Вы находитесь на странице: 1из 1

SCHEMATIC DIAGRAM FOR ELECTROCHLORINATION SYSTEM

SALT BRINE DUTY / STANDBY


CLEAN WATER DUTY / STANDBY EJECTOR
LOADING SATURATION
TANK SOFTENER ELECTROLYSER CHEMICAL TANKS DOSING SYSTEM
TANK TANK

Hydrogen Discharge
Pipe (To roof)

To Dosing
H2 degasification Level Level Point
Sensor Sensor

Product

Level
motive
motive water for system Sensor water

softened water

Clean Clean Ultra Loading Brine Brine Brine Softener with Concrete Slab Booster Pumps
Water Water Filter Platform Tank Saturation Pumps auto switchover with Tiles & Railings (for motive water of
Tank Pumps (concrete) Tank & auto backwash ejector & incoming
water for EC)

SOLIDIUM SDN. BHD.

Вам также может понравиться