Answer : Option No.(4)


Question Text:
Which of the following statements is wrong in terms of Levelling?

Options:
(1) The rise-and-fall method of booking is recommended as it is affords a complete arithmetical
check on all the observations
(2) Although the Height of Collimation method appears superior where there are a lot of
intermediate sights, there is no simple straightforward check on their reduction
(3) Height of Collimation method is useful when setting out levels on site
(4) The compensator has a wide working range. Even If the circular bubble is too much out of
adjustment, it will not result in tilt of the line of collimation
(5) None of the Options

Correction Answer : Option No.(4)