Вы находитесь на странице: 1из 2

E,P,C Pungut Well Test, Gathering Station And Water

Injection Plan

5 June 2016 admin Past Project, Portofolio 0

Build Facilities for processing fluid from well to designed line outside gathering
station. This E,P,C project will provide such as : Surge Tank, Skimming Tank, Wash
Tank, Pipe Line, Pump, Instrumentation, Lightening etc.

MEDCO

Description : Jasa Engineering, Pengadaan, Konstruksi, Instalasi, dan Commisioning


2 (dua) unit Skimmer Tank Kapasitas 10000 bbls (API 12 B)

Вам также может понравиться