Вы находитесь на странице: 1из 3

LILERATURE CASE STUDY | CHENNAI MOFUSSIL BUS TERMINUS | ABOUT THE CITY & SITE AND SURROUNDINGS

CHENNAI FACTFILE
STATE : TAMILNADU
AREA : 1189 SQKM

POPULATION : 46,81,087 (CEENCUS-2011)


PUPULATION DENSITY : 11,000 persons / sqkm

CLIMATE : WARM & HUMAID CLIMATE


AVG. TEMPERATURE : 3540 C (SUMMERS)
1522 C (WINTERS)
PRECIPITATION : 1400 MM

CHENNAI MOFUSSIL BUS TERMINUS


SITE AREA : 14.5 HACTARES (36 ACRE)
BUILT-UP AREA : 17,840 SQMT.
F.S.I. : 0.123
GROUND COVERAGE : 10 %
ARCHITECT : MR. KULDEEP SINGH

FOOTFALL / DAY : 2,50,000 PERSONS


HANDLING CAPACITY : 3000 BUSES
IDLE PARKING CAPACITY : 60
TOTAL NO. OF FINGERS : 3
EACH FINGER CAPACITY : 60 BUSES AT A TIME
THE WHOLE PREMISES IS FRIENDLY TO PHYSICALLY
CHELLENGED PEOPLE.

SURROUNDING BUS TERMINUS ARE AS FOLLOWS :


NORTH : 30M ROAD
EAST : RESIDENTIAL COLONY
SOUTH : KOYAMBEDU SEWAGE
TREATMENT PLANT
WEST : KOYAMBEDU SEWAGE
TREATMENT PLANT

NEAR-BY HOSPITAL : KAMALA HOSPITAL (2 KM)

ACCESS TO THE SITE :


I - ENTRY FOR PARKING AND AUTOS
II - MAIN ENTRY FOR PUBLIC
III & IV - ENTRY & EXIT WAYS FOR BUSES

DISTANCES FROM MAJOR LANDMARKS :


CHENNAI INTERNATIONAL AIRPORT : 12 KM
CENTRAL RAILWAY STATION : 13 KM
IIT MADRAS : 18 KM
40

30

20

10

0
JAN FEB MAR APR MAY JUNE JULY AUG SEP OCT NOV DEC
MRIDUL BHANDARI (B.ARCH | V YR. / X SEM.)
SHEET NO. 1
THESIS TOPIC : INTER-STATE BUS TERMINUS FOR UDAIPUR CITY
LITERATURE CASE STUDY
TH BUDDHA INSTITUTE OF ARCHITECTURE & TOWN PLANNING UDAIPUR (313001),
DATE : 27 FEBRUARY / 2015
RAJASTHAN
LILERATURE CASE STUDY | CHENNAI MOFUSSIL BUS TERMINUS | SITE PLAN

11

10

9
6 5

7 1

2
8 6

VIEW OF WAITING LOUNGE FROM PUBLIC


ENTRY / EXIT : VEHICULER : 6M ENTRANCE
BUSES : 30 M
TURNING RADIUS : 90 DEGREE : 15 M
180 DEGREE : 18.5 M LEGENDS
DRIVEWAY WIDTH : 11 M 1 - ENTRY / EXIT
2 - AUTO / TAXI STAND
NO. OF SEATINGS IN WAITING AREA : 1172 3 - TWO-WHEELER PARKING
4 - LOCAL BUS STATION
WATER SERVICES 5 - MAIN BUILDING BLOCK
UNDER WATER SUMPS : 3 LAKH CAPACITY 6 - FINGER BUILDING BLOCK
REVERSE OSMOSIS PLANT: 2 LAKH CAPACITY 7 - IDLE BAYS PARKING
FIREFIGHTING SUMP : 1(3 LAKH LITRE CAPACITY) 8 - MAINTAINANCE SHED
IT IS ALSO EQUIPPED WITH RAIN WATER HARVESTING UNIT. 9 - WASHING YARD SURFACE PARKING FOR TWO WHEELERS AUTO & TAXI STAND AREAL VIEW OF CMBT
10 - FUEL FILLING STATION
ELECTRICAL SERVICES 11 - BUS ENTRY / EXIT MRIDUL BHANDARI (B.ARCH | V YR. / X SEM.)
ELECTRIC SUB STATION: 600 KAV CAPACITY SHEET NO. 2
THESIS TOPIC : INTER-STATE BUS TERMINUS FOR UDAIPUR CITY
LITERATURE CASE STUDY
DIESEL GENERATOR: 380 KAV CAPACITY AS BACK UP. TH BUDDHA INSTITUTE OF ARCHITECTURE & TOWN PLANNING UDAIPUR (313001),
DATE : 27 FEBRUARY / 2015
RAJASTHAN
LILERATURE CASE STUDY | CHENNAI MOFUSSIL BUS TERMINUS | FINGER BLOCK PLAN

VIEW OF BUS BAYS BETWEEN TWO


FINGER BLOCKS

FINGER GROUND FLOOR PLAN DISPENSORY AT MAIN WAITING HALL

FINGER ELEVATION

FACILITIES PROVIDED AT THE BUS TERMINUS AT GROUND FLOOR


DISPENSARY : NEAR THE ENTRANCE KIYOSKS & ATM AT MAIN WAITING HALL
CLOAK ROOM : 1 NO.
RECEPTION/ENQUIRY COUNTER : 2 NOS.

MAINTENANCE SHED : 1 NO. (1400 SQ.MT.) FACILITIES PROVIDED AT THE BUS TERMINUS AT FIRST FLOOR
FUEL FILLING STATION : 1 NO. (855 SQ.MT.) OFFICE/COMMERCIAL SPACE : 2300 SQ.MT.
PARKING FACILITIES : SINGLE ENTRY FOR STAFF AND TRADE CENTER : 2 BLOCKS OF 5 SHOPS EACH.
PUBLIC PARKING
CREW REST ROOM : 2 Nos. (500 SQ.MT.)
THERE ARE TOTAL 44 SHOPS (600 SQM) IN THE TERMINAL
PRIVATE DORMITORIES ARE PROVIDED WITH BED FACILITY/AC HALLS
TIME KEEPERS ROOM : 6 NOs.
NO OF SHOPS IN MAIN HALL : 10 NOS.
DRINKING WATER FOUNTAINS WITH COOLER : 7 NOs. IN BUS FINGERS : 24 NOS.
FREE EMERGENCY CLINIC CUM DISPENSARY : M/S APOLLO HOSPITALS IN TRADE CENTRE : 10 NOS.
(150 SQ. MT.)
FREE WHEEL CHAIR FOR PHYSICALLY
POLICE OUT-POST : 1 NO.
CHELLENGED PEOPLE
SECURITY CABIN : 5 NOs.
FREE WHEEL CHAIRS : 6 NOs. MRIDUL BHANDARI (B.ARCH | V YR. / X SEM.)
BANK ATM : 4 NOs. SHEET NO. 3
THESIS TOPIC : INTER-STATE BUS TERMINUS FOR UDAIPUR CITY
LITERATURE CASE STUDY
TELEPHONE BOOTH : 30 NOs. TH BUDDHA INSTITUTE OF ARCHITECTURE & TOWN PLANNING UDAIPUR (313001),
DATE : 27 FEBRUARY / 2015
RAJASTHAN

Вам также может понравиться