TEST PROCEDURE CONFIGURATION 2

MECHANICAL PUSH-/PULL CLAMP

STEP 1

POSITION Icone VANE IN HYSON


FEED CABLE THROUGH UPPER BEAM

STEP 2

PLACE CONSTRICTED CPT ROD AR-VANE


PLACE CASING TUBE 500 mm
LOWER Icone VANE WITH HYSON
STEP 3 STEP 4

PLACE CASING TUBE 1000 mm + INNER CASING 56 REMOVE CASING TUBE


LOWER Icone VANE AND CLAMP WITH CATCHING CLAMP PLACE SLOTTED PUSH-/PULL ROD Icone VANE
SLIDE PUSHING PIECE 56 TO CENTER
CONNECT SLOTTED PUSH-/PULL ROD TO PUSHING PIECE

STEP 6

PULL VANE INSIDE PROTECTION TUBE


REMOVE SLOTTED PUSH-/PULL ROD Icone VANE
SLIDE PUSHING PIECE 56 BACK IN CARRIAGE
PLACE CPT ROD + CASING TUBE
STEP 7
THE SYSTEM IS NOW READY FOR MULTIPLE VANE TESTS
STEP 5
PUSH Icone VANE TILL DESIRED DEPTH STEP 8
CLAMP CASING TUBE ADD CPT-RODS AND CASING TUBES WHEN NEEDED
PUSH VANE OUT OF PROTECTION TUBE PLACE SLOTTED PUSH-/PULL ROD Icone
MAKE SURE THE VANE IS IDLE FROM ANY LOAD SLIDE PUSHING PIECE 56 TO CENTER
PERFORM "ZERO-READING" PUSH VANE OUT OF PROTECTION TUBE
MAKE SURE VANE ROTATES TILL NEXT QUADRANT PERFORM VANE TEST

ROTATE VANE TO NEXT QUADRANT


PULL VANE INSIDE PROTECTION TUBE
REMOVE ROD/PUSHING PIECE
PUSH Icone VANE TO NEXT DEPTH

TEST PROCEDURE CONFIGURATION 2


Icone VANE PROTECTED IN HYSON
IJzerweg 4, 8445 PK H eerenveen
P.O. box 68, 8440 AB H eerenveen 012647 REV A
tel : +31 (0)513 63 13 55
www.apvandenberg.com
info@apvandenberg.com
-
This drawing remains our property and may not be reproduced without permission. All rights reserved.

Вам также может понравиться