As Per the Schematic Drawings, the contents in this Test Format can be modified.
Note:
The following should be done before starting the activity
1. Approved commissioning copy schematic drawing shall be pre-checked.
2. All secondary injection and all components tests shall be completed and witnessed.
All test results must be available and signed.
3. Auxiliaries, timers, contactors, pulse units, annunciators, MCBs etc.
4. All final settings shall be applied and signed
Panel designation
Manufacture
2. Mechanical check and visual inspection: As per TCSP-105 Rev -01, Item No 4.1
4. D.C. LOOP:
Measuring
Item X ---- : ---- , --- X ---- : ---- , --- X ---- : ---- , --- X ---- : ---- , ---
points in MCB
1
2
3
4
5
6
7
8
Relay panel ----------- Control panel -- Fault recorder Hv & Lv CB FMK -- Function
Protection Trip CBF ACSE IND /flag Chan Close Remark as
Alarms Ch Event Trip T.B
operated relay start Start relay nel Block expected
87 T Diff 86 T1 50 / 62 FR --- GT----- 87T CB TC1 CB ----
X--:--,- 87 T Ch - TR Diff Prtn ( ) Yes
Prtn 94 T1 BF CH --- optd CB S --- CB S - X--:--,--
50P /51P GT --- 51S
86 T1 TR HV O/C FR ----
HV O/C 50 / 62 50 / 51 prtn CB --TC1 CB ---- X--:--,-- ( ) Yes
-------- 50 / 51 P Ch - prtn
prtn 94 T1 BF CH --- optd CB S ---- CB S - -
50S/51S FR --- --------
50S/51S TR LV O/C GT --- 51S
--- 50S/51
50S/51 + E/F prtn 50 / 51 prtn ( ) Yes
NS LV 94 T2 ------- -------- Ch - CH --- CB S ---- -------- X--:--,--
NS optd optd
O/C prtn
86 T2 HV REF FR --- GT --- 64 CB TC2 CB TC2
64 NP HV TR HV REF
50 / 62 64 NP Ch - NP / 64NS X--:--,-- ( ) Yes
REF prtn 94 T2 X--:--,- prtn optd CH --- CB S ---- CB S ----
BF optd optd -
LV REF GT --- 64
64 NS LV TR LV REF FR --- CB TC2 CB TC2
86 T2 50 / 62 64 NS Ch - NP / 64 NS X--:--,-- ( ) Yes
REF prtn X--:--,- prtn optd
94 T2 BF optd CH---- optd CB S ---- CB S - -
51 N stand TR stand BY FR ---- CB --TC1 CB ------
86 T1 50 / 62 GT --- 51 N
BY E/F Ch -- E/F prtn ( ) Yes
BF -------- 51 N optd CB S ---- CB S - X--:--,--
prtn 94 T1 optd CH----
51 NA ------ Neutral ------ ------- ------ THIS
neutral O/C TR neutral FMK -- alarm
CH -- ( ) Yes
O/C ------ ----- ------ Alarm 51 O/C alam ------ ----- ------ X--:--,-- for com
alarm NA optd panel
CB ----
50 / 62 BF 86 B FR ----
CBF prtn GT----- CBF Tc1 & CB ----
breaker 50 / 62 ( ) Yes
86 X--:--,- 50 / 62 BF CH - optd optd Tc2 X--:--,--
prtn BF CH --- CB S ---
CBF CB S ---
CB ----- Switch
86B B/B ---- Tc1 & Tc2 CB ---- (in / out
50 / 62 X--:--,-- ( ) Yes
prtn trip 86 B X--:--,- 86 B CH - -------- ) "out"
BF -------- --- CB S ---- CB S - -
position
CB ---- Switch
---- CB ------
86B B/B 86 B Tc1 &Tc2 (in / out
50 / 62 ( ) Yes
prtn trip X--:--,- 86 B CH -- -------- -------- X--:--,-- ) "in"
86 CBF BF --- CB S ---- CB S ---
position
86 T2 FR ---- CB TC2 CB ----- Trip
96 2
TR buch GT --- signal is
Buch
50 / 62 CH -- stage 2 Buchholz X--:--,-- cutted ( ) Yes
surge trip 94 T2 X--:--,- ------- CH --- CB S ---- CB S ---
BF prtn optd optd - after 5
K --
sec
FR ---- Trip
63QP -2 CB TC2 CB -----
86 T2 Tap Change signal is
Tap chan
50 / 62 CH -- Prtn Device X--:--,-- cutted ( ) Yes
prot dev X--:--,- --------- --------
94 T2 BF trip CH---- CB S ---- CB S --- - after 5
trip k --
sec
26 S TR FR ----
TR fire prtn -------- ------
fire prtn -------- GT --- fire ( ) Yes
optd X--:--,--
optd K --- ---------- -------- -------- CH prtn optd --------- ------
------- CH----
CH -- ------ ( ) Yes
5. OPERATIONAL CHECK:
Local / Remote Switch in LOCAL position, no operation from CR & ECC for all Equipments is O.K ( ) or Not O.K ( )
From Remarks
control
LCC D ----- From
panel
FMK Device operated Command Flickering Operation
(K-----) Indications
----------- operation as expected
Local/Remot
CR/ECC
e
Remote CR Disconnector ----- 06 Close
Remote ECC Disconnector ----- 06 Close
Remote CR Disconnector ---- 06 Open
Remote ECC Disconnector ----- 06 Open
Remote CR Disconnector ----- 04 Close
Remote ECC Disconnector ----- 04 Close
Remote CR Disconnector ----- 04 Open
Remote ECC Disconnector ---- 04 Open
C.B.--- 05(test &
Remote CR Close
service position)
Circuit breaker
Remote ECC Close -
05(service position)
Circuit breaker ------
Remote CR 05(test & service Open -
position)
Tested by: ENG. Witnessed by: ENG.
Remarks
LCC D--------- Device operated Command Semaphore Operation as
indication expected
Operate from LCC Earth Switch ------01X Close
Operate from LCC Earth Switch -----01X Open
Operate from LCC Earth Switch -----01Y Close
Operate from LCC Earth Switch ----01Y Open
Operate from LCC Earth Switch ----01Z Close
Operate from LCC Earth Switch -----01Z Open
Operate from LCC VT isolator -----93 Close
Operate from LCC VT isolator ----93 Open
Operate from k----- Earth Switch S-------01 Close/open
Control
panel Synchronism check Circuit breaker close blocking protection Operation of circuit
Circuit
(k-----) breaker
breaker Remarks
By syn. Lock-out Lock-out CBF Bus bar
CR / position By manual
Relay relay relay protn protn
ECC switch To Expected
------------ ( ---------) (--------) -------- ----------
CR Test - - - - - - Close Close
CR Test - - - - - - Open Open
CR Service On Close N/o N/o N/o N/o Close Close
CR Service Off Close N/o N/o N/o N/o Close Not close
CR Service On Open N/o N/o N/o N/o Close Not close
CR Service On Close O N/o N/o N/o Close Not close
CR Service On Close N/o O N/o N/o Close Not close
CR Service On Close N/o N/o O N/o Close Not close
CR Service On Close N/o N/o N/o O Close Not close
ECC Test - - - - - - Close Not close
ECC Test - - - - - - Open Not open
ECC Service Off Close N/o N/o N/o N/o Close Close
ECC Service Off Open N/o N/o N/o N/o Close Not close
ECC Service Off Close O N/o N/o N/o Close Not close
ECC Service Off Close N/o O N/o N/o Close Not close
Tested by: ENG. Witnessed by: ENG.
ECC Service Off Close N/o N/o O N/o Close Not close
ECC Service Off Close N/o N/o N/o O Close Not close