Discussion Sheet on Submission Document

Document No. HI-E-TL-TL-C2-00096-A


Document Title Loading diagram of towers (DDS6)
Submission Date 30 December, 2016

Date Event
30 December, 2016 The Contractor submitted the 1st edition (Rev.0) to the Employer.
04 January, 2017 The Employer sent the comments to the Contractor Parties.
28 September, 2017 The Contractor submitted the revision (Rev.1) to the Employer.
02 October, 2017 The Employer sent the comments to the Contractor Parties.
13 October, 2017 The Contractor submitted the revision (Rev.2) to the Employer.
17 October, 2017 The Employer sent the comments to the Contractor Parties.

NOTE: -Terms defined in the Coordination Agreement, the Supply Contract and the Construction Contract shall have the same meanings and construction in
this sheet.
- The Financing Parties may further give their comments on this document as indicated in Sub-Clauses 21.5 and 21.6 of the Conditions of Contract of
each the Supply Contract and the Construction Contract.

[Discussion Items]
Description in 1st edition
No. Section Comments by the Employer Comments by the Contractor
(30 December, 2016)
1 (Common) Please revise this document based on revision of
document No. HI-E-TL-TL-C2-02606-A: Loading
calculation of towers (DDS6) accordingly.
(04 January, 2017)

1/4 369372464.doc
Description in 1st edition
No. Section Comments by the Employer Comments by the Contractor
(30 December, 2016)
Revise
(27 September 2017)
Please revise this document based on revision of
document No. HI-E-TL-TL-C2-02606-A: Loading
calculation of towers (DDS6), if necessary.
(02 October 2017)
Revised
(10 October, 2017)
Noted.
(17 October 2017)

Description in Rev.1
No. Section Comments by the Employer Comments by the Contractor
(28 September, 2017)
2 Table of Content Combination No.6 The Employer is of the view that the number of
Normal Condition,Diagonal and circuit is not Double but Single.
Double Circuit Please revise it.
(02 October 2017)
Revised
(10 October, 2017)

Combination 10 is not Double but Single.


Please revise it.
(17 October 2017)
Revised
(17 October, 2017)
3 The Employer is of the view that there are some
transaction errors (Attachment 1).
Please check and revise them.
2/4 369372464.doc
Description in Rev.1
No. Section Comments by the Employer Comments by the Contractor
(28 September, 2017)
(02 October 2017)
Revised
(10 October, 2017)
Noted.
(17 October 2017)
4 Broken Condition The Contractor considers broken condition of
(XX+SC) Special arm for outer phase. However, the
Employer is of the view that it is not sure that outer
phase broken case is whether critical or not
compared with center or inner phase broken case.
If the Contractor is sure that the outer phase
broken case is critical, please let us know the
reason.
Otherwise, please add the broken case of center
phase and broken case of inner phase.
(02 October 2017) Revised.
Several case of broken condition for Special
Cross Arm had been added.
(10 October, 2017)

The Employer is of the view that the cases of


(MC+SC2), (MC+SC3), (BC+SC2) and (BC+SC3)
are also needed.
Please add the cases if the Contractor has no
evidence for exception of them.
(17 October 2017)
Revised
(17 October, 2017)
3/4 369372464.doc
Description in Rev.1
No. Section Comments by the Employer Comments by the Contractor
(28 September, 2017)
5 Under Stringing Stringing Special Cross Arm The Employer would like to confirm that the
Load Contractor really intends to conduct the stringing
of all phases of special arm at the same time.
If the Contractor conduct one by one, please
divide the case.
(02 October 2017)
Revised.
Stringing load for Special Cross Arm had
divided.
(10 October, 2017)

Noted.
(17 October 2017)

4/4 369372464.doc