Research Reactor
Chimney
Pipe Inlet
of RSPCS
Pneumatic Transfer
Bulk irradiation Facility
System Tubes
PCS Suction
Line
Flap Valves
of PCS
Commissioning Organisation
Management Group
ANSTO/INVAP
ARPANSA
Commissioning
Safety Review
Committee RRR Safety &
Licensing Mngr
Commissioning Group
Commissioning Teams
ANSTO/INVAP
QA
Audit
Quality
Assurance Group
Staffing and Training
• Experienced HIFAR staff
• Shared HIFAR/OPAL staff
• Staff seconded from within ANSTO
• New recruitment
• Contractors
• Training courses
• Simulator
Documentation
• Prepared by INVAP, reviewed by ANSTO
¾ Commissioning Plan
¾ Commissioning Test Procedures
¾ Safety Analysis Report
¾ Design, Operations and Maintenance Manuals
• Pre- Commissioning
• Stage A – Cold commissioning
• Stage B1 – First criticality
• Stage B2 – Low power tests
• Stage C – Power ascension and full power tests
Precommissioning
• Previous tests include:
• Factory acceptance tests
• Installation tests
• Functional tests
• INVAP responsible for all commissioning
• ANSTO project team provides oversight
• ANSTO witness and support precommissioning
activities
Stage A Cold Commisioning
• 47 test procedures completed:
¾ Safety system tests (FSS, SSS, Containment)
¾ Instrumentation and Control system tests (FRPS,
SRPS, PAM, RCMS, RMS)
¾ Reactor State tests (Power, Physics Test, Shutdown,
Refueling)
¾ Plant procedure verification
¾ Loss of Normal Power test
¾ Emergency drill
¾ 36 hr cold run
OPAL Control Room
Hot Commissioning
• ARPANSA issued the Operating Licence
in July 2006 allowing fuel to be loaded
• Reactor Operations by accredited ANSTO
operators under INVAP supervision
Stage B1
• Start up core with three different uranium
loadings.
• First critical 12 August 2006 with 14 fuel
assemblies loaded
• First Shutdown System shutdown value
measured
First Core FA Distribution
A1 B1 C C1 D1
~ 212 g U235 / FA without BP
R
1
A2 B2 C2 D2
~ 383 g U235 / FA with BP
CR 2 CR5 C R3
7-Nov-06
5-Nov-06
3-Nov-06
15 MW
1-Nov-06
20 MW
Stage-C Power Profile
30-Oct-06
Date
28-Oct-06
26-Oct-06
24-Oct-06
22-Oct-06
10 MW
20-Oct-06
5 MW
18-Oct-06
3 MW
16-Oct-06
1 MW
14-Oct-06
20
15
10
0
Core Power (MW th)
Commissioning Issues
• Noise in nucleonics instrumentation
• Wide range nucleonics detectors change
from pulse to Campbell mode
• CNS turbine
• Core outlet temperature sensors
• Cooling tower performance
• Delay in completion of irradiation facilities
Reactor pool
Reflector vessel
Core
Repairs to OPAL reflector vessel
Helium gas leak test
gas bubbles
Hf Control
Rods
Central
Control Rod
Fuel
Assemblies
Fuel Plates
Coolant Channels
between Fuel Plates