I, hereby confess that I have prepared this report on my own effort. I also admit not to receive or
give any help during the preparation of this report and pledge that everything mentioned in the
report is true.

______________________
Student Signature

Name :

Matric No. :

Date :
CENTRE FOR DIPLOMA STUDIES
DEPARTMENT OF CIVIL ENGINEERING

HYDRAULIC ENGINEERING LABORATORY

REPORT

SUBJECT CODE

TEST CODE & TITLE MMB 04/ DISCHARGE OVER WEIRS


COURSE CODE
TESTING DATE
STUDENT NAME
GROUP
1.

2.

GROUP MEMBER NAMES 3.

4.

5.

LECTURER/ INSTRUCTOR/
TUTOR NAME

REPORT RECEIVED DATE

ATTENDANCE/ DISCIPLINE
MARKS /15%
& INVOLVEMENT
DATA ANALYSIS /20%

RESULT /20%

DISCUSSION /25%

CONCLUSION /20%

TOTAL /100%
EXAMINER COMMENT RECEIVED STAMP
CENTRE FOR DIPLOMA STUDIES PAGE: 1/7
EDITION: 1
DEPT OF CIVIL ENGINEERING
REVIEW NO.: 03
EFFECTIVE DATE: 1/7/10
EXPERIMENT: DISCHARGE OVER WEIRS AMENDMENT
1/7/10
DATE:

1.0 OBJECTIVE

To study the relation between flowrate and total head above the cress level of the rectangular notch
and V notch.

2.0 LEARNING OUTCOME


At the end of this experiment, students are able to:
Calculate the flowrate in difference notch.
Identify the relationship between flowrate and total head.
Identify the velocity and the magnitude of the flowrate in notch.

3.0 THEORY OF THE EXPERIMENT

THEORY OF RECTANGULAR NOTCH AND V NOTCH

The notch is similar to that observed at a sharp edged orifice, and has the same effect of reducing the
discharge rate. Therefore rewrite the equation from sharp edged weirs as :
2 3
Q C d B 2 g
H
2
3
Where,
Cd Flowrate Coefficient
B Breadth of notch
H Head or depth of the point below the undisturbed surface level.

8 5
Q Cd 2g tan
15 2 H 2

Where,
Cd = Flowrate Cofficient

= Half angle of the V notch
2
H = Head or depth of the point below the undisturbed surface level.

CENTRE FOR DIPLOMA STUDIES PAGE: 2/7


EDITION: 1
DEPT OF CIVIL ENGINEERING
REVIEW NO.: 03
EFFECTIVE DATE: 1/7/10
EXPERIMENT: DISCHARGE OVER WEIRS AMENDMENT
1/7/10
DATE:

4.0 EQUIPMENT
1.Hydraulic Bench

2.Rectangular & V notch

3.Stop Watch

Figure 1: Rectangular Notch in Hydraulic Bench

Figure 2: V Notch in Hydraulic Bench

CENTRE FOR DIPLOMA STUDIES PAGE: 3/7


DEPT OF CIVIL ENGINEERING EDITION: 1
REVIEW NO.: 03
EFFECTIVE DATE: 1/7/10
EXPERIMENT: DISCHARGE OVER WEIRS AMENDMENT
1/7/10
DATE:

5.0 PROCEDURE

5.1 PROCEDURE OF RECTANGULAR NOTCH

1. The apparatus is first connected to the supply and then levelled.


Then, admit water from the bench supply until the level is
approximately correct.
2. The point gauge is then read or set to zero when it is exactly at
the level of the crest of the notch.
3. When the correct level has been obtained, the point gauge is also
brought exactly to the water surface, and the calibrated dial
either read or, if adjustment is possible, set to zero
4. Read the level at the gauge. (h1 = .mm).
5. Close the bench hole and take the time refer to the volume.
(V = .. liter, s1 = .)
4. 6. Open the bench hole at the hydraulic bench.
7. Repeat step 4 to 6 for different water level, h s ( h2 = h1 s )

5.2 PROCEDURE OF V NOTCH

1. The apparatus is first connected to the supply and then levelled. Then, admit water from the bench
supply until the level is approximately correct..
2. The point gauge is then read or set to zero when it is exactly at the level of the crest of the notch.
3. When the correct level has been obtained, the point gauge is also brought exactly to the water
surface, and the calibrated dial either read or, if adjustment is possible, set to zero.
4. Read the level at the gauge.
5. Close the bench hole and take the time refer to the volume.
(V = .. liter, s1 = .)
6. Open the bench hole at the hydraulic bench.
7. Repeat step 4 to 6 for different water level, hs ( h2 = h1 s )

CENTRE FOR DIPLOMA STUDIES PAGE: 4/7


EDITION: 1
DEPT OF CIVIL ENGINEERING
REVIEW NO.: 03
EXPERIMENT: DISCHARGE OVER WEIRS EFFECTIVE DATE: 1/7/10
AMENDMENT
1/7/10
DATE:

6.0 RESULT & ANALYSIS


6.1 Rectangular Notch
1. Note the breadth of weir (B = mm)
2. Write down the volume (V), time (T) dan head (H) in table 1.
3. Calculate the flowrate Q,h3/2,Cd dan QTheory in table1.
4. Plot graph Q versus h3/2 and calculate the Cd value from slope of the graph.
5. Compare the value of QTheory using the Cd value from the table.

Table 1
3 Theory
H V T Q Q
m m s H 2

m s
Cd
m 3
s 3
m 3

H1
H2
H3
H4
H5

6.2 V Notch
Write down the breadth of notch.
1. Note that the value of h and data refer to the volume in table 2.
2. Plot graph Q versus H5/2 and calculate the Cd value from slope of the graph.
3. Calculate the value in the table 2.
4. Calculate the value of QTheory using Cd value from table 2.

CENTRE FOR DIPLOMA STUDIES PAGE: 5/7


DEPT OF CIVIL ENGINEERING EDITION: 1
REVIEW NO.: 03
EFFECTIVE DATE: 1/7/10
EXPERIMENT: DISCHARGE OVER WEIRS AMENDMENT
1/7/10
DATE:

Table 2:
5 Theory
H V T Q Q
m m s H 2

m s
Cd
m 3
s 3
m 3

H1
H2
H3
H4
H5

7.0 QUESTION

1. Compare the differential value of QExperiment with Qtheory for rectangular and show one calculation of
QTeori for rectangular and V notch
2. Discuss the result for rectangular and V notch in this experiment.
3. As an engineer, what the theory using in this experiment. Conclude clearly about this theory and
the using of notch or weir.
4. Question by lecturer

5. Question by lecturer

CENTRE FOR DIPLOMA STUDIES PAGE: 6/7


EDITION: 1
DEPT OF CIVIL ENGINEERING
REVIEW NO.: 03
EXPERIMENT: DISCHARGE OVER WEIRS EFFECTIVE DATE: 1/7/10
AMENDMENT
1/7/10
DATE:
9.0 Answers

CENTRE FOR DIPLOMA STUDIES PAGE: 7/7


EDITION: 1
DEPT OF CIVIL ENGINEERING
REVIEW NO.: 03
EFFECTIVE DATE: 1/7/10
EXPERIMENT: DISCHARGE OVER WEIRS AMENDMENT
1/7/10
DATE:

Вам также может понравиться