Вы находитесь на странице: 1из 2

Top of Pro.

Top of Formation Formation


Abutment as abutment Formation
Br.No Chainage at Level as per level at site
per site comp. Drg. (top of slab) Level as per
Comp.Drg LS

a b c d e f g
1 943.623 553.619 553.53 554.074 553.875 553.979
2 971.913 553.139 553.285 554.264 554.161 554.114
3 1787.543 - - 553.427 - 553.494
4 2440.413 548.314 548.31 549.013 548.961 549.205
5 2859.353 547.350 547.37 548.185 547.987 548.215
6 3594.913 549.385 549.565 549.750 549.655 549.878
7 3704.913 549.572 549.56 550.127 549.946 550.108
Diff.
Rail Level as Rail Level as Pro. Rail Rise/
Desired top between
per per ini. Level as per Dressing
of abutment Extg top and
Comp.Drg Survey LS reqd
Desired Top

h i j k l m
554.549 554.565 554.721 553.419 0.111
554.739 554.906 554.856 553.554 -0.269
553.902 553.801 554.236 552.934 #VALUE!
549.488 549.313 549.947 548.645 -0.335
548.660 548.345 548.957 547.655 -0.285
550.330 550.097 550.618 549.316 0.249
550.602 550.37 550.866 549.564 -0.004

Вам также может понравиться