Академический Документы
Профессиональный Документы
Культура Документы
PT PIONEER
DIALY WORK REPORT
DATE DETAILS OF WORK
21/10/2014 - Disassemble and clean injetor no. 1 - 6
- Lapping injector no. 1 - 6
- Test preassure injector no. 1 - 6
- Adjust pressure injector at a preassure 31,0 Mpa
PT PIONEER
DIALY WORK REPORT
DATE DETAILS OF WORK
20/10/2014 - Plug valve steam seal
- Raft and plug cylinder head no. 1 - 6
- Tie cylinder head with torque 44 kg/cm
- Plug push rod, bridge & rocker arm
- Plug Suction & exhaust manifold
- Plug and raft fresh water cooler
- Plug and raft air cooler
- Clean turbocharger
- Plug the fuel pipe
- Plug zinc anti-corrosive