Вы находитесь на странице: 1из 13

Project No.

: 44673
Revision: 00

TECHNICAL DATA

Crane Type: BOS 6000-150 LITRONIC

Customer: Frigstad Engineering (Norway) AS


Project: 44673
LIEBHERR Project No.: 44673

13.10.2017 00 prepared Hartmann Matthies


Date Rev. Description Prepared Approved

Crane System Calculation.xls


No copying or duplication of this document without the permission of Liebherr.
This document has been issued electronically and is valid without signature.
1/13
Project No.: 44673
Revision: 00

Crane: BOS 6000-150 LITRONIC Project: 44673 Date: 13.10.17


MAIN HOIST 1 LOAD CHARTS: 6-FALL REEVING
Design code: DNVGL-ST-0378, "Standard for offshore and platform lifting appliances", May 2016
Calculation method: GM - General Method
Conditions: Crane location: Semi-Submersible
Crane is lifting to or from: Onboard: Onboard - Onboard
Offboard: Onboard - Supply vessel
Max. mean wind speed: 25 [m/s]
Static trim of installation: 3 / (3) []
Static heel of installation: 3 / (3) []
Height under pivot: min: 10.0 [m]
max: 22.0 [m]
160
Onboard, SWH 0.5
Onboard, SWH 1.0
140
Onboard, SWH 2.0
Onboard, SWH 3.0
120
Onboard, SWH 4.0

100 Onboard, SWH 5.0


Onboard, SWH 6.0
SWL [t]

80 Onboard, SWH 7.0


Offboard, SWH 0.5
60 Offboard, SWH 0.9

40

20

0
0 5 10 15 20 25 30 35 40 45 50 55 60
Radius R [m]
Lift mode Onboard Onboard Onboard Onboard Onboard Onboard Onboard Onboard Offboard Offboard
SWH [m] 0.5 1.0 2.0 3.0 4.0 5.0 6.0 7.0 0.5 0.9
vc [m/s] n.a. n.a. n.a. n.a. n.a. n.a. n.a. n.a. 0.13 0.23
vd [m/s] n.a. n.a. n.a. n.a. n.a. n.a. n.a. n.a. 0.30 0.54
az [g] 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
ay [g] 0.01 0.02 0.03 0.05 0.06 0.08 0.10 0.13 0.01 0.01
Radius SWL SWL SWL SWL SWL SWL SWL SWL SWL SWL
[m] [t] [t] [t] [t] [t] [t] [t] [t] [t] [t]
11.0 150.0 150.0 138.2 123.8 110.6 97.8 84.9 72.1 131.5 108.4
14.3 150.0 150.0 138.2 123.8 110.6 97.8 84.9 72.1 131.5 108.4
17.6 150.0 150.0 138.2 123.8 110.6 97.8 84.9 72.1 131.5 108.4
20.9 150.0 149.6 133.5 120.0 107.5 95.2 82.9 70.6 112.4 91.3
24.2 150.0 144.6 129.4 116.6 104.7 93.0 81.1 69.2 96.6 78.1
27.5 143.9 140.1 125.7 113.5 102.1 90.9 79.5 67.9 83.7 67.7
30.8 127.6 125.6 122.0 110.7 99.8 88.9 77.9 66.7 72.5 59.3
34.0 114.2 112.5 109.5 106.6 97.6 87.1 76.5 65.6 63.9 52.5
37.3 102.8 101.4 98.9 96.5 93.9 85.4 75.1 64.6 57.1 46.8
40.6 93.1 92.0 89.9 87.9 85.7 83.3 73.8 63.6 51.3 42.0
43.9 84.8 83.8 82.1 80.4 78.6 76.6 71.8 59.1 46.4 38.0
47.2 77.5 76.7 75.3 73.9 72.4 70.7 62.8 51.4 42.2 34.6
50.5 71.2 70.6 69.4 68.3 67.1 65.7 55.1 44.7 38.7 31.8
53.8 65.7 65.2 64.3 63.4 62.5 58.0 48.4 38.9 35.8 29.6
57.1 59.1 58.9 58.5 58.1 57.7 51.3 42.5 33.7 33.6 28.1
Remark: - the given preliminary load charts are subject of engineering modification.
- operational limitations: 1. due to low vertical hook velocity: none
2. due to low radial hook velocity: none
3. due to low lateral hook velocity: underlined SWL values
4. due to wave induced motions of the load: none
5. for the lifting of personnel: no personnel lift operation available

Crane System Calculation.xls


No copying or duplication of this document without the permission of Liebherr.
This document has been issued electronically and is valid without signature.
2/13
Project No.: 44673
Revision: 00

Crane: BOS 6000-150 LITRONIC Project: 44673 Date: 13.10.17


MAIN HOIST 1 LOAD CHARTS: 4-FALL REEVING
Design code: DNVGL-ST-0378, "Standard for offshore and platform lifting appliances", May 2016
Calculation method: GM - General Method
Conditions: Crane location: Semi-Submersible
Crane is lifting to or from: Onboard: Onboard - Onboard
Offboard: Onboard - Supply vessel
Max. mean wind speed: 25 [m/s]
Static trim of installation: 3 / (3) []
Static heel of installation: 3 / (3) []
Height under pivot: min: 10.0 [m]
max: 22.0 [m]
120
Onboard, SWH 0.5
Onboard, SWH 1.0

100 Onboard, SWH 2.0


Onboard, SWH 3.0
Onboard, SWH 4.0
80
Onboard, SWH 5.0
Onboard, SWH 6.0
SWL [t]

60 Onboard, SWH 7.0


Offboard, SWH 0.5
Offboard, SWH 1.0
40
Offboard, SWH 1.4

20

0
0 5 10 15 20 25 30 35 40 45 50 55 60
Radius R [m]
Lift mode Onboard Onboard Onboard Onboard Onboard Onboard Onboard Onboard Offboard Offboard Offboard
SWH [m] 0.5 1.0 2.0 3.0 4.0 5.0 6.0 7.0 0.5 1.0 1.4
vc [m/s] n.a. n.a. n.a. n.a. n.a. n.a. n.a. n.a. 0.13 0.25 0.35
vd [m/s] n.a. n.a. n.a. n.a. n.a. n.a. n.a. n.a. 0.30 0.60 0.84
az [g] 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
ay [g] 0.01 0.02 0.03 0.05 0.06 0.08 0.10 0.13 0.01 0.02 0.02
Radius SWL SWL SWL SWL SWL SWL SWL SWL SWL SWL SWL
[m] [t] [t] [t] [t] [t] [t] [t] [t] [t] [t] [t]
11.0 100.0 100.0 100.0 100.0 100.0 99.2 86.4 73.6 100.0 100.0 95.4
14.3 100.0 100.0 100.0 100.0 100.0 99.2 86.4 73.6 100.0 100.0 95.4
17.6 100.0 100.0 100.0 100.0 100.0 99.2 86.4 73.6 100.0 100.0 95.4
20.9 100.0 100.0 100.0 100.0 100.0 96.7 84.4 72.1 100.0 95.5 79.9
24.2 100.0 100.0 100.0 100.0 100.0 94.4 82.6 70.7 100.0 81.7 68.0
27.5 100.0 100.0 100.0 100.0 100.0 92.3 80.9 69.4 88.3 70.7 58.6
30.8 100.0 100.0 100.0 100.0 100.0 90.4 79.4 68.2 77.4 61.2 50.4
34.0 100.0 100.0 100.0 100.0 99.0 88.6 78.0 67.1 67.7 53.0 43.8
37.3 100.0 100.0 100.0 98.1 95.5 86.9 76.6 66.1 59.5 46.3 38.8
40.6 94.7 93.5 91.5 89.4 87.3 84.9 75.3 65.0 52.5 41.4 34.7
43.9 86.3 85.4 83.7 82.0 80.2 78.1 73.4 60.7 46.6 37.4 31.3
47.2 79.1 78.3 76.9 75.5 74.0 72.3 64.4 53.0 42.4 34.0 28.4
50.5 72.8 72.2 71.0 69.9 68.6 67.3 56.7 46.3 38.8 31.2 26.1
53.8 67.3 66.8 65.9 65.0 64.1 59.6 50.0 40.5 35.9 28.9 24.3
57.1 60.7 60.4 60.1 59.7 59.3 52.9 44.1 35.3 33.7 27.4 23.3
Remark: - the given preliminary load charts are subject of engineering modification.
- operational limitations: 1. due to low vertical hook velocity: none
2. due to low radial hook velocity: none
3. due to low lateral hook velocity: underlined SWL values
4. due to wave induced motions of the load: none
5. for the lifting of personnel: no personnel lift operation available

Crane System Calculation.xls


No copying or duplication of this document without the permission of Liebherr.
This document has been issued electronically and is valid without signature.
3/13
Project No.: 44673
Revision: 00

Crane: BOS 6000-150 LITRONIC Project: 44673 Date: 13.10.17


MAIN HOIST 1 LOAD CHARTS: 2-FALL REEVING
Design code: DNVGL-ST-0378, "Standard for offshore and platform lifting appliances", May 2016
Calculation method: GM - General Method
Conditions: Crane location: Semi-Submersible
Crane is lifting to or from: Onboard: Onboard - Onboard
Offboard: Onboard - Supply vessel
Max. mean wind speed: 25 [m/s]
Static trim of installation: 3 / (3) []
Static heel of installation: 3 / (3) []
Height under pivot: min: 10.0 [m]
max: 22.0 [m]
60
Onboard, SWH 0.5
Onboard, SWH 1.0

50 Onboard, SWH 2.0


Onboard, SWH 3.0
Onboard, SWH 4.0
40
Onboard, SWH 5.0
Onboard, SWH 6.0
SWL [t]

30 Onboard, SWH 7.0


Offboard, SWH 0.5
Offboard, SWH 1.0
20
Offboard, SWH 2.0
Offboard, SWH 2.9
10

0
0 5 10 15 20 25 30 35 40 45 50 55 60
Radius R [m]
Lift mode Onboard Onboard Onboard Onboard Onboard Onboard Onboard Onboard Offboard Offboard Offboard Offboard
SWH [m] 0.5 1.0 2.0 3.0 4.0 5.0 6.0 7.0 0.5 1.0 2.0 2.9
vc [m/s] n.a. n.a. n.a. n.a. n.a. n.a. n.a. n.a. 0.13 0.25 0.50 0.73
vd [m/s] n.a. n.a. n.a. n.a. n.a. n.a. n.a. n.a. 0.30 0.60 1.20 1.74
az [g] 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
ay [g] 0.01 0.02 0.03 0.05 0.06 0.08 0.10 0.13 0.01 0.02 0.03 0.04
Radius SWL SWL SWL SWL SWL SWL SWL SWL SWL SWL SWL SWL
[m] [t] [t] [t] [t] [t] [t] [t] [t] [t] [t] [t] [t]
11.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 38.8
14.3 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 38.8
17.6 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 38.8
20.9 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 38.8
24.2 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 38.8
27.5 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 38.8
30.8 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 36.2
34.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 43.5 30.7
37.3 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 37.5 26.0
40.6 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 48.5 32.4 22.3
43.9 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 42.8 28.0 19.7
47.2 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 46.7 37.9 24.3 17.6
50.5 50.0 50.0 50.0 50.0 50.0 50.0 50.0 47.9 41.9 33.8 21.8 15.9
53.8 50.0 50.0 50.0 50.0 50.0 50.0 50.0 42.0 37.9 30.4 20.0 14.6
57.1 50.0 50.0 50.0 50.0 50.0 50.0 45.7 36.9 34.7 27.9 18.9 13.9
Remark: - the given preliminary load charts are subject of engineering modification.
- operational limitations: 1. due to low vertical hook velocity: none
2. due to low radial hook velocity: SWL values in italic font
3. due to low lateral hook velocity: underlined SWL values
4. due to wave induced motions of the load: none
5. for the lifting of personnel: no personnel lift operation available

Crane System Calculation.xls


No copying or duplication of this document without the permission of Liebherr.
This document has been issued electronically and is valid without signature.
4/13
Project No.: 44673
Revision: 00

Crane: BOS 6000-150 LITRONIC Project: 44673 Date: 13.10.17


AUXILIARY HOIST 1 LOAD CHARTS: 1-FALL REEVING
Design code: DNVGL-ST-0378, "Standard for offshore and platform lifting appliances", May 2016
Calculation method: GM - General Method
Conditions: Crane location: Semi-Submersible
Crane is lifting to or from: Onboard: Onboard - Onboard
Offboard: Onboard - Supply vessel
Max. mean wind speed: 25 [m/s]
Static trim of installation: 3 / (3) []
Static heel of installation: 3 / (3) []
Height under pivot: min: 10.0 [m]
max: 22.0 [m]
25
Onboard, SWH 2.0
Onboard, SWH 7.0
Offboard, SWH 0.5
20
Offboard, SWH 1.0
Offboard, SWH 2.0
Offboard, SWH 3.0
15
Offboard, SWH 4.0
SWL [t]

Offboard, SWH 5.0


Offboard, SWH 6.0
10
Personnel, SWH 2.0

0
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70
Radius R [m]
Lift mode Onboard Onboard Offboard Offboard Offboard Offboard Offboard Offboard Offboard Personnel
SWH [m] 2.0 7.0 0.5 1.0 2.0 3.0 4.0 5.0 6.0 2.0
vc [m/s] n.a. n.a. 0.13 0.25 0.50 0.75 1.00 1.25 1.50 0.50
vd [m/s] n.a. n.a. 0.30 0.60 1.20 1.80 2.10 2.40 2.70 1.20
az [g] 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
ay [g] 0.03 0.13 0.01 0.02 0.03 0.05 0.06 0.08 0.10 0.03
Radius SWL SWL SWL SWL SWL SWL SWL SWL SWL SWL
[m] [t] [t] [t] [t] [t] [t] [t] [t] [t] [t]
12.7 20.0 20.0 20.0 20.0 20.0 16.5 14.1 9.6 2.2 1.5
16.3 20.0 20.0 20.0 20.0 20.0 16.5 14.1 9.6 2.2 1.5
19.8 20.0 20.0 20.0 20.0 20.0 16.5 14.1 9.6 2.2 1.5
23.4 20.0 20.0 20.0 20.0 20.0 16.5 14.1 9.6 2.2 1.5
26.9 20.0 20.0 20.0 20.0 20.0 16.5 14.1 9.6 2.2 1.5
30.4 20.0 20.0 20.0 20.0 20.0 16.5 14.1 9.6 2.2 1.5
34.0 20.0 20.0 20.0 20.0 20.0 16.5 14.0 9.6 2.2 1.5
37.5 20.0 20.0 20.0 20.0 20.0 16.4 14.0 9.6 2.2 1.5
41.1 20.0 20.0 20.0 20.0 20.0 16.4 14.0 9.6 2.2 1.5
44.6 20.0 20.0 20.0 20.0 20.0 16.4 14.0 9.6 2.2 1.5
48.1 20.0 20.0 20.0 20.0 20.0 16.4 14.0 9.6 2.2 1.5
51.6 20.0 20.0 20.0 20.0 20.0 16.3 13.9 9.6 2.2 1.5
55.1 20.0 20.0 20.0 20.0 20.0 16.3 13.9 9.6 2.2 1.5
58.6 20.0 20.0 20.0 20.0 20.0 16.3 13.9 9.6 2.2 1.5
62.1 20.0 20.0 20.0 20.0 20.0 16.3 13.9 9.6 2.2 1.5
Remark: - the given preliminary load charts are subject of engineering modification.
- operational limitations: 1. due to low vertical hook velocity: none
2. due to low radial hook velocity: SWL values in italic font
3. due to low lateral hook velocity: underlined SWL values
4. due to wave induced motions of the load: none
5. for the lifting of personnel: visibility: daylight, mean wind speed 10m/s

Crane System Calculation.xls


No copying or duplication of this document without the permission of Liebherr.
This document has been issued electronically and is valid without signature.
5/13
Project No.: 44673
Revision: 00

Lifting Height

a_hook_au
a_hook_au
a_hook_ma
R_main

R_aux1

R_aux2

H_au
H_aux
H_mai
a

H_re
Boom Pivot Point
Reference Level

Crane Center Line


Principal drawing

Reference Level (RL): Top of pedestal 13.4 [m] <- to sea level
Distance Boom Pivot Point - Reference Level Href 2.60 [m]

Main Hoist
Distance Boom Length Main Hoist L_main 57.0 [m]
Distance Hook Length Main Hoist a_hook,main 5.2 [m]
Reeving per Winch n 6
Subsea Operation: no
Boom Radius Lifting Height Lifting Height above Reference Level
angle above RL below RL 60

a Rmain Hmain 55
[] [m] [m] [m]
50
82.8 11.0 53.8 to sea level
79.4 14.3 53.2 to sea level 45

76.0 17.6 52.5 to sea level 40


72.6 20.9 51.5 to sea level
Lifting height [m]

35
69.0 24.2 50.2 to sea level
30
65.4 27.5 48.8 to sea level
61.7 30.8 47.1 to sea level 25

57.8 34.0 45.0 to sea level 20


53.7 37.3 42.7 to sea level
15
49.4 40.6 40.0 to sea level
44.8 43.9 36.8 to sea level 10

39.8 47.2 33.0 to sea level 5


34.2 50.5 28.5 to sea level 0
27.5 53.8 22.7 to sea level 0 5 10 15 20 25 30 35 40 45 50 55 60
Radius [m]
18.6 57.1 14.5 to sea level

Auxiliary Hoist 1
Distance Boom Length Aux. Hoist 1 L_aux1 62.0 [m]
Distance Hook Length Aux. Hoist 1 a_hook,aux1 3.9 [m]
Reeving per Winch n 1

Crane System Calcualtion.xls


No copying or duplication of this document without the permission of Liebherr.
This document has been issued electronically and is valid without signature.
6/13
Project No.: 44673
Revision: 00
Subsea Operation: no
Boom Radius Lifting Height Lifting Height above Reference Level
angle above RL below RL 65

a Raux1 Haux1 60

[] [m] [m] [m] 55


82.8 12.7 59.6 to sea level 50
79.4 16.3 59.0 to sea level
45
76.0 19.8 58.1 to sea level

Lifting height [m]


40
72.6 23.4 56.9 to sea level
35
69.0 26.9 55.6 to sea level
65.4 30.4 54.0 to sea level 30

61.7 34.0 52.1 to sea level 25


57.8 37.5 49.8 to sea level 20
53.7 41.1 47.3 to sea level 15
49.4 44.6 44.3 to sea level
10
44.8 48.1 40.8 to sea level
5
39.8 51.6 36.7 to sea level
0
34.2 55.1 31.7 to sea level 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70
27.5 58.6 25.4 to sea level
Radius [m]
18.6 62.1 16.5 to sea level

Crane System Calcualtion.xls


No copying or duplication of this document without the permission of Liebherr.
This document has been issued electronically and is valid without signature.
7/13
Project No.: 44673
Revision: 00

Velocities and Hydraulic Data

Drive Unit:
type [-] EH
motor manufacturer [-] -
power [kW] 2 x 345
voltage (EH-type only) [V] 690
frequence (EH-type only) [Hz] 60
engine speed [rpm] 1785
base power [kW] 83

Main Hoist:
reeving [-] 1x6
SWL [t] 150
hook velocity, empty hook [m/min] 22.4
hook velocity, SWL [m/min] 10.7
max. input power [kW] 400
max. used rope layer [-] 5
max. differential pressure in hydraulic system [bar] 350
mechanism group [-] M5 / L2 / T5

Auxiliary Hoist:
reeving [-] 1x1
SWL [t] 20
hook velocity, empty hook [m/min] 160
hook velocity, SWL [m/min] 40
max. input power [kW] 200
max. used rope layer [-] 2
max. differential pressure in hydraulic system [bar] 275
mechanism group [-] M5 / L2 / T5

Luffing System:
reeving [-] 1 x 12
luffing time, working range, empty hook [s] 124
luffing time, working range, full load [s] 255
max. input power [kW] 220
min. boom angle [] 18.6
max. boom angle [] 82.8
max. used rope layer [-] 6
max. differential pressure in hydraulic system [bar] 300
mechanism group [-] M5 / L2 / T5

Slewing System:
number of slewing gears 6
max. input power [kW] 200
max. slewing speed in normal drive mode [1/min] 0.37
max. slewing speed in fast drive mode [1/min] n.a.
max. slewing speed at max. slewing torque [1/min] 0.19
max. differential pressure in hydr. system [bar] 365
mechanism group [-] M2 / L1 / T3

Slew Bearing:
mechanism group [-] M4 / L2 / T4

Crane System Calculation.xls


No copying or duplication of this document without the permission of Liebherr.
This document has been issued eletronically and is valid without signature.
8/13
Project No.: 44673
Edition 00

REACTIONS TO FOUNDATION (RTF)


1. Design Code: DNVGL-ST-0378, "Standard for offshore and platform lifting appliances", May 2016

2. Installation type: floating

3. Category of loads:
A. Regular loads: Dead loads included
Duty- / Dead load- / Amplification factor included
Rated capacity included
Mass forces due to slewing and boom luffing included
Mass forces due to crane base acceleration included
Static crane inclination longitudinal included
transversal included
Out of plane influences (Off- / Sidelead) included
B. Occasional loads: In service wind loads included
z
Ice loads excluded
y
4. Reference level Interface between top of pedestal and slew bearing

5. Design method WSD - Working Stress Design (or Allowable/Permissible Stress Design)
x
Forces and moments are characteristic loads without partial safety factor. Boom direction

6. RTF - Table
Mx+y given in the following table to be fully rotated around z-Axis.
Fx+y given in the following table to be considered to increase Mx+y.
6.1. Excluding additional pedestal factor
Included loads Maximum forces Maximum moments
Fx+y [kN] Fz [kN] Mx+y [kNm] Mz [kNm]
Case 1 Regular loads only 500 -3590 63100 9400
Case 2 Regular and occasional loads 550 -3590 64600 10660

6.2 Including additional pedestal factor


Included loads Maximum forces Maximum moments
Fx+y [kN] Fz [kN] Mx+y [kNm] Mz [kNm]
Case 1 Regular loads only 550 -4670 64900 9400
Case 2 Regular and occasional loads 580 -4670 65000 10660
Note: Additional design factor according to:
Design Code: DNVGL-ST-0378, "Standard for offshore and platform lifting appliances", May 2016
Pedestal factor: 1.3

7. Failure load for Failure Mode Analysis


Failure criteria: Plastic bending and buckling of pedestal cross section with safety against yielding 1.0 and safety against buckling 1.0.

Forces Moments
Fx+y [kN] Fz [kN] Mx+y [kNm] Mz [kNm]
1705 -11140 200500 33085

13.10.2017 LWN Reactions to Foundation Hartmann Matthies


Date Work Description Prepared Approved

Crane System Calculation.xls


No copying or duplication of this document without the permission of Liebherr.
This document has been issued eletronically and is valid without signature.
9/13
Project No.: 44673
Revision: 00

CRANE IN STOWED CONDITION - REACTIONS TO FOUNDATION (RTF)


In the following report, the crane structure is examined under consideration of loads in stowed condition
and
the RTFs for the interfaces a.) Slewing unit - Pedestal
b.) Boom - Boom rest are given.

1. Loads
1.1 Category of loads
A. Regular loads: Static loads: Dead loads included
Static crane inclination longitudinal included
transversal included
Dynamic loads: Mass forces due to crane base acceleration included if applicable

B. Occasional loads: In service wind loads included


Ice loads included if applicable

1.2 Load combinations


Static loads: Static loads
Dynamic loads: Case 1: Static and dynamic loads
Case 2: Static, dynamic and occational loads

2. Design method WSD - Working Stress Design (or Allowable Stress Design)

3. Environmental conditions
Condition: [-] Transit Survival Accidential
Mean windspeed: v [m/s] 63 63 63
Static inclination: Longitudinal to boom (y-axis) [] 5 5 30
Transversal to boom (x-axis) [] 5 5 30
Accelerations: Longitudinal to boom (x) [m/s] 1.67 4.91 4.91
[g] 0.17 0.50 0.50
Transversal to boom (y) [m/s] 1.67 4.91 4.91
[g] 0.17 0.50 0.50
Normal to deck (z) [m/s] 2.06 9.81 9.81
[g] 0.21 1.00 1.00
Ice load: Ice thickness [mm] 0 0 0
Ice density [kg/m] 0 0 0
Snow load: Snow thickness [mm] 0 0 0
Snow density [kg/m] 0 0 0

Remark: - The given accelerations are the maximum accelerations that occure at:
the COG position of the slewing unit
the COG position of the boom
the main boom head position

4. Boom rest position


Boom angle: in stowed condition a [] 0
Center of boomrest: horizontal position (from crane center line) x_Boomrest [mm] 50660
vertical position (from boom pivot point) z_Boomrest [mm] -1387

13.10.2017 LWN Reactions to Foundation Hartmann Matthies


Date Work Description Prepared Approved

Crane System Calculation.xls


No copying or duplication of this document without the permission of Liebherr.
This document has been issued electronically and is valid without signature.
10/13
Project No.: 44673
Revision: 00

5. Crane Data

Boom length (main hoist): L [mm] 57000

Position of boom pivot point: x_Pivot [mm] 2700


z_Pivot [mm] 2600

COG boom to Crane Centerline (incl ropes): x_COG_Boom [mm] 27236

Hook position (boom in stowed condition): x_Hook_main [mm] 59700


x_Hook_aux [mm] 64682

Slewing unit weight (incl. ropes): m_SU [t] 105.7


Boom weight (incl. ropes): m_Boom [t] 73.3
Hook weight: m_Hook_main [t] 4.8
m_Hook_aux1 [t] 0.8

Remark: - Hooks must be secured against horizontal accelerations by one of the following options:
lashing
stowing in hook garage
stowing in hook cradle on deck
- Never pre-tension hooks in vertical direction against deck.
Damage due to deflection of installation in combination with a locked vertical degree of freedom may occur !

Crane System Calculation.xls


No copying or duplication of this document without the permission of Liebherr.
This document has been issued electronically and is valid without signature.
11/13
Project No.: 44673
Revision: 00

6. RTF - Forces and moments

6.1. Slewing unit - Pedestal

Reference level: Interface between top of pedestal and slew bearing

Condition: [-] Transit Survival Accidential


Static loads: Fx+y [kN] 197.3 197.3 1132.0
Fz [kN] 1377.0 1377.0 1377.0
Mx+y [kNm] 1092.2 1092.2 1849.0
Mz [kNm] 0.0 0.0 0.0
Dynamic loads: Case 1: Fx+y [kN] 480.9 1070.8 1935.1 z
Fz [kN] 1666.2 2754.0 2754.0
Mx+y [kNm] 1626.7 3015.7 3749.5 y
Mz [kNm] 0.0 0.0 0.0
Dynamic loads: Case 2: Fx+y [kN] 480.9 1070.8 1935.1
Fz [kN] 1666.2 2754.0 2754.0 x
Mx+y [kNm] 1626.7 3015.7 3749.5 Boom direction
Mz [kNm] 0.0 0.0 0.0

6.2. Boom - Boom rest

Reference level: Interface between boom rest upper part construction and boom

Condition: [-] Transit Survival Accidential


Static loads: Fx [kN] 86.8 86.8 86.8
Fy [kN] 39.4 39.4 226.0
Fz [kN] 433.9 433.9 433.9
Dynamic loads: Case 1: Fx [kN] 105.0 173.6 173.6
Fy [kN] 116.4 265.7 452.3
Fz [kN] 525.1 867.9 867.9
Dynamic loads: Case 2: Fx [kN] 105.0 173.6 173.6
Fy [kN] 204.5 353.8 540.5
Fz [kN] 525.1 867.9 867.9

Remark: - Horizontal Force at boom rest Fx: Friction due to relative movement between boom and support, = 0.2

Crane System Calculation.xls


No copying or duplication of this document without the permission of Liebherr.
This document has been issued electronically and is valid without signature.
12/13
Project No.: 44673
Revision: 00

7. Details of boom rest upper part construction:

Fz1 = 75% Fz Fz2 = 25% Fz Boom Head Direction


(Fz1 = 25% Fz) (Fz2 = 75% Fz)

FY

horizontal support
vertical support

Boom width: a [mm] 3800


Boom Rest width: b [mm] 1420
Width of outer horizontal protection: c [mm] 300
Outer diameter of chord members: d [mm] 273
Width of inner horizontal protection: e [mm] 400
f [mm] 710

Remark: - Horizontal Support must be located on Non-Walkway-Side. No horizontal support allowed on boom walkway side.
- LIEBHERR recommends to finally locate the upper part construction during crane assembly on the installation.

Crane System Calculation.xls


No copying or duplication of this document without the permission of Liebherr.
This document has been issued electronically and is valid without signature.
13/13

Вам также может понравиться