PARTIES INVOLVED IN THE CONSTRUCTION INDUSTRY

PROJECT MANAGEMENT
FEDERAL PUBLIC PRIVATE CONSULTANT, PARTNER,
SECTROR SECTOR ARCHITECT, ENGINEER
(CIVIL,
STATE
STRUCTURAL,MECHANICAL
ETC), QUANTITY SURVEYOR,
OWNER LAND SURVEYOR, INTERIOR
LOCAL DESIGNER, LANDSCAPE
DEVELOPER
ARCHITECT, OTHER
SPECIALIST CONSULTANTS

APPOVING CONSULTANT
AUTHORITIES S
FINANCIER
MAIN
BANK, FINANCE CONTRACTOR
COMPANY,
CREDIT
CORPORATION, NOMINATED SUB-
LEASING CONTRACTOR
MATERIAL &
EQUIPMENT
SUPPLIER BUILDER/
CONTRACTOR

NOMINATED
SUPPLIER
MANUFACTURER, MANPOWER
IMPORTER,
DISTRIBUTOR

TECHNOLOGIST SEMI-SKILLED
TECHNICIAN, SKILLED WORKER WORKER, UNSKILLED WORKER
TRADITIONAL PROCUREMENT METHOD
__________________________________

CLIENT

DESIGN
CONTRACT TEAM
ADMINISTRATOR
COLLATERAL WARANTY

MAIN
CONTRACTOR

DOMESTIC NOMINATED
SUB-CONTRACTOR SUB-CONTRACTOR

NOTES

1. Contract Administrators include the architect or civil engineer or project


manager or supervising officer.

2. Design Team includes the architect and anyone to whom he delegates


part of the design function- e.g. structural or services engineer.

3. However, specialists may also appear at different points of the work as


direct consultants to the client, the main contractor or the sub-contractor.
The contracts are signed with the client.
DESIGN & BUILD
(TURNKEY/PACKAGE)

CLIENT

CONTRACT COLLATERAL WARANTY


ADMINISTRATOR

MAIN
CONTRACTOR

DOMESTIC NOMINATED
SUB-CONTRACTOR SUB-CONTRACTOR

NOTES

1. Contract Administrator are as for the traditional procurement method

2. There are no separate Design Team. This function is taken on by the Main
Contractor who may of course sub-contractor all or part of the works
(design) to architects, specialist engineers, etc.
MANAGEMENT
CONTRACTING
____________________

CLIENT

CONTRACT DESIGN
ADMINISTRATOR TEAM

COLLATERAL WARANTY COLLATERAL WARANTY

MANAGEMENT
CONTRACTOR

WORK WORK
CONTRACTOR CONTRACTOR

NOTES

1. Design Team and Contract Administrators are as for the traditional


procurement method.

2. Although the contractual structure is very similar to the traditional method,


the allocation of risk is very different.

3. Specialist may come into the picture at different points (though they may not
be engaged as direct advisers to the management contractor)
CONSTRUCTION
MANAGEMENT
_______________________

CLIENT

CONSTRUCTION DESIGN
MANAGER TEAM

TRADE TRADE WORK


CONTRACTOR CONTRACTOR CONTRACTOR

NOTES

1. Design Team is as above. A specialist engineer may be a consultant to the


client the architect or a trade contractor

2. Contract administration is carried out by the Construction Manager, who


ranks alongside the Client are other professional advisers.

3. There is no main contract. Each of the trade contractors is linked directly


with the client. There is thus no need for.Collateral warranties.

Вам также может понравиться