INSPECTION & TEST PLAN

Project title: Construction of Mining Infrastructure and Housing Facilities for New Oil Shale Fired CFB thermal power plant

ITP Title Steel Structure ITP NO. JP17-025-ITP


SYSTEM
SYSTEM NAME Document submittal ATT-DS-008
NO.
UNIT NO. 001 REV. 01

INSPECTION RESPONSIBILITY ASSIGNMENTS

ITEM NO. PROJECT PHASE / TASK / ACTIVITY TPI Emp. Rep Quality Records REMARKS
INSPECTION JP. EUBC
ACCEPTANCE CRITERIA Safeguard F.B
FREQUANCY

1.0 Document approval

1.1 Review of Drawing Client specification one time H R R R drawing

1.2 Reviewing Q.C Plan ITP one time H R R R JS17-025-ITP

Every
1.3 Material Documents Review EN 10025-2 & ASTM H R R R MTCs
Delivery

2.0 PREFABRICATION

2.1 Cut to dimension marking As per approved drawings As required H R R R DIM. Report F21-5

Sepco Doc Code: SEPCO-JO2-QC-201-00-01


APZ Doc Code: APZ-QA-FR-MS-001 Rev.0
INSPECTION RESPONSIBILITY ASSIGNMENTS

INSPECTION
ITEM NO PROJECT PHASE / TASK / ACTIVITY ACCEPTANCE CRITERIA Quality Records REMARKS
FREQUANCY
JP. Safeguard EUBC F.B
(TPI) (Emp. Rep.)
3.0 FOAMING PROCESS

3.1 Check surface Temp. EN 13650 As required H W R R Foam. Report F21-4.0

Per each
3.2 Check Foam Density EN 13650 H S R R Foam. Report F21-4.0
Batch
. AS
3.3 Monitoring Foaming time H S R R Foam. Report F21-4.0
EN 13650 REQUIRED

3.4 Check Final Product dimension As per Fabrication Tolerances 100 % H W R R DIM. Report F21-5

3.4 Check Final Product Geometry As per Fabrication Tolerances 100% H W R R DIM. Report F21-1.0 & F21-2.0

4.0 MARKING AND PACKING


Final Coats Thickness Measuring AS painting inspection
4.1 SSPC -PA2 H R R R
(DFT) REQUIRED reports
AS
4.2 All parts shall be marked As project specification H R R R JP SPEC, DRW
REQUIRED
AS
4.3 Check packing As project specification H R R R JP SPEC, DRW F21-7.0
REQUIRED
Final documentation and
4.4 As project specification one time H H R R contract & specification
handover
AS
4.5 Shipping and release As project specification H H R R contract & specification
REQUIRED

H: Hold Point WWitness Point R: Document Review S: Surveillance

WWitness Point(the part e.g. EMP. Rep. has to be S: Surveillance (random attendance at
H: Hold Point(the part has to perform this check R: Document Review(the part has only to review
informed that a test is being performed but its site, no signature required on the
and it needs to be successful in order to the record/document that the check has been
presence and signature is obligatory to move on to Request For Inspection And Testing (RFI)
proceed to the next stage of the construction) done and passed)
the next stage) or its accompanying documentation.

Sepco Doc Code: SEPCO-JO2-QC-201-00-01


APZ Doc Code: APZ-QA-FR-MS-001 Rev.0